Summary
Summary
Summary
Agenda
The Waste Spotters Guide The Lean Production System Supports of the Lean Production System Focused Assessments Manufacturing Assessment
Lean Production System Road Map
Great tool when starting in a new area Helps us develop eyes for waste
AGHHHH!!!!!!
Transportation
Symptoms
Many conveyors Many busy hand trucks, forklifts, etc Widely spaced equipment Precise stacking and un-stacking
Countermeasures
Analyze process flow:
Can processes be linked or combined?
Inventory
Symptoms
Prescribed storage volume exceeded Material condition deteriorated Old dates on material labels (DUST) Stacks of containers for WIP Sophisticated stores system
Countermeasures
Investigate standards and procedures for:
Stock identification Stock location Replenishment, withdrawal Review basis for batch size Review setup process
Motion
Symptoms
Components, controls, etc. outside easy reach Double handling Layout not standardized Equipment widely spaced Operators bending
Countermeasures
Implement new layout Pay close attention to material presentation
Waiting
Symptoms
Operators idle or at slow pace Operators watching equipment
Countermeasures
Chart standard work Construct allocation, complete man / machine chart Re-balance work Bring in more work or shed work if required
7
Over Production
Symptoms
Piles of WIP Target and achievement unclear Standard number of parts unclear Precision stacking on available surfaces
Countermeasures
Query underlying reasons (e.g. payment schemes, material supply, equipment reliability, working pattern, etc) WIP and Mark Out location Condense layout, consider one-piece conveyance Standard expectations how much, where, when
Over Processing
Symptoms
Variation between different operators Variation between standard and actual operation Activity adds no value from customer perspective
Countermeasures
Determine quality standard and how to define and achieve standard operation Train operators Consider why process is being carried out
Defects
Symptoms
Poor material yield Work pieces in scrap bin High inspection effort Difficulty in assembly Rework facility Customer complaints Irregularity of work
Countermeasures
Clearly identify problems, causes, countermeasures Chart progress If supplier involved, give feedback and refuse to accept nonconforming parts Enforce clear objective standards
10
Opportunities
Waste Spotter's Checksheet
WHAT Transportation How Much (use data) WHY Possible Paradigms
Inventory
Motion
Waiting
Over Production
Over Processing
Defects
12
House of Lean
Garlock - TCV
Lean Principles
JIT Employees Involvement Continuous Improvement
5-Whys Hanedashi 5-Ss 6 Sigma
Speed To market
Jidoka
TAKT
TPM
Pull
Andon SMED
PokaYoke
Flow
The Pillars
Just-In-Time Production (J-I-T) J-I-T is a program that embraces single-piece production based on actual customer demand rather than forecast, producing only whats needed when it is needed. Time-Based Competition Compress the time to move product through the plant. The competitive reality is that the business producing the highest quality product at the greatest value in the shortest time sells the most product.
14
The Pillars
Employee Involvement Harnessing the energy and knowledge of everyone who works at your company by:
15
Focusing on the situation, not the individual Establishing clear goals Maintaining self confidence and esteem Providing clear feedback Taking initiative to make things better Leading by example Monitoring & recognizing contributions Training people to do their jobs well
Price
Do not mistake the difference between Value and Price. When the consumer acquires a product, it is because it has a special value. If the production cost increases; We increase the price! Dont take this road, it doesnt work. If your price increases without adding value, you loose your Customer. Reduce your costs; in the Profit Equation, it is the only area to maneuver.
16
5S Workplace Organization
5S is absolutely fundamental when it comes to lean
Ensures that the workplace is capable of:
visual control, standard work, and Lean Production
17
5S Workplace Organization
Sort - Determine what is needed to support standard work - remove everything else. Set in Order - Label and make tools & parts easy to find arrange them in the sequence of use. Shine - Clean, paint, and inspect the workplace Standardize - Standardize the 1st 3 Ss Write standard work for performing 5-S Sustain - Make it a habit and make it visual
18
5S Workplace Organization
5S is about eliminating waste
The fundamental premise of Lean
Use a 5S audit
Measuring is the only way to keep it going
19
The 5 Whys
5 Whys - Asking the question why many times to ensure that the root cause problem is accurately identified so that it can be corrected. Process Measures - Process measurements are those that portray achievement in terms of the continuous improvement of process parameters, not just in terms of process results.
