Algeria 1 GTFT Gas Plant 19-02-2012: Load Flow Analysis

This document contains details of a load flow analysis for the GTFT Gas Plant in Algeria, including: - 68 buses with loads defined at various voltage levels - 2 generator buses defined as swing buses - 74 branch elements such as transmission lines, cables, and transformers - Transformer, line, and cable parameters - Load flow was solved using the fast decoupled method to a precision of 0.0001000.

Uploaded by

nksuthar5399
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

Algeria 1 GTFT Gas Plant 19-02-2012: Load Flow Analysis

This document contains details of a load flow analysis for the GTFT Gas Plant in Algeria, including: - 68 buses with loads defined at various voltage levels - 2 generator buses defined as swing buses - 74 branch elements such as transmission lines, cables, and transformers - Transformer, line, and cable parameters - Load flow was solved using the fast decoupled method to a precision of 0.0001000.

Uploaded by

nksuthar5399
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

Project:

Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Electrical Transient Analyzer Program


Load Flow Analysis
Loading Category (1):

Design

Generation Category (1):

Design

Load Diversity Factor:

Swing

V-Control

Load

Total

66

68

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

37

23

14

74

Number of Buses:

Number of Branches:

None

Method of Solution:

Fast-Decoupled Method

Maximum No. of Iteration:

99

Precision of Solution:

0.0001000

System Frequency:

50.00 Hz

Unit System:

Metric

Project Filename:

GTFT

Output Filename:

D:\Electrical\ETAP 700\GTFT-ETAP\GTFT\Untitled.lfr

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Adjustments
Apply
Tolerance

Individual

Adjustments

/Global

Transformer Impedance:

Yes

Individual

Reactor Impedance:

Yes

Individual

Overload Heater Resistance:

No

Transmission Line Length:

No

Cable Length:

No

Apply

Individual

Adjustments

/Global

Transmission Line Resistance:

Yes

Individual

Cable Resistance:

Yes

Individual

Temperature Correction

Percent

Degree C

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Bus Input Data


Load
Bus
ID

Initial Voltage
kV

Sub-sys

60.000

5.500

9
10

Constant kVA

% Mag.

Ang.

MW

Mvar

100.0

0.0

3.200

1.920

999.0

0.0

0.134

0.058

5.500

100.0

0.0

0.134

0.058

0.400

100.0

0.0

11

0.400

100.0

0.0

12

0.400

100.0

0.0

13

0.400

100.0

0.0

14

0.400

100.0

0.0

15

0.400

100.0

0.0

16

0.400

100.0

0.0

17

5.500

100.0

0.0

18

5.500

100.0

0.0

19

5.500

100.0

0.0

20

5.500

100.0

0.0

21

5.500

100.0

0.0

23

5.500

100.0

0.0

24

5.500

100.0

0.0

25

5.500

100.0

0.0

26

5.500

100.0

0.0

27

5.500

100.0

0.0

28

0.400

100.0

0.0

29

60.000

100.0

0.0

30

60.000

100.0

0.0

31

0.400

100.0

0.0

32

0.400

100.0

0.0

33

0.400

100.0

0.0

0.485

0.208

34

0.400

100.0

0.0

35

0.400

100.0

0.0

36

0.400

100.0

0.0

37

0.400

100.0

0.0

38

0.400

100.0

0.0

39

0.400

100.0

0.0

40

5.500

100.0

0.0

1.033

0.467

41

5.500

100.0

0.0

1.059

0.478

Constant Z
MW
0.800

Constant I

Mvar
0.480

MW

Mvar

Generic
MW

Mvar

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Load
Bus
ID

Initial Voltage
kV

Sub-sys

% Mag.

Ang.

Constant kVA
MW

Mvar

Constant Z
MW

Constant I

Mvar

42

5.500

100.0

0.0

43

5.500

100.0

0.0

44

0.400

100.0

0.0

45

0.400

100.0

0.0

48

0.400

100.0

0.0

0.121

0.040

49

0.400

100.0

0.0

0.143

0.047

57

60.000

100.0

0.0

58

5.500

100.0

0.0

59

5.500

100.0

0.0

60

5.500

100.0

0.0

61

0.400

100.0

0.0

0.062

0.023

62

0.400

100.0

0.0

0.062

0.023

64

0.400

100.0

0.0

0.043

0.017

65

0.400

100.0

0.0

0.085

0.053

66

0.400

100.0

0.0

0.062

0.020

67

0.400

100.0

0.0

0.085

0.053

72

5.500

100.0

0.0

73

0.400

100.0

0.0

99

0.400

100.0

0.0

Bus1

60.000

100.0

0.0

Bus4

60.000

100.0

0.0

Bus6

60.000

100.0

0.0

Bus9

60.000

100.0

0.0

Bus11

60.000

100.0

0.0

Bus13

60.000

100.0

0.0

Bus15

5.500

100.0

0.0

Bus16

5.500

100.0

0.0

Bus17

60.000

105.0

0.0

Bus18

60.000

105.0

0.0

0.005

0.003

Bus20

0.400

100.0

0.0

Bus21

0.400

100.0

0.0

0.020

0.013

Bus23

0.400

7.3

0.0

0.038

0.000

Bus25

0.400

100.0

0.0

0.015

0.000

Bus27

0.400

100.0

0.0

0.005

0.000

1.526

0.759

Total Number of Buses: 68

6.068

3.201

MW

0.000

Generic

Mvar

0.000

MW

0.000

Mvar

0.000

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Generation Bus
ID

kV

Voltage
Type

Sub-sys

Generation

% Mag.

