ARTICLE IN PRESS

Int. J. Production Economics 112 (2008) 380390 www.elsevier.com/locate/ijpe

An objective-oriented and product-line-based manufacturing performance measurement


Chee-Cheng Chen
Department of Business Administration, National Pingtung University of Science and Technology, 1, Hseuh-fu Rd., Nei-pu, Pingtung 91201, Taiwan, ROC Received 1 August 2004; accepted 30 March 2007 Available online 1 May 2007

Abstract Performance-measurement systems (PMSs) that are based on traditional cost-accounting systems do not capture the relevant performance issues for todays manufacturing environment. A variety of integrated systems have been proposed to overcome the limitations of the traditional PMSs, but these systems have been inadequate. This paper presents an integrated dynamic performance measurement system (IDPMS) that integrates three main areas: company management, process improvement, and the factory shop oor. To achieve an integrated system, these three areas are linked through dynamically dened performance measures and performance standards from production planning to customer. The indicators are transformed into quantitative just-in-time parameters that are utilized with management by objectives (MBO) principles to develop a manufacturing PMS that satises both internal and external customers. An example is given that illustrates how the IDPMS addresses current PMS requirements. r 2007 Elsevier B.V. All rights reserved.
Keywords: Performance measurement; Management by objective; Process improvement; Customer satisfaction; Manufacturing

1. Introduction In todays highly competitive business environment, product manufacturers need to provide customized and innovative products. To achieve this, they require innovative methods of performance measurement. In measuring manufacturing performance, manufacturers usually compare their own plants with other manufacturing plants in the industry in terms of such parameters as customer satisfaction, product quality, speed in completing manufacturing orders, productivity, diversity of
Tel.: +886 8 7703202x7679; fax: +886 8 7740367.

E-mail address: [email protected].

product line, and exibility in manufacturing new products (Cordero et al., 2005). The essential function of a performance measure is to assess how well the activities within a process, or the outputs of a process, achieve specied goals. This involves a comparison of actual results with a predetermined goal and an assessment of the extent of any deviation from that goal. A target level of performance is usually expressed as a quantitative standard, value, or rate (Ahmad et al., 2005). The selection of a range of performance measures appropriate to a particular company should be made in the light of the companys strategic intentions, and should suit the competitive environment in which the company operates. For example,

0925-5273/$ - see front matter r 2007 Elsevier B.V. All rights reserved. doi:10.1016/j.ijpe.2007.03.016

ARTICLE IN PRESS
C.-C. Chen / Int. J. Production Economics 112 (2008) 380390 381

if technical leadership and product innovation represent the basis of a manufacturing companys competitive advantage, performance in these areas must be measured relative to the competitors. Similarly, if a service company differentiates itself in the marketplace on the basis of quality of service, it should be monitoring and controlling the desired level of quality (Ahmad and Dhafr, 2002). Whether the company is in the manufacturing sector or the service sector, it is necessary to choose an appropriate range of performance measures, and these measures must be balanced to ensure that one performance or set of performance dimensions is not stressed to the detriment of others. The mix that is chosen will differ from case to case. Incomplete metrics can lead to inappropriate action (Ahmad and Dhafr, 2002), and performance areas must therefore be operationalized (that is, made measurable) in a way that allows performance to be adequately measured against relevant performance indicators (Jose et al., 1999). To achieve this, many companies have adopted modern management strategiessuch as total quality management (TQM), just-in-time (JIT), computer-integrated manufacturing (CIM), and optimized production realization (OPR). A business can achieve success only by understanding and fullling the needs of its customers. A failure to recognize this can cause huge potential losses (Ernst and Young, 1992). A customer focus involves the establishment of links between customer requirements and internal processes (Sousa, 2003; Reiner, 2005), and implies a shifting of company goals from the maximization of company prots in one project to the optimization of the value of the customers project by meeting jointly agreed objectives (Cova and Salle, 2005). However, having adopted such a customer focus, many companies use performance measures that are based on outdated management cost systems that are incompatible with their new operating philosophies. Consequently, many researchers are suggesting new comprehensive approaches to performance measurementapproaches that support day-to-day operations by providing managers, supervisors, and operators with timely and relevant information (Shah and Ward, 2003). To provide a comprehensive overview of company performance, researchers have tried to combine more than one performance measurement through the development of integrated performance-measurement systems (PMSs). These integrated systems

