Report for:
LRQA reference: Assessment dates: Assessment location: Assessment criteria: Assessment team: LRQA office:
KLR 0403591/ 0003 25-28 Sept 06 Port Klang, Selangor, Malaysia ISO 9001:2000 Ir. Chong Kam Fook (Team Leader) Dr. Ooi Cheng Lee LRQA KL
Contents
Executive report.....................................................................................................................4 Assessment details................................................................................................................5 Assessment Findings Log - ISO 9001:2000........................................................................30 Assessment schedule..........................................................................................................33 Continual improvement tracking log (ISO 9001:2000, Port Klang)....................................35 Assessment plan..................................................................................................................36 1.Certificate details..............................................................................................................39 2.Certificate details..............................................................................................................40 3.Certificate details..............................................................................................................41 4.Certificate details..............................................................................................................42 5.Certificate details..............................................................................................................43 6.Certificate details..............................................................................................................44 7.Certificate details..............................................................................................................45 8.Certificate details..............................................................................................................46 9.Certificate details..............................................................................................................47 10.Certificate details............................................................................................................48 11.Certificate details............................................................................................................49 12.Certificate details............................................................................................................50 13.Certificate details............................................................................................................51 14.Certificate details............................................................................................................52 15.Certificate details............................................................................................................53 16.Certificate details............................................................................................................54 17.Certificate details............................................................................................................55 18.Certificate details............................................................................................................56 19.Certificate details............................................................................................................57 20.Certificate details............................................................................................................58 21.Certificate details............................................................................................................59 22.Certificate details............................................................................................................60 23.Certificate details............................................................................................................61 24.Certificate details............................................................................................................62
Lloyd's Register Quality Assurance Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as "LRQA". LRQA assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant LRQA entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract. Form: MSBSF43000/0.2 0106 Report: KLR0403591/0003 - 4-Jun-11 Page 2 of 63
Attachments
Refer KLR0403591_0003_0906_Additional_Certificate.Doc for 3 more certificates with suffix Y, Z and AA
This report was presented to and accepted by: Name: Job title: Mr. Baharin Dato Abd. Hamid Deputy Director
Page 3 of 63
Executive report
Assessment outcome:
No Major NC except 2 Minor non conformance (NC) were raised in this audit based on sampling and record evidences sighted. The company demonstrated management system was maintained and satisfying the requirements of ISO 9001:2000. The commitment of Top Management in implementing ISO 9001 system was sighted. Recommended for certificate renewal under scope as specified in draft certificate attached with this report.
Lloyd's Register Quality Assurance Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as "LRQA". LRQA assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant LRQA entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract. Form: MSBSF43000/0.2 0106 Report: KLR0403591/0003 - 4-Jun-11 Page 4 of 63
Assessment details
Introduction:
The certificate renewal visit was carried out by Ir. Chong Kam Fook (Team Leader) at Jabatan Laut Wilayah Timur, Kuala Terengganu & Pejabat Laut Kemaman (Day 1), Pejabat Laut Tanjung Gelang (Day 2) and Ibu Pejabat Laut, Port Klang (Day 3 & 4) and Dr. Ooi at Jabatan Laut Sabah Ibu Pejabat Kota Kinabalu and Pejabat Pelabuhan Kota Kinabalu (Day 1), Jabatan Laut Wilayah Persekutuan Labuan (Day 2), Jabatan Laut Wilayah Selatan Johor Bahru & Pejabat Pelabuhan Pasir Gudang (Day 3) and Ibu Pejabat Laut, Port Klang & Jabatan Laut Wilayah Tengah (Day 4). The Certificate Renewal assessment of the organisations quality management system was carried out to determine its continuing compliance. The organisation has been certified for six years and over this periods, the quality system has been satisfactorily maintained. Captain Ahmad (Director General), Baharin (Deputy Director), Yusnan (Marine Officer), Khairudin Abbas (Deputy QMR), Md. Ridzuan (Asst. Principal Director of ICT), Jamaluddin (Asst. Principal Director, ISM ), Nordin (Asst. Principal Director), Zulkurnain (Asst. Principal Director, Ship Registration), Ramli Ahmad (Asst. Principal Director, HEPP), Noor Ariff (Director, BKP) and Sukhbir Singh (Marine Officer, ISM) were present at the opening and closing meetings. The daily review meeting was held together with closing meeting as there was no major non conformity found. The certification scope assessment scope Provision of seamen certification. Issuance of Document of Compliance (DoC) of ISM Code. Conduct of Hydrographic Survey. Management of Dredging Works and Provision of ship registration. Operation of navigational aids system were confirmed. The grading of discrepancy under E-Report, continual improvement tracking log, audit methodology and reporting were briefed. There was no change to assessment plan. Audit results are reported by individual assessor and given as follows.
Assess or:
Day 01 (25 Sept 06) Kuala Terengganu & Kemaman Port Offices, Peninsular Malaysia
Page 5 of 63
Assessment Jabatan Laut Wilayah Timur & of: Kemaman Port Office
What we found:
The Jabatan Laut Wilayah Timur, Kuala Terengganu and Kemaman port offices are headed by Mr. Jasari Bin Awang & staffed of 5 persons and Aluwi Bin Muda & staffed of 4 respectively. Organisation chart reflected the current organisation structure. The staff responsibilities were defined and stated under individual File Meja. Quality policy signed by the latest Director General was displayed at front office and it was understood by the staff. The only quality objective applicable to Jabatan Laut Wilayah Timur was issuance of modular course certificate within 7 days after received application. Actual performance data was monitored by IPL, Port Klang. Both port offices process application of seamen certification which included seamen registration, management of seamen service (crew agreement and sign on / sign off), official log book, receive application of certificate of competency (CoC) and certificate of recognition (CoR). Jabatan Laut Wilayah Timur, Kuala Terengganu only issue modular course certificates.
Page 6 of 63
Assessment Jab Laut Wilayah Timur & Kemaman of: Port Office
Internal Quality Audit Management Review ISO documents & records control
What we found:
Activities related to seamen certification were audited by two internal auditors Abdul Nasar and Yusnan Abdul Rani on 22 Feb and 23 Feb 06 at Jabatan Laut Wilayah Timur, Kuala Terengganu and Kemaman port office respectively. One Observation & 2 minor CAR and 2 Observations were raised at respective office. There were evidences that necessary corrective actions were taken in addressing Laporan Ketakakuran and closed out. Audit report and Laporan Ketakakuran were maintained. The management review meeting minutes dated 3-4 Sept 06 was available at each office. A copy of management review meeting minutes was also saved into Malaysia Marine Department website (JALIN system) and it can be viewed by authorised personnel. A copy of quality manual and all relevant procedures were distributed to the local port office and it carried copy number 21 and 22 respectively. ISO documents were accessible during this audit. Discrepancy was noted in control copy # 22 in which Quality Manual, page 6 of 44 and 15 of 44 were still at revision 0. The said pages had been revised on 17 March 06 and both carried revision #1 during audit (raised as RC0609CKF01). Records related to seamen certifications were send together with Surat Penyerahan to IPL upon completion.
