INFORMATION TECHNOLOGY REFORM Progress Made More Needs To Be Done To Complete Actions and Measure Results

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

GAO

For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 24, 2012

United States Government Accountability Office

Testimony Before the Subcommittee on Federal Financial Management, Government Information, Federal Services and International Security, Committee on Homeland Security and Governmental Affairs, United States Senate

INFORMATION TECHNOLOGY REFORM Progress Made; More Needs to Be Done to Complete Actions and Measure Results
Statement of David A. Powner, Director Information Technology Management Issues

GAO-12-745T

Chairman Carper, Ranking Member Brown, and Members of the Subcommittee: I am pleased to be here today to discuss the progress the Office of Management and Budget (OMB) and key federal agencies have made on selected action items associated with information technology (IT) reform. While investments in IT have the potential to improve lives and organizations, some federally funded IT projects canand have become risky, costly, unproductive mistakes. With at least $79 billion spent in fiscal year 2011 by the U.S. government on IT investments, it is important to ensure the most efficient and effective use of resources. In December 2010, the Federal Chief Information Officer (CIO) released a 25-point plan for reforming federal IT management. This document established an ambitious plan for achieving operational efficiencies and effectively managing large-scale IT programs. It also clearly identified actions to be completed in three different time frames: (1) within 6 months (by June 2011), (2) between 6 and 12 months (by December 2011), and (3) between 12 and 18 months (by June 2012). You asked us to testify on our report being released today that describes the progress OMB and key federal agencies have made on selected action items in the IT Reform Plan and the extent to which sound measures are in place to evaluate the success of the initiative. 1 In this regard, my testimony specifically covers the progress made on 10 selected IT Reform Plan action items by OMB; the General Services Administration (GSA); and the Departments of Homeland Security, Justice, and Veterans Affairs. In preparing this testimony, we relied on our report being released at todays hearing. In that report, we evaluated progress by selecting 10 action items from the IT Reform Plan, focusing on action items that (1) were expected to be completed by December 2011, (2) covered multiple different topic areas, and (3) were considered by internal and OMB subject matter experts to be the more important items. We also selected three federal agencies (the Departments of Homeland Security, Justice, and Veterans Affairs) based on several factors, including high levels of IT spending and large numbers of investments in fiscal year 2011. We then evaluated the steps OMB and

GAO, Information Technology Reform: Progress Made; More Needs to Be Done to Complete Actions and Measure Results, GAO-12-461 (Washington, D.C.: Apr. 26, 2012).

Page 1

GAO-12-745T

the selected federal agencies had taken to implement the selected action items from the IT Reform Plan. In cases where the action was behind schedule, we compared plans for addressing the schedule shortfalls to sound project planning practices. We also determined whether and how agencies were tracking performance measures associated with these action items, and compared these measures to best practices in IT performance management. In addition, we interviewed OMB and selected agency officials regarding progress, plans, and measures. All work on which this testimony is based was performed from August 2011 to April 2012 in accordance with generally accepted government auditing standards. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on our audit objectives. We believe that the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objective.

Background

IT can enrich peoples lives and improve organizational performance. However, as we have described in numerous reports and testimonies, federal IT projects too frequently incur cost overruns and schedule slippages while contributing little to mission-related outcomes. Further, while IT should enable government to better serve the American people, the federal government has not achieved expected productivity improvementsdespite spending more than $600 billion on IT over the past decade. Over the last two decades, Congress has enacted several laws to assist agencies and the federal government in managing IT investments. Key laws include the Paperwork Reduction Act of 1995, 2 the Clinger-Cohen Act of 1996, 3 and the E-Government Act of 2002. 4 Also, the GPRA (Government Performance and Results Act) Modernization Act of 2010 includes IT management as a priority goal for improving the federal

