0% found this document useful (0 votes)
42 views23 pages

Project Closure: Presented To: Talha Khalid Presented By: Bilal Farooq Sohaib Abbas Dr. Mumtaz

This project involved identifying problems faced by small and medium enterprises (SMEs) in Pakistan. The project team conducted surveys of 250 SMEs to gather information on their challenges. The findings will be handed over to the government through a website. The project was self-funded and completed on time and on budget. Post-project meetings reviewed performance, and the lack of government support and language barriers during surveys were identified as risks that were mitigated by expanding the survey size. Lessons learned included starting with brainstorming, keeping the team motivated, and properly defining the project scope.

Uploaded by

Bilal
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX or read online on Scribd
0% found this document useful (0 votes)
42 views23 pages

Project Closure: Presented To: Talha Khalid Presented By: Bilal Farooq Sohaib Abbas Dr. Mumtaz

This project involved identifying problems faced by small and medium enterprises (SMEs) in Pakistan. The project team conducted surveys of 250 SMEs to gather information on their challenges. The findings will be handed over to the government through a website. The project was self-funded and completed on time and on budget. Post-project meetings reviewed performance, and the lack of government support and language barriers during surveys were identified as risks that were mitigated by expanding the survey size. Lessons learned included starting with brainstorming, keeping the team motivated, and properly defining the project scope.

Uploaded by

Bilal
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX or read online on Scribd
You are on page 1/ 23

Project Closure

¤Presented to: Talha Khalid


¤Presented by: Bilal Farooq
¤Sohaib Abbas
¤Dr. Mumtaz
Closure Phase Activities

¤ Implementation / Handover
¤ Sponsor’s Reaction
¤ Release of Resources
¤ Post Mortem
Implementation / Handover
The implementation which contains the
various problems of SME’s in Pakistan will
be handed over to the government
officials.
Sponsor’s Reaction
¤ The project team is the sponsor of the
project and the final output that will be
delivered has covered everything from
the deliverables to the end product
which are the problems faced by the
SME’s.
Release of Resources
¤ Not applicable
¤ Self-financed
Contract Types
¤ N/A
Final Report
Documentation present on the site
Post Mortem Meetings
Review of:
• Schedule
• Scope
• Budget
• Project team performance
• Project Successfully completed and
dissolved
Performance on the triple
constraints
COST
TIME
Risk Realized
¤ There is no support from the
government
¤ Inaccurate information from
the Questionnaires
¤ Problems occurred while
explaining the questions to
the Respondent due to
language barrier
Risk Mitigation

¤ We use the support of Electronic media


¤ Increase the sample size from 100 to 250
¤ Modify the questionnaires so that respondent can easily
understand the Questions
Contingency Plan
¤ Not getting the correct
information, therefore changing
our sample size.
¤ Not able to do primary research
on the whole Pakistan , so
limiting the scope to Punjab and
Federal area.
¤ Changes the sample size from
100 to 250.
End User Acceptance

¤ Not applicable
¤ And our end result is according to the defined
scope and objective of the study which were to
identify the SME’s problems and their
recommendations
Sponsor’s Approval

The project team is the sponsor for


this study
Sohaib Abbas Sheikh
Bilal Farooq
Dr.Mumtaz
Sehrish Fatima
Syed Adil Hassan
Iqbal Hunzai
Product Handover
¤The product will be handed over through the
use of a proxy/internet
¤Website:
www.bilalfarooq-bf.blogspot.com
Feedback to peers

¤ Time:-
° Initial phase of the project took the most
time as the group contained a mixture of
students from MBA and BBA
° All members of the group worked as
cohesive unit to finish the project on time

Cost:-
° The group contributed and equally
shared the cost that was incurred
Lessons Learned
¤ Always start the project with a brainstorming
session
¤ Buck up the team from the start
¤ Properly define and then re-define the scope
¤ Think BIG, take risks

You might also like