Factory operates 480 minutes a day (actual minutes not adjusted for anything other than breaks) 480 minutes / 240 hammers = 2 minute Takt
22
23
24
25
27
28
Goal = Minimum components which are easily manufactured & assembled with no waste.
29
Line Stop - Stopping production to expose waste or process failure. Done to focus immediate attention on the problem so that it is corrected now!
30
32
33
K.I.S.S.
Employee recognition
35
x o o o o x
Two widths of material required two different set-ups. Tooling was modified for quick change. The fixture for the wider material stays in the press. When it is time for the more narrow material, a second fixture is dropped in on top of the other fixture and attached with a one touch pin. Wide material fixture Narrow material fixture
x o o o o o
Raw Material
Finished Product
Production boards shows each value added step of the process. Production boards are great visual controls, which show how products are manufactured. They can be used to train new employees about how products are produced and to help educate everyone in the plant about the product. These visuals can also be used to point out quality issues.
Lean Summary What Questions do you have about what youve heard?
38
Manufacturing Assessment
Plant Location ________________ Assessment Date _____________ Lean Consultant _______________ Contact ______________________
Quality levels & production levels posted? Takt time clocks? Visual work instructions? 5-S Rating? Do they post it? Regular cleaning schedule? Aisles clean? People pick up litter? Point of use tooling? Only necessary items present? Set up times posted? Operation sequences posted? Inventory scattered around? Lot sizes? Equipment cleanliness? Chips? Grit? Air Filters?
Manufacturing - Assessment
LEVEL
Workforce
A Customer focus on Cost, Quality, & Delivery. Employees empowered to make changes. Skills matrix 100% complete, visible & maintained. Training >100 hours /year. Active cross training program.
Supervisors / Managers
Knows & understands bottlenecks (people, parts, equipment, process). Ongoing continuous improvement in those targeted areas. Visibly empowers his / her people. Understands and can teach Continuous Improvement tools.
LEVEL 5
Skills matrix complete and visible. Cross training as needed. Training >75 hours / year / employee. Teaming skills training. Active teams for continuous Improvement. Semi-formal education and training program. Critical skills identified. Training >50 hours/ year/employee. Plan for covering vacation and sick leave. Employee involvement awareness training. Basic skills identified. No cross training program. Training >25 hours / year / employee. Little employee involvement. No employee empowerment visible. No skills identified. No cross training. Training <10 hours / year / employee. No sense of urgency to improve operations. Employee turnover very high.
Knows bottlenecks & performs continuous improvement sporadically. Knows and can teach some C.I. Tools. Knows employee skills and provides training. Knows of Continuous Improvement. Has C.I. Teams run by outside consultants. Beginning to believe in C.I. . Knows skills of employees, but not written down.
Does not visibly believe in C.I.. Knows little of employee skills. Continually playing catch up with parts schedule. Makes all decisions for employees. Does not believe in C.I.. Continually delivering parts late to customer.
Notes:
Manufacturing - Assessment
LEVEL
5-S
All levels of 5-S implemented. Systems in place to maintain >20.0 rating. 5-S practiced daily. Full Visual Controls. Excellent safety rating. Standardization of all tools and gauges.
Visual Controls
Production / Quality & Performance metrics are communicated daily on boards. Information is updated daily. Easily interpreted visuals. Full visual work instructions. Visual controls for abnormalities.
LEVEL 5
Point of use for all daily tools and gages. Improving to >15.0 rating. Organization and Labeling. Some standardization of tools and gauges.
Central communication is established and updated weekly. Explanation required. Some visual controls for abnormalities. Work instructions assisted by drawings.
