Root Cause Template
Root Cause Template
This form is a tool for finding causes of process problems and developing actions for eliminating, preventing, and minimizing future problems. Incident Date: Investigator: RCA Initiated by:
Page 1 of 5 Date:
Describe the incident. What was defect, how many, how often, etc.
Step (not all required, depending on problem) D 1 Define the problem 2. Map Process (if required) M 3. Gather data 4. Cause/Effect Analysis (Seeking Root Cause) A 5. Verifying root cause with data 6. Solutions & Prevention steps development (including cost/benefit)
Date completed
I C
7. Pilot of implementation 8. Implementation 9. Control/Monitoring Plan (including Process Metrics) 10. Lessons Learned
Do in Visio, then copy to here. Keep Visio page rectangular no more than 7.5 inches wide.
2.Process Map
Sample
Page 2 of 5
4. Cause/Effect Diagram
Remember Do in Visio, then copy to here. Keep Visio shape rectanular no more than 7.5 inches wide.
SAMPLE
Page 3 of 5
Approval needed by:
Overall Action
Root Cause
Proposed Solutions
Practical Methods
Effectiveness
Feasibility
Cost Benefit
Overall
Action
Scale: 1-None 2-Somewhat 3-Moderate 4-Very 5-Extreme Cost Benefit Annualized cost of problem Percent of problem reduction Cost of proposed solution
1 2 3
Page 4 of 5
Lessons Learned
Page 5 of 5
Page 1
R 3 10/24/2002
FMEA For
SE V Potential Causes OC C Current Controls D ET RPN
Process Step/Input
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Page 2
R 3 10/24/2002
FMEA For
SE V Potential Causes OC C Current Controls D ET RPN
Process Step/Input
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Process Step/Input
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Process Step/Input
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
Actions Recommended
Responsibility
Action Taken
SE OC D V C ET RPN
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actions Recommended
Responsibility
Action Taken
SE OC D V C ET RPN
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Actions Recommended
Responsibility
Action Taken
SE OC D V C ET RPN
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0
Actions Recommended
Responsibility
Action Taken
SE OC D V C ET RPN
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0
Ranking
10
Very high severity ranking when a potential failure mode effects safe system operation and/or involves noncompliance with a government regulation without warning Very high severity ranking when a potential failure mode effects safe system operation and/or involves noncompliance with a government regulation with warning System / item inoperable, with loss of primary function System / item operable, but at a reduced level of performance. Customer dissatisfied. System / item operable, but comfort / convenience item(s) inoperable. Customer experiences discomfort. System / item operable, but comfort / convenience item(s) operable at a reduced level of performance. Customer experiences some dissatisfaction. Fit & Finish / Squeak & Rattle item does not conform. Defect noticed by most customers. Fit & Finish / Squeak & Rattle item does not conform. Defect noticed by average customers
8 7 6 5
4 3
Fit & Finish / Squeak & Rattle item does not conform. Defect noticed by discriminating customers No effect
2 1
Probability of failure
Very High: Failure is almost inevitable High: Repeated Failures Moderate: Occasional Failures Low: Relatively few failures Remote: Failure is highly unlikely
Ranking
10 8 7 6 5 4 3 2 1
DETECTION EVALUATION CRITERIA Likelihood the cause will be detected using the process controls Detection Criteria: Likelihood of Detection by Process Control
Absolute Uncertainty
Ranking
10
Process Control will not and/or cannot detect a potential cause / mechanism and subsequent failure mode; or there is no Process Control Very remote chance Process Control will detect a potential cause / mechanism and subsequent failure mode Remote chance Process Control will detect a potential cause / mechanism and subsequent failure mode Very low chance Process Control will detect a potential cause / mechanism and subsequent failure mode Low chance Process Control will detect a potential cause / mechanism and subsequent failure mode Moderate chance Process Control will detect a potential cause / mechanism and subsequent failure mode Moderately high chance Process Control will detect a potential cause / mechanism and subsequent failure mode High chance Process Control will detect a potential cause / mechanism and subsequent failure mode Very high chance Process Control will detect a potential cause / mechanism and subsequent failure mode Process Control will almost certainly detect a potential cause / mechanism and subsequent failure mode
Very remote Remote Very Low Low Moderate Moderately High High Very High Almost Certain
9 8 7 6 5 4 3 2 1