Mep. Requirements
Mep. Requirements
Mep. Requirements
March 2013
MEP STRATEGY
Avenues Phase 2
March 2013
MECHANICAL INSTALLATIONS
Avenues Phase 2
March 2013
MECHANICAL INSTALLATIONS
List of Mechanical Standards HEAT LOAD CLACULATIONS MECHANICAL REQUIREMENTS (Architectural Space Allocation) MECHANICAL SERVICES LOCATIONS
Avenues Phase 2
March 2013
NFPA 101- Safety life From Fire in building and Structures NFPA 90A Installation of Air Conditioning and Ventilating Systems.
NFPA 70 National Electric Code. NFPA 92 Smoke Control Systems.
2012 2012
2011 2012
1998
2005 2012 2000 2000 2000 2008 2002 2001 2012 2011 -
Drainage
Avenues Phase 2
March 2013
2012
2012 2011 2012 2011 2012 2012 2012 2011 2012
NFPA 54 - National Fuel Gas Code NFPA 58 - Liquefied Petroleum Gas Code NFPA 59
Avenues Phase 2
March 2013
AREA (SQ.MTR)/FL
3,738.40 1,177.03 1,141.56 1,670.22 1,544.32 1,812.14 3,425.61 1,954.49 336.45 336.45 336.45 336.51 2,250.88 367.43 426.66 431.28 409.05 2,728.36 2,166.67 12,186.63 1,023.14 39,799.72
Public alleys
The Courtyards Stone Axis Fine Dinning Courtyards TOTAL
DESCRIPTION
Internal Walk B01-B13 Pedestal Main Walk Internal Walk B14 TOTAL
Floor s
GF GF GF
Height
1 3 1
Occ. Laod
40 40 40
Avenues Phase 2
March 2013
Avenues Phase 2
March 2013
Fire Fighting
Pump Room
1000x1000 ( access for civil defence - 180 20000 x 9000 Direct from GF) 1000x1000 ( access for civil defense - 126 14000 x 9000 Direct from GF) 1000x1000 ( access for civil defence - 153 17000 x 9000 Direct from GF) 2 nos - 1000 x 800 200 (side access opening ) Pit dim ( 1500 x 1500 ) Pit dim ( 1500 x 1500 ) 81 12 15
refer to sketch #1
refer to sketch #2
refer to sketch #3
Water Distribution
Basement level
750.00
6 Irrigation System 7 8 9
Booster Pump Room Irrigation tank Irrigation Pump Room Black water Pit & Sub Pump Room Parking gray Water Pit & Sub Pump Room
Drainage System
10
Basement level Basement level Basement level Basement level Basement level
1 1 1 4
45 -
H= 3900 mm ( water level ) location refer to sketch #4 (reference Dubai Water req- attached ) 4 set of pump to deliver for 4 project zone Approximate irrigated Area of 1400 m2 Depth 2000 mm
4000 x 3000
Depth 2000 mm
Avenues Phase 2
March 2013
F W T
FPR
BSP
BPR D W T
BSP
GSP
BSP
S/S - 3
GSP
S/S - 4 S/S-1
BPR D W T
Avenues Phase 2
March 2013
ELECTRICAL INSTALLATIONS
Avenues Phase 2
March 2013
ELECTRICAL INSTALLATIONS
POWER DELIVERY METHODOLOGY LOAD ASSUMPTIONS LOAD CLACULATIONS AREA ALLOCATION PER S/S RMU LOCATIONS S/S LOCATIONS IN BASEMENT ROOM SIZES FOR S/S (3 OPTIONS) ELECTRICAL REQUIREMENTS (Architectural Space Allocation)
Avenues Phase 2
March 2013
DEWA NETWORK
RMU ROOM
TRANSFORMERS
MAIN LV PANELS
Avenues Phase 2
March 2013
LOAD ASSUMPTIONS
AREA RATIO 60% 40% TOTAL Front of Shop Kitchen AREA 100 m2 60 m2 24 m2 Load KW W / m2 W / m2 LIGHT 2.28 30 20 POWER 49.20 20 2000 COOLING 8.40 40 250 TOTAL 59.88 KW 598.8 Watts / SQR.MTR F&B RESTURANT F&B LIGHT
60% 40% AREA RATIO Kitchen TOTAL Front of Shop 180 m2 72 m2 AREA 300 m2 W / m2 W / m2 Load KW 20 20 LIGHT 5.04 20 800 POWER 61.20 40 250 COOLING 25.20 KW TOTAL 91.44 Watts / SQR.MTR 304.8
Avenues Phase 2
March 2013
LOAD ASSUMPTIONS
TYPE UNIT LIGHT POWER COOLING TOTAL ANCHOR / RETAIL ENTERTAINMENT ANCHOR W / m2 50 60 40 150 W / m2 30 100 40
170
SPA
W / m2 10 300 40
350
Avenues Phase 2
March 2013
LOAD CALCULATIONS
BASED ON DESIGN BRIEF
Avenues Phase 2
March 2013
LOAD ASSUMPTIONS
+40 W/M2
Avenues Phase 2
March 2013
LOAD CALCULATIONS
BASED ON DESIGN BRIEF
Avenues Phase 2
March 2013
LOAD CALCULATIONS
BASED ON DIFFERENT COOLING OPTIONS
CHILLERS OPTION 21,647.06
19 Nos. @ 1200KW
Avenues Phase 2
March 2013
WHICH WAY TO GO ?