Work areas and machine are clean and neat. Improving to >10.0 rating. There is minimum organization and storage. Only necessary items are present.
Removal of unnecessary items has been completed. There is a daily cleaning of work area. < 10.0 rating. No system to attack dirt and clutter. No 5-S program. Infrequent cleaning. No organization or standardization. <5.0 5-S rating.
Process improvement and some production info is visual and maintained. Explanation is required to interpret visuals. Work instructions are limited in use of visuals.
Some boards used for communication & process improvements. Production info is updated, but not shared. No visual boards for production metrics or general communications. Info not updated or maintained. Work instructions require frequent interpretation.
Notes:
Manufacturing - Assessment
LEVEL
TPM
TPM process implemented. OEE >85%. Planned Maintenance >90%. Predictive Tools used. Visual boards used for PM schedule. PM schedule on time within 5%. Operator PMs completed 100%. Equipment 100% leak free. OEE >75%. Planned Maintenance >80%. PM schedule on time within 10%. Operator PMs completed >90%. Equipment calibrated 100%. Coolant enhancement program. 50% leak free.
Set-up / Changeover
Zero setup (< 3 min.). All setups are external. Tools / gages in kits and standardized. Practiced and documented setups. Formal reduction program in place. Quick remove / install / align features. Mistake proofing in place.
LEVEL 5
Single minute setup (< 9 min.). Setups done external. Tools / gauges in kits. Documented setups. Formal reduction program. Some standardization.
OEE being performed routinely & >50%. PM schedule established. Operators clean equipment and perform daily checks. PMs comprise 50% of total maintenance work.
TPM training sessions held on routine basis. OEE observations started. Downtime history established. Initial cleaning of equipment. No PMs performed. 90% of maintenance work is on emergency basis. Equipment is run to failure. Operators/Cell leaders have no ownership of equipment. No downtime history.
Setups between 10 & 60 minutes. Some setups done externally. Some tools / gauges in kits. Reduce setups only when a problem. Few standardized tools.
Setups between 60 & 120 minutes. Setups done internally. Some tools / gauges in kits. No formal program for setup reduction. Operator variation exists. Setup > 120 minutes or do not know. All setup is internal. No tool/gauge kits. No setup reduction program or awareness.
Notes:
Manufacturing - Assessment
LEVEL
Standard Work
All workstations have posted SWCS displaying TAKT, operation sequence and manual / auto time. All operations below TAKT time. Cycle times are within 20% of each other. Zero O.T. Flexible resources for spontaneous bottlenecks. Standard work sheet elements are shown on boards for work area. Forms are understood and used by cell members. Achieve daily schedule with minimal O.T. Majority of operations are within TAKT time. Attacking C/T >T/T. Posted boards showing operation sequence. Not all personnel understand standard work. Bottlenecks are apparent. Alleviate by using buffer. Expedite when critical. Strategic O.T. Identified C/T > T/T operations. Work instructions developed by team. Improvements implemented quickly. Bottlenecks are apparent. C/T > T/T. WIP is excessive. O.T used for maintaining throughput. Expediting. Methods determined by individuals. No consistency. No bottleneck I.D. Expediting is significant. TAKT time not understood.
Inventory
One piece flow. Fully implemented Pull system. Zero buffer stock. < 2 days WIP. 40 turns/year. < 5% square foot inventory space.
LEVEL 5
Lot size < 3. Pull system within selected cells. Strategic buffer stock held at bottlenecks. MRP used for Long Term planning. Schedules adjusted daily. < 1 week WIP. 30 turns / year. 5-10% square foot of inventory space. Lot size < 10. Pull at incoming & outgoing areas. Significant buffer stock at bottlenecks. > 2 weeks WIP. 20 turns / year. 10-15% square foot of inventory space. Lot size > 10. No Pull system. MRP used for scheduling. > 3 weeks WIP. 10 turns / year. 20-30% square foot of inventory space. Batch or large lot sizes (30-50). Push manufacturing. Extra inventory scattered through shop. > 4 weeks WIP. < 5 turns / year. 50-60% inventory space.
