SCHEDULE OF RATES FOR CIVIL ENGINEERING WORKS IN SARAWAK 2010

JKR Sarawak May 2011

LOCATION FACTOR FROM BASE AT KUCHING CITY


(To be read together with the Rules of determining the Location Factor) Kuching City Padawan Santubong Siburan Bau Lundu Sematan 0% 2% 3% 3% 5% 8% 9% Sri Aman District Lubok Antu Linggi Pantu Engkilili Skrang 15% 20% 20% 13% 18% 15%

Samarahan District Serian Simunjan Sebuyau Asajaya Sadong Jaya Tebedu Tebakang Balai Ringin

2% 5% 12% 15% 10% 12% 8% 8% 8%

Sibu

District Kem Batu 10 & Kem Batu 14 Durin Bawang Assan Sungai Assan Kanowit Machan Nibong Tada Ng Tada Ng Dap

12% 13% 15% 13% 13% 16% 16% 15% 17% 20% 20% 20% 22% 40% 18% 20% 22% 16%

Betong

District Spaoh Debak Pusa Beladin Maludam Saratok Roban Kabong

20% 20% 20% 21% 22% 22% 20% 20% 20%

Ng Ngemah Ng Ngungun Ng Poi Ng Jagau Selangau Ulu Balingian Arip Stapang

Kapit

District Song Belaga Sg. Asap

30% 25% 70% 25%

Bintulu

District Tatau Sebauh

15% 20% 23%

LOCATION FACTOR FROM BASE AT KUCHING CITY


(To be read together with the Rules of determining the Location Factor)

Mukah

District Dalat Oya Igan Balingian Kuala Balingian Semop Matu Betanak Daro Bruit Tanjung Manis

20% 20% 20% 18% 23% 23% 30% 25% 30% 25% 30% 18%

Miri

City Subis Bekenu Marudi Long Lama Beluru

15% 15% 15% 25% 40% 22%

Limbang

District Lawas

30% 28%

Sarikei

District Bintangor Pakan Selalang Julau Meluan Ulu Entabai Engkamop Nanga Wak Nanga Entabai

18% 18% 20% 20% 20% 22% 23% 30% 15% 14%

RULES OF DETERMINING THE LOCATION FACTOR


1. The % factors as stated are for those projects accessible by motorised vehicles within 15km radius from the location shown.

2.

Where the project site is beyond 15km radius of the above stated locations, these additional % factors shall be added on to those percentages stated above: % addition (i) ( ii ) ( iii ) ( iv ) (v) > 15km > 45km > 90km > 135km > 180km < 45km < 90km < 135km < 180km < 220km 5% 10% 15% 20% 25%

3.

Where the project sites are accessible only by waterway (i) ( ii ) ( iii ) ( iv ) (v) ( vi ) areas within 15km radius areas within 30km radius areas within 60km radius areas within 90km radius areas within 120km radius areas within 150km radius 0% 5% 10% 15% 20% 25%

4.

Where the project sites can only be accessible by air, the location factor shall be doubled over the value obtained from that by motorised vehicles. Where the project sites can only be accessible by foot, the location factor shall be 50% over the value obtained from that by authorized vehicles Where in determining the locations factor and two or more factors and radial distances are equally applicable, the lower in each case shall be used. Where in determining the location factor and two or more factors and radial distances by the rules above whereby there can be a combination due to accessibility, say partly land and partly waterway or partly waterway and partly by foot, there shall be a combination of the rules according to the radial distance from the nearest locations stated above. Where in determining the location factor and the Site for the project lies within two more radial distances, the addition % for the radial distance within which more than 50% of the Site lies shall be used.

5.

6.

7.

8.

PREAMBLES
1. All rates shall be used and read together with the Location Factor from base at Kuching City. 2. All descriptions are to be read with reference to the Standard Specification for Road Works (including Bridge Structures) JKR/SPJ/1988, Addendum No. S-1 (Rev.1),all other subsequent Addendums and the drawings in the Standard Drawings for Road Construction (Latest Version) issued by Unit Rekabentuk Jalan, Cawangan Jalan, Ibu Pejabat Kerja Raya, Kuala Lumpur and the following :
(A) Piling a) Rates for driving of precast concrete piles and reinforced concrete lengthened piles shall include for the provision of all necessary mechanical plant, rig, temporary works, etc. and for the travelling of pile frame about the site.

