Well Completion PETRONAS
Well Completion PETRONAS
Well Completion PETRONAS
PROGRAM
The purpose of well completion is to provide
communication between the reservoir and the surface
production facilities.
TYPICAL WELL COMPLETION CONFIGURATION
Why well completion is so important ?
To effectively drain out the reservoir fluids to
surface. Proper completion design is crucial in
maximizing recovery.
To provide subsurface and surface flow control
and safety. Several zones could be produced
selectively or commingle it.
Isolate gas and water zones.
To support wellbore and avoid excessive sand
production.
The well completion provides :
Pressure control
A replaceable conduit for produced fluids
Selectivity of produced intervals
Simple well killing facilities
Potential for the exclusion of solids
M
e
c
h
a
n
ic
a
l
C
o
n
s
id
e
r
a
t
io
n
M
ethod of W
ell
C
om
pletion
T
y
p
e
o
f
W
e
l
l
C
o
m
p
l
e
t
i
o
n
D
e
s
i
g
n
D
a
t
a
R
e
q
u
i
r
e
m
e
n
t
S
p
e
c
ia
l S
tu
d
ie
s
R
e
q
u
ire
m
e
n
t
D
e
s
ig
n
P
r
o
c
e
s
s
ELEMENTS OF
WELL COMPLETION
DESIGN
R
e
s
e
r
v
o
i
r
C
o
n
s
i
d
e
r
a
t
i
o
n
Well Completion Design Consideration
2
1
3
4
5
6
7
1. Design Data Requirement
Well Testing Data
Production rate
Productivity Index, Skin and AOF
Basic Sediment and Water
Reservoir Pressure, Pr
Bottom Hole Flowing Pressure, Pwf
Temperature
Gas Oil Ratio (GOR), Gas Lliquid Ratio
(GLR) and Watercut (WC)
Type of fluid (oil, gas or water)
Degree API
Viscosity
Density
H2S, CO2 content
Fluid composition
1. Design Data Requirement ( cont..)
Reservoir Rock Properties
Depth
Thickness
Porosity and Permeability
Capillary pressure
Rock strength (Brinell Hardness Number
and compressive strength)
Stresses
Young Modulus
Poissons ratio
Formation grain size (sieve analysis)
IPR with various Water Cut and GORsensitivity
10% WC
40% WC
> 60% WC
Increasing water cut
P
r
e
s
s
u
r
e
,
P
s
i
Production Rate, Q
High GOR scf/stb
GOR 400 scf/stb
GOR 100 scf/stb
Increasing GOR
P
r
e
s
s
u
r
e
,
P
s
i
Production Rate, Q
IPC
TPC
Notes: IPR Inflow Performance Relationship; TPC Tubing Performance Curve; GOR- Gas Oil Ratio
2. Design Process Tubing Selection
IPR with THP and Pr Sensitivity
Increasing THP
THP 500 psi
THP 100 psi
THP 200
P
r
e
s
s
u
r
e
,
P
s
i
Production Rate, Q
Initial Pr
Depleted Pr
P
r
e
s
s
u
r
e
,
P
s
i
Production Rate, Q
Note: Pr Reservoir Pressure
To as large as 9 5/8
Tubing size ranges from 2 3/8
7
2 7/8
3 1/2
4
4 1/2
5 1/2
Completion Tubing Sizes
TUBING SIZE SENSITIVITY
Typical Casing Program
Conductor
Surface
casing
Intermediate
casing
Production
casing
Production
liner
Production casing
Perforation
Tubing
Tubing hanger
SCSSV
Landing/Seating
nipple
SSD
Wireline Entry
Guide
1/4 control line
Gaslift mandrel
(Side pocket mandrel)
Flow coupling
Dual packer
Blast joint
Telescopic joint
No-go nipple Single packer
Completion Accessories
3. Special Study Requirement
PVT
Core Analysis
Metallurgy
Formation Water/Crude Analysis
Production rate /Inflow performane
Formation strength
Fluid type (corrosion, scale and
wax/asphaltene)
Reservoir permeability
Reservoir pressure
No. of reservoirs
Reservoir management
4. Reservoir Considerations
There are various types of well completion :
5. Types of Well Completion
Single string / selective single
Dual string
Gravelpack
slim well
monobore
horizontal
multilateral
twin well / triple well
Y Block completion
smart / intelligent well
Selective Zone
Selective Zone
Gravel Packed
Gravel Packed
Cased Hole
Well Completion: Single String Types
With and without gravel packed
Cased Hole
Cased Hole
Cased Hole
Well Completion Dual Strings Types
With & Without Gravel Packed
Cased Hole No Gravel Packed
Short String Selective/Non Selective
Cased Hole With All Gravel Packed/
Only Shallower Reservoirs Gravel Packed
Slim Well
Drilling small hole sizes and completing with
smaller casing scheme.
