100% found this document useful (2 votes)
395 views29 pages

QA TestCases Template

Uploaded by

Rafi Uddin Shaik
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
395 views29 pages

QA TestCases Template

Uploaded by

Rafi Uddin Shaik
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.

ms_office

The Test Cases portion of this document outlines the specific cases to be tested. The Test Cases Procedures portion of this document contains the specific data needed to perform each test case.

Testing Synopsis
1 2 3 Purpose/Overview List Items to be tested Items not to be Tested Brief summary description. Refer to the functional requirements that specify the features and functions to be tested. List the features and functions that will not be covered in this test plan. Identify briefly the reasons for leaving them out.

Setup Data for Testing


Provide any additiona details, link to DocuShare collection (input files, sql scripts, data generation scripts)

Verification
Verification and Validation have specific implications within the summary of a test case: Context Implication 1 Successful transaction or update The expected results have happened, update to the database has been verified as complete, and access to the resulting record has been confirmed through related client functions, where applicable. 2 3 4 Valid or invalid field formats Defaults Required fields Valid formats are accepted and invalid format return the appropriate error message in the appropriate context (based on when validation is completed). Any and all possible default values are present and correct as retrieved from database records. Creative Commercials Insurance

Pass Criteria - The following guidelines are used to ensure good bug tracking and to provide a framework for incident reproducibility. Result Condition P F PASS FAIL Descirption All expected results were met. At least one of the expected results were not met. - When a failure occurs, file a bug in the bug database. The case could not be completed due to some network, hardware, software or other problem. - The case could not be completed due to some network, hardware, software or other problem. - A Not Run situation may also require having to file a bug. That should be evaluated on a case by case basis. Please include the case number in the bug description. - If a large block of tests fails or cannot be run for the same reason, every case should be marked.

NOT RUN

Testing Levels
1 2 3 Acceptance Testing Integration/System Testing Regression Testing Conditions that must be met before testing can begin. Listed test cases will be used for acceptance criteria that can be reused by a smoke test. Specify the tests will be carried out to fully exercise the program as a whole to ensure that all elements of the integrated system function properly. At each stage of new development or maintenance, a subset of the regression test library should be run, focusing on the feature or function that has changed from the previous version. Unit, integration, and system tests are all viable places for regression testing. For small maintenance fixes, identify this subset. In the final phase of a complete development cycle, a full regression test cycle is run. Emphasize regression tests for functions that are new or that have changed, for components that have had a history of vulnerability, for high-risk defects, and for previously-fixed severe defects.
Copyright 2006 eMeter Corporation. Page 1 of 29

Introduction

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

Negative Testing

Testing aimed at showing software does not work (Showing error when not supposed to).

Introduction

Copyright 2006 eMeter Corporation.

Page 2 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

Document History
Version 1.0 Author Rafi Uddin,Shaik Date 2/28/2012

Review Log
Version 1.0 2.0 Reviewed By XXXX XXXX Date 3/3/2012 3/12/2012

Rev History

Copyright 2006 eMeter Corporation.

Page 3 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

Purpose/Overview
Write the purpose of testing this application Write a detailed purpose and overview of the application under test Test Overview Items to be tested 1 write what are the items which are going to be tested in this release 2 3 4 5 Items not to be Tested 1 write what are the items which are going NOT to be tested in this release 2 3 4 5

Test Cases Execution Results Pass Fail Total -P-FNuber of TC 1 0 0

Not Executed -N1

Comments

TestSynopsis

Copyright 2006 eMeter Corporation.

Page 4 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

DocuShare Collection
Type Input Files SQL Scripts Data Generation Scripts (xml files) Comments write the DB url link for test data Link

Additional Details/Instructions
Summary add additional steps if you think if you need them Steps/Comments additional instructions if you think you need to include

SetupTestData

Copyright 2006 eMeter Corporation.

Page 5 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

Test Cases

Traceability Functional Spec Ref Number Design Spec Ref Number

Testing Level Integration Acceptance

Test Case ID

Test Case Description

1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 2

Online payment processing of vehicle insurances Check accont status for existing customers Verify that account number can not be left empty when checking acct.status

1.1

1.1 x

Register form

TestCases

Copyright 2006 eMeter Corporation.

Page 6 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

TestCases

Copyright 2006 eMeter Corporation.

Page 7 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

TestCases

Copyright 2006 eMeter Corporation.

Page 8 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

TestCases

Copyright 2006 eMeter Corporation.

Page 9 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

sting Level Regression Negative


TestCases

Copyright 2006 eMeter Corporation.