(B) Site Clearance And Earthwork All rates herein shall be held to include for supply and delivery to site, waste on materials, carriage and cartage, carrying in and return of empties, hoisting, setting, fitting and fixing in position, making and all other labours and everything else necessary (including any customs duty, etc.) for the proper completion of each item and for establishment charges and profit. Rates for site clearance shall include: a) b) c) d) Clearing all general vegetation, tall grass, lallang, creepers, shrubs, bushes and all undergrowth. Felling of trees of all sizes including cutting, grubbing up their stumps and roots and dispose off site. Clearing all rubbish, debris and unwanted materials. Breaking up and removing disused structures, surface beds and pavings, sewers, drains and drain pipes, manholes, underground wells, sumps, fencing, posts, retaining walls and other such like structures, including disconnecting and sealing off services, plugging any pipes cut off at perimeter of site. Removing existing tree stumps and grubbing up their roots and disposal off site. Filling holes and voids caused by removal of trees, tree stumps, roots, existing structures or obstructions with hardcore or suitable approved materials.

e) f)

SOR for Civil Engineering Works 2010

(C) Excavation i Excavation shall be measured to commence at existing ground level. All excavation and filling shall be measured nett. The quantities of excavation and filling shall be measured on the assumption that the gradient of the existing surfaces between the nearest adjacent spot levels and/ or between contours is constant. Boulders not exceeding one cubic metre shall be deemed to be included in the rates for excavation. Rates for excavation (including excavation of drainage) are to include : a. keeping all excavations free from water, mud, etc. by pumping or bailing if required b. planking and strutting, leveling, ramming or preparing bottoms, any double handling required and for additional excavation for planking, strutting and formwork. c. excavating by hand or mechanical means in various soil strata and water tables d. multiple handling e. protection of all services encountered f. additional excavation and backfilling due to Contractors method or process such as excavation for working space. g. reinstating to original condition all work disturbed by excavation. h. additional concrete infill where excavated below correct levels i. giving all required notice j. to ensure safety of excavation and adjoining structures.

(D) Concrete Work i. No allowance shall be made in the weight of steel reinforcement for rolling margin, trying wires, spacers, chairs and weight of weld etc. Concrete shall be measured nett without deduction for the volume of reinforcement. Rates for concrete shall be held to include : (a) forming, leaving or cutting grooves, chases, mortices, holes (b) making good and any sundry items of alike nature. (c) providing trial mixes, tests on materials and finished product, including non destructive test on and off-site (d) hoisting or pumping or placing in position (e) compacting by suitable means (f) laying in bays and associated works (g) curing and protection. Rate for precast concrete work shall include : (a) all reinforcement and moulds (b) lifting hooks, cast-in brackets, dowels and ther fixing devices (c) finishing fair on all exposed faces, and other surface treatment to receive other finishes (d) holes, sleeve, rates, notchings, sinkings, mortices and the like (e) temporary supports (f) hoisting and placing in position; setting, bedding, jointing and pointing in cement mortar; cutting off lifting hooks.

SOR for Civil Engineering Works 2010

Rates for bar reinforcement shall include : (a) allowance for rolling margin and weight of welds (b) cleaning by wire brushing or sand blasting (c) cutting to length and fabricating including bending to various bend and radii (d) providing and tying with galvanized steel wire at all intersections (e) providing seating or spacer blocks and chairs (f) providing all necessary laps and anchorages (g) submitting manufacturers mill and test certificate. Rates for fabric reinforcement shall include : (a) allowance for rolling margin and weight of welds (b) cleaning by wire brushing or sand blasting (c) cutting to length and fabricating including bending to various bend and radii (d) providing and tying with galvanized steel wire at all intersections (e) providing seating or spacer blocks and chairs (f) providing all necessary laps and anchorages (g) submitting manufacturers mill and test certificate. (h) straight, circular or raking cutting and notching. ii. Sawn formwork shall mean formwork to produce concrete surfaces suitable for plastering or tiling. Wrot formwork shall means formwork to produce fair face concrete surfaces suitable for direct application of decorations. Formwork shall be deducted for openings over one square metres. Rates for formwork shall be held to include : (a) for erection, raking and circular cutting, splayed edges, notchings, (b) allowance for overlaps and passing at angles, battens, strutting, bolting, wedging, (c) easing, striking and removal. (d) batten framing (e) stopping all holes, cracks and crevices (f) mould oil

(E) Rates for each item of paving shall be held to include for all rounded angles, arrises and making good and any other sundry items of alike nature.

(F) Rates for each item of skirtings, risers, channels and the like shall be held to include for all short lengths formed, cut and purpose made angles, junctions, ends, etc. and making good and any other sundry items of alike nature.