Angle

Bus15

5.500

Swing

100.0

0.0

Bus16

5.500

Swing

100.0

0.0

MW

0.000

Mvar

0.000

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Mvar Limits
% PF

Max

Min

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Line/Cable Input Data


Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)
Length

Line/Cable
ID

Library

Size

Adj. (m)

% Tol.

#/Phase

C8313-A

1,0NCUN3

185

20.0

0.0

75

0.118200

0.076300

C8313-B

1,0NCUN3

120

20.0

0.0

75

0.181900

0.076900

Cable3

1,0NCUN3

95

300.0

0.0

75

0.229700

0.077400

Cable5

11NCUN3

70

200.0

0.0

75

0.327145

0.130000

Cable6

1,0NCUN3

150

120.0

0.0

75

0.145400

0.076700

Cable7

1,0NCUN3

185

20.0

0.0

75

0.118200

0.076300

Cable8

1,0NCUN3

120

20.0

0.0

75

0.181900

0.076900

Cable9

1,0NCUN3

95

300.0

0.0

75

0.229700

0.077400

Cable13

11NCUN3

70

200.0

0.0

75

0.327145

0.130000

T (C)

0.0000936

0.0000936

Cable14

15NCUS3

70

200.0

0.0

75

0.310700

0.095800

Cable17

1,0NCUN3

120

20.0

0.0

75

0.181900

0.076900

Cable18

1,0NCUN3

185

20.0

0.0

75

0.118200

0.076300

Cable20

15NCUS3

70

200.0

0.0

75

0.310700

0.095800

Cable25

1,0NCUN3

120

20.0

0.0

75

0.181900

0.076900

Cable26

1,0NCUN3

185

20.0

0.0

75

0.118200

0.076300

Cable28

15NCUS3

70

220.0

0.0

75

0.310700

0.095800

Cable30

15NCUS3

70

220.0

0.0

75

0.310700

0.095800

To MC8101

3,3NCUN3

50

500.0

0.0

75

0.471165

0.089000

To PT8322

15NCUS3

120

20.0

0.0

75

0.181900

0.089500

To SG8310-1

15NCUS3

300

150.0

0.0

75

0.074200

0.083200

To SG8310-2

15NCUS3

300

150.0

0.0

75

0.074200

0.083200

CPC-GTFT

307

27000.0

0.0

75

0.137954

0.292309

0.0000040

Line1

49.5

1000.0

0.0

75

1.169750

0.408689

0.0000032

Line / Cable resistances are listed at the specified temperatures.

0.0000789

Project:

ETAP

GTFT Gas Plant

Location:

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

2-Winding Transformer Input Data

Transformer
ID
EA

Rating
MVA

Prim. kV

Sec. kV

Z Variation
%Z

X/R

% Tap Setting

+ 5%

- 5%

% Tol.

Prim.

Sec.

Adjusted
%Z

Phase Shift
Type

Angle

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

PT8220

10.000

60.000

5.500

7.50

15.50

-2.500

7.5000

Std Pos. Seq.

0.000

PT8221

10.000

60.000

5.500

7.50

15.50

-2.500

7.5000

Std Pos. Seq.

0.000

PT8222

10.000

60.000

5.500

7.50

15.50

-2.500

7.5000

Std Pos. Seq.

0.000

PT8320

1.600

5.500

0.400

6.10

7.10

-2.500

6.1000

Std Pos. Seq.

0.000

PT8321

1.600

5.500

0.400

6.10

7.10

-2.500

6.1000

Std Pos. Seq.

0.000

PT8322

1.600

5.500

0.400

6.10

7.10

6.1000

Std Pos. Seq.

0.000

PT8330

0.300

0.400

0.400

5.50

5.80

5.5000

Std Pos. Seq.

0.000

PT8331

0.300

0.400

0.400

5.50

5.80

5.5000

Std Pos. Seq.

0.000

PT8420

1.600

5.500

0.400

6.10

7.10

6.1000

Std Pos. Seq.

0.000

PT8421

1.600

5.500

0.400

6.10

7.10

6.1000

Std Pos. Seq.

0.000

PT8430

0.300

0.400

0.400

5.50

5.80

5.5000

Std Pos. Seq.

0.000

PT8431

0.300

0.400

0.400

5.50

5.80

5.5000

Std Pos. Seq.

0.000

PT8520

1.600

5.500

0.400

6.10

7.10

6.1000

Std Pos. Seq.

0.000

PT8521

1.600

5.500

0.400

6.10

7.10

6.1000

Std Pos. Seq.

0.000

PT8530

0.300

0.400

0.400

5.50

5.80

5.5000

Std Pos. Seq.

0.000

PT8531

0.300

0.400

0.400

5.50

5.80

5.5000

Std Pos. Seq.

0.000

PT8720

1.600

5.500

0.400

6.10

7.10

6.1000

Std Pos. Seq.

0.000

PT8721

1.600

5.500

0.400

6.10

7.10

6.1000

Std Pos. Seq.

0.000

PT8730

0.300

0.400

0.400

5.50

5.80

5.5000

Std Pos. Seq.

0.000

PT8731

0.300

0.400

0.400

4.00

3.09

4.0000

Std Pos. Seq.