address many of the shortcomings of older PMSs; however, there are still issues associated with todays manufacturing environment that must be considered. For example, these systems work primarily as monitoring-and-controlling tools, and most have not incorporated an explicit feedback loop that supports improvement in performance measurement. In addition, these systems are not dynamic, and they cannot therefore provide mechanisms for adapting to a changing manufacturing environment. To address these shortcomings, this paper presents an integrated dynamic performance-measurement system (IDPMS), which has been developed in collaboration with an international electronics rm (D company) in Taiwan. The proposed system focuses on improving manufacturing competitiveness by overcoming the limitations of existing PMSs and by facilitating continuous improvement (Ghalayini et al., 1997). To this end, the system incorporates interaction among three groups: (i) management (production planning); (ii) manufacturing; and (iii) customers. Having proposed the system and having discussed the indicators used in it, the present paper presents a case simulation to verify the practical suitability of the proposed system. The remainder of this paper is arranged as follows. Following this Introduction, the next section of the paper reviews the literature pertaining to performance measurement. Section 3 then presents the proposed IDPMS. Section 4 illustrates how the system would be applied. Sections 5 and 6 provide a result comparison and summarize the benets of IDPMS with respect to existing PMSs. 2. Literature review 2.1. Overview An effective PMS should include the traditional nancial and cost-accounting criteria used by senior management and also the tactical-performance criteria that are used in assessing a rms current level of competitiveness. Such tactical-performance measures vary according to the needs of the various management levels and functional areas within the organization. Each functional area should develop and utilize a set of performance criteria consistent with its particular operating characteristics and strategic objectives. An effective PMS should lead

ARTICLE IN PRESS
382 C.-C. Chen / Int. J. Production Economics 112 (2008) 380390

to the integration of operations, marketing, nance, engineering, and accounting to ensure that they act as a unied and coordinated value-adding system. The system must have a long-term orientation such that continual improvement in both product and process leads to a sustainable competitive advantage (Wisner and Fawcett, 1991). In designing a PMS to support strategy implementation, particular challenges in modern manufacturing industries must be addressed. The rapid escalation in global competition has brought new doctrines (for example, JIT, TQM, and the exible factory), and this has necessitated new approaches to performance measurementincluding the expansion of traditional efciency-focused manufacturing PMSs to embrace new manufacturing-performance measures (Abernethy and Lillis, 1995; Chenhall, 1997; Perera et al., 1997). However, the widespread use of multiple measures has raised several implementation issues, including the potential problem of inadequate managerial commitment (Ittner and Larcker, 1998; Lillis, 2002). Because companies operate in dynamic environment, and because performance measurement is thus a dynamic process, Suwignjo et al. (2000) developed a quantitative model for performance-measurement system (QMPMS), which used the analytic hierarchy process (AHP) to quantify the effects of various factors on performance. The system allowed for the fact that performance measures will change over time and vary between companies. In a similar vein, Hayes and Wheelwright (1984) noted that management must make decisions in a variety of areas (such as capacity, facilities, technology, quality, and so on), each of which presents a variety of choices and each of which can have an effect on the manufacturing functions ability to implement the organizations business strategy. Senior management therefore needs to consult closely with its manufacturing function to obtain its perspective on the major issues that are facing the business. In this regard, Choe (2004) has noted that advanced manufacturing technology (AMT) can achieve low cost, improved quality, increased exibility, and dependability of supply, and that the measurements of manufacturing performance in AMT should reect these four strategic goals. The works of Gunasekharan et al. (2005) and Gupta and Galloway (2003) are two examples of scholarly work (among a plethora of articles) that has focused on the use of nancial and cost-based performance measures in manufacturing operations.

A customer orientation has been variously dened. For example, it has been dened as the set of beliefs that puts the customers interest rst (Desphande et al., 1993) or, alternatively, as a rms ability and will to identify, analyze, understand, and answer user needs (Gatignon and Xuereb, 1997; Matsuo, 2006). Yet another denition was supplied by Narver and Slater (1990), who dened customer orientation as the sufcient understanding of ones target buyers to be able to create superior value for them continuously. According to Liu et al. (2002), a customer orientation is a set of beliefs that places customers needs and satisfaction as the priority of an organization; it focuses on dynamic interactions among the organization, its customers, its competitors in the market, and its internal stakeholders. In summary, the term customer orientation refers to an organization (and individuals within the organization) focusing their efforts on understanding and satisfying customers (Huff and Kelley, 2005). Given these denitions, a customer-focused manufacturing strategy should include the dimensions of cost, quality, exibility, and dependability of supply (Ahmad and Dhafr, 2002). In this context, it is important to note that a focus on the customer is the underpinning principle of the TQM philosophy, which is concerned with how an organization designs and introduces products and services, integrates production-and-delivery requirements, and manages supplier performance (Evans and Lindsay, 1999). From a total quality perspective, all strategic decisions that a company makes should be customer-driven (Evans and Dean, 2000). Knowing the customer begins with a detailed evaluation of what is known about the customer, which is essentially an exercise in measuring customer satisfaction (Player and Keys, 1999). Mohr-Jackson (1991) proposed an extended concept of customer orientation to include internal customers, noting that this requires additional activities. These include: (i) understanding internal customers requirements for the effective delivery of needs and preferences of external customers; (ii) obtaining information about external customers needs and preferences through effective interdepartmental communication; and (iii) creating additional nal buyer value by increasing internal customer benets. According to this view, the provision of superior value to the external customer requires superior value to be provided at each point in the value chain. Internal suppliers therefore need to

