Computer Network Proposal

This proposal outlines a computer network for 3 interconnected buildings. It includes a generalized design showing the layout and main components in each building, including servers, routers, switches, and over 200 desktop and laptop computers. A cost sheet provides the equipment needed, quantities, prices, and a total project cost of $78,078.06. The goal is to create a reliable network that allows large databases to be accessed across buildings 24 hours a day for a small to medium sized business.

Uploaded by

Mugluu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
260 views

Computer Network Proposal

This proposal outlines a computer network for 3 interconnected buildings. It includes a generalized design showing the layout and main components in each building, including servers, routers, switches, and over 200 desktop and laptop computers. A cost sheet provides the equipment needed, quantities, prices, and a total project cost of $78,078.06. The goal is to create a reliable network that allows large databases to be accessed across buildings 24 hours a day for a small to medium sized business.

Uploaded by

Mugluu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Computer Network

Proposal
By Taylor Gardner

Introduction
This

is a proposal for a computer


Network spanning 3 buildings. The
equipment selected is for a typical
network for a small to medium sized
business. The most important factor
as of the request of the client was to
be able to keep the network up and
running 24 hours a day. Also, by the
nature of the business, large data
bases of information need to be

3 Buildings Network
Interconnected Network

Generalized Design
Building
A

Building
B

Building
C

Overview of Design
Main components in
each building.
Building
B
Building
A

Building
C

Details of Building A

Main
Office
Serv
er

Details of Building B
Cubical Area with
60 computers

Details of Building C
Another cubical
area
With 60
Computers

Cost Sheet of Entire


Project
Item
Router
Switch
Server
Server Work
Station
Server Rack
Hard Drives
UPS
Printer
CAT6 - 4
Desktop Computer
Computer Monitor
Laptop Computer
Software
Total

Quantity
2
8
1
1

Price
$261.00
$176.00
$5107.00
$518.75

Total
$522.00
$1408.00
$5107.00
$518.75

2
8
3
4
300
140
145
5
1

$522.86
$449.00
$864.00
$326.00
$3.00
$224.99
$189.00
Lot
$585.00

$1045.72
$3592.00
$2592.00
$1304.00
$900.00
$31498.60
$27405.00
$1599.99
$585.00
$78078.06

Grand Total of :
$78,078.06

Credits
Designed by: Taylor Gardner
With the help of Visio and Excel.