This will enable faster drilling with less casing
tubular, cement and associated drilling materials
hence lower cost.
Monobore
Big bore Monobore
(e.g. 3 1/2 tubing
with 3 1/2 liner)
4-7 tubular
DUAL SLIMHOLE MONOBORE
23 hole
Flush Joint
Horizontal Well
Twin well - Horizontal
Requires special wellhead
and x-mas tree arrangement
Two wells in
one conductor
TAML (Technology Advancement MultiLateral)
- 7" SC1AH Packer
- 4.00" Sealbore Extension
3.1/2" Float Shoe, Float
Collar and Landing Collar
Level 6 FORMation
Junction 9.5/8"X7"X7"
LOWER
LATERAL
- Xover 4.1/2" 12.6 N Vam to 3.1/2" 9.2ppf New Vam
- Perforations in
N-Series Sands
7" SC1AH Packer
- 4.00" Sealbore Extension
- Xover 4.1/2" 12.6 N Vam to 3.1/
2" 9.2ppf New Vam
- Perforations in
N-Series Sands
3.1/2" Float Shoe,
Float Collar and
Landing Collar
Size 51B Baker GT
Dual 3.1/2"X3.1/2" Dual Completion
Baker 9.5/8"X3.1/2"X3.1/2"
Dual Completion Module (DCM)
Size 80-40 Locator Seal Assembly
Level 6
EW-117
Level 6 Multilateral
The Triple Wellhead is
now a proven technology
It will make a marginal
field economical to be
developed
It has the potential also
to enhance project
economics with
installation of smaller
platforms to drill the
same number of wells
Triple Well Head
Three wells drilled
and completed
from one shared
conductor
It provides 6
production strings
Triple well
Y Block
Completion
Without Y Block,
selectivity on short
string is not possible
(for gravelpack
completion).
Typical Dual
string Completion
Over the Coupling
Umbilical Clamp
9 5/8" PES HF-1 Hydraulic Feed Through Packer
Note all lines fed thru from Flatpack to respective tool
3 1/2" LV Ball Valve
3 1/2" PES Triple Gauge
w External Port to Lower
Zone
3 1/2" CC-1 Sleeve
1/4" Hydraulic
Tube terminated
from PDG to LV
3 1/2" SCSSV
PES 5 Line Flatpack
1/4" Hydraulic
Tube from Gauge
transducer to LV
Valve
Advantages
1-Shorter Manufacturing Time
2-Significantly Lower Capex
3-Two Less Electronic Connections
Dual Zone Completion with Triple P/T
Gauge Mandrel
SCSSV Line
PT Gauge I Wire
Control Valve Hydraulic Line
PES Taper Lock Clamp
(Stabilizes Flatpack End)
Hydraulic Splice Sub w Cover Sleeves
(Acts as Hydraulic Termination Point & Take off for Hydraulic lines
to surface, also a hydraulic tee for "common hydraulic line")
bottom CC-1 Sleeve)
SMART well with
downhole inflow
control and P/T
gauges
SMART
2 SMART VALVES
Under Balanced Drilling
SMART Commingling
Expandable Sand Screen
Triple Gauge
Interval Control Valve
Lubricator Valve
150 ftah (50 ft tvd)
8 1/2 hole,
TD at 8113 ft
(3890 ftss, 69 deg)
9 5/8 csg @ 7864 ftah
(3630 ftss, 69 deg)
13 3/8 csg at 4000 ftah
(2461 ftss, 69 deg)
26 conductor
@ 600 ftah
7 Tbg L80 CS
3 1/2 Tbg L80 CS
3.1/2 SSD
3.1/2 Ball Valve
with P/T gauges