ARTICLE IN PRESS
C.-C. Chen / Int. J. Production Economics 112 (2008) 380390 383

demonstrate an internal-customer orientation by focusing on satisfying the requirements of their internal customers, thus ensuring that a customer orientation is developed throughout the organization (Hauser et al., 1996), rather than limiting this orientation to the point of customer contact (Conduit and Mavondo, 2001). In this respect, Breyfogle et al. (2001) noted that a good PMS addresses both external quality and internal quality. Bhote (1991) has asserted: If performance isnt being measured, it isnt being managed. In this regard, management by objectives (MBO), which was introduced to industry in the early 1950s by Drucker (1954), has been used effectively by senior management. The rst step is to establish objective measurements, and the best measures are customer-focused and goal-oriented. They help people to learn how to improve their performance by pointing out where they are decient and by establishing achievable timetables to reach desired levels. In this way, they can be used as a basis for improved performance (George and Weimerskirch, 1998). Ahmad et al. (2005) noted that performance measurement involves a comparison of actual operation results with established performance targets. In this regard, Six-Sigma (Gack and Robinson, 2003) and Balanced Scorecard (BSC) (Kaplan and Norton, 2001) offer frameworks for business improvement. Both approaches begin with goal denition, and both are based on a quantitative measurement of performance using pre-dened business goals and pre-dened metrics (Trienekens et al., 2005). 2.2. Recent concepts and practices in manufacturing performance The manufacturing performance assessment and analysis introduced in Ahmad and Benson (1999) covered the areas of quality, delivery reliability, cost (price minus prot margin), and delivery lead time. The KPIs within manufacturing strategy are cost, quality, inventory, exibility, and delivery (Corbett, 1998). A part of a project survey was carried out to identify which performance indicators companies use and which ones they characterize as important. The top ve were: protability, conformance to specications, customer satisfaction, return on investment, and materials/overhead cost. When looking at the performance areas to which the

specic indicators are related and considering their relative importance it was also possible to rank the importance of these performance areas (from top to bottom): efciency, quality, competence (technical), exibility, innovativeness, speed, and capacity (Jose et al., 1999). The measured KPIs are normally split into six sections: (1) safety and environment, (2) exibility, (3) innovation, (4) performance, (5) quality, and (6) dependability. The focus was on the KPI of the dependability which consist of: (1) customer complaints, (2) on-time-in-full delivery to customers (OTIFc), (3) on-time-in-full delivery from suppliers (OTIFs), and (4) overall equipment effectiveness (OEE) product rate quality rateavailability (Ahmad and Dhafr, 2002). A six-item scale is used to measure the operational performance of a manufacturing plant after different levels lean manufacturing practice. The items include 5-year changes in scrap and rework costs, manufacturing cycle time, rst pass yield, labor productivity, unit manufacturing cost, and customer lead time (Shah and Ward, 2003). Global competition demands the manufacturing organizations improve quality, reduce delivery time, and minimize costs. In response to this, many manufacturing organizations have implemented different excellence programs to improve their performance. Lean manufacturing techniques, performance measurement, and benchmarking, were included in many of those excellence programs (Ahmad et al., 2005). 2.3. Popular model review D Company was supported to establish the manufacturing performance evaluation through integrating quality, cost, and delivery by the Corporate Synergy Development center (CSD), Taiwan. The manufacturing performance (Y) is measured by Y W q Q W c C W d D, where
Q : score of quality good production , good production failed QC

(1)

(2) Wq: weight of quality, C : score of cost P actual cost target cost P 0:60 , target cost

ARTICLE IN PRESS
384 C.-C. Chen / Int. J. Production Economics 112 (2008) 380390

Wc: weight of price,


D : score of delivery 1 number of delayed lots , number of delivered lots (4)

Wd is the weight of delivery, and Wq+Wc+ Wd 100. From the rating system dened by the D Company, we can nd three factors are usually considered when the manufacturer adopts the formula of grading to measure the manufacturing performance. (a) Quality (Q)quality of product, (b) Cost (C)price of product, (c) Delivery (D)delivery time of product. The weight of each factor can be adjusted when we apply the calculations of grading that depend on the needs of manufacturers. Some specic manufacturers just consider quality, while others put quality and cost into consideration. Some of them consider all three, quality, service, and delivery. Two example equations are provided for the score calculations of manufacturing performance: Score of manufacturing performance 40Q 35C 25D 40Q 40C 20D. or 5 (6)