Notes:
Manufacturing - Assessment
LEVEL
Quality
DPM < 10. CPK = 1.47. All processes are certified. Real time process control. $0 MRB. Mistake proofing devices at all operations. Op Cert. fully implemented.
Material Management
100% on time delivery. 100% certified suppliers. Dedicated supply management team to work process. Minimum number of material handlers. On time release of material. Sub tier partnerships.
LEVEL 5
DPM < 63. CPK = 1.33. 100% of processes are certified. Real time process data collected at certain operations. $0 MRB. Mistake proofing devices at some operations. Op Cert. training.
DPM < 254. CPK = 1.22. Process studies to identify KIV, KOV, KPV. Basic SPC tools applied to process variables. Minimum $$ MRB. Root cause analysis used to identify defect drivers. DPM < 652. CPK = 1.14. SPC used on product dimensions not process variables. MRB $$ are significant. Mistake proofing awareness. DPM < 2,700. CPK = 1.0. There is significant scrap & rework. No SPC awareness tools. No mistake proofing awareness.
95% on time delivery. 80% of suppliers certified. Some process improvement teams to work supplier issues. On time release of material.
90% on time delivery. Select suppliers certified. Some teams to work supplier process issues. Material release sometimes is late.
< 90% on time delivery. 100% of incoming material inspected. No process team to work with suppliers. Lots of material handlers & expediters.
< 80% on time delivery. 100% of incoming material inspected. Fire fighting of material management issues. No supplier consolidation.
Notes:
5S 5-S 5 -S 5 -S
Workf orce
PM T
y y ry ry tor tor to to en en en en nv nv IIn IInv
l ria nt ate me M ge a an M
p Set-U
1
Qua l it y
Vis u al Co nt ro ls
Here, Global
Inventory
People Production
Planning Training
Quality
Work Force Poke Flexibility Yoke Set-Up Quality Kaizen Times Awareness 5-S Visual Controls
Manufacturing - Assessment
LEVEL
2. 5-S
All levels of 5-S implemented. Systems in place to maintain >20.0 rating. 5-S practiced daily. Full Visual Controls. Excellent safety rating. Standardization of all tools and gauges.
LEVEL 5
Current and Future state maps and implementation plans are complete for top 90% of SKUs.
Point of use for all daily tools and gages. Improving to >16.0 5-S rating. Organization and Labeling. Some standardization of tools and gauges.
Work areas and machine are clean and neat. Improving to >12.0 5-S rating. There is minimum organization and storage. Only necessary items are present. Removal of unnecessary items has been completed. There is a daily cleaning of work area. < 8.0 5-Srating. Beginning stage of 5-S implementation. >3.0 5-S rating. No system to attack dirt and clutter. No 5-S program. Infrequent cleaning. No organization or standardization. <3.0 5-S rating.
Current and Future state maps and implementation plans are complete for top 75% of SKUs.
Current and Future state maps and implementation plans are complete for top 50% of SKUs. Current State and Future State maps and an implementation plan are complete for one manufacturing family. Manufacturing families are defined for the plant using process mapping or other similar techniques. No value stream mapping has occurred.
Notes:
Manufacturing - Assessment
LEVEL
3. Visual Controls
Production / quality & performance metrics are communicated daily on boards. Information is updated hourly. Easy to understand visuals. Management reviews take place at the cell. Visual controls for abnormalities (Andons) are used. Visual work instructions are in all major production cells.
4. Workforce Flexibility
A Customer focus on cost, quality, and delivery. Employees empowered to make changes. Skills matrix 100% complete, visible & maintained. Training >100 hours /year. 100% of employees cross trained. Skills matrix complete and visible. Team skills training. Active teams for continuous Improvement. >75% employees cross trained in cells.
LEVEL
Boards are up at all major production cells and production information is updated.