0.000

PT9301

1.600

5.500

0.400

6.25

7.10

6.2500

Std Pos. Seq.

0.000

T2

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T4

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T5

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T6

28.000

5.500

60.000

12.50

23.70

12.5000

Std Pos. Seq.

0.000

T7

28.000

5.500

60.000

12.50

23.70

12.5000

Std Pos. Seq.

0.000

T8

28.000

5.500

60.000

12.50

23.70

12.5000

Std Pos. Seq.

0.000

T9

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T10

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T11

0.250

60.000

0.400

5.50

5.58

5.5000

Std Pos. Seq.

0.000

T14

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T15

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T16

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

Project:

ETAP

GTFT Gas Plant

Location:

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Transformer
ID

Rating
MVA

Prim. kV

Sec. kV

Z Variation
%Z

X/R

% Tap Setting

+ 5%

- 5%

% Tol.

Prim.

Sec.

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Adjusted
%Z

Phase Shift
Type

Angle

T17

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T18

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

T19

5.000

60.000

5.500

8.00

12.10

8.0000

Std Pos. Seq.

0.000

2-Winding Transformer Load Tap Changer (LTC) Settings


Transformer Load Tap Changer Setting
Transformer
ID

Connected Buses ("*" LTC Side)


Primary Bus ID

Secondary Bus ID

% Min.
Tap

% Max.
Tap

% Step

Regulated Bus ID

%V

kV

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Branch Connections
CKT/Branch
ID

Connected Bus ID
Type

From Bus

% Impedance, Pos. Seq., 100 MVA Base


To Bus

EA

2W XFMR

Bus1

20

13.18

159.46

160.00

PT8220

2W XFMR

18

4.71

72.97

73.13

PT8221

2W XFMR

19

4.71

72.97

73.13

PT8222

2W XFMR

72

4.71

72.97

73.13

PT8320

2W XFMR

10

51.84

368.09

371.72

PT8321

2W XFMR

11

51.84

368.09

371.72

PT8322

2W XFMR

27

12

53.17

377.52

381.25

PT8330

2W XFMR

39

49

311.50

1806.68

1833.33

PT8331

2W XFMR

38

48

311.50

1806.68

1833.33

PT8420

2W XFMR

23

13

53.17

377.52

381.25

PT8421

2W XFMR

24

14

53.17

377.52

381.25

PT8430

2W XFMR

36

66

311.50

1806.68

1833.33

PT8431

2W XFMR

34

64

311.50

1806.68

1833.33

PT8520

2W XFMR

25

15

53.17

377.52

381.25

PT8521

2W XFMR

26

16

53.17

377.52

381.25

PT8530

2W XFMR

31

61

311.50

1806.68

1833.33

PT8531

2W XFMR

32

62

311.50

1806.68

1833.33

PT8720

2W XFMR

42

44

53.17

377.52

381.25

PT8721

2W XFMR

43

45

53.17

377.52

381.25

PT8730

2W XFMR

37

67

311.50

1806.68

1833.33

PT8731

2W XFMR

35

65

410.54

1268.56

1333.33

PT9301

2W XFMR

72

73

54.48

386.81

390.63

T2

2W XFMR

Bus1

20

13.18

159.46

160.00

T4

2W XFMR

Bus4

21

13.18

159.46

160.00

T5

2W XFMR

Bus4

21

13.18

159.46

160.00

T6

2W XFMR

Bus16

Bus18

1.88

44.60

44.64

T7

2W XFMR

Bus16

Bus18

1.88

44.60

44.64

T8

2W XFMR

Bus15

Bus17

1.88

44.60

44.64

T9

2W XFMR

Bus6

58

13.18

159.46

160.00

T10

2W XFMR

Bus6

58

13.18

159.46

160.00

T11

2W XFMR

30

28

388.08

2165.50

2200.00

T14

2W XFMR

Bus9

59

13.18

159.46

160.00

T15

2W XFMR

Bus9

59

13.18

159.46

160.00

T16

2W XFMR

Bus11

60

13.18

159.46

160.00

T17

2W XFMR

Bus11

60

13.18

159.46

160.00

T18

2W XFMR

Bus13

17

13.18

159.46

160.00

T19

2W XFMR

Bus13

17

13.18

159.46

160.00

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

CKT/Branch

Connected Bus ID

ID
C8313-A

Type

From Bus

Page:

10

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

% Impedance, Pos. Seq., 100 MVA Base


To Bus

R
147.75

X
95.38

Cable

10

39

175.86

C8313-B

Cable

11

38

Cable3

Cable

Bus20

Bus23

Cable5

Cable

26

Cable6

Cable

Bus20

Bus25

Cable7

Cable

13

Cable8

Cable

14

Cable9

Cable

Bus21

Bus27

Cable13

Cable

25

Cable14

Cable

42

20.54

6.33

21.50

Cable17

Cable

16

32

227.38

96.12

246.86

Cable18

Cable

15

31

147.75

95.38

175.86

Cable20

Cable

43

20.54

6.33

21.50

Cable25

Cable

45

35

227.38

96.12

246.86

Cable26

Cable

44

37

147.75

95.38

175.86

Cable28

Cable

24

22.60

6.97

23.65

Cable30

Cable

23

22.60

6.97

23.65

To MC8101

Cable

12

99

14723.90

2781.25

14984.28

To PT8322

Cable

27

1.20

0.59

1.34

To SG8310-1

Cable

18

3.68

4.13

5.53

To SG8310-2

Cable

19

3.68

4.13

5.53

CPC-GTFT

Line

Bus17

10.35

21.92

24.24

0.3845526

Line1

Line

Bus18

30

3.25

1.14

3.44

0.0116318

CB4

Tie Breakr

Bus17

29

CB8

Tie Breakr

30

57

CB22

Tie Breakr

Bus20

Bus21

CB29

Tie Breakr

Bus17

Bus18

CB31

Tie Breakr

73

Bus20

CB8311A

Tie Breakr

40

CB8311B

Tie Breakr

41

CB8315

Tie Breakr

12

33

SW1

Tie Switch

29

Bus1

SW3

Tie Switch

29

Bus4

SW4

Tie Switch

29

Bus6

SW6

Tie Switch

57

Bus9

SW7

Tie Switch

57

Bus11

SW8

Tie Switch

57

Bus13

227.38

96.12

246.86

4306.88

1451.25

4544.81

21.63

8.60

23.27

1090.50

575.25

1232.92

36

147.75

95.38

175.86

34

227.38

96.12

246.86

4306.88

1451.25

4544.81

21.63

8.60

23.27

0.0005663

0.0005663

0.0000063

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

11

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT

Bus
ID
7

10

11

12

Voltage
kV

% Mag.

60.000

97.708

5.500

5.500

0.400

0.400

0.400

99.544

99.324

101.828

101.646

98.239

Generation

Ang.
-1.4

-2.0

-2.2

-2.3

-2.5

-3.3

MW

Load

Mvar
0

MW
0

Load Flow
Mvar

3.964

0.134

0.134

ID

2.378

0.058

0.058

13

0.400

99.419

-2.2

14

0.400

99.225

-2.3

15

0.400

99.408

-2.2

16

0.400

99.189

-2.4

17

5.500

99.377

-0.6

18

5.500

99.628

-2.0

Bus17

MW

XFMR
Mvar

Amp

% PF

% Tap

-7.557

-4.018

84.3

88.3

18

1.519

0.695

16.4

90.9

-2.500

19

1.990

0.929

21.6

90.6

-2.500

72

0.084

0.017

0.8

98.1

-2.500

25

0.060

0.023

6.8

93.6

42

0.082

0.053

10.3

84.2

23

0.060

0.020

6.7

94.7

18

-1.516

-0.673

174.9

91.4

10

0.145

0.053

16.3

94.0

40

1.034

0.467

119.6

91.1

26

0.060

0.023

6.8

93.6

43

0.082

0.052

10.3

84.4

24

0.042

0.017

4.8

92.5

27

0.486

0.219

56.4

91.2

19

-1.986

-0.891

230.1

91.2

11

0.122

0.044

13.7

94.1

41

1.059

0.478

122.8

91.1

39

0.145

0.052

218.5

94.2

-0.145

-0.052

218.5

94.2

38

0.122

0.043

183.7

94.3

-0.122

-0.043

183.7

94.3

99

0.000

0.000

0.0

0.0

27

-0.485

-0.208

775.3

91.9

33

0.485

0.208

775.3

91.9

36

0.061

0.020

92.7

94.8

23

-0.061

-0.020

92.7

94.8

34

0.042

0.017

66.0

92.6

24

-0.042

-0.017

66.0

92.6

31

0.060

0.023

94.0

93.4

25

-0.060

-0.023

94.0

93.4

32

0.060

0.023

93.8

93.4

26

-0.060

-0.023

93.8

93.4

Bus13

0.000

0.000

0.0

100.0

Bus13

0.000

0.000

0.0

100.0

1.517

0.674

174.9

91.4

-1.517

-0.674

174.9

91.4

-2.500

-2.500

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Bus
ID
19

Voltage
kV
5.500

% Mag.
99.435

Generation

Ang.
-2.2

MW

Load

Mvar
0

MW
0

12

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Load Flow
Mvar

Page:

ID
0

20

5.500

99.377

-0.6

21

5.500

99.377

-0.6

23

5.500

99.529

-2.0

24

5.500

99.313

-2.2

25

5.500

99.529

-2.0

26

5.500

99.309

-2.2

MW

XFMR
Mvar

Amp

% PF

1.988

0.893

230.1

-1.988

-0.893

230.1

91.2

Bus1

0.000

0.000

0.0

100.0

Bus1

0.000

0.000

0.0

100.0

Bus4

0.000

0.000

0.0

100.0

Bus4

0.000

0.000

0.0

100.0

-0.060

-0.020

6.7

94.7

91.2

13

0.061

0.020

6.7

94.8

-0.042

-0.017

4.8

92.5

14

0.042

0.017

4.8

92.5

-0.060

-0.023

6.8

93.3

15

0.060

0.023

6.8

93.3

-0.060

-0.023

6.8

93.3

16

0.060

0.023

6.8

93.3

-0.486

-0.219

56.4

91.2

27

5.500

99.317

-2.2

12

0.486

0.219

56.4

91.2

28

0.400

99.377

-0.6

30

0.000

0.000

0.0

100.0

29

60.000

99.377

-0.6

Bus17

0.000

0.000

0.0

100.0

30

31

32

60.000

0.400

0.400

99.377

99.296

99.028

-0.6

-2.2

-2.4

Bus1

0.000

0.000

0.0

100.0

Bus4

0.000

0.000

0.0

100.0

Bus6

0.000

0.000

0.0

100.0

Bus18

-0.005

0.000

0.0

100.0

28

0.000

0.000

0.0

100.0

57

0.005

0.000

0.0

100.0

15

-0.060

-0.023

94.0

93.4

61

0.060

0.023

94.0

93.4

16

-0.060

-0.023

93.8

93.4

62

0.060

0.023

93.8

93.4

33

0.400

98.239

-3.3

0.485

0.208

12

-0.485

-0.208

775.3

91.9

34

0.400

99.113

-2.3

14

-0.042

-0.017

66.0

92.6

35

0.400

98.824

-2.4

36

0.400

99.310

-2.2

37

0.400

99.108

-2.2

38

0.400

101.332

-2.5

64

0.042

0.017

66.0

92.6

45

-0.082

-0.052

141.2

84.5

65

0.082

0.052

141.2

84.5

13

-0.060

-0.020

92.7

94.8

66

0.060

0.020

92.7

94.8

44

-0.082

-0.052

141.3

84.3

67

0.082

0.052

141.3

84.3

11

-0.122

-0.043

183.7

94.3

% Tap

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Bus
ID

39

Voltage
kV

% Mag.

0.400

101.568

Generation

Ang.

-2.4

MW

Load

Mvar

MW

13

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Load Flow
Mvar

Page:

ID

MW

XFMR
Mvar

Amp

% PF

48

0.122

0.043

183.7

94.3

10

-0.145

-0.052

218.5

94.2

49

0.145

0.052

218.5

94.2

40

5.500

99.544

-2.0

1.033

0.467

-1.034

-0.467

119.6

91.1

41

5.500

99.324

-2.2

1.059

0.478

-1.059

-0.478

122.8

91.1

42

5.500

99.524

-2.0

-0.082

-0.053

10.3

84.2

43

5.500

99.304

-2.2

44

0.400

99.280

-2.2

45

0.400

99.062

-2.4

48

44

0.082

0.053

10.3

84.1

-0.082

-0.052

10.3

84.4

45

0.082

0.052

10.3

84.4

37

0.082

0.052

141.3

84.3

42

-0.082

-0.052

141.3

84.3

35

0.082

0.052

141.2

84.6

43

-0.082

-0.052

141.2

84.6
94.9

0.400

100.214

-3.7

0.121

0.040

38

-0.121

-0.040

183.7

49

0.400

100.237

-3.7

0.144

0.047

39

-0.144

-0.047

218.5

95.0

57

60.000

99.377

-0.6

30

-0.005

0.000

0.0

100.0

58

5.500

99.377

-0.6

59

5.500

99.377

-0.6

60

5.500

99.377

-0.6

Bus9

0.000

0.000

0.0

100.0

Bus11

0.000

0.000

0.0

100.0

Bus13

0.000

0.000

0.0

100.0

Bus6

0.000

0.000

0.0

100.0

Bus6

0.000

0.000

0.0

100.0

Bus9

0.000

0.000

0.0

100.0

Bus9

0.000

0.000

0.0

100.0

Bus11

0.000

0.000

0.0

100.0

Bus11

0.000

0.000

0.0

100.0

61

0.400

98.691

-2.8

0.060

0.022

31

-0.060

-0.022

94.0

93.8

62

0.400

98.425

-3.0

0.060

0.022

32

-0.060

-0.022

93.8

93.8

64

0.400

98.671

-2.7

0.042

0.017

34

-0.042

-0.017

66.0

92.9

65

0.400

97.825

-2.9

0.081

0.050

35

-0.081

-0.050

141.2

85.0

66

0.400

98.758

-2.8

0.060

0.019

36

-0.060

-0.019

92.7

95.2

67

0.400

97.908

-3.0

0.081

0.050

37

-0.081

-0.050

141.3

85.0

72

5.500

100.197

-1.4

-0.084

-0.017

9.0

98.1

73

0.084

0.017

9.0

98.1

72

73

99
Bus1

0.400

100.088

-1.6

-0.084

-0.016

123.6

98.2

Bus20

0.084

0.016

123.6

98.2

0.400

98.239

-3.3

12

0.000

0.000

0.0

0.0

60.000

99.377

-0.6

20

0.000

0.000

0.0

100.0

20

0.000

0.000

0.0

100.0

% Tap

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Bus
ID

Bus4

Bus6

Bus9

Bus11

Bus13

Voltage
kV

% Mag.

60.000

99.377

60.000

60.000

60.000

60.000

99.377

99.377

99.377

99.377

Generation

Ang.

-0.6

-0.6

-0.6

-0.6

-0.6

MW

Load

Mvar

MW

14

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Load Flow
Mvar

Page:

ID

MW

XFMR
Mvar

Amp

% PF

29

0.000

0.000

0.0

100.0

21

0.000

0.000

0.0

100.0

21

0.000

0.000

0.0

100.0

29

0.000

0.000

0.0

100.0

58

0.000

0.000

0.0

100.0

58

0.000

0.000

0.0

100.0

29

0.000

0.000

0.0

100.0

59

0.000

0.000

0.0

100.0

59

0.000

0.000

0.0

100.0

57

0.000

0.000

0.0

100.0

60

0.000

0.000

0.0

100.0

60

0.000

0.000

0.0

100.0

57

0.000

0.000

0.0

100.0

17

0.000

0.000

0.0

100.0

17

0.000

0.000

0.0

100.0
100.0

57

0.000

0.000

0.0

* Bus15

5.500

100.000

0.0

2.547

1.303

Bus17

2.547

1.303

300.3

89.0

* Bus16

5.500

100.000

0.0

5.093

2.605

Bus18

2.547

1.303

300.3

89.0

Bus18

2.547

1.303

300.3

89.0
89.5

Bus17

60.000

99.377

-0.6

7
Bus15
29
Bus18

Bus18

Bus20

60.000

0.400

99.377

100.088

-0.6

-1.6

30

0.400

100.088

-1.6

0.026

0.016

3.810

82.6

-1.266

27.5

89.5

0.000

0.000

0.0

100.0

-5.085

-2.544

55.1

89.4

0.005

-0.011

0.1

-38.6

Bus16

-2.545

-1.266

27.5

89.5

Bus16

-2.545

-1.266

27.5

89.5

Bus17

5.085

2.544

55.1

89.4

Bus23

0.037

0.000

53.6

100.0

Bus25

0.016

0.000

23.2

100.0

Bus21

0.031

0.016

50.0

89.0

-0.084

-0.016

123.6

98.2
100.0

73
Bus21

7.635
-2.545

Bus27

0.005

0.000

7.7

Bus20

-0.031

-0.016

50.0

89.0

Bus23

0.400

98.488

-1.9

0.037

0.000

Bus20

-0.037

0.000

53.6

100.0

Bus25

0.400

99.910

-1.7

0.016

0.000

Bus20

-0.016

0.000

23.2

100.0

Bus27

0.400

99.857

-1.6

0.005

0.000

Bus21

-0.005

0.000

7.7

100.0

% Tap

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA

Page:

15

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

16

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Bus Loading Summary Report


Directly Connected Load
Constant kVA

Bus
ID

kV

Rated Amp

MW

Constant Z

Mvar

MW

Total Bus Load

Constant I

Mvar

MW

Generic

Mvar

MW

Mvar

MVA

% PF

Amp

60.000

3.200

1.920

0.764

0.458

8.559

88.3

84.3

5.500

0.134

0.058

1.659

91.4

174.9

5.500

0.134

0.058

2.177

91.2

230.1

10

0.400

0.154

94.2

218.5

11

0.400

0.129

94.3

183.7

12

0.400

0.528

91.9

775.3

13

0.400

0.064

94.8

92.7

14

0.400

0.045

92.6

66.0

15

0.400

0.065

93.4

94.0

16

0.400

0.064

93.4

93.8

17

5.500

100.0

0.0

18

5.500

1.660

91.4

174.9

19

5.500

2.179

91.2

230.1

20

5.500

100.0

0.0

21

5.500

100.0

0.0

23

5.500

0.064

94.8

6.7

24

5.500

0.045

92.5

4.8

25

5.500

0.065

93.3

6.8

26

5.500

0.065

93.3

6.8

27

5.500

0.533

91.2

56.4

28

0.400

0.0

0.0

29

60.000

100.0

0.0

30

60.000

0.005

100.0

0.0

31

0.400

0.065

93.4

94.0

32

0.400

0.064

93.4

93.8

33

0.400

0.485

0.208

0.528

91.9

775.3

34

0.400

0.045

92.6

66.0

35

0.400

0.097

84.5

141.2

36

0.400

0.064

94.8

92.7

37

0.400

0.097

84.3

141.3

38

0.400

0.129

94.3

183.7

39

0.400

0.154

94.2

218.5

40

5.500

1.033

0.467

1.134

91.1

119.6

41

5.500

1.059

0.478

1.162

91.1

122.8

42

5.500

0.098

84.2

10.3

43

5.500

0.097

84.4

10.3

Percent
Loading

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

17

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Directly Connected Load


Constant kVA

Bus
ID

kV

Rated Amp

MW

Constant Z

Mvar

MW

Total Bus Load

Constant I

Mvar

MW

Generic

Mvar

MW

Mvar

MVA

% PF

Amp

44

0.400

0.097

84.3

141.3

45

0.400

0.097

84.6

141.2

48

0.400

0.121

0.040

0.128

94.9

183.7

49

0.400

0.144

0.047

0.152

95.0

218.5

57

60.000

0.0

0.0

58

5.500

100.0

0.0

59

5.500

100.0

0.0

60

5.500

100.0

0.0

61

0.400

0.060

0.022

0.064

93.8

94.0

62

0.400

0.060

0.022

0.064

93.8

93.8

64

0.400

0.042

0.017

0.045

92.9

66.0

65

0.400

0.081

0.050

0.096

85.0

141.2

66

0.400

0.060

0.019

0.063

95.2

92.7

67

0.400

0.081

0.050

0.096

85.0

141.3

72

5.500

0.086

98.1

9.0

73

0.400

0.086

98.2

123.6

99
Bus1

0.400

0.0

0.0

60.000

100.0

0.0
0.0

Bus4

60.000

100.0

Bus6

60.000

100.0

0.0

Bus9

60.000

100.0

0.0

Bus11

60.000

100.0

0.0

Bus13

60.000

100.0

0.0

Bus15

5.500

2.860

89.0

300.3

Bus16

5.500

5.721

89.0

600.5

Bus17

60.000

8.532

89.5

82.6

Bus18

60.000

5.690

89.5

55.1

Bus20

0.400

0.086

98.2

123.6

Bus21

0.400

0.020

0.013

0.005

0.003

0.035

89.0

50.0

Bus23

0.400

0.037

0.037

100.0

53.6

Bus25

0.400

0.001

0.015

0.016

100.0

23.2

Bus27

0.400

0.005

0.005

100.0

7.7

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).