(d) Quality level: The percentage of defects inside lots from various process stages are sometimes extremely different and may signicantly impact prots. (e) Customer orientation: These models do not involve full satisfaction levels or views from actual product users. (f) Objective orientation: If indicators are applied to manufacturing project performance measures with different characteristics, arguments will always ensue. Setting a target for each performance measurement using achievement level or AL will be one of the solutions. This study attempts to highlight suitable factors that if applied to day-to-day, year-to-year, and product-to-product in industry PMSs that could help transform these factors into measurable, quantitative, and JIT parameters. These parameters could be utilized in planning and establishing a manufacturing performance rating system based on our work with an international electronics rm (D company). The relevance of the proposed system to a manufacturing team, product line (internal customer), and external customers is presented. The system logic is then detailed. In addition to describing the system, applications and conclusions are drawn. 3. A new model with a customer focus To address the above-mentioned concerns, the present study set out to develop an integrated and dynamic manufacturing performance-measurement model. Two central concerns for all measurement systems are: (i) what to measure and (ii) how to weight the various performance categories. Most of the objective and quantiable variables in manufacturing performance have been previously specied, but management might also wish to use a number of qualitative factors in assessing manufacturing performanceincluding problem-resolution ability, technical ability, and corrective-action response. Although these factors are somewhat subjective in nature, management can still assign each factor a score or rating. 3.1. Satisfaction indicators in manufacturing An IDPMS (Ghalayini et al., 1997) was developed in conjunction with the D Company of Chungli, Taiwan. The IDPMS integrated three

In practice, these manufacturing PMSs were unable to quantify the customer orientation and objective orientation requirement levels in the past decade. These measurement systems cannot highlight the quality or business concerns in a JIT manner that will promote the effectiveness of improvements. The advantages of establishing a new model is obvious after analyzing the concerns listed below. (a) Internal failure: These models do not reect the rework, scrap, and sorting that could occur on the production line due to manufacturing quality problems. (b) Customer voice: These models do not help highlight customer complaints and their possible impact on the organization. (c) Equipment effectiveness and engineering efciency: These models do not evaluate the efciency of engineering maintenance programs caused by poor manufacturing management. Potential programmatic impacts, such as schedule and cost impacts, should also be brought to managements attention.

ARTICLE IN PRESS
C.-C. Chen / Int. J. Production Economics 112 (2008) 380390 385

main areas of the company: (i) management; (ii) the process-improvement team; and (iii) the factory shop oor. To achieve an integrated system, these three areas were linked through the specication, reporting, and updating of certain dened performance measures. The four main indicators established in this study were adapted from Ahmad and Dhafr (2002):

   

Cc (customer complaint); Od (on-time delivery); Ee (equipment effectiveness); and Cq (cost of quality).

3.1.2. On-time delivery (Od) This indicator measures the delivery of product on time and in fullwith no errors in product, packaging, transport, or supporting documentation. The commonly used performance measures in this area are unit penalty, mean tardiness, maximum lateness, and minimum lateness. Tardy jobs can incur costs, such as contractual penalties, depending on how late they are (Lengyel et al., 2003). Such a measure requires a rigorous recording system by the plant (or by the distribution company if this aspect is out-sourced). The KPI goal of this measure is to achieve a value greater than y% (with a y value greater than 99 being suggested). 3.1.3. Equipment effectiveness (Ee) This measure is designed to determine the reliability of assets and their capability to deliver the desired performance. This measure is assessed by taking the product of two sub-measures quality rate and availability. Equipment effectiveness (Ee) is thus obtained as follows: Ee quality rate availability: The quality rate is the amount of product that is right the rst timewithout adjustment, recycles, and so on. To achieve a satisfactory performance in this regard, it is necessary to achieve a very high rst-time-right rate. Quality rate is calculated as follows: Quality rate good production . good production failed QC

These performance indicators were selected because: (i) they indicate important manufacturing performance areas; (ii) provide critical links among business strategy, internal organization, and technology; and (iii) are fairly easy to measure or estimate. The companys relative performance in each area of the plant (or specic product line) can be assessed by comparing the relevant performance indicators with internal goals/standards, competitors, and customer demand. After comparisons are made for all performance areas, an overview of the performance gaps can be made. 3.1.1. Customer complaint (Cc) A customer complaint was dened as a quality or reliability issue occurring with an external customer and conrmed as being caused by manufacturing failure. Normally, a formal notication from the customer and a formal corrective action report (CAR) are required to conrm that an issue exists. These complaints might arise from any business area. A measurement can be made to identify operational problems that might be avoided in future. This measurement is determined by the number (and nature) of customers complaints. Written, verbal, and anecdotal information are all recorded. These data are then shared to avoid repeat problems at other sites. The quality-assurance department is responsible for the provision of the required information on a regular basis. The KPI to be measured is the number of customer complaints receivedexpressed as an absolute number or as a percentage of the dispatches. The goal is to achieve fewer than x% complaints on dispatches (with an x value of less than 1 being suggested).