(G) Rates for mild steel tubing are to include for short running lengths, sockets, backnuts, elbows and bends.

SOR for Civil Engineering Works 2010

(H) Bituminous Road And Hardstandings Rates for site surface water drainage and culvert shall include: a) Sampling and testing of aggregates and bituminous mixtures as specified. b) Protecting mixed material in transit and while awaiting tripping. c) Laying, rolling and consolidating sub-base, base course, binder and wearing course in layers or sequence as required. d) Laying by hand of narrow strips remaining alongside machine work. e) Making joints, working around manhole covers and other like projections. f) Finishing surfaces to gradient and falls. g) Added filler to bituminous mixture. h) Maintenance of surface as work progress.

(I) Gabion Work Rates for gabion work shall include: a) Excavation and disposal of excavated material off site to Contractors own dump. b) Dewatering, upholding the sides of excavation and keeping the excavation free of water. c) Trimming and leveling at founding/base level. d) Cage and tying wire. e) Filling material. f) Transport, handling, assembling, tying, fixing, staking, tensioning and placing in dry condition and/or under water.

(J) Turfing And Tree Planting Rates for seeding and turfing shall include: (a) Carry out the work in such sequence or section as directed. (b) Preparatory work in forking and loosening ground surface including riding all weed, roots and debris. (c) Dressing with fertilizer, tending, watering, covering with wet sacking, moving and protection of newly seeded/turfed area. (d) Maintenance. Rates for tree planting shall include: a) Carry out the work in such sequence or section as directed. b) Selection and tagging of plant material. c) Planting operation including excavation for rootball, top soil, refilling, support and ties. d) Irrigation, pruning and trimming. e) Plant replacement. f) Spraying or other disease control operation. g) Protection. h) Maintenance.

SOR for Civil Engineering Works 2010

A Item No

EARTHWORKS Description Unit Rate (RM)

General Site Clearance:

1 2 3 4

Clearing and grubbing within the Site of all trees, bushes, etc. Stripping top soil to 150mm thick Demolition and removal of existing pavement. Scarify and remove existing pavement to the required level.
Roadway Excavation

Ha M2

2,625.00 1.10

M2 M2

5.30 2.60

Roadway excavation in all materials other than rock including stockpiling aside for embankment construction. Roadway excavation in all materials other than rock including cart away from site. Extra over for excavation in rock including removal from site :Open excavation (including use of explosives, etc). Trench excavation.
Embankment Construction:

M3

4.50

M3

7.90

7 (a) (b)

M3 M3

21.00 42.00

Supply, lay, grade and compact in layers imported suitable fill material to formation level. Take from stockpile on site, lay, grade and compact in layers suitable excavated fill material to formation level. Supply and lay geotextile (Polyfelt TS65 or equivalent) . Supply and lay woven geotextile. i) Polyfelt PET 200 or equivalent. ii) Polyfelt PET 400 or equivalent. Supply and lay geogrid. i) Polyfelt GX 60/30 or equivalent. ii) Polyfelt GX 80/30 or equivalent. Supply, lay, grade and compact in layers imported sand fill material to formation level. Construct capping layer using stockpiled materials on slopes of embankment, including excavation of embankment toe drain.
Free Draining Material and Drainage Blanket

M3

15.80

M3
M2

3.70
6.50

10 11

M2 M2

21.00 30.00

12

M2 M2

14.00 16.00

13

M3

24.20

14

M3

8.40

15

Supply, lay, grade and compact free draining material (eg. River gravel) on geotextile (measured separately).

M3

47.30

SOR CIVIL WORK 2010/Page 1 of 18

A Item No

EARTHWORKS...(CONT'D) Description Unit Rate (RM)

Free Draining Material and Drainage Blanket (Cont'd)

16

Supply and lay Non-woven geotextile to receive free draining material. i) Polyfelt TS 50 or equivalent. ii) Polyfelt TS 65 or equivalent.
Preparation of formation:

M2 M2

5.30 6.50

17

Prepare, grade to fall and compact subgrade in suitable materials other than sand. Prepare and compact subgrade in sand material.
Protective Vegetation for Erosion Control:

M2
M2

2.10
1.60

18

19

100mm square turfs for spot turfing on cut slopes, embankments and benches including top soil. Hydroseeding with protective mat (Vigormat V380e or equivalent) on cut slopes, embankments and benches. Establishing leguminous plants as specified on cut slopes, embankments and benches.
Miscellaneous Works:

M2

5.30

20

M2

6.30

21

M2

6.30

22

Supply and place 1.0m x 1.0m x 1.0m PVC coated wire gabion complete with rockfill.