2 3 4

44 U.S.C. 3501 et seq. 40 U.S.C. 11101 et seq. The E-Government Act of 2002, Pub. L. No. 107-347 (Dec. 17, 2002).

Page 2

GAO-12-745T

government. 5 Each of these laws delineates roles and responsibilities for OMB and agencies regarding information technology and its management. As set out in these laws, OMB is to play a key role in helping federal agencies manage their investments by working with them to better plan, justify, and determine how much they need to spend on projects and how to manage approved projects. Within OMB, the Office of E-government and Information Technology, headed by the Federal CIO, directs the policy and strategic planning of federal IT investments and is responsible for oversight of federal technology spending. Agency CIOs are also expected to have a key role in IT management. Federal law, specifically the Clinger-Cohen Act, has defined the role of the CIO as the focal point for IT management, requiring agency heads to designate CIOs to lead reforms that would help control system development risks; better manage technology spending; and achieve real, measurable improvements in agency performance. In addition, the CIO Councilcomprised of CIOs and Deputy CIOs of 28 agencies and chaired by OMBs Deputy Director for Managementis the principal interagency forum for improving agency practices related to the design, acquisition, development, modernization, use, sharing, and performance of federal information resources. The CIO Council is responsible for developing recommendations for overall federal IT management policy; sharing best practices; including the development of performance measures; and identifying opportunities and sponsoring cooperation in using information resources.

Federal IT Reform Plan Strives to Address Persistent Challenges

After assessing the most persistent challenges in acquiring, managing, and operating IT systems, in December 2010 the Federal CIO established a 25-point IT Reform Plan designed to address challenges in IT acquisition, improve operational efficiencies, and deliver more IT value to the American taxpayer. 6 The actions were planned to be completed in
5 Pub. L. No. 111-352, 124 Stat. 3866 (2011). The GPRA (Government Performance and Results Act) Modernization Act of 2010 amends the Government Performance and Results Act of 1993, Pub. L. No. 103-62, 107 Stat. 285 (1993). 6

OMB, 25 Point Implementation Plan to Reform Federal Information Technology Management (Washington, D.C.: Dec. 9, 2010).

Page 3

GAO-12-745T

three different time frames: (1) within 6 months (by June 2011), (2) between 6 and 12 months (by December 2011), and (3) between 12 and 18 months (by June 2012). Several different organizations were assigned ownership of the key action items, including the Federal CIO, the CIO Council, GSA, the Office of Personnel Management, the Office of Federal Procurement Policy, the Small Business Administration, and other federal agencies. Table 1 contains detailed information on selected action items in the IT Reform Plan.
Table 1: OMBs IT Reform Plan: Selected Action Items, Required Activities, and Responsible Parties Plan number Action item title 1 Complete detailed implementation plans to consolidate 800 data centers by 2015 Required activities

Responsible parties OMB and federal agencies

Due date June 2011

Shift to a cloud first policy

Stand-up contract vehicles for secure Infrastructure-as-ab Service solutions Launch a best practices collaboration platform

Complete consolidation plans that include a technical roadmap, clear consolidation targets, and measurable milestones Identify dedicated agency-specific program managers Establish a cross-government task force comprised of the agency program managers Ensure the task force meets monthly Launch a public dashboard for tracking progress towards closures a Establish a federal strategy for moving to cloud computing Identify three services (per agency) that are to move to cloud computing Establish migration plans for the three services that are to move Fully migrate the first service within 12 months Make a common set of contract vehicles for secure cloud-based infrastructure solutions available governmentwide

OMB and federal agencies

June 2011

GSA

June 2011

10

Establish a portal for program managers to exchange information CIO Council on best practices Require agencies to submit their experiences to the portal Codify and synthesize agency submissions to provide a searchable database that facilitates real-time problem solving Define an IT acquisition specialist position Establish the requirements, guidance, curriculum, and process for becoming one Create guidance to strengthen the IT acquisition skills and capabilities of IT acquisition specialists Work with IT and acquisition community to develop guidance on d contracting for modular development Obtain feedback from industry leaders Develop templates and samples supporting modular development OMB and federal agencies

June 2011

13

Design a cadre of specialized IT acquisition c professionals Issue contracting guidance and templates to support modular development

June 2011

15

Office of Federal Procurement Policy

December 2011

Page 4

GAO-12-745T

Plan number Action item title 17 Work with Congress to create IT budget models that align with modular development

Required activities Analyze working capital funds and transfer authorities to identify current IT budget flexibilities Identify programs at agencies where additional budget flexibilities could improve outcomes Work with Congress to propose budgetary models to complement the modular development approach Evaluate mechanisms for increased transparency for these programs