The availability is dened in terms of the number of hours the plant actually operates divided by the number of hours in a month. For example, if a factory plans to operate for 22 hours per day for 25 days per month, the maximum available number of hours is 550. If so, availability is calculated as follows: Availability 550 number of hours of total shutdown . 550 Ee rests on the principle that the best manufacturing performance occurs when a plant operates to full capacity, always produces a perfect product, and never breaks down. Data on capacity usage, quality performance, and equipment breakdown are therefore required to determine the Ee. The manufacturing manager at the site is responsible for providing the required information on a timely basis.

ARTICLE IN PRESS
386 C.-C. Chen / Int. J. Production Economics 112 (2008) 380390

It is suggested that an Ee of 99.5% on critical equipment should be the target. This can be achieved if quality rate is greater than 99.9%, and availability is greater than 99.6%. To achieve this goal, the following practices should be implemented: six-sigma performance; fully automatic start-up; shutdown and fail-safe; intelligent measurement; total accurate dynamic models; multivariate statistical process control; design for success not failure; and predictive maintenance. 3.1.4. Cost of quality (Cq) Cost of quality (or, more accurately, cost of poor quality) is invisible and seldom pursued; it is often referred to as a hidden quality cost (Dahlgaard et al., 1998; Krishnan et al., 2000). It is effectively an opportunity cost of sales lost brought about by a customers experience of a poor-quality product or poor delivery service. The consequential costs of such failure include engineering time, management time, shop and eld downtime, delivery problems, lost orders, lost market share, customer dissatisfaction, and decreased capacity generally. Some companies have found a multiplier effect between the measured costs and the true failure costs (Chen and Yang, 2003). The measure is dened in terms of a comparison between actual cost and target cost in completing a specic manufacturing task. The goal is to achieve a measure of z% consequential loss on sales revenue as a result of failure (with a z value less than 3 being suggested). 3.2. Target values for manufacturing performance At the end of each year, senior management in a manufacturing enterprise measures the performance of each manufacturing team or product line and sets

target values for the following year. These targets are announced as a management commitment or pledge for all customers of various product lines. An example case study will be discussed. This case study examines a manufacturer whose actual values for the year 2004 and target values for the year 2005 for each performance indicator are given in Tables 1 and 2. 3.3. New performance measurement model The present study developed a new model through the integration of the four indicators discussed above (Cc, Od, Ee, and Cq), with appropriate weights of r1, r2, r3, and r4, respectively. Performance (P) was obtained by matching AL through comparisons of a range of percentages from actual values and target values for each indicator. That is, Actual Cc is compared with target Cc to get an AL, which is used to obtain a PCc, Cc performance value through matching. (1) The performance of Od, Ee, and Cq (POd, PEe, and PCq, respectively) can be measured in the same way. Formula example 1: PCcCc performance depends on the AL of target Cc. Formula: PCc achievement level of target Cc, ALn 1.00 AL1: Cc lower than target above 60% 0.95 AL2: Cc lower than target 4160% 0.90 AL3: Cc lower than target 2140% 0.85 AL4: Cc lower than target 620% 0.80 AL5: Cc equivalent to target 75% 0.75 AL6: Cc higher than target 620% 0.70 AL7: Cc higher than target 2140% 0.65 AL8: Cc higher than target 4160% 0.60 AL9: Cc higher than target above 60%.

Table 1 The actual values for various power supply product business units (B.U.), year 2004 B.U. Indicator Cccustomer complaint Odon-time delivery Eeequipment effectiveness Quality rate Availability Cqcost of quality Desktop power Adaptor power Telecom. power Server power

3.6% on dispatches 96.6% 94.6% 97.6% 96.9% 8.1% of sales

2.2% on dispatches 97.8% 97.1% 99.1% 98.0% 4.7% of sales

7.3% on dispatches 94.2% 81.7% 93.2% 87.7% 13.6% of sales

3.8% on dispatches 97.1% 95.9% 98.5% 97.4% 8.5% of sales

ARTICLE IN PRESS
C.-C. Chen / Int. J. Production Economics 112 (2008) 380390 Table 2 The target value for various power supply product business units (B.U.), year 2005 B.U. Indicator Cccustomer complaint Odon-time delivery Eeequipment effectiveness Quality rate Availability Cqcost of quality Desktop power Adaptor power Telecom. power Server power 387

Less than 2% on dispatches Higher than 98.5% Higher than 98.0%

Less than 1% on dispatches Higher than 99.5% Higher than 99.0%

Less than 5% on dispatches Higher than 96% Higher than 85.0%

Less than 2% on dispatches Higher than 99% Higher than 98.0%

Higher than 99.0% Higher than 99.8% Higher than 95.0% Higher than 99.0% Higher than 99.0% Higher than 99.2% Higher than 90.0% Higher than 99.0% Lower than 6.0% of sales Lower than 3.0% of sales Lower than 10.0% of sales Lower than 6.0% of sales