Page 7 of 63
Assessment Jabatan Laut Wilayah Timur, Kuala of: Terengganu: Seamen Certification What we looked at:
Records related to Semen Registration (Roslan, Seaman No: 200606004433 and Zunika, No: 200601004427); Seamans Record Book Crew Agreement & Official Log book (Sejahtera Pertama (official no: 329363) and Inai Siantan (official no: 330423) Change to List of Crews for Fordeco 33 tug, Inai Teratai 341 tug and Inai Teratai 122 tug Certificate Of Competency (Ramedan, seamen no: 200206012941 and Mat Noor, No: 200508006472); application to sit for examination for CoC received from Awang Bin Dollah (200603001803) Certificate of Recognition (Ishidro Damny, Seaman No: 200528004982 and Daniel Mangay, No: 200228011724) Modular course Basic Safety Training conducted by Ranaco Marine (Ref: RM/AD/354/2006) verification of above application through JALIN and reviewed procedures PT-HEPP-02, PT-HEPP04, PT-HEPP-05; PT-HEPP-06, PT-HEPP-07, PT-HEPP-08 and PT-HEPP-09.
What we found:
Application and processing for seamen registration were reviewed. Seafarer Registration Form and all supporting documents were available and verified prior to the acceptance. With effect from 1 June 06, seafarers particulars were keyed into Sistem Dokumentasi Pelaut (SDP) which was updraded from previous Jalin / Maklumat Pelaut centralized computer system. Seamen Document and Seamen Identity Document for Foreigner were issued to local and foreign seafarers respectively when application found acceptable. Seamans Record Book was issued when local / foreign seafarer in compliance with requirements. Crew sign on / sign off were carried out properly and found in order. Both new issuance and old Crew Agreement and Change to List of Crew (when there is crew sign on / sign off) were send back to IPL as sighted on Borang Penyerahan. Application form of CoC and its supporting documents were send to Ibu Pejabat Laut, Port Klang for further processing. The watch-keeping rating and endorsement was keyed into JALIN system as stipulated in PT-HEPP-02, issue 1, clause 6.1.4. Acknowledgement of receipt of CoC by applicant was sighted on Borang Penyerahan Perakuan Kekompetenan. A temporary Written Acknowledgement of Application for CoR and Letter of Acknowledgement was issued to new applicant and renewal respectively when application was acceptable. Acknowledgement of receipt of CoR by applicant was sighted on Borang Penerimaan Perakuan Pengiktirafan. For Office Use area on Borang Penerimaan Perakuan Pengiktirafan was updated when Master / Representative return back photostat copy of CoR with certificate holders signature (page 2) to local port office as stated under PT-HEPP-04, issue 1, clause 6.3.3. Application form, supporting documents of seamen document, seamen record book, Official Log Book and Crew Agreement (both expired and new issue) were send together with Borang Penyerahan to Ibu Pejabat Laut of Semenanjung Malaysia (HEPP) upon completion. Borang Penyerahan were satisfactorily maintained. The local office had created a check list for each type of application which is ease in processing of application.
Page 8 of 63
Assessment Jabatan Laut Wilayah Timur, Kuala of: Terengganu: Modular Course What we looked at:
Modular Course verification, issuance of modular course certificate to candidates and its procedure PTHEPP-09, revision 1; STCW 95 Basic Safety Training conducted by Ranaco Marine, Kuala Terengganu on 13-17 August 06.
What we found:
There was evidence that staff in-charge had checked Senarai Pendaftaran of Training Institution available on www.marine.gov.my regularly. A spot check was carried out on STCW 95 Basic Safety Training conducted by Training Centre on 13-17 August 06. Borang Pemeriksaan Senarai Peserta Kursus as required by PT-HEPP-09 was sighted. Course participant attendant were verified through JALIN system. Modular certificate was issued to candidate who had successfully completed the course. The local office had created a check list for application which is ease in processing of application.
Page 9 of 63
Assessment Pejabat Laut Kemaman: of: Seamen Certification What we looked at:
Records related to Semen Registration (local seafarer Mohd. Nizam, Seaman No: 200611006046 and foreign seafarer Melki Sedik, No: 200624002591) Crew Agreement & Official Log book (M.V. Victoria 2 (official no: 328143) and M.V. Setia Damai (official no: 325978, renewal) Change to List of Crews for M.V. Permit Sepoi (Official No: 329580, crew sign on) and M.V. Sealink Maju 2 (Official No: 328174) Certificate Of Competency (Abd Aziz, seamen no: 200603005173 and Che Sulaiman, No: 200203010863) Certificate of Recognition (Umar, renewal, Seaman No: 200524007278 and Achmad Helza, new application, No: 200624004218) Modular course Basic Safety Training conducted by Ranaco Marine (Ref: RM/AD/354/2006) verification of above application through JALIN and reviewed procedures PT-HEPP-02, PT-HEPP04, PT-HEPP-05; PT-HEPP-06, PT-HEPP-07 and PT-HEPP-08.
What we found:
Application and processing for seamen registration were reviewed. Seafarer Registration Form and all supporting documents were available and verified prior to the acceptance. With effect from 1 June 06, seafarers particulars were keyed into Sistem Dokumentasi Pelaut (SDP) which was updraded from previous Jalin / Maklumat Pelaut centralized computer system. Seamen Document and Seamen Identity Document for Foreigner were issued to local and foreign seafarers respectively when application found acceptable. Seamans Record Book was issued when local / foreign seafarer in compliance with requirements. Crew sign on / sign off were carried out properly and found in order. Both new issuance and old Crew Agreement and Change to List of Crew (when there is crew sign on / sign off) were send back to IPL as sighted on Borang Penyerahan. Application form of CoC and its supporting documents were send to Ibu Pejabat Laut, Port Klang for further processing. The watch-keeping rating and endorsement was keyed into JALIN system as stipulated in PT-HEPP-02, issue 1, clause 6.1.4. Acknowledgement of receipt of CoC by applicant was sighted on Borang Penyerahan Perakuan Kekompetenan. A temporary Written Acknowledgement of Application for CoR and Letter of Acknowledgement was issued to new applicant and renewal respectively when application was acceptable. Acknowledgement of receipt of CoR by applicant was sighted on Borang Penerimaan Perakuan Pengiktirafan. For Office Use area on Borang Penerimaan Perakuan Pengiktirafan was updated when Master / Representative return back photostat copy of CoR with certificate holders signature (page 2) to local port office as stated under PT-HEPP-04, issue 1, clause 6.3.3. Application form, supporting documents of seamen document, seamen record book, Official Log Book and Crew Agreement (both expired and new issue) were send together with Borang Penyerahan to Ibu Pejabat Laut of Semenanjung Malaysia (HEPP) upon completion. Borang Penyerahan were satisfactorily maintained.
