Statistical Process Control: Operations Management R. Dan Reid & Nada R. Sanders
Statistical Process Control: Operations Management R. Dan Reid & Nada R. Sanders
Process
Control
Operations Management
by
R. Dan Reid & Nada R. Sanders
2nd Edition Wiley 2005
PowerPoint Presentation by R.B. Clough - UNH
2005 Wiley
Sources of Variation in
Production and Service
Processes
Unavoidable
Process Capability
Time 2
Time 3
Observation
1
15.8
16.1
16.0
Observation
2
16.0
16.0
15.9
Observation
3
15.8
15.8
15.9
Observation
4
15.9
15.9
15.8
Step 1:
Calculate the Mean of Each
Sample
Time 1
Time 2
Time 3
Observation 1
15.8
16.1
16.0
Observation 2
16.0
16.0
15.9
Observation 3
15.8
15.8
15.9
Observation 4
15.9
15.9
15.8
Sample means
(X-bar)
15.875
15.975
15.9
.2
.1
n
4
An Alternative Method for the Xbar Chart Using R-bar and the A2
Factor
Use this method
when sigma for the
process distribution
is not known. Use
factor A2 from Table
6.1
Sample Size
(n)
2
3
4
5
6
7
8
9
10
11
12
13
14
15
A2
1.88
1.02
0.73
0.58
0.48
0.42
0.37
0.34
0.31
0.29
0.27
0.25
0.24
0.22
D3
0.00
0.00
0.00
0.00
0.00
0.08
0.14
0.18
0.22
0.26
0.28
0.31
0.33
0.35
D4
3.27
2.57
2.28
2.11
2.00
1.92
1.86
1.82
1.78
1.74
1.72
1.69
1.67
1.65
Time 2
Time 3
Observation 1
15.8
16.1
16.0
Observation 2
16.0
16.0
15.9
Observation 3
15.8
15.8
15.9
Observation 4
15.9
15.9
15.8
Sample ranges
(R)
0.2
0.3
0.2
Center line:
CL R
Sample Size
(n)
2
3
4
5
6
7
8
9
10
11
12
13
14
15
A2
1.88
1.02
0.73
0.58
0.48
0.42
0.37
0.34
0.31
0.29
0.27
0.25
0.24
0.22
D3
0.00
0.00
0.00
0.00
0.00
0.08
0.14
0.18
0.22
0.26
0.28
0.31
0.33
0.35
D4
3.27
2.57
2.28
2.11
2.00
1.92
1.86
1.82
1.78
1.74
1.72
1.69
1.67
1.65
Constructing a P-Chart:
A Production manager for a tire company has inspected
the number of defective tires in five random samples
with 20 tires in each sample. The table below shows the
number of defective tires in each sample of 20 tires.
Sample
Sample
Size (n)
Number
Defective
20
20
20
20
20
Step 1:
Calculate the Percent defective of Each
Sample and the Overall Percent Defective
(P-Bar)
Sampl Number
e
Defectiv
e
Sample
Size
Percent
Defectiv
e
20
.15
20
.10
20
.05
20
.10
20
.05
Total
100
.09
p(1-p) (.09)(.91)
p=
=
=0.064
n
20
CL p .09
UCL p z
p z
.09
3(.064) .282
LCL
.09
3(.064) .102
Constructing a C-Chart:
The number of
weekly customer
complaints are
monitored in a
large hotel.
Develop a three
sigma control
limits For a CChart using the
data table On the
right.
Week
Number of
Complaints
10
Total
22
#complaints
22
CL
2.2
# of samples
10
SQC in Services
Homework
Ch. 6 Problems: 1, 4, 6, 7, 8, 10.