Semi-formal education and training program. Critical skills identified. Employee involvement awareness training. >50% cross trained in cells.
Some boards used for communication and process improvements. Information is up to date. Some visual boards for production metrics and general communications are on plant floor. No visual boards for production metrics or general communications.
Informal training program. >25% cross trained in cells Basic skills identified. No cross training program. Little employee involvement.
No employee empowerment visible. No skills identified. No cross training. No sense of urgency to improve operations. Employee turnover high.
Notes:
Manufacturing - Assessment
LEVEL
5. Training
>80 hours/year training per employee
6. Production Planning
One piece or set planning to demand
LEVEL
4
>60 hours/year training per employee Hourly Planning to demand
Bi-weekly Planning
Monthly Planning
Notes:
Manufacturing - Assessment
LEVEL
7. Supplier Management
100% supplier on time delivery. 100% certified suppliers. Dedicated supply-mgmt. team to work process. Minimum material handlers. JIT release of material. Sub tier partnerships in place. >95% supplier on time delivery. 80% of suppliers certified. Some process improvement teams to work supplier issues. JIT release of material beginning. > 90% supplier on time delivery. Select suppliers certified. Some teams to work supplier process issues. > 80% supplier on time delivery. Specific incoming material inspected based on supplier performance. Supplier measurement system in place. > 70% supplier on time delivery. Random incoming material inspected. No process team to work with suppliers. No measurement system. < 70% supplier on time delivery. Random incoming material inspection. No supplier consolidation.
8. Operator Flexibility
Only one operator performing multiple processes to complete a product running at TT.
LEVEL
Minimize the number of operators in all cells to maximize productivity in the cell at TT.
Advanced operator saving. > 50% of processes have one man running multiple operations.
Operator saving begins as operators start to run more than one machine. >25% of processes have one man running multiple operations.
Combine machine and hand motions (operators perform tasks while the machine is running) but still have one man to one operation.
Mix machine and hand motion. Operators watch the machine run. All operations have one man to one operation.
Notes:
Manufacturing - Assessment
LEVEL
10. Kaizen
Spontaneous kaizen.
LEVEL
Chaku Chaku (loading/loading line). > 80% of all processes with automatic unload. Operators perform jobs with no wasted movement.
Mix of Chaku Nagu (line where operators do load / unload) and Chaku Chaku (loading / loading line). > 60% of all processes with automatic unload. Operators perform jobs with little wasted movement. Chaku Nagu (line where operators do load / unload). > 40% of all processes with automatic unload. Majority of equipment automatically returns to starting position. Operators perform jobs with some wasted movement. Separating work between human & machine. > 20% of all processes with automatic unload. Beginning to reduce wasted movements of operators. Auto processing (creating released hands). < 20% of all processes with automatic unload. No work done to reduce wasted movements of operators.
4
Kaizens once a week (without consultants).
Kaizen pushed by corporate or only with consultants or had >1 kaizen event within past 6 months. No kaizen event within past 6 months.
Notes:
Manufacturing - Assessment
LEVEL
LEVEL
Production consistently meets TAKT time. TT known and posted in > 90% of production areas.
Standard work sheet elements are shown on boards in all major production areas. Forms are understood & used by cell members. Posted boards showing operation sequence in all major production areas. Improvements are implemented quickly in all major production areas. Not all personnel understand standard work. Work instructions developed by work team in all major production areas.
Production is consistently below TAKT time. TT known and posted in > 75% of production areas.
TAKT time known, but production Cycle times regularly exceed TAKT time. TT known and posted in > 50% of production areas.
TAKT time known, but production Cycle times regularly exceed TAKT time. TT known and posted in > 25% of production areas. TT known and posted in < 25% of production areas.
Some work instructions exist, but they may not be located at actual operation.
Notes:
Manufacturing - Assessment
LEVEL
LEVEL
Production Flow Line (cells) completing work for all product lines.
Kanbans up to date, cards legible (if applicable), audited (and resized if needed) regularly, no obsolete parts and there is a clear signal method. > 75% of items on kanban.