Day 02 (26 Sept 06) Tanjung Gelang Port Office, Kuantan, Peninsular Malaysia
Page 10 of 63
What we found:
Seamen certification activities carried out at local office included seaman registration, article sign on / sign off, official log book, CoC and CoR. The Kemaman Port Office (HEPP) is headed by Puan Soraya and staffed of 5 persons. Organisation chart reflected the current staff reporting. The staff responsibilities were defined and a copy was available in individual File Meja. Quality policy was displayed and it was understood by the staff. None of the quality objectives was applicable to local port officer. Local port office processes application of seamen certification which included seamen registration, management of seamen service (crew agreement and article sign on / sign off), official ship logbook, receive application of certificate of competency (COC) and certificate of recognition (CoR).
What we found:
Activities related to seamen certification were audited by two internal auditors Abdul Nasar and Yusnan Abdul Rani on 24 Feb 06. 1 major, 1 minor CAR and 2 Observations were raised. There were evidences that necessary corrective actions were taken in addressing Laporan Ketakakuran and closed out. Audit report and Laporan Ketakakuran were maintained. The management review meeting minutes dated 3-4 Sept 06 was available at each office. A copy of management review meeting minutes was also saved into Malaysia Marine Department website (JALIN system) and it can be viewed by authorised personnel. A copy of quality manual and all relevant procedures were distributed to the local port office and it carried copy number 23. ISO documents were accessible during this audit. Although original document of page 15 of 44 (organisation chart) was withdrawn and kept in separate file, however, original page of previous revision (issue 1, revision 1) was not stamped BATAL as it is required under PS-BDPK-03, revision 1, issue 1, clause 6.2.8 (raised as RC0609CKF01 ) Records related to seamen certifications were send together with Surat Penyerahan to IPL upon completion.
Page 11 of 63
Assessment Tg Gelang Port Office: of: Seamen Certification What we looked at:
Records related to Semen Registration (local seafarer Mohd. Soffian, Seaman No: 200611004547 and foreign seafarer Isak, No: 200624006352) Crew Agreement & Official Log book (M.T. Sutra Satu (official no: 328437, renewal) and M.T. Kuantan (official no: 327187, renewal) Change to List of Crews for M.T. Sari Marina (Official No: 326664, crew sign on) and M.V. Opal (Official No: 329949) Application of Certificate of Competency (Abdul Wahid, seamen no: 200220012059 and Khairul Nizam, Cert. No: 009126); application for examination for CoC (Mohd. Firdaus, No: 200303019674) Certificate of Recognition (Arung Biring, renewal, Seaman No: 200324021983 and Muhamad Johari, new application, No: 200624005121); Application for endorsement of specialised training (Muhamad Shah, No: 200006010054) verification of above application through JALIN and reviewed procedures PT-HEPP-02, PT-HEPP04, PT-HEPP-05; PT-HEPP-06, PT-HEPP-07 and PT-HEPP-08. Complaint of an offence to be compound (No: 001538) raised and submitted to Director General of Malaysia Marine Department
What we found:
Application and processing for seamen registration were reviewed. Seafarer Registration Form and all supporting documents were available and verified prior to the acceptance. Seafarers particulars were keyed into Jalin / Maklumat Pelaut centralized computer system. Seamen Document and Seamen Identity Document for Foreigner were issued to local and foreign seafarers respectively when application found acceptable. Seamans Record Book was issued when local / foreign seafarer in compliance with requirements. Crew sign on / sign off were carried out properly and found in order. Both new issuance and old Crew Agreement and Change to List of Crew (when there is crew sign on / sign off) were send back to IPL as sighted on Borang Penyerahan. Application form of CoC and its supporting documents were send to Ibu Pejabat Laut, Port Klang for further processing. Details of application for watch-keeping rating and endorsement of specialised training were keyed into JALIN system as stipulated in PT-HEPP-02, issue 1, clause 6.1.4. Acknowledgement of receipt of CoC by applicant was sighted on Borang Penyerahan Perakuan Kekompetenan. A temporary Written Acknowledgement of Application for CoR and Letter of Acknowledgement was issued to new applicant and renewal respectively when application was acceptable. Acknowledgement of receipt of CoR by applicant was sighted on Borang Penerimaan Perakuan Pengiktirafan. For Office Use area on Borang Penerimaan Perakuan Pengiktirafan was updated when Master / Representative return back photostat copy of CoR with certificate holders signature (page 2) to local port office as stated under PT-HEPP-04, issue 1, clause 6.3.3. Application form, supporting documents of seamen document, seamen record book, Official Log Book and Crew Agreement (both expired and new issue) were send together with Borang Penyerahan to Ibu Pejabat Laut of Semenanjung Malaysia (HEPP) upon completion. Borang Penyerahan were satisfactorily maintained. Complaint of an offence to be compound was raised and submitted to Director General of Malaysia Marine Department following ship owner of M.T. Masindra 9 (Official No: 327311) failed to renew crew agreement (overdue about 2 months) as required under session 104 (1) Malaysia Shipping Ordinance 1952. Receipt of payment of penalty imposed on late renewal paid by ship owner was sighted
Day 03 (27 Sept 06) Ibu Pejabat Laut Semenanjung Malaysia, Port Klang
Form: MSBSF43000/0.2 0106 Report: KLR0403591/0003 - 4-Jun-11 Page 12 of 63
Outstanding issues raised in previous audit as stated at Assessment Findings Summary Log attached to this report
What we found:
Corrective actions were carried out and addressed each discrepancy. All Minor NC were closed out.
Organisation chart, job description; quality policy and objectives and performance monitoring, commitment of Top Management; exclusion on ISO clause; statutory / regulatory requirements
What we found:
The Director General was interviewed and he admitted the improvement in the organisation following the implementation of ISO9001 system. The top management commitment in maintaining the ISO 9001 system was sighted. The quality policy was signed by new Director General and a copy was displayed at headquarters and regional port offices. No change to the objectives since the last visit. Actual performance of quality objectives (Jan-July 06) were monitored and analysed according to defined interval. Organisation chart dated 17 March 06 reflected the current reporting of staff at IPL and other regional port offices. Captain Ahmad and Encik Baharin were appointed as new Director General and Deputy Director on 1 June and 6 June 06 respectively. Appointment of New Deputy Director as QMR was sighted on letter send out by the Director General on 30 June 06. Responsibilities of employees were remained unchanged and it was documented in individual Senarai Tugas Harian. Exclusion made on ISO clause 7.3, 7.5.2 and 7.6 and its justifications as stated in the quality manual was remained appropriate. All statutory / regulatory which the organisation needs to comply such as STCW 1995, Merchant Shipping Ordinance 1952, etc. had been identified and documented in quality manual.