Responsible parties OMB and federal agencies

Due date June 2011

20

Work with Congress to consolidate commodity IT spending under e agency CIO Reform and strengthen Investment Review Boards Redefine role of agency CIOs and CIO Council

OMB and Work with Congress to consolidate commodity IT spending under the federal agency CIO agencies Develop a workable funding model for commodity IT services Have the CIO Council and agency CIOs identify commodity services to be included in this funding model as they are migrated towards shared services Revamp IT budget submissions f Have agencies conduct TechStat reviews Have OMB analysts provide training to agency CIOs in the TechStat methodology Make agency CIOs responsible for managing the portfolio of large IT projects within their agencies Have the CIO Council periodically review the highest priority TechStat findings assembled by the agency CIOs
Source: GAO analysis of OMBs IT Reform Plan.
a

June 2011

21

OMB and federal agencies Federal CIO and agency CIOs

June 2011

22

June 2011

Cloud computing is an emerging form of computing where users have access to scalable, ondemand capabilities that are provided through Internet-based technologies. It has the potential to provide IT services more quickly and at a lower cost.

b Infrastructure-as-a-Service is one type of cloud computing in which a vendor offers various infrastructure components such as hardware, storage, and other fundamental computing resources. c While the IT Reform Plan discusses having agencies develop cadres of specialists, there is no requirement for agencies to do so. d

According to the IT Reform Plan, modular development is a system development technique that delivers functionality in shorter time frames by creating requirements at a high level and then refining them through an iterative process, with extensive engagement and feedback from stakeholders. Commodity services are systems or services used to carry out routine tasks (e.g., e-mail, data centers, and web infrastructure).

OMB defines a TechStat as a face-to-face, evidence-based accountability review of an IT investment that results in concrete actions to address weaknesses and reduces wasteful spending by turning around troubled programs and terminating failed programs.

GAO Has Previously Reported on Needed Improvements in Federal IT Management

Given the challenges that federal agencies have experienced in acquiring and managing IT investments, we have issued a series of reports aimed at improving federal IT management over the last decade. Our reports cover a variety of topics, including data center consolidation, cloud computing, CIO responsibilities, system acquisition challenges, and modular development. Key reports that address topics covered in the IT

Page 5

GAO-12-745T

Reform Plan include reports on data center consolidation, 7 cloud computing, 8 best practices in IT acquisition, 9 IT spending authority, 10 investment review and oversight, 11 and agency CIO responsibilities. 12 For example, in July 2011, we reported that only one of the agencies submitted a complete data center inventory and no agency submitted a complete data center consolidation plan. 13 We concluded that until these inventories and plans are complete, agencies might not be able to implement their consolidation activities and realize expected cost savings. We recommended that agencies complete the missing elements in their plans and inventories. In response to our recommendations, in October and November 2011, the agencies updated their inventories and plans. We have ongoing work assessing the agencies revised plans, and in February 2012, we reported that our preliminary assessment of the

7 GAO, Data Center Consolidation: Agencies Need to Complete Inventories and Plans to Achieve Expected Savings, GAO-11-565 (Washington, D.C.: July 19, 2011), and Followup on 2011 Report: Status of Actions Taken to Reduce Duplication, Overlap, and Fragmentation, Save Tax Dollars, and Enhance Revenue, GAO-12-453SP (Washington, D.C.: Feb. 28, 2012).

GAO, Information Security: Federal Guidance Needed to Address Control Issues with Implementing Cloud Computing, GAO-10-513 (Washington, D.C.: May 27, 2010), and Information Security: Additional Guidance Needed to Address Cloud Computing Concerns, GAO-12-130T (Washington, D.C.: Oct. 5, 2011). GAO, Information Technology: Critical Factors Underlying Successful Major Acquisitions, GAO-12-7 (Washington, D.C.: Oct. 21, 2011). GAO, Information Technology: VA Has Taken Important Steps to Centralize Control of Its Resources, but Effectiveness Depends on Additional Planned Actions, GAO-08-449T (Washington, D.C.: Feb. 13, 2008).
11 GAO, IT Dashboard: Accuracy Has Improved, and Additional Efforts Are Under Way To Better Inform Decision Making, GAO-12-210 (Washington, D.C.: Nov. 7, 2011); Information Technology: OMB Has Made Improvements to Its Dashboard, but Further Work Is Needed by Agencies and OMB to Ensure Data Accuracy, GAO-11-262 (Washington, D.C.: Mar. 15, 2011); Information Technology: OMB's Dashboard Has Increased Transparency and Oversight, but Improvements Needed, GAO-10-701 (Washington, D.C.: July 16, 2010); Information Technology: Management and Oversight of Projects Totaling Billions of Dollars Need Attention, GAO-09-624T (Washington, D.C.: Apr. 28, 2009); Information Technology: Agencies and OMB Should Strengthen Processes for Identifying and Overseeing High Risk Projects, GAO-06-647 (Washington, D.C.: June 15, 2006); and Information Technology: OMB Can Make More Effective Use of Its Investment Reviews, GAO-05-276 (Washington, D.C.: Apr. 15, 2005). 12 GAO, Federal Chief Information Officers: Opportunities Exist to Improve Role in Information Technology Management, GAO-11-634 (Washington, D.C.: Sept. 15, 2011). 13 10 9