CHILLER
Maintenance by Client Electricity cost by client vs. billing tenants (BTU Meters) Available cooling load is limited by Chiller Capacity
Direct-Expansion (DX)
Machines are maintained by tenants Electricity Cost is passed to tenants Cooling load can increase as much of spare electricity is available.
Avenues Phase 2
March 2013
LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD EXAMPLE 1
GLA (sq.m.) 47 47 110 30 91 38 35 53 53 F&B Designation QS Fast QS Fresh Casual QS Fast QS Fast Coffee QS Fast Coffee Coffee QS Fast QS Fast QS Fast Brand 1 KFC Taco Bell Nordsee BKK Pizza Hut Express Costa Wild Peeta Armani Fauchon Shawarmerize It Hattam India Electrical 220.00 220.00 220.00 50.00 150.00 60.00 50.00 70.00 70.00 W/m2 4,677.87 4,651.16 1,993.66 1,648.53 1,645.10 1,560.87 1,412.03 1,330.55 1,330.55
TOTAL AREA
18 Units
AVERAGE W/M2
46
48 50 62 65 57 57 26 73
50.00
50.00 50.00 60.00 60.00 50.00 50.00 22.00 60.00
1,089.56
1,048.22 1,006.44 974.34 917.99 881.68 875.35 840.34 817.44
Impulse Coffee
QS Fast QS Fast Impulse Coffee
Bateel Caribou
Subway Al Safar Dunkin Donuts Starbucks
Avenues Phase 2
March 2013
LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD EXAMPLE 2
GLA (sq.m.) 57 26 73 63 28 136 83 100 72 104 77 79 111 F&B Designation QS Fast Impulse Coffee QS Fast Impulse Casual Coffee QS Fast Brand 1 Al Safar Dunkin Donuts Starbucks Fat Burger 40 Fruits Nandos Coffee House Pad Thai Electrical 50.00 22.00 60.00 50.00 22.00 100.00 60.00 70.00 50.00 70.00 50.00 50.00 70.00 W/m2 875.35 840.34 817.44 797.58 787.12 735.29 720.55 697.42 690.70 672.43 646.50 635.73 633.08
TOTAL AREA
13 Units
AVERAGE W/M2
Avenues Phase 2
March 2013
LOAD CALCULATIONS
IMPACT OF RETAIL MIX SIZES ON ELECTRICAL LOAD EXAMPLE 1
F&B 9,476.00 SQ.MTR
@ 700 W/M2
569 KW / UNIT
114 KW / UNIT
57 KW / UNIT
SIZE / QTY
USE
LOAD
Avenues Phase 2
March 2013
S/S-1
RMU-1
B10
S/S-3
B09
RMU-3
B08
S/S-2
RMU-2
S/S-4
Avenues Phase 2
March 2013
S/S - 2
S/S - 3
S/S - 4 S/S-1
S/S - 1
Avenues Phase 2
March 2013
4.5 Mtr.
4 Nos.
9 Mtr.
LV ROOM 126 m2
8 Mtr.
GENERATOR ROOM 24 m2
Avenues Phase 2
March 2013
9 Mtr.
4 Nos.
18 Mtr.
LV ROOM 135 m2
9 Mtr.
GENERATOR ROOM 27 m2
Avenues Phase 2
March 2013
18 Mtr. (9x2)
<4 Nos.
TRANSFORMER ROOM 81 m2
9 Mtr.
LV ROOM 81 m2
Avenues Phase 2
March 2013
Services
Item
Location
QTY
Minimum Shaft Min. Volume Dimension (m x Area Minimum Height (m) Capacity (m3) m) (m2)
Notes
RMU ROOM-1 HV Rooms RMU ROOM-2 RMU ROOM-3 RMU ROOM-4 TRANSFORMER ROOM-1 Transformer Rooms TRANSFORMER ROOM-2 TRANSFORMER ROOM-3 TRANSFORMER ROOM-4 BASEMENT LEVEL GROUND LEVEL
1 1 1 1 1 1 1 1
3.1 3.1 SUBJECT TO DEWA APPROVAL 3.1 3.1 3.1 3.1 SUBJECT TO DEWA APPROVAL 3.1 3.1
Avenues Phase 2
March 2013
Services
Item
Location
Notes
N/A
N/A
125
3.5
LV Rooms
N/A
N/A
125
3.5
N/A
N/A
125
3.5
ADJACENT TO TRANSFORMER GENERATOR ROOM-1 1 ROOM-2 Generator Rooms ADJACENT TO TRANSFORMER GENERATOR ROOM-2 1 ROOM-3 ADJACENT TO GENERATOR ROOM-3 TRANSFORMER 1 ROOM-4
N/A
N/A
24
3.5
N/A
N/A
24
3.5
N/A
N/A
24
3.5