Percent
Loading

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

18

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Branch Loading Summary Report

Transformer
CKT / Branch
ID
CPC-GTFT

Cable & Reactor


Type

Ampacity
(Amp)

Loading
Amp

Line

202.15

84.29

41.70

93.86

0.12

0.13

Capability
(MVA)

Loading (input)
MVA

Loading (output)

MVA

Line1

Line

EA

Transformer

5.000

0.000

0.0

0.000

0.0

PT8220

Transformer

10.000

1.670

16.7

1.660

16.6

PT8221

Transformer

10.000

2.196

22.0

2.179

21.8

PT8222

Transformer

10.000

0.086

0.9

0.086

0.9

PT8320

Transformer

1.600

0.155

9.7

0.154

9.6

PT8321

Transformer

1.600

0.130

8.1

0.129

8.1

PT8322

Transformer

1.600

0.533

33.3

0.528

33.0

PT8330

Transformer

0.300

0.154

51.2

0.152

50.6

PT8331

Transformer

0.300

0.129

43.0

0.128

42.5

PT8420

Transformer

1.600

0.064

4.0

0.064

4.0

PT8421

Transformer

1.600

0.045

2.8

0.045

2.8

PT8430

Transformer

0.300

0.064

21.2

0.063

21.1

PT8431

Transformer

0.300

0.045

15.1

0.045

15.0

PT8520

Transformer

1.600

0.065

4.1

0.065

4.0

PT8521

Transformer

1.600

0.065

4.0

0.064

4.0

PT8530

Transformer

0.300

0.065

21.6

0.064

21.4

PT8531

Transformer

0.300

0.064

21.4

0.064

21.3

PT8720

Transformer

1.600

0.097

6.1

0.097

6.1

PT8721

Transformer

1.600

0.097

6.1

0.097

6.1

PT8730

Transformer

0.300

0.097

32.3

0.096

32.0

PT8731

Transformer

0.300

0.097

32.2

0.096

31.9

PT9301

Transformer

1.600

0.086

5.4

0.086

5.4

T2

Transformer

5.000

0.000

0.0

0.000

0.0

T4

Transformer

5.000

0.000

0.0

0.000

0.0

T5

Transformer

5.000

0.000

0.0

0.000

0.0

T6

Transformer

28.000

2.860

10.2

2.842

10.2

T7

Transformer

28.000

2.860

10.2

2.842

10.2

T8

Transformer

28.000

2.860

10.2

2.842

10.2

T9

Transformer

5.000

0.000

0.0

0.000

0.0

T10

Transformer

5.000

0.000

0.0

0.000

0.0

T11

Transformer

0.250

0.000

0.0

0.000

0.0

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

19

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Transformer
CKT / Branch
ID

Cable & Reactor


Type

Ampacity
(Amp)

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

Loading (output)

MVA

T14

Transformer

5.000

0.000

0.0

0.000

0.0

T15

Transformer

5.000

0.000

0.0

0.000

0.0

T16

Transformer

5.000

0.000

0.0

0.000

0.0

T17

Transformer

5.000

0.000

0.0

0.000

0.0

T18

Transformer

5.000

0.000

0.0

0.000

0.0

T19

Transformer

5.000

0.000

0.0

0.000

0.0

* Indicates a branch with operating load exceeding the branch capability.

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

20

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Branch Losses Summary Report