Page 10 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

TestCases

Copyright 2006 eMeter Corporation.

Page 11 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

Y Y Y Y

TestCases

Copyright 2006 eMeter Corporation.

Page 12 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office

TestCases

Copyright 2006 eMeter Corporation.

Page 13 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Preconditions Test Cases Steps Test Data Description and Location

Online payment processing of vehicle insurances 1.1 1. Customer should have internet Verify that account number can not be left empty when checking acct.status connection 2. Customer information is already entered into the database server 3.Customer has the capability to pay the bills online 1. Go to the web page http://www.chkacct.ccinsurance.com 2. Try not enter any value in the account number text box and click check account status button 3. Check to see the acct.status radio buttons are not selected. 4. check to see the database connection is working

https://db.ccinsurance.co m/chkacctstatus.table

TestProcedures

Copyright 2006 eMeter Corporation.

Page 14 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Preconditions Test Cases Steps Test Data Description and Location

TestProcedures

Copyright 2006 eMeter Corporation.

Page 15 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Preconditions Test Cases Steps Test Data Description and Location

TestProcedures

Copyright 2006 eMeter Corporation.

Page 16 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Preconditions Test Cases Steps Test Data Description and Location

TestProcedures

Copyright 2006 eMeter Corporation.

Page 17 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Preconditions Test Cases Steps Test Data Description and Location

TestProcedures

Copyright 2006 eMeter Corporation.

Page 18 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Preconditions Test Cases Steps Test Data Description and Location

TestProcedures

Copyright 2006 eMeter Corporation.

Page 19 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Preconditions Test Cases Steps Test Data Description and Location

TestProcedures

Copyright 2006 eMeter Corporation.

Page 20 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Preconditions Test Cases Steps Test Data Description and Location

TestProcedures

Copyright 2006 eMeter Corporation.

Page 21 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Expected Result with Verification Steps Verification Steps Results Expected Tibco Messages DB (schema, sql) P|F|N Comments - BUG ID - Reason why TC was not executed

Online payment processing of vehicle insurances 1.1 1. Verify Verify that account number can not be left empty when checking acct.status that the user can reach the web page http://www.chkacct.ccinsurance.com 2. Verify that all 4 radio buttons active and inactive and closed and suspended are not selected. 3. Verify that check acct status button is visible 1. The system should throw a error dialog box saying that "you can not have account number to be empty" 2. The system should not enable the check account status button to be enabled when the account number is left empty. 1. Select * from accounts_master where account_number = xxxxx F

http://localhost:808 0/browse/DV-11

TestProcedures

Copyright 2006 eMeter Corporation.

Page 22 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Expected Result with Verification Steps Verification Steps Results Expected Tibco Messages DB (schema, sql) P|F|N Comments - BUG ID - Reason why TC was not executed

TestProcedures

Copyright 2006 eMeter Corporation.

Page 23 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Expected Result with Verification Steps Verification Steps Results Expected Tibco Messages DB (schema, sql) P|F|N Comments - BUG ID - Reason why TC was not executed

TestProcedures

Copyright 2006 eMeter Corporation.

Page 24 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Expected Result with Verification Steps Verification Steps Results Expected Tibco Messages DB (schema, sql) P|F|N Comments - BUG ID - Reason why TC was not executed

TestProcedures

Copyright 2006 eMeter Corporation.

Page 25 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Expected Result with Verification Steps Verification Steps Results Expected Tibco Messages DB (schema, sql) P|F|N Comments - BUG ID - Reason why TC was not executed

TestProcedures

Copyright 2006 eMeter Corporation.

Page 26 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Expected Result with Verification Steps Verification Steps Results Expected Tibco Messages DB (schema, sql) P|F|N Comments - BUG ID - Reason why TC was not executed

TestProcedures

Copyright 2006 eMeter Corporation.

Page 27 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Expected Result with Verification Steps Verification Steps Results Expected Tibco Messages DB (schema, sql) P|F|N Comments - BUG ID - Reason why TC was not executed

TestProcedures

Copyright 2006 eMeter Corporation.

Page 28 of 29

\\vboxsrv\conversion_tmp\scratch20804\102977962.xls.ms_office Test Cases Test Case Id Test Case Description Expected Result with Verification Steps Verification Steps Results Expected Tibco Messages DB (schema, sql) P|F|N Comments - BUG ID - Reason why TC was not executed

TestProcedures

Copyright 2006 eMeter Corporation.

Page 29 of 29

You might also like