NO

262.50

SOR CIVIL WORK 2010/Page 2 of 18

B
Item No.

DRAINAGE WORKS Description Unit Rate (RM)

Drains

1 (a) (b) 2 (a)

Surface drain - unlined: Embankment toe drain, type TD 1. Roadside earth drain, Type 2. Surface drain - lined Reinforced concrete roadside drain complete with concrete structs, all excavation and part backfill. i) Type 2. ii) Type 3. iii) Type 4. Reinforced concrete bench/berm drain complete with concrete structs, all excavation and part backfill. i) Type 1. ii) Type 2. Reinforced concrete embankment toe drain complete with concrete structs, all excavation and part backfill. i) Type 3. ii) Type 4. Reinforced concrete shoulder drain Type SD 1 complete with concrete structs, all excavation and part backfill. Interceptor drain complete with concrete structs, all excavation and part backfill. i) Type 1. ii) Type 2. Cascade drain: Cascade drain : Reinforced concrete slope drain complete with concrete structs, all excavation and part backfill. Cascade drain : Reinforced concrete outfall drain complete with concrete structs, all excavation and part backfill. Sub-soil drain complete with all excavation and part backfill. i) Type 1. ii) Type 2. 500mm Thick gabion mattress laid on ground including rockfill and laying at slope. Filling of existing stream/drain using imported suitable fill material including compaction. Borrow pit<15km.
M M 10.50 8.40

M M M

84.00 136.50 157.50

(b)

M M

73.50 94.50

(c)

M M

210.00 189.00

(d)

94.50

(e)

M M

73.50 84.00

3 (a)

241.50

(b)

288.80

M M

57.80 73.50

M2
M2

157.50
18.90

SOR CIVIL WORK 2010/Page 3 of 18

B
Item No.

DRAINAGE WORKS...(CONT'D) Description Unit Rate (RM)

Precast concrete Pipe Culverts:

Precast concrete Class "Z" butt joint pipe culvert of the following sizes complete with cast-in -situ concrete joint complete with reinforcement, formwork, well compacted granular material as surround, and reinforced concrete cradle and including excavation and part backfill : Single 600 mm diameter. Single 900 mm diameter. Twin 900 mm diameter. Single 1200 mm diameter. Twin 1200 mm diameter. Triple-cell 1200 mm diameter. Single 1500 mm diameter. Twin 1500 mm diameter. Triple-cell 1500 mm diameter. Single 1800 mm diameter. Twin 1800 mm diameter. Triple-cell 1800 mm diameter. Reinforced concrete outlet structures comprises headwall, wingwall, apron, culvert marker post and all necessary excavation and part backfill including jointing to pipe culvert of the following sizes: Single 600 mm diameter. Single 900 mm diameter. Twin 900 mm diameter. Single 1200 mm diameter. Twin 1200 mm diameter. Triple-cell 1200 mm diameter. Single 1500 mm diameter. Twin 1500 mm diameter. Triple-cell 1500 mm diameter.
NO NO NO NO NO NO NO NO NO 2,467.50 2,730.00 4,095.00 3,412.50 5,187.00 5,880.00 4,914.00 7,350.00 9,450.00 M M M M M M M M M M M M 850.00 1,150.00 2,100.00 1,500.00 2,700.00 3,850.00 1,900.00 3,500.00 5,050.00 2,290.00 4,300.00 6,200.00

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) 8

(a) (b) (c) (d) (e) (f) (g) (h) (i)

SOR CIVIL WORK 2010/Page 4 of 18

B
Item No.

DRAINAGE WORKS...(CONT'D) Description Unit Rate (RM)

(j) (k) (l) 9

Single 1800 mm diameter. Twin 1800 mm diameter. Triple-cell 1800 mm diameter. Reinforced concrete inlet sump structure complete with hinged grating cover and frame, grating and all necessary excavation and part backfill including jointing to pipe culvert of the following sizes: Single 600 mm diameter. Single 900 mm diameter. Single 1200 mm diameter. Single 1500 mm diameter. Single 1800mm diameter.
Reinforced Concrete Box Culvert

NO NO NO

5,775.00 7,507.50 11,025.00

(a) (b) (c) (d) (e)