Page 13 of 63
Assessmen Ibu Pejabat Laut, Port Klang t of: Management System Elements
Khairuddin Abbas (Asst Principal Director, HR) Md. Ridzuan (Asst Principal Director, IT)
What we found:
Ibu Pejabat Laut and selected regional port offices as shown on Jadual Perancangan Audit Dalaman MS ISO 9001:2000 Bagi Tahun 2006 and Pelan Audit Kualiti Dalaman were audited in August 06. Reviewed Laporan Audit Kualiti Dalaman and Laporan Ketakakuran of Jabatan Laut Wilayah Utara, PTP Port Office and Port Offices of Jabatan Laut Sarawak and found to be in order except that Laporan Ketakakuran. The management review was held on 4 Sept 06, chaired by the Director General and attended by the Deputy Director (Wakil Pengurusan Kualiti, WPK), Deputy WPK, Regional Port Office Director and ISO Secretary. All necessary agenda were discussed included review of actual performance for quality objectives for the periods Jan-July 06. Minutes and supporting materials were maintained. Noticed that necessary corrective actions and follow-up on effectiveness of Major, Minor CAR and Observations (Laporan Ketakakuran) raised in recent IQA to PTP Port Offices e.g. 1 /2, 1 /2, 2 /6, etc. dated 1 and 2 August 06 and to Pejabat Laut Wilayah Utara e.g. 2/5, 3/5, 4/5, etc. dated 21 & 22 August 06 were not carried out on timely basis. Corrective actions and area for auditor follow-up were remained not filled at the time of the audit (Raised as Minor NC0609CKF02). There was no customer complaint reported. Customer satisfaction survey forms obtained under seamen certification (consists of seamen registration, crew sign on / sign off, on-line port clearance, CoC, CoR, CoC examination), aids to navigations, modular course certificates issuance, Issuance of DoC of ISM code in year 2006 were sighted. Rating of customer feedback was generally found to be satisfactorily. There was no preventive action initiated since the last visit. Data analysis carried out on quality objective performance, suppliers / subcontractors performance and customer satisfaction feedbacks were sighted. JALIN system had been upgraded to Sistem Dokumentasi Pelaut (SDP) and it was implemented on 1 June 06. Selected Port Offices such as Jabatan Laut Wilayah Timur (Kuala Terengganu), Pejabat Pelabuhan Pasir Gudang, etc. had used SDP in processing various application received daily. The LRQA / UKAS logo were printed on employees business cards, letterheads and company website. The usage of logo was found satisfactorily.
Page 14 of 63
Assessment Ibu Pejabat Laut, Port Klang of: Documents & Records Control &
Bilik File
What we found:
Control on both master and distribution of ISO documents to the regional port offices were reviewed and found satisfactorily. Document Master List (Senarai Induk Dokumen) reflected implementation data of ISO documents and history of document changes. Document changes were carried out in proper manner and approved by the defined authority prior to the distribution. Description of change was summarised on Rekod Pindaan. Reviewed documents distributed to regional port offices. Noticed that Borang Pengedaran Dokumen Kulaiti shown acknowledgement of recipient of Kemaman Port Office and Tanjung Gelang were not maintained at Issuing Office (Headquarters). Although original document of page 6 of 44 (Rekod Pindaan) and 15 of 44 (organisation chart) were withdrawn and attached with Borang Cadangan Pindaan, however, it was not stamped BATAL as it is required under PS-BDPK-03, revision 1, issue 1, clause 6.2.8 (raised as RC0609CKF01 ). External documents such as STCW 95, Ordinan Perkapalan Saudagar 1952, etc. were distributed to relevant Units and its control was found satisfactorily. Quality records were maintained in accordance to retention time defined. Old records were currently stored in hard cover file at designated area and retrievable during audit. Reviewed Official Log Book, Change to List of Crews, Crew Agreement send by Jabatan Laut Wilayah Timur at Bilik Fail. Noticed that 2 out of 4 Borang Penyerahan i.e. (27) JLWT Jilid 2 and (305) JLWT dated 12/1/09 were not able be traced at Bilik File. Currently, acknowledgement of receipt of documents send by Regional Port Office was not returned to sender (raised as RC0609CKF01 ).
Assessment Ibu Pejabat Laut, Port Klang of: Human Resource Management What we looked at:
Staff competency and training needs identification; training plan 2006; staff training records; evaluation of training effectiveness; training for new staff
What we found:
Training needs identified by immediate superior or proposed by staff in year 2006 were compiled. All new staff had attended induction training and attendance was updated into individual Buku Perkhidmatan Kerajaan. Buku Perkhidmatan Kerajaan of current staff were found up-to-date. The effectiveness of training three out of five samples / courses selected for further review was not evaluated. The affected trainings were Retreat Keselamatan Fizikal & Keselamatan Dokumen, APEC on port security, Understanding & Managing Complaints in the Public Sector attended by Abdul Nasar, Ahmad Dasha and Khairudin Abbas on 4 July 06, 12-15 June 06 and 6 July 06 respectively. The training effectiveness is required under ISO 9001:2000 clause 6.2.2 (c) as to know whether training meet objective or improve staff competency or otherwise (Raised as Minor NC0609CKF03).
Day 04 (28 Sept 06) Ibu Pejabat Laut Semenanjung Malaysia, Port Klang
Page 15 of 63
What we found:
The JLS responsible for verifying compliance with the requirements of the ISM Code and issuing DoC to Companies. Notification and confirmation of annual verification / initial audit was noted carried out and found in order. Audit was carried out according to audit plan. Audit discrepancy was graded accordingly, follow-up on corrective action and Major / Minor CAR closed out. Audit Notes prepared by auditors were maintained. DoC Audit Report was submitted to and verified by Marine Department Director. Draft of Document of Compliance was prepared and submitted to Marine dept Director for approval. Original DoC was endorsed upon satisfactorily closing of Minor / Major NC after each annual verification. The followings were Noted: a) Ship sampling which is mandatory for initial audit was not shown on Audit Plan of Seacor Marine (Asia) Pte. Ltd. Ship sampling is carried out upon closure of NCR and vessel is available. b) No comment provided by the auditor for closure of major / minor NCR although record evidences were attached. (Raised as RC0609CKF04)
Assessment Ibu Pejabat Laut, Port Klang of: Conduct of Hydrographic Survey What we looked at:
Planning for year 2006 and bathymetric survey of: a) Kuala Sungai Perak, Bagan Datoh (completed on 26 Feb 06) b) Sungai Kemaman (completed on 22 May 06) c) Kuala Sungai Endau, Tanjung Gemok (Pre and post survey completed in Nov 05 and on 22March 06 respectively).