18 5/8 surface casing
@ 1600 ftah (1445 ft.tvd,
37 deg)
H1
L1
L2
SSD
2 ICV
LV
1
3
L
H
6. Methods of Well Completion
Cased hole
Open hole
Open Hole
Cased Hole
METHOD OF WELL COMPLETION
Conventional
Single/dual
Slimhole-
monobore
26
13-3/8
9-5/8
7
24 /
20x
13-3/8
9-5/8
3-1/2 tbg
2 x 7
2 x 3-1/2
Slimhole
Single
3-1/2
7
26
TD = 5450-8000 ft
4-1/2
Sequence of Completion Operations :
Well cleanout
Perforate
Kill well
(Sand exclusion - if required)
Run and set completion string
Install X-mas tree
Flowline Tie-in
Unloading well
Handover to production
reservoir
reservoir
reservoir
reservoir
Well Preparation And
Cleaning Clean Out
Assembly
Bit and
Scraper
+
Cleanout
Fluid
reservoir
reservoir
reservoir
reservoir
Well Perforating
Perforating
gun
Assembly
reservoir
reservoir
reservoir
reservoir
Running Completion
Install Christmas Tree
well
Production Flow Line Tie-In
Production
header
To
Production
system
well
reservoir
reservoir
reservoir
reservoir
Unloading Well and
Handover To Production
Operations
Safety
Simplicity/Reliability
Well Surveillance/Monitoring Requirement
Tubing Stress and Movement
Future Slick/E-line Intervention Technology
Future Work-over and Abandonment.
7. Mechanical Considerations
There are different ways of completing wells
with different types of artificial lift
Types of artificial lift :
Gas lift
Sucker rod (Bean Pump)
Progressing Cavity Pump (PCP)
Electrical Submersible Pump (ESP)
Subsurface Hydraulic Jet Pump (SHJP)
Plunger Lift
Artificial lift Gaslifting Well
GAS LIFT WELL
Injection
gas
Produced fluid Gas Sold or Flared
SEPARATOR
Oil & Water out
GAS SOURCE
WELL
GAS LIFT WELL
Injection
gas
Produced fluid Gas Sold or Flared
SEPARATOR
Oil & Water out
GAS SOURCE
WELL
Gaslift System
Side Pocket Mandrel with
Gas-Lift Valve Gas-Lift CompletionSPMs
and Retrievable Valves
Artificial Lift
Sucker rod (Bean Pump)
Artificial Lift
Artificial Lift
Sucker Rod Pump (SRP)
Progressing Cavity Pump (PCP)
Artificial Lift
Artificial Lift
Progressive Cavity Pump (PCP)
PCP Down Hole Equipment PCP Surface Facilities
Artificial Lift
Progressive Cavity Pump (PCP)
Artificial Lift
Electrical Submersible Pump (ESP)
Electrical Submersible Pump (ESP)
Artificial Lift
Artificial Lift
Hydraulic Jet Pump (HJP)
Artificial Lift
Hydraulic Jet Pump (HJP)
Plunger Lift
Artificial Lift
THANK YOU
PCSB's well completion review
Most of PCSB's wells are cased hole either
single or dual completion. However, there are
a few wells completed opened hole (slotted
liner).
Tubing size used range from 2-3/8" to 5-1/2
OD.
PCSB has completed horizontal wells,
multilateral wells, wells with gravel packing
completion, slim well and one twin well.
Completion with 1 packer to 6 packers,
completing from 1 to 5 zones in a single
wellbore.