2013 Visayas Power Supply and Demand Situation: Republic of The Philippines Department of Energy
2013 Visayas Power Supply and Demand Situation: Republic of The Philippines Department of Energy
2013 Visayas Power Supply and Demand Situation: Republic of The Philippines Department of Energy
Super Typhoon
Yolanda hit
Visayas (08
Nov 2013)
2013 Max
Demand =
1,572 MW (06
May)
Summer
2013
HVDC
unoperational due
to toppled tower
(09 Nov-14 Dec)
1,800
1,600
1,400
1,200
7.2 magnitude
earthquake hit
Bohol (15 Oct)
1,000
800
600
400
200
0
W1
W2
W3
W4
W5
W6
W7
W8
W10
W9
W11
W12
W13
W14
W15
W16
W17
W18
W19
W20
W21
W22
W23
W24
W25
W26
W27
W28
W29
W30
W31
W32
W33
W34
W35
W36
W37
W38
W39
W40
W41
W42
W43
W44
W45
W46
W47
W48
W49
W50
W51
W52
Jan
Feb
Mar
Apr Coal May
Geothermal
Thermal
Hydro
Jun
Jul
Oil
Aug
Sep
Oct
Biofuels
Nov
Dec
VISAYAS POWER
SUPPLY and DEMAND
OUTLOOK
2014-2020
VISAYAS SUPPLY-DEMAND
OUTLOOK 2014-2020
3500
3000
2500
2014
2015
2016
2000
1500
1000
Available Capacity
Committed
Required Reserve
Peak Demand
Notes
a. Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve
requirement
b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric
power with national economic growth applied to 7 percent GDP growth rate (GR) target for
2014-2015.
c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric
power with national economic growth applied to 8 percent GDP growth rate (GR) target for
2016-2020.
VISAYAS SUPPLY-DEMAND
Projected
Reserve
OUTLOOK
2014-2020
800
600
400
200
-200
-400
Projected Reserve
Dispatchable Reserve
Contingency Reserve
-600
Notes
a. Regulating Reserve: Refers to a Generating Unit that assists in Frequency Control by
providing automatic Primary and/or Secondary Frequency response. Equals to 4 % of the peak
demand
b. Contingency Reserve: Generating Capacity that is intended to take care of the loss of the
largest Synchronized Generating Unit or the power import from a single Grid interconnection,
whichever is larger.
Mother/ JV Company
Location
Villasiga HEP
Rated
Capacity
(MW)
Project Cost
Target
(Php Billion) Commissioning
8.00
1.4
Oct 2014
50.00
Aug 2014
54.00
2.15
Aug 2014
31.00
Sep 2014
82.00
10.2
Sep 2014
50.00
5.21
Dec 2014
18.00
1.7
Dec 2014
3.00
3.60
Dec 2014
0.2
Jun 2015
COAL
Phase 1-135MW
(1st Unit)
Mother/ JV Company
Location
Rated
Capacity
(MW)
Brgy. Nipa,
Concepcion, Iloilo
270.00
Phase 2-135MW
(2nd Unit)
TOTAL
579.60
Project Cost
Target
(Php Billion) Commissioning
26.4
Project Proponent
Mother/ JV Company
Location
Energy Development
Corporation
2015
20.00
2016
300.00
March 2017
470.00
49.00
December 2015
40.00
December 2018
TBA
89.00
Bronzeoak Philippines
20.00
May 2014
30.00
January 2015
TOTAL SOLAR
First Maxpower International First Maxpower International
Corporation
Corporation
TOTAL WIND
150.00
TOTAL GEOTHERMAL
San Carlos Solar
San Carlos Solar Energy Inc.
Photovoltaic Power Project
(SACASOL)
Rated Capacity
Target
(MW)
Commissioning
50.00
Pulupandan, Negros
Occidental
50.00
50.00
November 2015
Project Proponent
Mother/ JV Company
Location
Igbaras, Iloilo
Hilabangan (Upper
Cascade)
Hilabangan (Lower
Cascade)
5.10
January 2015
4.80
August 2015
3.00
August 2015
4.50
October 2016
3.10
October 2016
4.20
October 2016
4.00
October 2016
3.30
October 2016
Madalag, Aklan
18.00
August 2017
Kabankalan, Negros
Occidental
Kabankalan, Negros
Occidental
TOTAL HYDRO
46 MW Biomass-Fired
Cogeneration Power Plant
40 MW Battery Storage
Project
Universal Robina
Corporation
TOTAL BIOMASS
AES Philippines Power
AES Philippines Power Partners
Partners Co., LTD.
Co., LTD.
TOTAL BATTERY
TOTAL
Rated Capacity
Target
(MW)
Commissioning
50.00
Kabankalan, Negros
Occidental
46.00
July 2014
46.00
Kabankalan, Negros
Occidental
40.00
40.00
795.00
March 2015
END OF PRESENTATION