What we found:
Pre-survey was carried out by Jabatan Laut personnel to determine the need of dredging at channel or river mouth under jurisdiction of Marine Department. River mouths in Peninsular Malaysia which were identified for hydrographic survey in year 2006 was shown on Projek Ukur Hidrografi. Data collection and processing were carried out with the aids of Hydropro and Terramodel softwares. Bathymetric survey maps were generated and a copy was submitted to Aids to navigation (users). Survey plans were maintained. Memo send out to Aids To Navigation to request in relocating 5 buoys at Kuala Sg. Perak, Bagan Datoh was sighted. Conduct of survey was compliance with documented procedure PT-BKP-06.
Page 16 of 63
Process:
What we found:
Dredging activities carried out by Malaysia Maritime & Dredging Corporation (MMDC) was monitored through site meeting held monthly. There was evidence that actual progress reported by MMDC monthly were discussed during monthly site meeting with MMDC and meeting minutes were maintained. Laporan Kemajuan Bulanan was prepared and submitted to the Division Director monthly after each site meeting. Correspondance with local authorities such as Department of Environment, Land Office and Irrigation (JLS) on approval of dumping site were sighted.
Assessment Ibu Pejabat Laut, Port Klang of: Purchasing What we looked at:
Purchasing procedures; monitoring of supplier / subcontractors performance through evaluation; Purchases made from Big City Forwarders (Pesanan: AD 620015, navigation lightings), Neotech System (Pesanan: AD 619901, deskstop) and Suff Engrg. (Pesanan: AD 620037, repair MV Pelita) were selected for review.
What we found:
All of above suppliers are shown on Registered Subcontractor list. Purchase requirements stated on Borang Pesanan Pembelian / Pembaikan received from the requestor were reviewed and suppliers were sourced accordingly. Specification stated on suppliers quotation was adequately reviewed by requestor prior to each purchase. Borang Pesanan was issued to selected supplier / subcontractor. Although purchase was made from registered supplier, post evaluation as required under ISO 9001:2000 clause 7.4.2 was not carried out for registered supplier / subcontractor (Raised as RC0609CKF05).
Page 17 of 63
Process:
Ibu Pejabat Laut, Port Klang Infrastructure (MIS) and Work Environment
What we found:
Offices for staff was found conducive. Basic facilities required in carrying out ISO activities were provided to each staff. MIS Unit had identified 4 projects for this financial year i.e. (a) to upgrade WAN of JALIN, (b) to purchase hardware & software for current users, (c) to upgrade / expand Sistem Dokumen Pelaut (SDP) and (d) set up network / system for new Pulau Indah Training Centre under Rancangan Malaysia Ke-9. Detailed Schedule of each projects were sighted. SDP was implemented at selected port office at the time of the audit. Normal computer system breakdown were rectified and recorded into Borang Penyenggaraan ICT. MIS department had carried out repairs / maintenance when computer users raised Borang Penyelenggaraan ICT. Work environment at regional port offices and headquarter were found conducive and basic office appliance were provided to all staff.
Assessor :
DAY 1 (25 Sep 2006) - Jabatan Laut Sabah, Ibu Pejabat, Kota Kinabalu & Pejabat Laut Kota Kinabalu
Page 18 of 63
Page 19 of 63
Page 20 of 63
Assessment Pejabat Laut Kota Kinabalu of: - Seamen Certification Audit trails and sources of evidence:
Sampled following records for the application, processing and issuance of seamen card.:Jafree b. Jamli No. Pelaut: 200612006400, seamen book no. 02394 Kyaw Thu Tun No. Pelaut: 200627006330 Jatmiko No. Pelaut: 200524006686 Sampled records for application for Certificate of Recognition (CoR) for seamen certification. Sampled following Crew Agreements: Labuan Express Tiga (official no: 327888) and M.V. Swee Long Sah (official no: 325740). Sampled Change to List of Crews for M.V. Borcos Sabahan 2 (official no: 328948)
Page 21 of 63
Page 22 of 63
Assessment Jabatan Laut Wilayah Labuan of: - Seamen Certification Audit trails and sources of evidence:
Sampled following records for the application, processing and issuance of seamen card.:Lye Kwok Wai No. Pelaut: 200635000537 Mohd. Sisali b. Mod. Ismail No. Pelaut: 200613002497 Seamen Book No. 35000263 Mohammad Azmie b. Naib No. Pelaut 200615002494 Seamen Book No. 35000261 Sampled following records for application for Certificate of Competency (CoC):Khair Anuar Mohamad 2nd Class Steam Sampled records for application for Certificate of Recognition (CoR) for seamen certification:Elizalde Fermindoza Espora Engineer Officer Class III Elverio Dinglasa Dacal Chief Mate Sampled following Crew Agreements and Change to List of Crews, Official Ship Logbook. Seamans Certification: Modular Course Certificate control of training centre.
Page 23 of 63
Assessment Jabatan Laut Wilayah Labuan of: - Ship Registration Audit trails and sources of evidence:
Reviewed the application for Name of Ship and Ship Registration by Makjaya for the ship Labroy 180 for compliance with requirements and ship registration procedure PT-BKI-01 and PT-BKI-02;
Assessment Pejabat Laut Johor Bahru of: & Pejabat Laut Pasir Gudang
Organisation & Management Responsibility
Auditee(s): Rohayu
Page 24 of 63
Follow-up of above CoC applications of Jan 2006 was carried out at Ibu Pejabat Laut. It was found that the CoC in case (1), (4) and (5) were sent to port office at Pulau Pinang, Kemaman and Kuching respectively. Case (2) was actually an application for Kad Pelaut and not for CoC. Case (3) was held up due to the JALIN system not having the steer-man course category and this requires modification by IT. In view of the choice given to the applicant to select the port office for collection of the certificate, the port office should record this choice of collection of the certificate in the monitoring form Borang I Pemantauan Objektif Kualiti. Such cases also seen in Jabatan Laut Sabah. There are two training centres for the modular courses, viz., Polis Marine Tampoi and MSTS. Random checks of attendance of participant attendance carried out. Certificates for participants printed out and certificates issued were recorded.
Page 25 of 63
Auditee(s):
Hj. Kamaruzaman b. Jonid Penolong Pegawai Laut Abd. Jalal b. Mohaidin, Merinyu Kanan Noriszaha, Merinyu Kapal Hamzah b. Salleh, Merinyu Kapal Sulastry Molyani b. Mohd. Yusof, Merinyu Kapal
Page 26 of 63
DAY 4 (28 Sep 2006) Ibu Pejabat, Laut, Port Klang & Jabatan Laut Wilayah Tengah, Port Klang
Page 27 of 63
Assessment Ibu Pejabat Laut, Port Klang of: - Navigational Aids System Audit trails and sources of evidence:
Maintenance of Navigational Aids System : Light Buoys, Light House and Beacons Repairs of Navigational Aids System
Assessment Ibu Pejabat Laut, Port Klang of: - Ship Registration Audit trails and sources of evidence:
Page 28 of 63
Assessment Jabatan Laut Wilayah Tengah of: - Ship Registration Audit trails and sources of evidence:
Reviewed the application for Name of Ship and Ship Registration for the ship Geniki Sarawak (Official no. 330521) for compliance with requirements and ship registration procedure PT-BKI-01 and PT-BKI-02; Reviewed the application for Name of Ship and Ship Registration for the ship Jetta 27 (Official no. 330547) and Jetta 28 (Official no. 330548).
