COating Standard IMO
COating Standard IMO
COating Standard IMO
SUMMARY
1 Introduction
2 Design of the Coating System
3 Agreement on the inspection procedures & plan
4 New Construction
5 Coating Technical File
1 Introduction
Adoption of PSPC:
Dec. 2006
Delivery
Keel laying*
* In absence of a building contract
Building contract
- MSC.215 (82) (PSPC)
- MSC.216 (82)
Statutory matter
SOLAS Reg. II-1 / 3-2 amended by MSC.216(82)
WBT All Ships 500 G.T. , DSSS Bulk Carriers 150 M
2010 BV Internal Use Only
BV Surveyors Training-PSPC
Adoption of PSPC:
Dec. 2006
June 2008
Delivery
Keel laying*
- IACS UI SC 223
Building contract
- MSC.215 (82) (PSPC)
- MSC.216 (82)
Statutory matter
SOLAS Reg. II-1 / 3-2 amended by MSC.216(82)
WBT All Ships 500 G.T. , DSSS Bulk Carriers 150 M
2010 BV Internal Use Only
BV Surveyors Training-PSPC
July 2009
BV Surveyors Training-PSPC
Dec. 2006
Dec. 2008
- BV NR 530 (Rev.1)
BV Surveyors Training-PSPC
Shipyard, Shipowner,
Coating Manufacturer
Inspection Agreement
Administration or
Recognized Organization
Shipyard
Administration or
Recognized
Organization
BV Surveyors Training-PSPC
4 Coating standard
4.4 - Table 1 - Basic coating system requirements
5 Coating system approval
6 Coating inspection requirements
6.2 - Table 2 - Inspection items
7 Verification requirements
8 Alternative systems
Annex 1 - Test procedures for coating qualification
Annex 2 - Typical reports
Annex 3 - Dry film thickness measurements
2010 BV Internal Use Only
BV Surveyors Training-PSPC
10
Design of
Coating System
Coating pre-qualification
test (Table 1. 1.3)
Job Specification
(Table 1. 1.4)
NDFT
(Table 1. 1.5)
2010 BV Internal Use Only
BV Surveyors Training-PSPC
11
3 Tripartite Agreement
3 Tripartite Agreement
1 Purpose
2 Definitions
3 General principles
4 Coating standard
4.4 - Table 1 - Basic coating system requirements
5 Coating system approval
6 Coating inspection requirements
6.2 - Table 2 - Inspection items
7 Verification requirements
8 Alternative systems
Annex 1 - Test procedures for coating qualification
Annex 2 - Typical reports
Annex 3 - Dry film thickness measurements
2010 BV Internal Use Only
BV Surveyors Training-PSPC
13
3 Tripartite Agreement
Is to cover at least the following:
BV Surveyors Training-PSPC
14
Tripartite Agreement
When more than one CI is assigned, their areas of responsibilities are to be identified.
BV Surveyors Training-PSPC
15
4 New Construction
New Construction
1 Purpose
2 Definitions
3 General principles
4 Coating standard
4.4 - Table 1 - Basic coating system requirements
5 Coating system approval
6 Coating inspection requirements
6.2 - Table 2 - Inspection items
7 Verification requirements
8 Alternative systems
Annex 1 - Test procedures for coating qualification
Annex 2 - Typical reports
Annex 3 - Dry film thickness measurements
BV Surveyors Training-PSPC
17
BV Surveyors Training-PSPC
18
Table 2
Qualified Coating Inspectors shall carry out inspection of the PSP and issue the
coating log(s)
BV Surveyors Training-PSPC
19
Cleanliness grade
Sa 2 (*ISO -8501-1:1988/suppl.
1994).
Profile
Level of contaminants
*ISO 8503-1/2 ).
Environmental parameters
(*ISO -8502-6).
RH% < 85%RH,
Steel T> 3C
+ Dew point T
BV Surveyors Training-PSPC
20
Steel Preparation
Table 2
Surface treatment
Qualified Coating Inspectors shall carry out inspection of the SSP and issue the
coating log(s)
2010 BV Internal Use Only
BV Surveyors Training-PSPC
21
Steel condition
Welds defects
treated (*ISO -8501-3 Grade P2 ).
Sa 2
welds.
Sa 2
Surface treatment
30-75 m
( Fine(G) to Medium(G)
*ISO 8503-1/2 ) in case of full or partial
blasting.
1 for dust
size 5, 4, 3 for lower
size dust to be removed if
visible (*ISO 8502-3)
BV Surveyors Training-PSPC
22
Sa 2
30-75 m
1 for dust
size 5, 4, 3 for lower
size dust to be removed if
visible (*ISO 8502-3)
BV Surveyors Training-PSPC
23
Stripe Coating
Inspections items
defined in MSC.215(82) Table 1
and Table 2
2nd Coating
Erection/Surface treatment
Coating Repair
Qualified Coating Inspectors shall carry out inspection of the Coating Application
and issue the coating log(s)
2010 BV Internal Use Only
BV Surveyors Training-PSPC
24
Environmental parameters
NDFT measurements
Repairs
+ Dew point T
NDFT to be confirmed
according to Annex 3
Defective areas to be marked
up
Repairs to be re-checked and
documented
BV Surveyors Training-PSPC
25
: Long
BV Surveyors Training-PSPC
26
BV Surveyors Training-PSPC
27
BV Surveyors Training-PSPC
28
CLEARED
BV Surveyors Training-PSPC
29
andstatement
Rule forofCPS
issue
request
compliance or TAC
Inspection Agreement
review
Coating specifications
agree
Coating Manufacturer
IMO
- Standard
Coating Process
International
2 PSPC
on containers
implement
Phase 2: conformance of
coating works with PSPC
BV carries out some verifications as detailed in the PR34 / UI
SC 223 / NR 530 which are based on PSPC requirements
2010 BV Internal Use Only
BV Surveyors Training-PSPC
Shipyard
check ID
Shipowner
Bureau Veritas
submit
30
Checking that the inspector is qualified in accordance with the qualification requirements
Checking on sampling basis that inspectors reports of surface preparation and coating
application indicate the compliance with manufacturers Technical Data Sheet and Statement of
Compliance or Type Approval Certificate
BV Surveyors Training-PSPC
31
BV Surveyors Training-PSPC
32
BV Surveyors Training-PSPC
34
BV Surveyors Training-PSPC
35
BV Surveyors Training-PSPC
36
Any deviations found during the review are to be raised with the
Shipyard, which is responsible for identifying and implementing the
corrective actions.
BV Surveyors Training-PSPC
37
BV Surveyors Training-PSPC
38