OEE

The document discusses overall equipment effectiveness (OEE) and how it is calculated. OEE is equal to availability multiplied by performance multiplied by quality rate. Availability is calculated as net run time divided by time for production. Performance is calculated as actual production divided by ideal production. Quality rate is calculated as total good parts divided by total parts. OEE provides a measure of how effectively a production system is utilizing the available time for production.

Uploaded by

atgdxt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
141 views5 pages

OEE

The document discusses overall equipment effectiveness (OEE) and how it is calculated. OEE is equal to availability multiplied by performance multiplied by quality rate. Availability is calculated as net run time divided by time for production. Performance is calculated as actual production divided by ideal production. Quality rate is calculated as total good parts divided by total parts. OEE provides a measure of how effectively a production system is utilizing the available time for production.

Uploaded by

atgdxt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 5

NH AG

OEE

WCM Team

April 2008

NH CE

O.E.E. Overall Equipment Effectiveness

OEE = Availability * Performance * Quality rate

Availability

Quality rate

Loss due to failure, type


change, set-up
adjustments, system
start/stop ...

Quality defects
Reworks

Performance

Loss due to minor


stoppages and slowdowns

April 2008

Production System

O.E.E. Overall Equipment Effectiveness

Time for production

Loss due to failure,


type change, set-up
adjustments,
system start/stop ...

Run time

Net run time

Time with
added
value

April 2008

Loss due
to minor
stoppages
and slowdowns

OEE

Availability = 1 Stoppage time


Time for production

Performance = TC.ideal x pcs.No.


Run time

Quality = 1- No. of defective pcs.


Total No. of pcs.

Loss due
to Quality

Production System

Definition of Overall Equipment Effectiveness

April 2008

Production System

(3)/(3)

Dettaglio

l'OEE massimo NON si calcola sulle 24 ore (e quindi sui 3 turni) in


ogni caso MA in base ai volumi previsti dal PO. Quindi se il PO
prevede dei volumi che richiedono solo 2 turni, il OEE, da
calcolare su 2 turni. Al contrario se i volumi sono cosi' alti da
richiedere 3 turni, il max OEE lo calcolo su 3 turni..