7 rules of Kanban followed. > 50% of items on kanban.
Some production flow lines (cells) completing work (for > 50% of product lines).
Some production flow lines (cells) completing work (for > 25% of product lines). Isolated Islands - Some flow randomly distributed in the shop.
In early stages of Kanban. < 25% of items (by unit volume) on kanban.
No Kanban. No Pull.
Notes:
Manufacturing - Assessment
LEVEL 5
16. Inventory
Days Supply of Inventory (DSI) < 5
LEVEL
4
One Day or less of components stored at the cell/line. Replenish what is used each day. Std work for material handling in place
One Week or less of components stored at the cell/line. Transportation initiated by downstream process in weekly pulls
Two Weeks or less of components stored at the cell/line. Transportation initiated by downstream process in bi-weekly pulls. Two Weeks or more of components stored on the cell/line, pushed by upstream process.
Notes:
Manufacturing - Assessment
LEVEL
17. TPM
Predictive Tools used. Visual boards used for PM schedule. PM schedule on time within 5%. Operator PMs completed 100%. Equipment 100% leak free. PM schedule on time within 10%. Operator PMs completed > 90%. Equipment calibrated 100%. Equipment 75% leak free.
LEVEL
PM schedule established and on time within 20%. Operator PMs completed > 75%. Equipment 50% leak free. OEE measurements being performed regularly. OEE > 50%.
Operators clean equipment & perform daily checks at all major equipment. PMs comprise > 50% of total maintenance work. TPM training sessions held on routine basis. Down time history established. Initial cleaning of equipment at selected equipment. Equipment is run to failure. Operators / Cell leaders have no ownership of equipment. No downtime history.
No OEE measures.
Notes:
Manufacturing - Assessment
LEVEL
20. Set-Up
Zero setup (< 100 sec. average). Practiced & documented setups. Quick remove / install / align features. Mistake proofing in place. SMED (< 9min. average). Set-ups done external. Tools / gauges in kits and standardized. Documented set-ups. Formal reduction program active. Some standardization. Set-ups < 30 minute average. Mixture of internal and external. Some tools / gauges in kits. In the process of implementing set-up reduction program with set-up times posted by each machine (where applicable). Set-ups < 60 minute average. Some set-ups done externally. Some tools / gauges in kits. In early stage of developing a setup reduction program. Documenting setup times. Set-up < 120 minute average. Majority of set-up is internal. Little tool / gauge kitting. No set-up reduction program. Some set-up awareness. Set-up > 120 minute average or do not know. All set-up is internal. No tool / gauge kitting. No set-up reduction program or awareness.
LEVEL
The BS&C equipment is modified - within reason - to create as flexible a line as possible. Some lines / cells allow for increased flow.
Using BS&C equipment, but line is created around equipment. Lines / cells allow for minimal flow. Battle Ship & Cannon (BS&C) - big capacity high-speed machines unrelated to TAKT & Demand; Using large machine for small products, sophisticated computers / robots for simple products (overkill).
Notes:
Manufacturing - Assessment
LEVEL
LEVEL
Quality requirements are clearly understood and posted in all appropriate work areas. Inspection, sorting, and correction are replaced by a high amount of prevention and/ or design for manufacturability.
Quality requirements are clear, and some operators are performing inspection activities. Quality requirements are posted in most work areas. Quality requirements are clear and understood. Quality or Inspection Department is responsible for checking product. Quality is inspected in; sorting is evident. Quality awareness efforts started. Some quality requirements are known, but are not used nor maintained. No quality focus. Quality levels and requirements are not known.
Automatic detection of defects within processes and stopping those processes at all major operations.
Automatic inspection - detect and throw out bad parts - at all major processes. Bad parts do not get to next station.
Final inspection required and performed at critical processes - check & sort.
Notes:
Score = 33
Equipment Flexibility
Perfect Plant
Quality Awareness
Poke Yoke