Coal Transportation and Handling
Coal Transportation and Handling
Coal Transportation and Handling
http://studygalaxy.com/
24 December 2012 PMI Revision 00 1
power plant, adequate emphasis needs to be given for its proper handling and storage. -It is equally important to have a sustained flow of this fuel to maintain uninterrupted power generation.
-This Presentation describes the existing systems of coal transportation and handling.
24 December 2012 PMI Revision 00 2
Grades of Coal
Grade Useful Heat Value (UHV) (Kcal/Kg) Corresponding Ash% Gross Calorific Value + Moisture % at GCV (Kcal/ Kg) (at 5% (60% RH & 40O C) moisture level)
Not exceeding 19.5 19.6 to 23.8 Exceeding 6454 Exceeding 6049 but not exceeding 6454
A B
C
D E F G
23.9 to 28.6
28.7 to 34.0 34.1 to 40.0 40.1 to 47.0 47.1 to 55.0
PMI Revision 00
24 December 2012
24 December 2012
PMI Revision 00
Daily on an average around 30,000 Tone of Coal is required for a typical 2000 MW Station.
Each super Thermal Power Project has been linked to a particular coal mine to meet its coal requirements The required coal is supplied through Rail wagon. If the power station is away from coal mines then it is fed through Indian Railway system other wise for pit head station it is done through Merry Go Round railway system
24 December 2012
PMI Revision 00
Merry Go Round (MGR) system is a private, full fledged Railway system of NTPC used for hauling the required Coal from Mines to its Thermal power plants. Each coal rake consists of Bottom open Broad Gauge wagons (BOBR) hauled by one/two locomotive.
Modern Multi Aspect Colour Light Signalling (MACLS) system with panel Interlocking is provided for the safety of the rake movement.
24 December 2012
PMI Revision 00
It consists of one or two loading silos depending upon the coal requirement of the linked power station The capacity of the silos for the NTPC project varies between 2400 ton/4000 ton. The silos are cylindrical and fed by twin belt conveyors. For accurate weighing of coal to each wagon, Load cells are provided with silos. A sampling unit suitable size coal is provided at the feed point of the loading silo to collect samples for quality analysis The loading operation of the coal rake takes place while it is moving under the silo at a speed of 0.8 k.m. per hr. Wagons are provided with bottom discharge hoppers fitted with pneumatically operated automatic door actuating mechanism. Line side equipment is installed by the track hopper for initiating the opening of doors in groups of 10-14 wagons. The unloading operation of 60 tonne per load wagon takes about 20/30 seconds.
24 December 2012 7
24 December 2012
PMI Revision 00
Loading
24 December 2012
PMI Revision 00
COAL UN LOADING
At NTPC end, Coal is unloaded in the Track hoppers. Track Hopper, normally of 200-250m length. After placing the wagons on the hopper, electrical pulse is given to the pneumatic device for opening the bottom doors. Coal rushes down due to its own weight. When the track hopper is empty, it takes only 20 seconds for unloading one wagon i.e. 60 Tons. This coal falls on a T table, over which a paddle feeder runs and pushes the coal on to a conveyor.
24 December 2012
PMI Revision 00
10
TRACK HOPPER
24 December 2012
PMI Revision 00
11
COAL-HANDLING SYSTEM:
Coal handling system is the arrangement for transferring of coal from coal-wagons to coal-bunker or coal stock yard. It also provide arrangement for separation of material impurities, crushing of coals, Coal sampling etc. In the coal handling system of NTPC stations, three coal paths are normally available Path A - direct conveying of coal from track hopper to boiler bunkers. Path B - from track hopper to stockyard Path C - from stockyard to boiler bunkers. The storage facilities at the stockyards have been provided only for crushed coal.