NO NO NO NO NO

1,102.50 1,638.00 2,047.50 2,467.50 3,276.00

10 (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) 11

Reinforced concrete box culvert barrel with fill height not exceeding 3.0m high complete with all excavation and part backfill and keeping trenches dry. Single 1.5m x 1.5m Twin 1.5m x 1.5m Single 2.0m x 2.0m Twin 2.0m x 2.0m Single 2.5m x 2.5m Twin 2.5m x 2.5m Triple 2.5m x 2.5m Single 3.0m x 3.0m Twin 3.0m x 3.0m Triple 3.0m x 3.0m Single 3.5m x 3.5m Twin 3.5m x 3.5m Triple 3.5m x 3.5m Reinforced concrete box culvert barrel with fill height exceeding 3.0m high and not exceeding 6.0m high complete with all excavation and part backfill and keeping trench dry. Single 1.5m x 1.5m Twin 1.5m x 1.5m Single 2.0m x 2.0m Twin 2.0m x 2.0m Single 2.5m x 2.5m Twin 2.5m x 2.5m Triple 2.5m x 2.5m Single 3.0m x 3.0m Twin 3.0m x 3.0m

M M M M M M M M M M M M M

2,677.50 3,554.30 4,767.00 6,300.00 6,247.50 8,295.00 11,550.00 6,615.00 8,820.00 16,590.00 9,051.00 12,001.50 22,575.00

(a) (b) (c) (d) (e) (f) (g) (h) (i)

M M M M M M M M M

3,024.00 4,042.50 5,386.50 7,182.00 7,108.50 9,324.00 13,020.00 7,297.50 9,712.50

SOR CIVIL WORK 2010/Page 5 of 18

B
Item No.

DRAINAGE WORKS...(CONT'D) Description Unit Rate (RM)

11

(j) (k) (l) (m) 12

Reinforced concrete box culvert barrel with fill height exceeding 3.0m high and not exceeding 6.0m high complete with all excavation and part backfill and keeping trench dry. (Cont'd) Triple 3.0m x 3.0m Single 3.5m x 3.5m Twin 3.5m x 3.5m Triple 3.5m x 3.5m Reinforced concrete box culvert barrel with fill height exceeding 6.0m high and not exceeding 9.0m high complete with all excavation and part backfill and keeping trench dry. Single 1.5m x 1.5m Twin 1.5m x 1.5m Single 2.0m x 2.0m Twin 2.0m x 2.0m Single 2.5m x 2.5m Twin 2.5m x 2.5m Triple 2.5m x 2.5m Single 3.0m x 3.0m Twin 3.0m x 3.0m Triple 3.0m x 3.0m Single 3.5m x 3.5m Twin 3.5m x 3.5m Triple 3.5m x 3.5m Reinforced concrete inlet and outlet structures comprises headwall, wingwall, apron, culvert marker post complete with all necessary excavation and part backfill including jointing to reinforced concrete box culvert of the following sizes: Single 1.5m x 1.5m reinforced concrete box culvert barrel : Twin 1.5m x 1.5m reinforced concrete box culvert barrel : Single 2.0m x 2.0m reinforced concrete box culvert barrel : Twin 2.0m x 2.0m reinforced concrete box culvert barrel : Single 2.5m x 2.5m reinforced concrete box culvert barrel : Twin 2.5m x 2.5m reinforced concrete box culvert barrel : Triple 2.5m x 2.5m reinforced concrete box culvert barrel : Single 3.0m x 3.0m reinforced concrete box culvert barrel : Twin 3.0m x 3.0m reinforced concrete box culvert barrel : Triple 3.0m x 3.0m reinforced concrete box culvert barrel : Single 3.5m x 3.5m reinforced concrete box culvert barrel :

M M M M

18,705.80 9,922.50 13,230.00 25,515.00

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) 13

M M M M M M M M M M M M M

3,360.00 4,525.50 6,037.50 8,032.50 7,770.00 10,395.00 14,490.00 7,875.00 10,500.00 21,000.00 10,710.00 14,280.00 28,350.00

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)

NO NO NO NO NO NO NO NO NO NO NO

6,961.50 9,765.00 12,390.00 17,325.00 16,380.00 23,730.00 31,080.00 17,850.00 25,620.00 40,425.00 24,360.00

SOR CIVIL WORK 2010/Page 6 of 18

B
Item No.