GAO-11-565.

Page 6

GAO-12-745T

updated plans showed that not all agency plans were updated to include all required information. 14 We discuss each of the topics in more detail in the report being publicly released today. 15

OMB and Key Federal Agencies Have Made Progress on IT Reform Action Items, but Much Remains to Be Done

As discussed in our report, OMB and key federal agencies have made progress on selected action items identified in the IT Reform Plan, but there are several areas where more remains to be done. Of the 10 key action items we reviewed, 3 were completed and the other 7 were partially completed by December 2011. The action items that are behind schedule share a common reason for the delays: the complexity of the initiatives. In all seven of the cases, OMB and the federal agencies are still working on the initiatives. However, OMB and federal agencies have established time frames for completing only two of these initiatives. In a December 2011 progress report on its IT Reform Plan, OMB reported that it made greater progress than we determined. The agency reported that of the 10 action items, 7 were completed and 3 were partially completed. OMB officials from the Office of E-government and Information Technology explained that the reason for the difference in assessments is that they believe that the IT Reform Plan has served its purpose in acting as a catalyst for a set of broader initiatives. They noted that work will continue on all of the initiatives even after OMB declares the related action items to be completed under the IT Reform Plan. We disagree with this approach. In prematurely declaring the action items to be completed, OMB risks losing momentum on the progress it has made to date. Table 2 provides both OMBs and our assessments of the status of the key action items, with action items rated as completed if all of the required activities identified in the reform plan were completed, and partially completed if some, but not all, of the required activities were completed.

14 15

GAO-12-453SP. GAO-12-461.

Page 7

GAO-12-745T

Table 2: GAOs Assessment of the Status of Key Action Items OMBs reported status (as of December 2011)

Plan number and action item title

GAOs assessment Description Partially completed In 2011, agencies published their updated consolidation plans and identified dedicated program managers for their data center consolidation efforts. Also, OMB established a cross-government task force comprised of the agency program managers that meets monthly and launched a public dashboard for tracking progress in closing data centers. However, not all of the agencies updated data center consolidation plans include the required elements. Of the three agencies we reviewed, one (the Department of Justice) lacked required milestones and targets for servers and utilization. In addition, in February 2012, we reported finding similar gaps in multiple agencies consolidation a plans. When asked why the plans were not yet complete, agencies reported that it takes time to adequately plan for data center consolidation and many found that they need more time. We have previously recommended that agencies complete the b missing elements from their data center consolidation plans. OMB has noted that agencies are expected to provide an update on their plans in September 2012. The Federal CIO published a strategy for moving the government to cloud computing and had each agency identify three services to be moved to the cloud. In addition, each of the three agencies we reviewed established migration plans for these services and had migrated at least one service to the cloud by December 2011. However, each of the three agencies migration plans we reviewed were missing key required elements, including a discussion of needed resources, migration schedules, or plans for retiring legacy systems. We have ongoing work performing a more detailed review of seven agencies progress in implementing the federal cloud computing policy underway, and c plan to issue that report in the summer of 2012. However, at this point there are no time frames for agencies to complete their migration plans. GSA has established a common set of contract vehicles for secure cloud-based infrastructure solutions, and made them available governmentwide. As of January 2012, federal agencies could purchase cloud solutions from three GSA-approved vendors.

