Busway Handling Maintenance

This document summarizes best practices for handling, installing, testing and maintaining busduct systems. It provides recommendations for proper storage and protection of busduct from moisture both during transportation and at job sites. Guidelines are given for installation procedures and arrangements, as well as testing and commissioning of busduct systems. Routine inspection and maintenance procedures are outlined to ensure long-term reliable operation of busduct installations.

Uploaded by

Thức Võ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
203 views25 pages

Busway Handling Maintenance

This document summarizes best practices for handling, installing, testing and maintaining busduct systems. It provides recommendations for proper storage and protection of busduct from moisture both during transportation and at job sites. Guidelines are given for installation procedures and arrangements, as well as testing and commissioning of busduct systems. Routine inspection and maintenance procedures are outlined to ensure long-term reliable operation of busduct installations.

Uploaded by

Thức Võ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 25

1

Technical Seminar on Busduct Handling,


Installation, Testing and Maintenance
2
Material Storage & Protection
- Water / Dust Precaution
Water/ dust will provide alternative path /
heating point
Damage insulation
Latent hazard of short circuit
Solution
Double packing (plastic bag+carton box)
Apply rain coat after installation each day
Proper storage management
3
Factory Precaution
Double packing (plastic bag+carton box)


4
Factory Precaution
Double packing (plastic bag+carton box)


5
Site Recommendation
Apply rain coat after installation each day
Protecting the end Using proper Plastic Shield


6
Proper Storage
Storage in Dry and Clean Warehouse
Storage in Dirty and Open Area


7
Site Storage
Wetted Floor

8
Good Example of Busduct Storage
Stored in Dry & Clean Place,
Raise Crate with wooden Blocks
Provide Curb to Protect
Vertical Busduct

9
6. Installation Procedure
Video of Installation (about 8 minutes)
10
Quality Project Management Services
Provided by Schneider
Product Training
Site Measurement
Optimum busduct routing design
Detail shop drawing preparation
On site technical support
Training on installation procedure
Missing Link and Remedial Units
Joint inspection (not contractual service)

11
Missing Links / Remedial Units
Missing link reserve 1 pc of busduct for final measurement
Increase accuracy of busudct dimension
Save time for rectifying installation mistake
Streamline the installation

Missing Link
12
Missing Link

13
Contractor-Supplier Interaction
Project Start
Technical support
and routing deisgn
AutoCad Drawing
BRASS and
manufacturing
instruction
Project
Management
Support
Installation support
After sales services
and missing links
Fabrication
We are not only a
busduct supplier
14
Vertical Spring Hanger
Release of Locknut


15
Installation Arrangement Horizontal Hanger

16
Installation Arrangement Horizontal Hanger
17
Testing & Commissioning
A.Factory Test
Factory Test 7500V dc Hi-pot
Test
100% test before delivery
Insulation = 10M/ ft
(IEC require 1M/ ft )
Check weak point of insulation
18
Testing & Commissioning
B. On Site Test
Mega test before any energizing
NEMA:
M =100/ Length of Busduct in Ft (1000V)

Reading of individual busduct normally
> 10 M
19
System coordination with other trades
Try to design the systems to move water
services for busduct system
Eliminate the water hazard from burst or leaked
pipes / drains

20
System coordination with other trades
Water Drip from
Ceiling
21
System coordination with other trades
Large Drain Pipe
Overhead
22
11. Maintenance Issues
Routine inspection
Vertical spring hanger adjustment & Bowing
Symptom
Thermal checking/ scanning
Spare part provision
23
Routine Inspection
Insulation test recommended by NEMA
Check at least 1 per year
Check after electrical short circuit or ground
fault
Visual inspection on joints and terminals
Remove damp or clean dust when necessary
Check tighten torque of joint bolt if necessary
Check any cracks, loosen/ broken parts

24
Trouble Shooting
Recommend spare parts
1 pair of flanged ends for each busduct
rating used
A number of plug-in units
24-hours services hotline provided by
Schneider Busway
Contact local Schneider office
25