Assignment of Material Management: Summary of Case Study
Assignment of Material Management: Summary of Case Study
Assignment of Material Management: Summary of Case Study
cost for each task and the customer value structure was formulated by identifying all customer attribute on which value are to be determined. The following were the two models which were used 1. Integrated procurement model:- The centralized indent processing unit processes online indents that are raised by various functional groups for procuring spare, material for the annual maintenance. CIPU maintain an updated database which helps in preparing online purchase proposals for receiving offers from the prospective supplier. These offers are then evaluated through decision support system. 2. Integrated warehousing and surplus disposal method:- Under this model the anticipated spare requirement for plant operation &procurement policy form the inventory profile of the organization. Deriving surplus identification parameters &linking these with computerized inventory control system the online information on surplus material and inventory is adjusted. From the analysis and dynamic trend of globalization the study has led to philosophy of applying radical changes through BPR to achieve success along with two important activities material planning &procurement process and warehousing & surplus disposal. At last this study reveals: Monitoring of online inventory position for management information to enable correct decision at the correct time. Designing an effective vendor evaluating system for ensuring product quality, correct timing and optimum cost. Forming a network through the internet with other unit for exchange of information related to material procurement and inventory. Providing appropriate authority and responsibility to unit personnel for effective handling of issues and concern of material management.