Solar Smart City
Solar Smart City
Solar Smart City
Since the Wheeling Charges for Solar Power Projects is Zero (0) in
AP (acc to Solar Power Policy 2015).Basing on this point we can setup
a solar power plant at any location in AP and utilize the power
obtained by it by exporting the Solar Power generated at the Power
Plant to APEPDCL and Import the Power required for us at any location
by making PPA with Dept.
Net Bill to be paid= (Import Export)x Cost per Unit + Fixed Charges ( if Import
is High).
Net Revenue from Solar = (Import Export)x Cost per Unit ( if Export is High).
Below table shows the list of Departments and allocated land and power capacity:
Department
area in acres
Solar Capacity
Cow Sheds
700Kwp
Godowns
500Kwp
Cold Storage
300Kwp
0.25
100Kwp
Staff quarters
200Kwp
Organic
Cultivation
90
18.2Mwp
Total
100
20 MWp
Office
Employment Details
Department
No of Employees
Office
10
Cow Sheds
30
Godowns
15
Cold Storage
15
Organic Cultivation
180
20
Panel Cleaning
20
Electrical Maintenance
10
Total staff
300