Status 2
Closed
Finding 3
Process / Aspect 5
internal audit
Date 6
27 Dec 05
Ref 7
0512CKF01
Clause 8
8.2.2
RC
Closed
RC
Closed
RC
Closed
Minor NC
Closed
SFI Minor NC
New Closed
SFI
New
It was noted that above audit only covered seamen certification Revised Audit Plan has included management activities only. Other areas such as responsibility and authority, system elements and it was distributed to all port IQA, management review, etc. were not audited offices. However, implementation of audit plan was not sighted at Miri and Sg. Udang port office. QMR called a briefing to all auditors to clarify the audit scope on 31 July 06. Implementation was sighted in recent audit. It was noted that annual management review meeting minutes Same discrepancy was sighted on Miri Port Office. was not circulated to the local port office Management review minutes dated 1/3/06 was not available. Minutes was saved in Jab Laut Website under JALIN system and it is accessible by all port office. It was noted that the actual achievement of quality objective i.e. Letter issued on 3 April 06 to IPL Director pengeluaran sijil kursus modular < 7 hari bekerja under explaining the problems of not achieving quality seamen certification (refer to quality manual, clause 2.1.1.) was objectives. However, the actual performance data not worked out and reported by Sibu Port Office to the Top remained not sighted. Monitoring data for Sibu, Management. Total number of modular courses conducted Sarawak for Jan-Sept 06 was sighted. Target was monthly were recorded instead not achieved. It was noted that customer satisfaction on modular course, on- Only one customer of on-line port clearance (i.e. line port clearance had yet to determine during this audit Hapag Lloyd) was replied. Customer satisfaction for modular course certificate had yet to determine. 'Maklumbalas dan Aduan Pelanggan Tahun 2006' was received overall, all areas were rated Good. The management review meeting minutes was not circulated to Minutes was saved in Jab Laut Semananjung the local port office. The internal auditor found above Malaysia website (JALIN System) and it is discrepancy during recent internal audit and it was graded as accesible to all port office. Observation. This discrepancy was already highlighted to the management during SV 4 audit under item 0512.CKF02 It is recommended to record the date of receipt and issuance of Not required seamen identity document on application form so the efficiency of works could be monitored Noticed that the Crew Agreement (new issuance) was kept in All official log book & change to list of crew were local office instead of sending back to IPL as it is stated under returned to IPL as sighted on physical copy and PT-HEPP-06, issue 1, clause A 6.1.7. Same discrepancy was 'Borang Penyerahan'. noted on Change to List of Crew as required under PT-HEPP06, issue 1, clause 6.1.9. Noticed that For Office Use area on Borang Penerimaan Not required Perakuan Pengiktirafanwas only updated when Master / Representative return back photostat copy of CoR with certificate holders signature (page 2) to the local port office as stated under PT-HEPP-04, issue 1, clause 6.3.3. There is possibility that Master or representative does not return photostat copy of CoR to local port office. 2. New, Open, Closed 7. YYMM<Initials>seq.# Minor NC = Minor nonconformity 3. Description of the LRQA finding 8. Clause of the applicable standard RC = Requires correction Report: KLR0403591/0003 - 4-Jun-11
27 Dec 05
0512CKF02
5.6.1
27 Dec 05
0512CKF03
8.4
customer satisfaction
29 Dec 05
0512CKF07
8.2.1
05 Apr 06
0604CKF01
5.6.2
Seamen Card / Seamen Document Application (Miri) Article Sign On / Sign Off (Miri Port Office)
05 Apr 06 05 Apr 06
0604CKF02 0604CKF03
7.1 7.1
05 Apr 06
0604CKF04
7.1
1. Grading of the finding * 6. Date of the finding * Major NC = Major nonconformity Form: MSBSF43000/0.2 0106
5. Process, aspect, department or theme xLRQA = Issue for follow-up by LRQA at next visit Page 30 of 63
Grade 1
Minor NC
Status 2
Closed
Finding 3
Process / Aspect 5
Date 6
Ref 7
Clause 8
Noticed that one of the quality objectives i.e. issuance of Monthly monitoring data for the periods Jan - July quality objective monitoring 05 Apr 06 0604CKF05 5.3.1 modular course certificate within 7 working days was related to 06 was sighted. (Sg. Udang Port Office) local office. Data related to date received and issuance of certificate for each modular courses conducted by Training Institute / Centre were available. However, data had yet to consolidate and actual achievement status was not monitored Minor NC Closed A total of 10 Laporan Ketakuran were raised at Sungai Udang All Laporan Ketakakuran had been graded internal quality audit (Sungai 05 Apr 06 0604CKF06 8.2.2 Port Office. All 10 discrepancies were not graded accordingly accordingly. QMR called a meeting on 31 July 06 Udang) and Laporan Audit Dalaman was not issued to local office. and had briefed all internal auditors on audit Besides that, audit records did not demonstrate other areas scopes. Recent internal audits (Feb 06) was such as responsibility and authority, quality objectives, IQA, reviewed and covered all necessary areas. management review, etc. were audited. This discrepancy was highlighted during previous (SV 4) audit under item 0512CKF01 RC Closed Noticed that Change to List of Crew (No: JL/HEPP/D/02) as Change to List of Crew had been implemented with Article Sign On / Sign Off (Sg. 05 Apr 06 0604CKF07 7.1 required under PT-HEPP-06, issue 1, clause 6.1.9 was not effect from March 06. Udang Port Office) implemented for crew sign on / sign off. Further investigation revealed that above form was not available in local port office. Staff in-charge able to complete clients application as it was stated on cover letter given by applicant RC Closed Noticed that Format Penyerahan Perakuan Kekompetenan 'Format Penyerahan Perakuan Kekompetenan' was CoC (Sg. Udang Port Office) 05 Apr 06 0604CKF08 7.1 was not implemented in local port office. Acknowledgement of implemented since May 06 and found to be receipt of CoC by applicant was sighted on log book satisfactorily. Minor NC Closed Actual performance data for (a) issuance of password and Each quality objectives were monitored by quality objective monitoring & 06 Apr 06 0604CKF09 5.3.1 userid for seamen certification within 5 working days and (b) individual Units and data were available reporting (IPL, Port Klang) issuance of modular course certificate within 7 days and (c) to ensure dredging in compliance with schedule were not monitored and reported during management review held on 1 March 06. RC New a) Discrepancy was noted in control copy # 22 in which document control 26 Sep 06 0609CKF01 