DRAINAGE WORKS...(CONT'D) Description Unit Rate (RM)

(l) (m)

Twin 3.5m x 3.5m reinforced concrete box culvert barrel : Triple 3.5m x 3.5m reinforced concrete box culvert barrel :
Concrete Works for Drainage

NO NO

34,807.50 55,125.00

14 15 (a) (b) (c ) 16 (a) (b) 17 (a) (b) (c ) (d) (e) 18 (a) (b) (c ) 19 (a) (b) (c ) (d) (e)

50mm thick lean concrete Grade 15P/20 as blinding for drainage works. Reinforced Concrete of the following grades for Drainage Works: Grade 20/20. Grade 25/20. Grade 30/20. Formwork as described to Class F1 & U1 Finish type To sides of drain, culverts, wingwall, headwall, and the like. To soffit of culvert cover slab and the like. High Yield Deformed Steel Reinforcement Bars as described: 10mm Diameter. 12mm Diameter. 16mm Diameter. 20mm Diameter. 25mm Diameter. Mild Steel Reinforcement Bars as described: 6mm Diameter. 8mm Diameter. 10mm Diameter. Steel Mesh Reinforcement:
Type B785 ( minimum 8.14kg/m2). Type A142 (minimum 2.22kg/m2). Type A8 (minimum 3.55kg/m2). Type A7 (minimum 3.02kg/m2). Type A6 (minimum 2.22 kg/m2).

M2

13.10

M3 M3 M3

231.00 262.50 294.00

M2 M2

36.80 36.80

Tonnes Tonnes Tonnes Tonnes Tonnes

3,000.00 3,000.00 2,900.00 2,900.00 2,900.00

Tonnes Tonnes Tonnes

3,000.00 3,000.00 3,000.00

M2 M2 M2 M2 M2

35.00 10.00 16.00 13.00 10.00

SOR CIVIL WORK 2010/Page 7 of 18

B
Item No.

DRAINAGE WORKS...(CONT'D) Description Unit Rate (RM)

Miscellaneous Works

20 21

Grouted stone pitching of various thickness. 12mm Thick joint filler.

M3 M2

162.75 26.25

SOR CIVIL WORK 2010/Page 8 of 18

C
Item No.

FLEXIBLE PAVEMENT AND ROAD FURNITURES Description Unit Rate (RM)

Flexible Pavement

1 2 3 4 5 6 7 8 9

Subbase course including drainage layer under compacted earth shoulder. Roadbase course. Wet-mix macadam. Bituminous tack coat. Asphaltic concrete binder course. Bituminous prime coat. Asphaltic concrete wearing course. Compacted earth shoulder. Bituminous waterproof layer. Traffic signs complete with concrete footing, post, supporting frame including all necessary excavation

M3 M3 M3 M2

78.80 78.80 95.00 2.10

M3 M2 M3 M3 M2

472.50 2.60 472.50 21.00 2.60

10

Regulatory (Type RP & RM) road signs of various shapes and not exceeding 1.0m2 in area. Warning (Type WD) road signs of various shapes and not exceeding 1.0m2 in area. Guide/Information (Type GI) road signs of various shapes and not exceeding 1.0m2 in area. Guide/Destination (Type GD) road signs of various shapes with the following areas (All Provisional):
Not exceeding 1.0m2 in area. Exceeding 1.0m2 and not exceeding 2.0m2 in area.

NO

420.00

11

NO

420.00

12

NO

420.00

13

(a) (b) 14

NO NO
NO

420.00 735.00
48.00

Post Delineator. 3mm thick Road Markings (measured nett) and Direction Arrows in Thermoplastic paint

15 16 17

Type 3 : Centre lines for straight road. Type 1b : Centre lines for Mountainous Terrain or Short Radius Curve. Type 2a- Broken Lane Lines.

M2 M2 M2

18.00 18.00 18.00

SOR CIVIL WORK 2010/ Page 9 of 18

C
Item No.

FLEXIBLE PAVEMENT AND ROAD FURNITURES...(CONT'D) Description Unit Rate (RM)

3mm thick Road Markings (measured nett) and Direction Arrows in Thermoplastic paint (Cont'd) 18 19 20 21 22 23 24 25 26 27 28 29 Type 2b - Unbroken Lane Lines. Type 10 - No Passing on Both Sides. Type 11 - No Passing on One Side. Type 6 - Edge Line/ Channelising line. Type 1 - Continuity Line. Type 8 - Stop Line. Type 2 - Give-way Line. Cross Hatching. Chevron Hatching for Diverging Traffic. Chevron Hatching for Merging Traffic. Yellow Box Marking. Direction arrows of various shapes.
Miscellaneous Works M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 19.00 19.00 19.00 19.00 19.00 19.00 19.00 21.00 21.00 21.00 21.00 21.00

30 31

Reflective roadstud. Precast concrete road kerb, overall size 600mm long x 150mm wide x 305mm high, complete with laying on concrete bedding. Extra over for Precast concrete road kerb with opening, overall size 600mm long x 150mm wide x 305mm high, complete with laying on concrete bedding.

