Introduction
Objective of the activity is to ensure that Handover between BSMW1 and BSMW2 is ok Call within the MSC are functioning properly. In addition with Data testing both for GPRS/EDGE and 3G service within the MSCs ensuring no Quality and Connectivity issues.
Activity mainly highlights PRE and POST statistics observed after up-grading activity as MSS level. Objective MSS-6 PRE Drive (18/9/2012) / POST Drive (19/9/2012)
Events 2G to 2.75G
The Events
2G Events Pre - Count
5 4 1 0 0 0 1 3 4 1 1 0 3 1
Post - Count
3
3 0 0 0 0 3 0 24 0 1 0 23 0
Post - Count
1 0 1 3.63 18s 36s 4 4 0 100% 28.69 s 3s 20s 1 1 0
Outgoing Call Starts Outgoing Call Setup OK Outgoing Call Setup Failure Incoming Call Starts Objective Incoming Call Setup OK Incoming Call Setup Failure Call Completed Call Dropped Handover OK Handover Failure Location Update OK Location Update Failure Number of Inter MSC HOs Attempted Number of Inter MSC HOs Failures Number of Inter BSC HOs Attempted Number of Inter BSC HOs Failures
Peak UL
98.56 K bits/s
Min DL
90bits/s
Peak DL
315.95 K bits/ s
Average DL
156.59 K bits/s
Peak UL
56.32 K bits/s
Min DL
90 bits/s
Peak DL
253.60K bits/ s
Average DL
83.88 K bits/s
Events 3G Voice
PRE Stats:
Coverage
Quality
0.07 12.7
Objective
Attempts Setup Fail Setup OK Dropped Completed Ongoing
8.26
39.84
51.9 87.23
POST Stats:
Coverage
Quality
Events 3G Data
PRE Stats:
Location Area Update
Attempts Completed Objective Success Rate 1 1 100
Completed
Success Rate
1
100
Completed
Success Rate
1
100
Data Testing
HSDPA Throughput (Kbps) HSDPA Throughput (Kbps) HSDPA Throughput (Kbps) HSDPA Throughput (Kbps) PPF House Pasiasnsi CCM Kirumba 650 556 469 -
POST Stats:
Location Area Update
Attempts Completed 1 1
Success Rate
100
Data Testing
HSDPA Throughput (Kbps) HSDPA Throughput (Kbps) HSDPA Throughput (Kbps) HSDPA Throughput (Kbps) PPF House Pasiasnsi CCM Kirumba 650 556 469 -
Objective Comments
PRE RxQual
POST RxQual
Objective Comments
3G Testing - EcNo
Observations:
Objective
No changes observed
PRE EcNo
POST EcNo
3G Testing - RSCP
Observations:
Objective
Comments
PRE RSCP
POST RSCP
No changes observed
Objective Comments
Both static and dynamic measurements were taken. Different routes were taken since the previous route was blocked
Objective
Comments
Summary
3G and GPRS test were taken on sites served by BSMW1 Some of the post DT routes were changed because the previous routes were blocked Post Short Call (hotspot area) test observed call set up failure (see logfile below)
Objective
The Events
Count 21 20 1 0 0 0 20 0 13 0 0 0
Outgoing Call Starts Outgoing Call Setup OK Outgoing Call Setup Failure Incoming Call Starts Incoming Call Setup OK Incoming Call Setup Failure Call Completed Call Dropped Handover OK Handover Failure Location Update OK Location Update Failure