4.2.3 Quality Manual, page 6 of 44 and 15 of 44 were still at revision 0. The said pages had been revised on 17 March 06 and both carried revision #1 during audit (Kemaman Port Office) b) Although original document of page 15 of 44 (organisation chart) was withdrawn and kept in separate file, however, original page of previous revision (issue 1, revision 1) was not stamped BATAL as it is required under PS-BDPK-03, revision 1, issue 1, clause 6.2.8 (Tanjung Gelang Office) c) Reviewed Official Log Book, Change to List of Crews, Crew Agreement send by Jabatan Laut Wilayah Timur at Bilik Fail. Noticed that 2 out of 4 Borang Penyerahan i.e. (27) JLWT Jilid 2 and (305) JLWT dated 12/1/09 were not able be traced at Bilik File. Currently, acknowledgement of receipt of documents send by Regional Port Office was not returned to sender (IPL, Port Klang) Minor NC New Noticed that necessary corrective actions and follow-up on corrective action (Laporan 27 Sep 06 0609CKF02 8.5.2 effectiveness of Major, Minor CAR and Observations (Laporan Ketakakuran) 1. Grading of the finding * 2. New, Open, Closed 3. Description of the LRQA finding 4. Review by LRQA 5. Process, aspect, department or theme 6. Date of the finding 7. YYMM<Initials>seq.# 8. Clause of the applicable standard * Major NC = Major nonconformity Minor NC = Minor nonconformity RC = Requires correction SFI = Scope for improvement xLRQA = Issue for follow-up by LRQA at next visit Form: MSBSF43000/0.2 0106 Report: KLR0403591/0003 - 4-Jun-11 Page 31 of 63
Grade 1
Status 2
Finding 3
Ketakakuran) raised in recent IQA to PTP Port Offices e.g. 1 / 2, 1 /2, 2 /6, etc. dated 1 and 2 August 06 and to Pejabat Laut Wilayah Utara e.g. 2/5, 3/5, 4/5, etc. dated 21 & 22 August 06 were not carried out on timely basis. Corrective actions and area for auditor follow-up were remained not filled at the time of the audit. The effectiveness of training three out of five samples / courses selected for further review was not evaluated. The affected trainings were Retreat Keselamatan Fizikal & Keselamatan Dokumen, APEC on port security, Understanding & Managing Complaints in the Public Sector attended by Abdul Nasar, Ahmad Dasha and Khairudin Abbas on 4 July 06, 12-15 June 06 and 6 July 06 respectively. The training effectiveness is required under ISO 9001:2000 clause 6.2.2 (c) as to know whether training meet objective or improve staff competency or otherwise. The followings were Noted: a) Ship sampling which is mandatory for initial audit was not shown on Audit Plan of Seacor Marine (Asia) Pte. Ltd. Ship sampling is carried out upon closure of NCR and vessel is available. b) No comment provided by the auditor for closure of major / minor NCR although record evidences were attached. Although purchase was made from registered supplier, post evaluation as required under ISO 9001:2000 clause 7.4.2 was not carried out for registered supplier / subcontractor Records of internal quality audits and minutes of management review were not available at Jabatan Laut Sabah - Ibu Pejabat. Applicants for CoC and CoR are given the choice of selecting the port office for collection of the certificate. The port office should record this choice in the monitoring form Borang I Pemantuan Objektif Kualiti. It would be beneficial to have a separate category in the analysis of quality objective/target of applications > 90 days for CoR and > 30 days for CoC that could be termed as rejected applications that do not meet the specified conditions for issuance of the certificate.
Process / Aspect 5
Date 6
Ref 7
Clause 8
Minor NC
New
27 Sep 06
0609CKF03
6.2.2 (c)
RC
New
28 Sep 06
0609CKF04
7.1
RC
New
purchasing
28 Sep 06
0609CKF05
7.4
RC SFI
New New
28 Sep 06 28 Sep 06
0609OCL01 0609OCL02
SFI
New
Not required
Analysis of data
28 Sep 06
0609OCL03
8.4
SFI
New
Data on quality objectives for seamen certification in Jabatan Not required Laut Wilayah Tengah were not readily available. The collection and analysis of data by each port office should be reviewed so that a clear reporting format for data and its analysis are available for effective evaluation. 2. New, Open, Closed 7. YYMM<Initials>seq.# Minor NC = Minor nonconformity 3. Description of the LRQA finding 8. Clause of the applicable standard RC = Requires correction Report: KLR0403591/0003 - 4-Jun-11
28 Sep 06
0609OCL04
8.4
1. Grading of the finding * 6. Date of the finding * Major NC = Major nonconformity Form: MSBSF43000/0.2 0106
5. Process, aspect, department or theme xLRQA = Issue for follow-up by LRQA at next visit Page 32 of 63
Assessment schedule
Management system elements to be assessed at each visit:
Management review Management of change Corrective action
Continual improvement
Use of LRQA logo and other marks Customer feedback and complaints
Internal audit
Visit type > Due date > Start date > End date > Assessor days > Process / Aspect Seamen Certification (Head Office) Navigational Aids System (Head Office) Ship Registration (Head Office) Issuance of DoC of ISM Code (HO) Conduct of Hydrographic Survey (HO) Mgmt. of Dredging Work (HO) Purchasing Stores MIS Human Resource Management Infrastructure & Work Environment Doc. & Records Control & Bilik File Ship Registration (JL Wilayah Tengah) Seamen Certification (JL Wilayah Tengah) Ship Registration (JL Wilayah Utara) Seamen Certification (JL Wilayah Utara) Ship Registration (Kuching) Seamen Certification (Muara Tebas) Ship Registration (Labuan) Seamen Certification (Labuan) Seamen Certification (Wilayah Selatan) Seamen Certification (Wilayah Timur) Seamen Certification (Kemaman) Seamen Certification (Kuala Perlis) Seamen Certification (Kuah)
Form: MSBSF43000/0.1 1005
Apr 07 TBC 3
Oct 07
Apr 08
Oct 08
Apr 09
Oct 09 TBC
Final selection will be determined after review of management elements and actual performance
Report: KLR0403591/0003 - 4-Jun-11 Page 33 of 63
Certificate renewal
8
SV 1
SV 2
SV 3
SV 4
SV 5
A L L A R E A S
Visit type > Due date > Start date > End date > Assessor days > Process / Aspect Seamen Certification (Lumut) Seamen Certification (Sg. Udang, Melaka) Seamen Certification (Port Dickson) Seamen Certification (Tg Pelepas) Seamen Certification (Pasir Gudang) Seamen Certification (Tg. Gelang) Seamen Certification (Sibu) Seamen Certification (Sarikei) Seamen Certification (Bintulu) Seamen Certification (Miri) Seamen Certification & Ship Registration (Ibu Pejabat Kota Kinabalu) Seamen Certification (Pejabat Pelabuhan Kota Kinabalu) Seamen Certification (Sandakan) Seamen Certification (Tawau)
Apr 07 TBC 3
Oct 07
Apr 08
Oct 08
Apr 09
Oct 09 TBC
Final selection will be determined after review of management elements and actual performance
Page 34 of 63
Certificate renewal
8
SV 1
SV 2
SV 3
SV 4
SV 5
Assessment plan