24 December 2012 12
24 December 2012
PMI Revision 00
13
Coal Handling
The coal handling system is designed to provide 100% standby for all the equipment and conveyors. The capacity of the coal handling system for super thermal stations varies from 1200 to 2000 t/h, normally, for a stage of 1000 MW,
24 December 2012
PMI Revision 00
14
15
24 December 2012
PMI Revision 00
16
24 December 2012
PMI Revision 00
17
CRUSHERS
To crush the coal from 200mmto 20mm size received from vibrating screen Crusher hammer are made of MAGNEESE STEEL . Hammer row -4(stage 1) (a)Row-1 & 2 =18 hammer each (b)Row-3&4=20 hammers each
24 December 2012
No of hammer in each Crusherstage-1 = 76 hammers stage-2 = 92 hammers Weight of each hammer=18.5kg Crushing motor rating -740kw/3.3kv Life of hammer =4 lac MT of coal PMI Revision 00 Normal capacity=600 tons/hr
18
Normally these crushers have a capacity of around 600 tons per 24 December 2012 hour. PMI Revision 00
19
CONVEYOR BELTS
Made of diff. Layers or piles of fabric duck with rubber protected by a rubber cover on both sides & edges. Fabric duck are designed to withstand tension created in carrying the load . Nylon rubber cover protect the fabric duck. Material =fire resistant grade. Belt Width=1600 mm. Strength= 1000/1250 kN. Belt speed=3.2-3 m/s. Belt length=20km.
24 December 2012
PMI Revision 00
20
IDLERS Idlers consists essentially of rolls made out of seamless steel tubes enclosed fully at each end fitted with stationary shaft, antifriction bearing and laybrith sealing. TYPES
TROUGHING IDLERS- shape the belt to support a moving load without spillage or damage to the belt.
IMPACT IDLERS - absorb the shock of falling material at loading and transfer points to protect belt from damage.
24 December 2012 PMI Revision 00 21
POSITIVE ACTION TROUGHING TRAINERS automatically maintain troughing side alignment in one-way conveyors. A center pivot frame and offset neutral guide rolls provide the troughing action. RETURN IDLERS support the empty belt during the return run.
POSITIVE ACTION RETURN TRAINERS automatically maintain return belt alignment on one-way conveyors.
24 December 2012 PMI Revision 00 22
PULLEYS
Rubber coating is used to increase friction factor between belt & pulley (rubber lagging
Shell dia-500mm. Shaft dia-1400mm. Pulley length-1800mm. Shaft length-2350mm(bearing centre to centre)
24 December 2012 PMI Revision 00 23
DRIVE UNIT
Motors coupled to reduction gear with the help of flexible/fluid coupling on the high speed shaft of the Gear box Flexible coupling on the input side
TAKE UPS
Take up pulley to facilitates
SKIRT BOARD
Used with chutes at trail end. Guides material centrally on the belt while loading until it has settle down on the belt
SCRAPPERS
Placed at discharge pulley in order to clean the carrying side of belt. It avoids the wear of return idlers due to build up material.
24 December 2012 PMI Revision 00 25
24 December 2012
PMI Revision 00
26
24 December 2012
28
24 December 2012
PMI Revision 00
30
STACKER-CUM- RECLAIMER
Coal to/from stock yard Generally 2nos
Capacity ---200T/hr
Maximum---400T/hr
Bucket wheel Boom conveyor
24 December 2012 PMI Revision 00 31
STACKER RECLAIMER
RECLAIMER IN OPERATION STACKER IN OPERATION
Bucket wheel
24 December 2012
PMI Revision 00
32
METAL DETECTOR
Any Metal with an area of 100 Sq Cm will be detected. Conveyor is tripped after detection. MD is not having interlock with start up. A sandbag is dropped near the Metal piece for easy location
33
TRIPPERS
To stack material at desired bunker Provided with wheels which moves on rails parallel to conveyor.
Three types motorized tripper Belt propelled manually operated tripper
24 December 2012
34
WEATHERING OF COAL
WHEN COAL IS EXPOSED TO ATMOSPHERE - IT REACTS WITH OXYGEN - PRODUCTION OF HEAT - RISE IN TEMPERATURE - OXIDATION REACTION IS ACCELERATED - NUMBER OF CHANGES IN PHYSICAL AND CHEMICAL PROPERTIES OF COAL TAKE PLACE - IT IS CALLED WEATHERING OF COAL.
24 December 2012
PMI Revision 00
35
SURFACE AREA
SI ZE OF COAL ( MM ) 50 75 12 03 0. 3 0. 2 % LOSS I N CV 1 YEAR 2 YEAR O 11 . 0. 24 0. 5 1. 0 1. 0 2. 1
PMI Revision 00
36
Freshly mined coals should be stacked and old coal should be used.
Freshly mined coals should not be stacked over old coal. Stacking of coal layer by layer, with compaction of each layer.
24 December 2012
PMI Revision 00
38
Segregation of stockpiles into various segments and relevent records of period of stacking, quality of coal (cv) should be maintained.
Compaction of finer particles over the bigger particles.
24 December 2012
PMI Revision 00
39