(1) Complete Completed detailed implementation plans to consolidate at least 800 data centers by 2015

(3) Shift to cloud-first policy

Completed

Partially completed

(4) Stand-up contract vehicles for secure Infrastructureas-a-Service solutions (10) Launch a best practices collaboration platform

Completed

Completed

Completed

Partially completed

The CIO Council developed a web-based collaboration portal to allow program managers to exchange best practices and case studies, and all three agencies we reviewed have submitted case studies to OMB for the portal. However, the data accessible by the portal has not yet been effectively codified and synthesized, making it difficult for program managers to search the databases and for them to use it for problem solving. For example, a general search for cloud computing best practices identified more than 13,000 artifacts, while a date-bounded search for the last year identified 14 artifactsof which only 8 clearly provided information on best practices in cloud computing. The vice chairman of the CIO Council explained that the portals shortcomings are due to how new it is, and noted that the council is still working to improve the portals functionality. However, the CIO Council has not established a time frame for providing this additional functionality.

Page 8

GAO-12-745T

Plan number and action item title (13) Design a cadre of specialized IT acquisition professionals

OMBs reported status (as of December 2011) Completed

GAOs assessment Description Completed In 2011, the Office of Federal Procurement Policy issued guidance defining an IT acquisition specialist; established the requirements, guidance, curriculum, and process for becoming one; and established guidance to strengthen the IT acquisition skills and capabilities of IT acquisition specialists. Because the development of the cadre is voluntary, the status of the agencies we reviewed varies: the Department of Veterans Affairs has a cadre of specialized IT acquisition professionals, the Department of Homeland Security is developing one, and the Department of Justice is still considering whether they need such a cadre. An official within the Office of Federal Procurement Policy stated that the agency worked with the IT and acquisition community to develop draft guidance for modular development, and has obtained feedback from industry leaders. However, the office has not yet issued this guidance, or the required templates and samples supporting modular development. An Office of Federal Procurement Policy official explained that delays were due to challenges in ensuring consistent definitions of modular development across the government and industry. The office currently plans to issue its guidance and templates in spring 2012. OMB reported that it analyzed existing legal frameworks to determine what budget flexibilities are currently available and where additional budget flexibilities are needed, and worked to promote these ideas (such as multiyear budgets or revolving funds) with selected congressional committees. Also, the three agencies we reviewed identified programs where additional budget flexibilities could improve outcomes. For example, the Department of Homeland Security proposed a working capital fund for centralized IT operations and maintenance functions. However, in response to OMBs ideas, there has not yet been any new legislation to create budget authorities as a result of the IT Reform Plan and OMB has not identified options to increase transparency for programs that would fall under these budgetary flexibilities. OMB officials noted that they are behind schedule in working with Congress, in part because when the IT Reform Plan was issued in December 2010, the fiscal year 2012 budget process was already under way. They explained that this meant they needed to wait to incorporate changes into the fiscal year 2013 budget process. However, OMB has not yet established time frames for completing this activity. OMB issued a memo in August 2011 that, among other things, required agencies to d consolidate commodity IT services under the agency CIO. In addition, the federal CIO has discussed the importance of consolidating commodity IT under the agency CIOs with selected congressional committees. However, OMB noted that this action item is behind schedule and that it is continuing to discuss the implementation of the memo and the development of models for funding commodity IT with agencies and Congress. Further, the three agencies we reviewed had not yet reported to OMB on their proposals for migrating commodity IT services to shared services, in part because they were waiting for guidance from OMB. OMB officials noted that part of the reason for the delay is that when the IT Reform plan was issued in December 2010, the fiscal year 2012 budget process was already under way. Therefore, they needed to wait a year to incorporate changes into the fiscal year 2013 budget process. However, OMB has not established a time frame for completing this activity.