Assessment type Initial / Re-certification / Change to Approval Assessment team Ir. Chong Kam Fook (Team Leader) Dr. Ooi Cheng Lee Assessment Scope: As stated under draft certificates (Total 27 sites inclusive headquarter) (Day 1) 10:00 Introductory meeting with management to explain the scope of the visit, assessment methodology, method of reporting and to discuss the company's organisation (approximately 30 minutes). The Team Leader will agree a time to meet with top management to discuss policy and objectives for the management system. LRQA team briefing for a team of two or more assessors or (experts). Ir. Chong Kam Fook (Team Leader) Guide: Yusnan Jabatan Laut Wilayah Timur (Kuala Terengganu): 1:00 2:00 Yusnan 5:00 Lunch. Pejabat Pelabuhan Kemaman: Close. Seamen certification Report writing. seamen certification 11:30 Guide: Ir. Awang Ismail 1:00 2:00 Amir Dr. Ooi Cheng Lee Jabatan Laut Sabah- Ibu Pejabat (Kota Kinabalu) Lunch. Pejabat Pelabuhan Kota Kinabalu: Close. Seamen Certification Report writing. Seamen Certification Assessment criteria ISO 9001:2000 Assessment dates 25-28 Sept 2006 Issue date 12 April 06
(Day 2) 9:00 Guide: Yusnan 1:00 2:00 Review of findings from previous day. Review of the assessment plan for the day. Pejabat Pelabuhan Tanjung Gelang: Lunch Fuah Naemoon Report writing. 5:00 Close Seamen certification 9:00 Fuah Naemoon Jabatan Laut Wilayah Persekutuan Labuan: Lunch Jabatan Pelabuhan Wilayah Labuan: Close Ship Registration Report writing. Seamen Certification
Page 36 of 63
(Day 3) 9:00 Guide: Khairudin Abbas Review of findings from previous day. Review of the assessment plan for the day. Ibu Pejabat Laut Semenanjung Malaysia, Port Klang 1:00 Khairudin Abbas Lunch Ibu Pejabat Laut Semenanjung Malaysia, Port Klang 5:00 Close Customer satisfaction Human resource management Document & records control & Bilik File Usage of Logos Report writing. Close Yusnan Organisation / management responsibility Internal audit Management review Corrective action Preventive action Data analysis & continual improvement Lunch Pejabat Pelabuhan Pasir Gudang: Seamen Certification 9:30 Guide: Yusnan Jabatan Laut Wilayah Selatan (Johor Bahru): Seamen Certification
Report writing.
(Day 4 ) 9:00 Review of findings from previous day. Review of the assessment plan for the day. Discussion of all outstanding issues from previous visits. Guide: Sukhbir Singh Ibu Pejabat Laut Semenanjung Malaysia, Port Klang Issuance of DoC of ISM codes Conduct of Hydrographic Survey Mgmt. of Dredging Work; Infrastructure (MIS) & work environment Lunch Yusnan Jabatan Laut Wilayah Tengah: Ship Registration Seamen Certification Guide: Khairudin Abbas Ibu Pejabat Laut Semenanjung Malaysia, Port Klang: Seamen certification Navigational Aids System Ship Registration
Lunch Ibu Pejabat Laut Semenanjung Malaysia, Port Klang Purchasing (goods & services)
Page 37 of 63
Page 38 of 63
1. Certificate details
Jabatan Laut Semenanjung Malaysia - Ibu Pejabat (Marine Department Peninsular Malaysia - Headquarters) Port Klang, Selangor, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Provision of seamen certification. Issuance of Document of Compliance (DoC) of ISM Code. Conduct of Hydrographic Survey. Management of Dredging Works.
Suffix/ A Technical review date: Certificate expiry: 10 Oct 2009 Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 39 of 63
2. Certificate details
Jabatan Laut Wilayah Tengah (Marine Department Central Region) Port Klang, Selangor, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 40 of 63
3. Certificate details
Jabatan Laut Semenanjung Malaysia - Ibu Pejabat (Marine Department Peninsular Malaysia Headquarters) Port Klang, Selangor, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 41 of 63
4. Certificate details
Jabatan Laut Semenanjung Malaysia - Ibu Pejabat (Marine Department Peninsular Malaysia - Headquarters) Port Klang, Selangor, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 42 of 63
5. Certificate details
Jabatan Laut Wilayah Utara (Marine Department Northern Region) Pulau Pinang, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 43 of 63
6. Certificate details
Jabatan Laut Wilayah Selatan (Marine Department Southern Region) Johor Bahru, Johor, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 44 of 63
7. Certificate details
Jabatan Laut Wilayah Timur (Marine Department Eastern Region) Kuala Terengganu, Terengganu, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 45 of 63
8. Certificate details
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 46 of 63
9. Certificate details
Jabatan Laut Wilayah Persekutuan Labuan (Marine Department Labuan Region) Labuan, Federal Territory, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 47 of 63
Pejabat Pelabuhan Kuala Perlis (Kuala Perlis Port Office) Kuala Perlis, Perlis, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 48 of 63
Pejabat Pelabuhan Kuah (Kuah Port Office) Kuah, Pulau Langkawi, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 49 of 63
Pejabat Pelabuhan Lumut (Lumut Port Office) Sri Manjung, Perak, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 50 of 63
Pejabat Pelabuhan Sungai Udang (Sungai Udang Port Office) Sungai Udang, Melaka, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 51 of 63
Pejabat Pelabuhan Port Dickson (Port Dickson Port Office) Port Dickson, Negeri Sembilan, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 52 of 63
Pejabat Pelabuhan Tanjung Pelepas (Tanjung Pelepas Port Office) Gelang Patah, Johor, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 53 of 63
Pejabat Pelabuhan Pasir Gudang (Pasir Gudang Port Office) Pasir Gudang, Johor, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 54 of 63
Pejabat Pelabuhan Tanjung Gelang (Tanjung Gelang Port Office) Tanjung Gelang, Pahang, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 55 of 63
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 56 of 63
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 57 of 63
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 58 of 63
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 59 of 63
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 60 of 63
Pejabat Pelabuhan Kota Kinabalu (Kota Kinabalu Port Office) Kota Kinabalu, Sabah, Malaysia
has been approved by Lloyd's Register Quality Assurance to the following Management System Standards:
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 61 of 63
Type of certificate:
Single certificate
(Complete this form)
Multi-site certificate
(Complete additional multisite form)
Multiple languages
(Complete required forms for each required language)
Further instructions:
QA Register entry (for UKAS accreditation only) Required Not required
Page 62 of 63
Page 63 of 63