Or we may have many kinds of values set either in the number of achievement levels or in the actual output vs. target degree range depending on the organizational requirements. Two additional valuesetting examples are shown as below: Formula example 2: PCcPerformance of Cc. Formula: PCc achievement level of target Cc, ALn 1.00 AL1: Cc lower than target above 80% 0.90 AL2: Cc lower than target 6180% 0.80 AL3: Cc lower than target 4160% 0.70 AL4: Cc lower than target 2140% 0.60 AL5: Cc equivalent to target 720% 0.50 AL6: Cc higher than target 2140% 0.40 AL7: Cc higher than target 4160% 0.30 AL8: Cc higher than target 6180% 0.20 AL9: Cc higher than target above 80%. Formula example 3: PCcPerformance of Cc. Formula: PCc achievement level for target Cc, ALn 1.00 AL1: Cc lower than target above 80% 0.80 AL2: Cc lower than target 3180% 0.60 AL3: Cc equivalent to target 730% 0.40 AL4: Cc higher than target 3180% 0.20 AL5: Cc higher than target above 80%. Similarly, value-setting exibility can be applied for all other indicators (Od, Ee, and Cq), or only some of them. The maintenance of performancemeasurement consistency, continuity, and exibility is necessary. The weights r1, r2, r3, and r4, can be set by constructing a scalerating these performance indicators/objectives in terms of their relative importance. It is strongly recommended that

decision-makers approximate the importance of each indicator using AHP and pairwise comparisons (Saaty, 1980). (2) Manufacturing performance measurement formula

(a) If a manufacturing team organizes just one product group, the manufacturing performance value (Pm) will be the same as the product performance value (Pp). This value is given by Pm Pp 100 r1 PCc r2 POd r3 PEe r4 PCq, 7 where r1 r2 r3 r4 1; ri X0; 1pip4. (b) If a manufacturing team organizes several groups of products (more than one type), the Pm is obtained using: Pm Pp1 Pp2 Ppn n where n41. (8)

(c) The parameters in this formula are applied exibly to cover all kinds of manufacturing projects with different characteristics. For instance, (1) If a manufacturing project is not suitable for the Ee measurement, the parameter weights can be r1 r2 r4 1. (2) If another manufacturing project has been adopted for a program-support role, and is not suitable for Cqs control, the formula weights can be expressed using r1 r2 r3 1.

ARTICLE IN PRESS
388 C.-C. Chen / Int. J. Production Economics 112 (2008) 380390

4. Results comparison An example is presented to demonstrate how the proposed model of formula (7) can be applied to performance measurement of a manufacturing team, and to compare it with the popular model of formula (5). The proposed method can be compared with different AL and weight values for each performance indicator. Formula example 1 is used in this comparison. The basic manufacturing data from two product groups (Desktop power and Telecom. power) are given in Tables 3 and 4. The results from the proposed model of formula (7) and the popular model of formula (5) are shown in Tables 3 and 4, respectively. Compared with formula (5), the application of the new model of formula (7) has produced sensitive, accurate, and effective manufacturing performance rating results for different achievement levels. 5. Conclusions The proposed manufacturing performance-measurement model with a customer-satisfaction orientation could be applied by rms in different industries to address all kinds of manufacturing management situations. The proposed model can assist rms in selecting and rewarding the best manufacturing teams and integrating their capabilities to develop an appropriate prot-improvement

program for meeting and exceeding specic customer requirements. The merits of the proposed model are that it is complete, exible, and effective. In terms of completeness, the model integrates four performance indicators and covers three stages (planning, production, and customer). The main manufacturing activities in industry are horizontally involved in this system. The system also extends the customer-satisfaction concept vertically from manufacturing to include the user and customer. In terms of exibility, the model provides four exible weights to combine performance parameters linearly in a manner that assists management in formulating the most suitable measurements for several kinds of manufacturing projects/teams in different industries. To ensure accuracy and effectiveness, and different weight combinations (r1, r2, r3, and r4) can be set in this system. In terms of effectiveness, the proposed model addresses the same manufacturing performance requirements as are found in the ISO-9000 and QS-9000 quality-management systems. The main purpose of these requirements is to generate effective quality improvement. The system presented in this study provides an effective method for measuring manufacturing quality improvement (PCc, PCq, and PEe) with measurable, JIT aspects. Grades for manufacturing performance can be developed after the performance measurement. This supports senior management in adopting suitable strategic actions to promote manufacturing-team

Table 3 Comparison in desktop power performance measurements using two different formulas, (5) and (7), time: JanuaryMarch, year: 2005 Indicator Target (%) p2.0 X98.5 X98.0 X99.0 X99.0 p6.0 Actual value (%) Weight of formula (7), r1, r2,y,r4 Score using formula example 1 0.75 0.75a 0.90b 0.65c 76.0%d Weight of formula (5), Wc, Wq, and Wd Score using formula (5)

PCc POd PEe Quality rate Availability PCq Total

2.3 98.3 98.5 99.4 99.1 9.1

0.3 0.3 0.2 0.2

0.35 0.4 0.25

0.983 0.994 0.569 88.39%e

a On-time delivery rate ^98.5% means delinquency of delivery against customer requirements o1.5%. The calculation of achievement level (AL) should be (98.3%98.5%)/(198.5%) 10013.3%higher delinquency than target value 13.3%. b Similarly, Ees achievement level is (98.5.0%98.0%)/(198.0%) 10025.0%better than target value 25.0%. c The calculation of Ccs achievement level is as same as Cqs which is (9.1%6.0%)/6.0% 10051.7%worse than target value 51.7%. d [(0.75 0.3)+(0.75 0.3)+(0.90 0.2)+(0.65 0.2)] 100%76.0%. e [(0.983 0.35)+(0.994 0.4)+(0.569 0.25)] 100%88.39%.

