DISTRIBUTION
SECTOR
A distribution utility has the obligation to provide
distribution services and connections to its system
for any end-user within its franchise area consistent
with the distribution code. They are required to
provide open and non-discriminatory access to its
distribution system to all users.
SUPPLY SECTOR
The ERC shall promulgate rules and regulations
prescribing the qualification of electricity suppliers,
which shall include among the other requirement, a
demonstration of their technical capability, and credit
worthiness.
SUPPLY SECTOR
The ERC shall have authority to require electricity
suppliers to furnish a bond or other evidence of the
ability of the supplier to withstand market
disturbances or other events that may increase the
cost providing service.
TRANSMISSION
RELIABILITY
Submission of Normalized reliability Data
Initial Reliability targets
SCHEDULING AND
DISPATCH
Market transition
MEMBERSHIP OF WESM
GENERATING COMPANIES
DISTRIBUTION UTILITIES
SUPPLIERS
BULK CONSUMERS / END USERS
OTHER SIMILAR ENTITIES (AUTHORIZED BY ERC)
MARKET RULES
ERC approves the price determination methodology
Rules must provide a level playing field to all power
industry participants
Establishing a merit order dispatch instruction
Determining market clearing price for each time period
Administering the market
Prescribing guidelines for market operation in system
emergencies
Amending the market rules
MARKET RULES
All members, whether direct or indirect, shall be bound by
the market rules with respect to the transactions in the
spot market
The grid code shall be used together with the market
rules
MARKET OPERATOR
Autonomous group constituted by DOE
With equitable representation from electric power industry
participants
Undertake preparatory work and initial operation of WESM
Not later than 1 year after the implementation of WESM, an
independent entity shall be formed
EXISTING CONTRACTS
Effectivity of Contract
All existing contracts are effective unless revoked or a new
contract is entered into pursuant to the provisions of the Grid
Code
TRANSITIONAL COMPLIANCE
Statement of Compliance
Within six months from effectivity of the Grid Code
Technical specification and performance standards prescribed in the Grid
Code and Distribution Code
Approval of Exemption
Only for cases where the reliability of the Grid will not be
compromised