NO

31.50

52.50

32

NO

15.80

SOR CIVIL WORK 2010/ Page 10 of 18

D Item No.

BRIDGE WORKS

Description

Unit

Rate (RM)

Earthworks

Fill spread, grade and compact in layers to formation level using imported suitable fill material. 300mm Thick rubble pitching as slope protection works complete with mortar pointing. Coarse aggregate as capping layer including laying between piles.
Concrete Works

M3

23.10

M2 M3

63.00 84.00

4 5 (a) (b) (c) (d) (e)


6

50mm thick lean concrete Grade 15P/20 as blinding. Reinforced concrete of the following grades: Grade 25/20. Grade 30/20. Grade 35/20. Grade 40/20. Grade 50/20.
Formwork as described to Class F1 & U1 finish type including falsework

M2

15.80

M3 M3 M3 M3 M3

304.50 325.50 346.50 367.50 399.00

(a) (b) (c) (d) (e) 7 (a) (b) (c) (d) 8

To sides of approach slab, platform slab, transition slab, and the like. to sides of abutment and the like. To sides and soffit of pile cap. To soffit of deck slab. To sides and soffit of diaphragm. Formwork as described to Class F2 & U2 Finish Type including falsework To sides of abutment wingwall and the like. To sides and soffit of pier, column, headstock and the like. To sides of kerb and the like. To sides of parapet and the like. Supply, fabricate and placing into position 125mm thick precast concrete footway slab complete with BMC A5 fabric reinforcement. 10mm Diameter mild steel reinforcement bars as described.

M2

42.00

M2 M2 M2 M2

47.30 47.30 47.30 47.30

M2 M2 M2 M2

52.50 52.50 52.50 52.50

M2
Tonnes

63.00
3,600.00

SOR CIVIL WORK 2010/Page 11 of 18

D Item No.

BRIDGE WORKS... (CONT'D)

Description

Unit

Rate (RM)

10 (a) (b) (c ) (d) (e) 11 (a) (b) (c) (d)

Hot Rolled Type 2 Deformed steel reinforcement bars as described. 10mm Diameter. 12mm Diameter. 16mm Diameter. 20mm Diameter. 25mm Diameter. Steel Mesh Reinforcement
Type A5 (minimum 1.54 kg/m2). Type A6 (minimum 2.22 kg/m2). Type A7 (minimum 3.02 kg/m2). Type A8 (minimum 3.95 kg/m2). Miscellaneous Bridge Works Tonnes Tonnes Tonnes Tonnes Tonnes 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00

M2 M2 M2 M2

7.50 11.00 14.80 19.40

12 (a) (b) 13 (a)

Sub-soil drainage behind Abutment Granular backfill materials to back of abutment. 90mm Diameter P.V.C. pipe as sub-soil drain, bedded in sand. Dowel bar: 25mm Diameter Hot Rolled Type 2 Deformed steel reinforcement bar as dowel bar of various lengths, embedded into concrete. 20mm Ditto. 25mm Diameter Hot Rolled Type 2 Deformed steel reinforcement bar as dowel bar of various lengths, with one embedded 200mm into concrete, and the other end fixed to 50mm outer diameter tight fitting rubber dowel cap between prestressed girder, complete with compressive materials. 20mm Ditto. Elastometric laminated bearing pad of the following sizes on and including 20mm thick epoxy resin mortar bedding. 400 x 350 x 39mm. 350 x 500 x 69mm. 300 x 200 x 29mm.
NO NO NO 840.00 1,050.00 630.00

M3
M

78.80
26.30

M
M

36.00
25.00

(b) (c)

M
M

50.00
35.00

(d) 14

(a) (b) (c)

SOR CIVIL WORK 2010/Page 12 of 18

D Item No.

BRIDGE WORKS... (CONT'D)

Description

Unit

Rate (RM)

15 16 17 18

24mm thick "Expandite natural bonded cork filler" or equivalent joint filler. 6mm Thick plywood lining as separator. Prepare and apply one coat of heavy bitumen paint on concrete surface. Type A scupper drain complete with forming inlet in asphaltic concrete wearing course, and rectangular hollow section as outlet. Therma Joint or approved deck expansion joints complete with joint filler. Hot-dip galvanised mild steel parapet railing, complete with bolts, U-shaped castin bolts, post, sliding joint, and end railing.