ARTICLE IN PRESS
C.-C. Chen / Int. J. Production Economics 112 (2008) 380390 389 Table 4 Comparison of Telecom. power performance measurements using two different formulas, (5) and (7), time: JanuaryMarch, year: 2005 Indicator Target (%) p5.0a X96.0 X85.0 X95.0 X90.0 p10.0 Actual value Weight of formula (7), r1, Score using formula r2,y,r4 example 1 (%) 2.3 98.3 91.0 96.7 94.1 9.1 0.3 0.3 0.2 0.2 0.95a 0.95b 0.90c 0.85 92.0% Weight of formula (5), WC, Wq, and Wd 0.35 0.4 0.25 Score using formula (5) 0.983 0.967 0.609 88.31%

PCc POd PEe Quality rate Availability PCq Total


a

(2.3%5.0%)/5.0% 10054.0%. (98.3%96.0%)/(196.0%) 10057.5%. c (91.0%85.0%)/(185.0%) 100 40.0%.


b

performance. Applicable strategic actions can be consideredincluding prot-sharing, internal promotion programs, organizational expansion projects, and so on. This depends on the willingness and capabilities of the management and manufacturing teams. Acknowledgments The authors thank the manufacturing management team from D Company for their valuable assistance with this research project, and Prof. Sean A. Day for proofreading the article. This study was partly supported by the National Science Council, Taiwan (project number: NSC 95-2622-E-238-020001-CC3).

References
Abernethy, M.A., Lillis, A.M., 1995. The impact of manufacturing exibility on management control system design. Accounting, Organizations and Society 20, 241258. Ahmad, M., Benson, R., 1999. Benchmarking in the process industries. Institute of Chemical Engineers. Ahmad, M.M., Dhafr, N., 2002. Establishing and improving manufacturing performance measures. Robotics and Computer-Integrated Manufacturing 18, 171176. Ahmad, M.M., Dhafr, N., Benson, R., Burgess, B., 2005. Model for establishing theoretical targets at the shop oor level in speciality chemicals manufacturing organizations. Robotics and Computer-Integrated Manufacturing 21, 391400. Bhote, K.R., 1991. Next Operation as Customer (NOAC). AMA Membership Publication Limited, American Management Association, New York, pp. 5460. Breyfogle, F.W., Cupello, J.M., Meadows, B., 2001. Managing Six Sigma: A Practical Guide to Understanding, Assessing, an

Implementing the Strategy That Yields Bottom-Line Success. Wiley, New York, pp. 95135. Chen, C.C., Yang, C.C., 2003. Total-costs based evaluation system of supplier quality performance. Total Quality Management 14 (3), 325339. Chenhall, R., 1997. Reliance on manufacturing performance measures, total quality management and organizational performance. Management Accounting Research 8, 187206. Choe, J.M., 2004. The relationships among management accounting information, organizational learning and production performance. Strategic Information Systems 13, 6185. Conduit, J., Mavondo, F.T., 2001. How critical is internal customer orientation to market orientation? Journal of Business Research 51, 1124. Corbett, M.L., 1998. Benchmarking manufacturing performance in Australia and New Zealand. Benchmarking Quality Management Technology 5 (4), 271282. Cordero, R., Walsh, S.T., Kirchhoff, B.A., 2005. Motivating performance in innovative manufacturing plants. The Journal of High Technology Management Research 16, 8999. Cova, B., Salle, R., 2005. Six key points to merge project marketing into project management. International Journal of Project Management 23, 354359. Dahlgaard, J.J., Kristensen, K., Kanji, G.K., 1998. Fundamentals of Total Quality Management: Process Analysis and Improvement. Chapman & Hall, London, pp. 3638, 202206. Desphande, R., Farley, J.U., Webster, F.E., 1993. Corporate culture, customer orientation and innovativeness in Japanese rms: a quadrad analysis. Journal of Marketing 57, 2337. Drucker, P.S., 1954. The Practice of Management. Harper & Row, New York. Ernst & Young Quality Improvement Consulting Group, USA, 1992. Total Quality, A managers guide the 1990S. Kogan Page Limited, London, pp. 205217. Evans, J.R., Dean, J.W., 2000. Excellence! Making Quality Work in Your Company. South-Western College Publishing, Cincinnati, Ohio, pp. 14, 122. Evans, J.R., Lindsay, W.M., 1999. The Management and Control of Quality, fourth ed. South-Western College Publishing, Cincinnati, Ohio, pp. 472480.