(15) Issue contracting guidance and templates to support modular development

Partially completed

Partially completed

(17) Work with Partially Congress to completed create IT budget models that align with modular development

Partially completed

(20) Work with Congress to consolidate commodity IT spending under agency CIOs

Partially completed

Partially completed

Page 9

GAO-12-745T

Plan number and action item title

OMBs reported status (as of December 2011)

GAOs assessment Description Completed In 2011, OMB revamped its requirements for agency IT budget submissions. OMB also developed, published, and provided training for agency CIOs on how to conduct TechStat reviews that includes accountability guidelines, engagement cadence, evaluation processes, and reporting processes. By December 2011, all 24 agencies conducted at least one TechStat review. In August 2011, OMB issued a memo directing agencies to strengthen the role of the CIO away from solely being responsible for policymaking and infrastructure maintenance to a role that encompasses true portfolio management for all IT. However, OMB acknowledged that there is disparity among agency CIOs authorities and that it will take time for agencies to implement the required changes. Of the three agencies we reviewed, two CIOs reported having true portfolio management for all IT projects, and one did not. The Department of Homeland Securitys CIO does not yet have responsibility for the portfolio of all IT projects. We have ongoing work assessing the departments governance of IT investments. Regarding changes in the role of the CIO Council, the council formed a committee to focus on management best practices. This committee analyzed the outcomes of agency TechStat reviews over the past year and published a report discussing governmentwide trends in December 2011.
Source: GAO analysis of OMB and agency data.
a b c

(21) Reform Completed and strengthen Investment Review Boards (22) Redefine role of agency CIOs and the CIO Council Completed

Partially completed

GAO-12-453SP. GAO-11-565.

The seven agencies are the Departments of Agriculture, Health and Human Services, Homeland Security, State, and Treasury, as well as GSA and the Small Business Administration.

OMB, Memorandum for Heads of Executive Departments and Agencies: Chief Information Officer Authorities, M-11-29 (Washington, D.C.: Aug. 8, 2011).

Until OMB and the agencies complete the action items called for in the IT Reform Plan, the benefits of the reform initiativesincluding increased operational efficiencies and more effective management of large-scale IT programsmay be delayed. With the last of the action items in the IT Reform Plan due to be completed by June 2012, it will be important for OMB and the agencies to ensure that the action items due at earlier milestones are completed as soon as possible.

Page 10

GAO-12-745T

OMB Has Not Established Measures for Evaluating Results on Most IT Reform Initiatives

The importance of performance measures for gauging the progress of programs and projects is well recognized. In the past, OMB has directed agencies to define and select meaningful outcome-based performance measures that track the intended results of carrying out a program or activity. 16 Additionally, as we have previously reported, aligning performance measures with goals can help to measure progress toward those goals, emphasizing the quality of the services an agency provides or the resulting benefits to users. 17 Furthermore, industry experts describe performance measures as necessary for managing, planning, and monitoring the performance of a project against plans and stakeholders needs. 18 According to government and industry best practices, performance measures should be measurable, outcome-oriented, and actively tracked and managed. Recognizing the importance of performance measurement, OMB and GSA have established measures for 4 of the 10 action items we reviewed: data center consolidation, shifting to cloud computing, using contract vehicles to obtain Infrastructure-as-a-Service, and reforming investment review boards. Moreover, OMB reported on three of these measures in the analytical perspectives associated with the Presidents fiscal year 2013 budget. Specifically, regarding data center consolidation, OMB reported that agencies were on track to close 525 centers by the end of 2012 and expected to save $3 billion by 2015. On the topic of cloud computing, OMB reported that agencies had migrated 40 services to cloud computing environments in 2011 and expect to migrate an additional 39 services in 2012. Regarding investment review boards, OMB reported that agency CIOs held 294 TechStat reviews and had achieved more than $900 million in cost savings, life cycle cost avoidance, or reallocation of funding. However, OMB has not established performance measures for 6 of the 10 action items we reviewed. For example, OMB has not established

16 17

OMB, Guide to the Program Assessment Rating Tool.

GAO, NextGen Air Transportation System: FAAs Metrics Can Be Used to Report on Status of Individual Programs, but Not of Overall NextGen Implementation or Outcomes, GAO-10-629 (Washington, D.C.: July 27, 2010).
18

Thomas Wettstein and Peter Kueng, A Maturity Model for Performance Measurement Systems, and Karen J. Richter, Ph.D., Institute for Defense Analyses, CMMI for Acquisition (CMMI-ACQ) Primer, Version 1.2.

