MRP
MRP
MRP
REQUIRMENT
PLANNING ( MRP )
Abhishek
Archana
Bipin
Ram
Rajendra
Sunanda
MATERIAL REQUIREMENT
PLANNING ( MRP )
Lead Times
MRP by date report
(Item Master File) MRP
Program
s Planned orders report
Inventory Data
Purchase requirements
Purchasing data
Exception reports
7
B IL L S O F M A T E R IA L S
• BOM is a list of quantities of components,
ingredients, and materials required to make a
product
• A bill of material defines a product by providing a
product structure
•
Types of Bills:
• Modular bills - Bills of material for modules are
called modular bills
• Bills of material organized by major subassemblies
or by product options
• Super bill: It includes items with fractional
options
•
•
BOM (Contd…)
is in stock
•
qStatic
• Economic Order Quantity (EOQ)
•
qDynamic
• Lot-For-Lot (L4L)
LOT SIZING – L4L TECHNIQUE
1 50 50 0 Rs 0.00 Rs 47 Rs 47
2 60 60 0 0.00 47 94
3 70 70 0 0.00 47 141
4 60 60 0 0.00 47 188
5 95 95 0 0.00 47 235
6 75 75 0 0.00 47 282
7 60 60 0 0.00 47 329
8 55 55 0 0.00 47 376
LOT SIZING – EOQ TECHNIQUE
1 50 351 301 Rs Rs 47 Rs
15.05 62.05
2 60 0 241 12.05 0 74.10
3 70 0 171 8.55 0 82.65
4 60 0 111 5.55 0 88.20
5 95 0 16 0.80 0 89.00
6 75 351 292 14.60 47 150.60
7 60 0 232 11.60 0 162.20
8 55 0 177 8.85 0 171.05
∑=525
LO T S IZ IN G – E O Q T E C H N IQ U E
•
3) In ve n to ry is m o ve d th ro u g h th e p la n t o n a JIT
b a sis.
• 4 ) A fte r p ro d u cts a re m a n u fa ctu re d th e y a re
m o ve d to th e in ve n to ry. R e ce ip t o f th e se p ro d u cts
in to in ve n to ry re d u ce s th e q u a n titie s re q u ire d fo r
su b se q u e n t p la n n e d o rd e rs in th e M R P syste m .
• 5 ) B a ck Flu sh syste m is u se d to re d u ce in ve n to ry
b a la n ce s. B a ck Flu sh in g u se s th e b illo f m a te ria lto
d e d u ct co m p o n e n t q u a n titie s fro m in ve n to ry a s
e a ch u n it is co m p le te d .
•
FEEDBACK
No
Yes
Execute
capacity
Plans
Yes Yes
HOW MRP-II DIFFER FROM
MRP?
(a)Order Bill
(b)Planning Bill
(c)Receipt Bill
(d)Model Bill