CKT / Branch
ID
CPC-GTFT

From-To Bus Flow

To-From Bus Flow

MW

MW

Mvar

Mvar

Losses
kW

% Bus Voltage
kvar

From

To

Vd
% Drop
in Vmag

-7.557

-4.018

7.635

3.810

77.8

-208.5

97.7

99.4

1.67

PT8220

1.519

0.695

-1.517

-0.674

1.3

20.8

97.7

99.6

1.92

PT8221

1.990

0.929

-1.988

-0.893

2.3

35.9

97.7

99.4

1.73

PT8222

0.084

0.017

-0.084

-0.017

0.0

0.1

97.7

100.2

2.49

Cable13

0.060

0.023

-0.060

-0.023

0.0

-0.6

99.5

99.5

0.02

Cable14

0.082

0.053

-0.082

-0.053

0.0

0.0

99.5

99.5

0.02

Cable30

0.060

0.020

-0.060

-0.020

0.0

0.0

99.5

99.5

0.02

To SG8310-1

-1.516

-0.673

1.517

0.674

1.0

1.1

99.5

99.6

0.08

PT8320

0.145

0.053

-0.145

-0.052

0.1

0.9

99.5

101.8

2.28

Cable5

0.060

0.023

-0.060

-0.023

0.0

-0.6

99.3

99.3

0.02

Cable20

0.082

0.052

-0.082

-0.052

0.0

0.0

99.3

99.3

0.02

Cable28

0.042

0.017

-0.042

-0.017

0.0

0.0

99.3

99.3

0.01

To PT8322

0.486

0.219

-0.486

-0.219

0.0

0.0

99.3

99.3

0.01

-1.986

-0.891

1.988

0.893

1.8

2.0

99.3

99.4

0.11

PT8321

0.122

0.044

-0.122

-0.043

0.1

0.6

99.3

101.6

2.32

C8313-A

0.145

0.052

-0.145

-0.052

0.3

0.2

101.8

101.6

0.26

C8313-B

0.122

0.043

-0.122

-0.043

0.4

0.2

101.6

101.3

0.31

To MC8101

0.000

0.000

0.000

0.000

0.0

0.0

98.2

98.2

0.00

-0.485

-0.208

0.486

0.219

1.5

10.9

98.2

99.3

1.08

To SG8310-2

PT8322
Cable7

0.061

0.020

-0.060

-0.020

0.1

0.0

99.4

99.3

0.11

PT8420

-0.061

-0.020

0.061

0.020

0.0

0.2

99.4

99.5

0.11

Cable8

0.042

0.017

-0.042

-0.017

0.0

0.0

99.2

99.1

0.11

PT8421

-0.042

-0.017

0.042

0.017

0.0

0.1

99.2

99.3

0.09

Cable18

0.060

0.023

-0.060

-0.023

0.1

0.0

99.4

99.3

0.11

PT8520

-0.060

-0.023

0.060

0.023

0.0

0.2

99.4

99.5

0.12

Cable17

0.060

0.023

-0.060

-0.023

0.1

0.0

99.2

99.0

0.16

PT8521

-0.060

-0.023

0.060

0.023

0.0

0.2

99.2

99.3

0.12

T18

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T19

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

EA

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T2

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T4

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T5

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

-0.005

0.000

0.005

-0.011

0.0

-11.5

99.4

99.4

0.00

T11
Line1

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

CKT / Branch
ID

From-To Bus Flow

To-From Bus Flow

MW

MW

Mvar

Mvar

Losses
kW

Page:

21

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

% Bus Voltage
kvar

From

To

Vd
% Drop
in Vmag

PT8530

0.060

0.023

-0.060

-0.022

0.1

0.8

99.3

98.7

0.60

PT8531

0.060

0.023

-0.060

-0.022

0.1

0.8

99.0

98.4

0.60

PT8431

0.042

0.017

-0.042

-0.017

0.1

0.4

99.1

98.7

0.44

Cable25

-0.082

-0.052

0.082

0.052

0.2

0.1

98.8

99.1

0.24

PT8731

0.082

0.052

-0.081

-0.050

0.4

1.2

98.8

97.8

1.00

PT8430

0.060

0.020

-0.060

-0.019

0.1

0.7

99.3

98.8

0.55

Cable26

-0.082

-0.052

0.082

0.052

0.1

0.1

99.1

99.3

0.17

PT8730

0.082

0.052

-0.081

-0.050

0.3

1.7

99.1

97.9

1.20

PT8331

0.122

0.043

-0.121

-0.040

0.5

2.9

101.3

100.2

1.12

PT8330

0.145

0.052

-0.144

-0.047

0.7

4.1

101.6

100.2

1.33

PT8720

0.082

0.053

-0.082

-0.052

0.1

0.4

99.5

99.3

0.24

PT8721

0.082

0.052

-0.082

-0.052

0.1

0.4

99.3

99.1

0.24

T9

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T10

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T14

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T15

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T16

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

T17

0.000

0.000

0.000

0.000

0.0

0.0

99.4

99.4

0.00

PT9301

0.084

0.017

-0.084

-0.016

0.0

0.3

100.2

100.1

0.11

T8

2.547

1.303

-2.545

-1.266

1.5

36.5

100.0

99.4

0.62

T6

2.547

1.303

-2.545

-1.266

1.5

36.5

100.0

99.4

0.62

T7

2.547

1.303

-2.545

-1.266

1.5

36.5

100.0

99.4

0.62

Cable3

0.037

0.000

-0.037

0.000

0.6

0.2

100.1

98.5

1.60

Cable6

0.016

0.000

-0.016

0.000

0.0

0.0

100.1

99.9

0.18

Cable9

0.005

0.000

-0.005

0.000

0.0

0.0

100.1

99.9

0.23

95.3

-24.2

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Alert Summary Report


% Alert Settings
Critical

Marginal

Loading
Bus

100.0

95.0

Cable

100.0

95.0

Reactor

100.0

95.0

Line

100.0

95.0

Transformer

100.0

95.0

Panel

100.0

95.0

Protective Device

100.0

95.0

Generator

100.0

95.0

OverVoltage

105.0

102.0

UnderVoltage

90.0

95.0

OverExcited (Q Max.)

100.0

95.0

UnderExcited (Q Min.)

100.0

Bus Voltage

Generator Excitation

Page:

22

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

Project:
Location:

ETAP

GTFT Gas Plant

7.5.0

Algeria

Contract:
Engineer:

Fouad SEKHRI

Filename:

GTFT

Study Case: Load Flow

Page:

23

Date:

19-02-2012

SN:

12345678

Revision:

Base

Config.:

Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF

Source (Swing Buses):

7.640

3.908

8.581

Source (Non-Swing Buses):

0.000

0.000

0.000

Total Demand:

7.640

3.908

8.581

89.03 Lagging

Total Motor Load:

6.067

3.201

6.860

88.44 Lagging

Total Static Load:

1.476

0.731

1.647

89.63 Lagging

Total Constant I Load:

0.000

0.000

0.000

Total Generic Load:

0.000

0.000

0.000

Apparent Losses:

0.096

-0.024

System Mismatch:

0.001

0.000

Number of Iterations: 7

89.03 Lagging