ARTICLE IN PRESS
390 C.-C. Chen / Int. J. Production Economics 112 (2008) 380390 Lillis, A.M., 2002. Managing multiple dimensions of manufacturing performancean exploratory study. Accounting, Organizations and Society 27, 497529. Liu, S.S., Luo, X., Shi, Y.Z., 2002. Integrating customer orientation, corporate entrepreneurship, and learning orientation in organizations-in-transition: an empirical study. International Journal of Research in Marketing 19, 367382. Matsuo, M., 2006. Customer orientation, conict, and innovativeness in Japanese sales departments. Journal of Business Research 59, 242250. Mohr-Jackson, I., 1991. Broadening the market orientation: an added focus on internal customers. Human Resource Management 30 (4), 455467. Narver, J.C., Slater, S.F., 1990. The effect of a market orientation on business protability. Journal of Marketing 54, 2035. Perera, S., Harrison, G., Poole, M., 1997. Customer-focused manufacturing strategy and the use of operations based nonnancial performance measures: a research note. Accounting, Organizations and Society 22, 557572. Player, S., Keys, D., 1999. Activity-Based Management: Arthur Andersens Lessons From the ABM Battleeld, second ed. Wiley, New York, p. 172. Reiner, G., 2005. Customer-oriented improvement and evaluation of supply chain processes supported by simulation models. International Journal of Production Economics 96, 381395. Saaty, T.L., 1980. The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation, rst ed. McGraw-Hill, New York, pp. 90165. Shah, R., Ward, P.T., 2003. Lean manufacturing: context, practice bundles, and performance. Journal of Operations Management 21, 129149. Sousa, R., 2003. Linking quality management to manufacturing strategy: an empirical investigation of customer focus practices. Journal of Operation Management 21 (1), 118. Suwignjo, P., Bititci, U.S., Carrie, A.S., 2000. Quantitative models for performance measurement system. International Journal of Production Economics 64, 231241. Trienekens, J.J.M., Kusters, R.J., Rendering, B., Stokla, K., 2005. Business-oriented process improvement: practices and experiences at Thales Naval The Netherlands (TNNL). Information and Software Technology 47, 6779. Wisner, J.D., Fawcett, S.E., 1991. Linking rm strategy to operating decisions through performance measurement. Production and Inventory Management Journal 32 (3), 511. Gack, G.A., Robinson, K., 2003. Integrating improvement initiatives: connecting six sigma for software, CMMI, personal software process and team software process. Software Quality Professional 5 (4). Gatignon, H., Xuereb, J., 1997. Strategic orientation of the rm and new product performance. Journal of Marketing Research 34, 7790. George, S., Weimerskirch, A., 1998. Total Quality Management, Strategies and Techniques Proven at Todays Most Successful Companies, second ed. Wiley, New York, pp. 43, 178. Ghalayini, A.M., Noble, J.S., Crowe, T.J., 1997. An integrated dynamic performance measurement system for improving manufacturing competitiveness. International Journal of Production Economics 48, 207225. Gunasekharan, A., Williams, H.J., McGaughey, R.E., 2005. Performance measurement and costing system in new enterprise. Technovation 25, 523533. Gupta, M., Galloway, K., 2003. Activity-based costing/management and its implications for operations management. Technovation 23, 131138. Hauser, J., Simester, D., Wernerfelt, B., 1996. Internal customers and internal suppliers. Journal of Marketing Research 33, 268280. Hayes, R.H., Wheelwright, R.H., 1984. Restoring Our Competitive Edge, Competing Through Manufacturing, rst ed. Wiley, New York, pp. 3645. Huff, L., Kelley, L., 2005. Is collectivism a liability? The impact of culture on organizational trust and customer orientation: a seven-nation study. Journal of Business Research 58, 96102. Ittner, C.D., Larcker, D.F., 1998. Innovations in performance measurement: trends and research implications. Journal of Management Accounting Research 10, 205238. Jose, A.F.B.G., Harry, B., Frank, C.M., 1999. Baudet University of Twente, Enschede, The Netherlands Kostas Seferis TASIS, Athens, Greece, CI and performance: a cute approach. International Journal of Operations and Productions Management 19 (11), 11201137. Kaplan, R.S., Norton, D.P., 2001. The Strategy-Focused Organization. Harvard Business School Press, Boston. Krishnan, S.K., Agus, A., Husan, N., 2000. Cost of quality: the hidden costs. The TQM Magazine, Abingdon 11 (46), 844848. Lengyel, A., Hatono, I., Ueda, K., 2003. Scheduling for on-time completion in job shops using feasibility function. Computers and Industrial Engineering 45, 215229.