Page 11

GAO-12-745T

measures related to the best practices collaboration platform, such as number of users, number of hits per query, and customer satisfaction. Further, while OMB has designed the guidance and curriculum for developing a cadre of IT acquisition professionals, it has not established measures for tracking agencies development of such a cadre. Table 3 details what performance measures and goals, if any, are associated with the action item.
Table 3: Assessment of Performance Measures Associated with Selected IT Reform Action Items Action item (1) Complete detailed implementation plans to consolidate 800 data centers by 2015 Performance measures

Performance goals

Number of data center closures Expected cost savings

(3) Shift to a cloud-first policy

(4) Stand-up contract vehicles for secure Infrastructure-as-aService solutions

Number of services transitioned to a cloud computing environment Number of legacy systems eliminated Anticipated cost savings Number of task orders issued under the contract vehicle Dollar amounts awarded through the contract vehicle Period of performance for the contract
a

The IT Reform Plan identifies a goal to consolidate 800 data centers by 2015. In December 2011, in conjunction with a decision to include smaller data centers in the consolidation effort, the Federal CIO increased this goal to more than 1,000 data centers by 2015. In February 2012, OMB announced a goal of saving $3 billion by 2015. The IT Reform Plan states that each agency will identify three services to move to the cloud and that one of those services must move within 12 months. OMB has not yet announced goals for eliminated legacy systems or anticipated cost savings. GSA established a goal of having at least one task order issued under the Infrastructure-as-a-Service blanket purchase agreement in the first year. GSA has not yet announced goals for its second year.

(10) Launch a best practices collaboration platform (13) Design a cadre of specialized IT acquisition professionals (15) Issue contracting guidance and templates to support modular development (17) Work with Congress to create IT budget models that align with modular development (20) Work with Congress to consolidate commodity IT spending under agency CIOs

Page 12

GAO-12-745T

Action item (21) Reform and strengthen investment review boards

Performance measures

Performance goals

Number of TechStat reviews Number of terminated programs Cost savings associated with TechStat reviews
a

OMB established a goal of having agency CIOs terminate or turn around one third of all underperforming IT investments by June 2012.

(22) Redefine role of agency CIOs and the CIO Council


a

Source: GAO analysis of OMB and agency data.

Performance measures or goals have not been established for this action item.

Until OMB establishes and tracks measureable, outcome-oriented performance measures for each of the action items in the IT Reform Plan, the agency will be limited in its ability to evaluate progress that has been made and whether or not the initiative is achieving its goals.

Implementation of Recommendations Could Help Ensure Key Efforts are Completed and Results are Identified

In our report being released today, we are making several recommendations to help ensure the completion of key IT reform initiatives and that the results of these initiatives are measured. Specifically, we are recommending that the Departments of Homeland Security, Justice, and Veterans Affairs complete elements missing from the agencies plans for migrating services to a cloud computing environment, and identify and report on the commodity services proposed for migration to shared services. All three agencies agreed with our recommendations and identified steps that they are undertaking to address them. In addition, we are recommending that the Federal CIO ensure that the action items called for in the IT Reform Plan are completed by the responsible parties prior to the completion of the IT Reform Plans 18 month deadline of June 2012 and that the agency provide clear time frames for addressing the shortfalls associated with the IT Reform Plan action items. The Federal CIO agreed with both of these recommendations and stated that OMB intends to complete the action items by the deadline. We are also recommending that the Federal CIO accurately characterize the status of the IT Reform Plan action items in an upcoming progress report in order to keep momentum going on action items that are not yet completed. The Federal CIO disagreed with this recommendation and stated that OMB has accurately characterized the completeness of the action items, and therefore, the recommendation does not apply. We do not agree with OMBs characterization of four action items. Specifically, OMB considers the action items associated with

