Seminar
Seminar
Seminar
e
1
Guided by,
Submitted by,
ANUSHA.A
Jisha
.s
Dept. of Civil
Engineering
Roll No : 13
S7 CIVIL
INTRODUCTION
The first bridge were made by nature as simple as a log
fallen across a stream .
And eventually stones, using a simple support and cross
beam arrangement
Most of these early bridges could not support heavy
weights or withstand strong currents. this led to the
development of better bridges
Bridges were classified according to the moment, shear,
compression, tension
BRIDGE CONSTRUCTION
OVERVIEW
1.
2.
3.
4.
5.
6.
7.
SITE SELECTION
Factors to be considered:1.Location of bridge site.
2.Transportation distance.
3.Nature of crossing and affordability.
4.Availability of local materials.
5.Traffic volume.
6.Availability of local bridge builders.
7.Temporary crossing.
8.Space for foundation
9.Slope profile
TYPES OF BRIDGES
1.Structure type .
2.Fixed or movable bridges.
3.Double decked bridges.
4.Viaducts.
5.Three-way bridges.
6.Bridge type by use.
7.Bridge type by material.
6
1.STRUCTURE TYPE
BRIDGES
1.1.Beam bridge.
1.2.TRUSS BRIDGE
1.3.CANTILEVER BRIDGE
1.4.ARCH BRIDGE
1.6.SUSPENSION BRIDGES
1.7.CABLE-STAYED BRIDGE
2.FIXED OR MOVABLE
BRIDGES
3.DOUBLE-DECKED BRIDGES
1.It is used for decreasing the traffic
congestion.
2.Some double-decked bridges are used only
for street traffic.
4.VIADUCTS
A viaduct is made up of multiple
bridges connected into one longer
structure.
15
5.THREE-WAY BRIDGES
A three-way bridges has three separate spans which
meet near the center of the bridge. The bridge
appears as a T or Y when viewed from above.
Three-way bridges are extremely rare.
16
7.BRIDGE TYPES BY
MATERIAL
COMPONENT OF BRIDGES
1 Foundation:The foundation are different type:raft foundation,
well foundation, open foundation and pile foundation.
2 Substructure:The substructure is the portion of the bridge
structure such as pier and abutments above the
foundation unit and supporting the superstructure.
3 Superstructure:Superstructure is the portion of bridge
structure above the substructure level like beam,
hand rail, foot path etc.
18
20
SUPERSTRUCTURE
1.For particular site there are numerous structural
arrangements are possible.
2.Final proposal be made on the greater examination of the
site condition may be technical, aesthetic and construction
methodology.
3.Special care need to be taken in case of deep gorge where
there is sizable difference between soffit level and bed level.
21
Sl. No
Type of superstructure
Span length
1.5 to 15m
3 to 10m
10 to 25m
25 to 45m
10 to 15m
10 to 20m
15 to 30m
25 to 50m
35 to 75m
10
PSC cantilever
constructions/continuous
75 to 150m
11
200 to 500m
22
MANAGEMENT OF
CONSTRUCTION ACTIVITIES
1.Plant Management
2.Material Management
3.Finance Management
4.Quality Management
5.Safety Management
6.Documentation Management
7.Personnel Management
23
1.PLANT MANAGEMENT
.
1.Time available for work execution.
2.Details of equipment and also minimum
requirement as per job position.
3.Rated capacity of equipment/plant.
4.Assessed capacity.
5.Schedule of maintanence.
6.Inventory of spare parts required.
7.Repair cover to equipment/plant.
24
2.MATERIAL MANAGEMENT
1.Material management is a parallel activity
along with start of the project.
2.Selection and purchasing of various items
such as
aggregates,sand,cement,steel,structural
steel, shuttering consumables, electrical
fittings.
3.Forecasting the quantities and recording
the costs of various items.
25
3.FINANCE MANAGEMENT
It includes budget fixation on monthly basis, on the basis of
work done or minimum to be fed at site, on the decision of
management authorities.
4.QUALITY MANAGEMENT
1.Training to staff should be provided to update the quality
control measures.
2.At site laboratory be established to check the quality of
concrete.
3.Tests be analysed at site based on the size of job.
4.Mix design should be prepared based on the latest code
and to produce the concrete of desirable strength.
5.Compaction of concrete be given more attention before
final setting.
6.Quality assurance on ground improve the aesthetic of
26
structures.
5.SAFETY MANAGEMENT
1.All the workers be given briefing about the safety
requirements based on the site hazards.
2.Specially when the simply supported structure is
attempted on deep gorges.
3.In case of foundation if the deep excavation is
involved.
4.In case of pneumatic sinking is being used for well
foundation,following safety measures are considered:
.accelerate circulation of air
.slow decompression
.duplicate and spare equipment
.illumination inside working chamber
.signalling arrangements
.caution about incidental loading
5.In case of staging/shuttering for superstructure.
27
28
6.DOCUMENTATION
MANAGEMENT
1.Document management during the
construction is an art in itself.
2.Proper and systematic management of
documents is requirement for department as
well as contractor.
3.Documentation that every project manager
must have at their disposal are as under:
.Proposal and Estimates.
.Project schedule.
.Project change orders.
28
7.PERSONNEL MANAGEMENT
2
9
ECOLOGICAL PROBLEMS
1.Deforestation
2.Disturbance of geological strata
3.Hill face disturbance
4.Drainage pattern interruption
5.Water resource disturbance
6.Siltation problem
7.Destruction to flora and fauna
8.Pollution
9.Destruction of medicinal wealth
30
PROTECTIVE MEASURES
1.Environment impact assessment
2.Geological investigation
3.State of wild
4.Avoidance of unstable zones
5.Least disturbance to natural streams and gradients
6.Restriction on reserve forests
7.Judicial way of doing works
8.Minimum blasting operations
9.Half tunneling must be restored
10.Ropeway technique
11.Suitable drainage system
12.Restoration of natural springs and waterways
13.Rebuilding of environment
31
CONCLUSION
With the changing scenariothere is urgent need
to manage the bridge project effectively.
Construction management basically is a tool to
complete the project effectively within fixed
amount but in less time. Manager should have
knowledge sequence of all the activities. Decision
making for both sides the contractor and the client
needs to be fast and time bound otherwise the
project will get delayed which will have cost over
run. Control in form of reviewing monitoring has a
catalyst effect to boost the progress.
32
REFERENCES
1. Abdullah C.H., Mohamad A., Yusof M.A.M., Gue
S.S. & Mahmud M. (2007), Development of Slope
Management in Malaysia
2. 2. Campbell, S.D.G., Shaw, R., Chao, P.A. and
Dias, A. (2005). The use of soil bioengineering
measures to repair selected natural terrain
landslides in Hong Kong, The Hong Kong
Institution of Engineers Geotechnical Division
3. Gue, S. S. & Tan, Y. C. (2004), "Guidelines for
Development on Hill-Site", Tropical Residual Soils
Engineering (TRSE), 6th 7th July 2004.Annual
Seminar on Safe and Greep Slopes.
33
THANK YOU