OPTIMIZATION TECHNIQUES
Linear Programming Problem Regional Planning
The Southern Confederation of Kibbutzim is a group of three
kibbutzim (communal farming communities in Israel. Overall planning for this group is done in its Coordinating Technical Office. This Office currently is planning agricultural production for the coming year.
The agricultural output of each kibbutz is limited by both the
amount of available irrigable land and the quantity of water
allocated for irrigation by the Water Commissioner . These data are given as follows
2
Problem Description contd
Kibbutz
Usable Land(Acres)
Water Allocation(Acre Feet)
400
600
600
800
300
375
Problem Description contd
The crops suited for this region include sugar beets , cotton ,
and sorghum. These crops differ primarily in their expected net return per acre and their consumption of water.
In addition , the Ministry of Agriculture has set a maximum
quota for the total acreage that can be devoted to each of
these crops by the Southern Confederation of Kibbutzim , as follows
Problem Description contd
Crop Maximum Quota(Acres) Water Consumption(Ac re Feet/Acre) 3 Net Return($ /Acre)
Sugar beets
600
1,000
Cotton
500
750
Sorghum
325
250
Problem Description contd
Because of the limited water available for irrigation ,the Southern
Confederation of Kibbutzim will not be able to use all its irrigable land for planning crops.
To ensure equity between the three kibbutzim ,it has been agreed that
every kibbutz will plant the same proportion of its available irrigable land.
Any combination of the crops may be grown at any of the kibbutzim. The job facing the Coordinating Technical Office is to plan how many acres
to devote to each crop at the respective kibbutzim while satisfying the given restrictions.
The objective is to maximize the total net return to the Southern
confederation of kibbutzim as a whole. 6
Formulation as a Linear Programming Problem
Kibbutz Allocation (Acres) Crop 1 2 3
Sugar Beets
X1
X2
X3
Cotton
X4
X5
X6
Sorghum
X7
X8
x9
Formulation as a Linear Programming Problem
Maximize Z = 1000 (x1 + x2 + x3 )+ 750( x4 + x5 + x6)+ 250( x7 + x8 + x9)
Subject to following constraints :
1. Usable land for each kibbutz : x1+x4+x7 <= 400; x2+x5+x8 <= 600; x3+x6+x9 <= 300; 2. Water allocation for each kibbutz : 3 x1 + 2 x4 + x7 <= 600; 3 x2 + 2 x5 + x8 <= 800; 3 x3 + 2 x6 + x9 <= 375; 8
Formulation contd.
3. Total acreage for each crop : x1+x2+x3 <= 600; x4+x5+x6 <= 500; x7+x8+x9 <= 325; 4. Equal proportion of land planted : 3 (x1+x4+x7)-2 (x2+x5+x8) = 0; (x2+x5+x8)-2 (x3+x6+x9) = 0; 4 (x3+x6+x9)-3 (x1+x4+x7) = 0;
5. Non negativity : X j >= 0 ,for j = 1, 2, ,9
9
Standard form of LPP
1. Usable land for each kibbutz : x1+x4+x7 +s1 = 400; x2+x5+x8 +s2= 600; x3+x6+x9 +s3= 300; 2. Water allocation for each kibbutz : 3 x1 + 2 x4 + x7 +s4= 600; 3 x2 + 2 x5 + x8 +s5= 800; 3 x3 + 2 x6 + x9 +s6= 375;
1 0
Standard form of LPP
3. Total acreage for each crop : x1+x2+x3 +s7= 600; x4+x5+x6 +s8= 500; x7+x8+x9 +s9= 325; 4. Equal proportion of land planted : 3 (x1+x4+x7)-2 (x2+x5+x8) = 0; (x2+x5+x8)-2 (x3+x6+x9) = 0; 4 (x3+x6+x9)-3 (x1+x4+x7) = 0; 5. Non negativity : X j >= 0 ,for j = 1, 2, ,9
11