Page 13

GAO-12-745T

data center consolidation, cloud-first policy, best practices collaboration portal, and redefining roles of agency CIOs and the CIO Council to be completed. While we agree that OMB has made progress in each of these areas, we found activities specified in the IT Reform Plan that have not yet been completed. For example, in the area of data center consolidation, we found that selected agency plans are still incomplete. In addition, in the move to cloud computing, selected agency migration plans lack key elements. Thus, we believe that the recommendation is warranted. To address our concerns regarding performance measures, we are recommending that the Federal CIO establish outcome-oriented measures for each applicable action item in the IT Reform Plan. The Federal CIO disagreed with our recommendation and noted that OMB measured the completeness of the IT Reform Plan action items and not the performance measures associated with broader initiatives. We continue to believe that our recommendation is appropriate because there are multiple action items in the IT Reform Plan that are not aligned with broader initiatives and for which there are no measures. Examples include the best practices portal, developing a cadre of specialized IT acquisition professionals, and establishing budget models that align with modular development. Given that the purpose of the IT Reform Plan is to achieve operational efficiencies and improve the management of largescale IT programs, we maintain that it is appropriate to establish performance measures to monitor the IT Reform Plans results. In summary, OMB and selected agencies have made strides in implementing the IT Reform Plan, including pushing agencies to consolidate data centers, migrating federal services to cloud computing, improving the skills of IT acquisition professionals, and strengthening the roles and accountability of CIOs. However, several key reform items remain behind schedule despite OMB stating that these items have been completed. In addition, OMB has not established performance measures for gauging the success of most of its reform initiatives. For example, while OMB is tracking the number of services that agencies move to a cloud computing environment and the number of data center closures, it is not tracking the usefulness of its efforts to develop a best practices collaboration portal or a cadre of IT acquisition professionals.

Page 14

GAO-12-745T

Overstating progress and not implementing appropriate performance measures do not position the federal IT community to leverage and build on the progress made to date. Moving forward, it will be important for OMB to continue to provide guidance, goals, and oversight to ensure that critical IT reform efforts extend well beyond the original 18-month time frame. It will also be important for agencies to aggressively pursue the completion of IT reform initiatives. Chairman Carper, Ranking Member Brown, and Members of the Subcommittee, this concludes my statement. I would be happy to answer any questions at this time.

GAO Contact and Staff Acknowledgments

If you or your staffs have any questions about this testimony, please contact me at (202) 512-9286 or at [email protected]. Individuals who made key contributions to this testimony are Colleen Phillips (Assistant Director), Cortland Bradford, Rebecca Eyler, Kathleen S. Lovett, and Jessica Waselkow.

(311270)

Page 15

GAO-12-745T

This is a work of the U.S. government and is not subject to copyright protection in the United States. The published product may be reproduced and distributed in its entirety without further permission from GAO. However, because this work may contain copyrighted images or other material, permission from the copyright holder may be necessary if you wish to reproduce this material separately.

GAOs Mission

The Government Accountability Office, the audit, evaluation, and investigative arm of Congress, exists to support Congress in meeting its constitutional responsibilities and to help improve the performance and accountability of the federal government for the American people. GAO examines the use of public funds; evaluates federal programs and policies; and provides analyses, recommendations, and other assistance to help Congress make informed oversight, policy, and funding decisions. GAOs commitment to good government is reflected in its core values of accountability, integrity, and reliability. The fastest and easiest way to obtain copies of GAO documents at no cost is through GAOs website (www.gao.gov). Each weekday afternoon, GAO posts on its website newly released reports, testimony, and correspondence. To have GAO e-mail you a list of newly posted products, go to www.gao.gov and select E-mail Updates. The price of each GAO publication reflects GAOs actual cost of production and distribution and depends on the number of pages in the publication and whether the publication is printed in color or black and white. Pricing and ordering information is posted on GAOs website, http://www.gao.gov/ordering.htm. Place orders by calling (202) 512-6000, toll free (866) 801-7077, or TDD (202) 512-2537. Orders may be paid for using American Express, Discover Card, MasterCard, Visa, check, or money order. Call for additional information.

Obtaining Copies of GAO Reports and Testimony


Order by Phone

Connect with GAO To Report Fraud, Waste, and Abuse in Federal Programs Congressional Relations Public Affairs

Connect with GAO on Facebook, Flickr, Twitter, and YouTube. Subscribe to our RSS Feeds or E-mail Updates. Listen to our Podcasts. Visit GAO on the web at www.gao.gov. Contact: Website: www.gao.gov/fraudnet/fraudnet.htm E-mail: [email protected] Automated answering system: (800) 424-5454 or (202) 512-7470 Katherine Siggerud, Managing Director, [email protected], (202) 5124400, U.S. Government Accountability Office, 441 G Street NW, Room 7125, Washington, DC 20548 Chuck Young, Managing Director, [email protected], (202) 512-4800 U.S. Government Accountability Office, 441 G Street NW, Room 7149 Washington, DC 20548

Please Print on Recycled Paper.

You might also like