M2

63.00

M2 M2

42.00 15.80

NO
M

78.80
1,417.50

19 20

262.50

SOR CIVIL WORK 2010/Page 13 of 18

E
Item No.

PILING Description Unit Rate (RM)

Precast Concrete Piles

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Supply, handle & pitch 150mm x 150mm initial/head pile 6.00m long. Supply, handle & pitch 150mm x 150mm extension pile 6.00m long. Supply, handle & pitch 200mm x 200mm initial/head pile 6.00m long. Supply, handle & pitch 200mm x 200mm extension pile 6.00m long. Supply, handle & pitch 250mm x 250mm initial/head pile 6.00m long. Supply, handle & pitch 250mm x 250mm initial/ head pile 9.00m long. Supply, handle & pitch 250mm x 250mm initial/ head pile 12.00m long. Supply, handle & pitch 250mm x 250mm extension pile 6.00m long. Supply, handle & pitch 250mm x 250mm extension pile 9.00m long. Supply, handle & pitch 250mm x 250mm extension pile 12.00m long. Supply, handle and pitch 300mm x 300mm initial/head pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 300mm x 300mm extension pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 350mm x 350mm initial/head pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 350mm x 350mm extension pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 400mm x 400mm initial/head pile 6.00m long. Ditto 9.00m long. Ditto 12.00m long. Supply, handle and pitch 400mm x 400mm extension pile 6.00m long.

M M M M M M M M M M M M M M M M M M M M M M M M M M

32.30 29.50 59.40 55.60 93.00 83.00 79.00 88.20 83.70 76.70 146.70 129.00 120.80 140.00 125.20 117.90 192.60 169.30 157.70 184.00 163.60 153.40 252.00 221.70 206.50 241.50

SOR CIVIL WORK 2010/Page 14 of 18

E
Item No.

PILING...(CONT'D) Description Unit Rate (RM)

Precast Concrete Piles (Cont'd)

27 28 29 30 31 32 33 34 35 36 37 38 39

Ditto 9.00m long. Ditto 12.00m long. Drive to set 200mm x 200mm pile. Ditto 250mm x 250mm pile. Ditto 300mm x 300mm pile. Ditto 350mm x 350mm pile. Ditto 400mm x 400mm pile. Drive to set 200mm x 200mm pile as raker piles. Ditto 250mm x 250mm pile. Ditto 300mm x 300mm pile. Ditto 350mm x 350mm pile. Ditto 400mm x 400mm pile. Butt weld connection 0.60m girth between edges of and including mild steel extension head, base cap plates, bars etc and including coated heavily with bituminous compound for jointing 200mm x 200mm R.C piles. Ditto for jointing 250mm x 250mm R.C piles. Ditto for jointing 300mm x 300mm R.C piles. Ditto for jointing 350mm x 350mm R.C piles. Ditto for jointing 400mm x 400mm R.C piles. Cut off and dump away surplus length of 150mm x 150mm precast concrete pile and strip off pile head, bend back reinforcement for connection as specified. Ditto 200mm x 200mm ditto. Ditto 250mm x 250mm ditto. Ditto 300mm x 300mm ditto. Ditto 350mm x 350mm ditto. Ditto 400mm x 400mm ditto. Provide all equipment, hydraulic jack, deflection gauges, kentledge, temporary staging, etc. and test a test pile of any size to a vertical load test including all extra cost before commencement of the main piling works complete with report.

M M M M M M M M M M M M

214.70 201.30 7.00 9.00 11.00 15.00 20.00 15.00 18.20 21.50 26.00 28.60

NO NO NO NO NO

90.00 135.00 195.00 265.00 350.00

40 41 42 43 44

NO NO NO NO NO NO

14.00 20.00 25.00 30.00 35.00 40.00

45 46 47 48 49 50

Tonne

120.00

SOR CIVIL WORK 2010/Page 15 of 18

E
Item No.

PILING...(CONT'D) Description Unit Rate (RM)

Precast Concrete Spun Piles 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 Supply, handle & pitch 250mm diameter initial/ head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 250mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 300mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 300mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 350mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 350mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 400mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 400mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 450mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. M M M M M M M M M M M M M M M M M M M M M M M M M M 75.70 65.50 60.90 69.00 61.00 57.50 97.10 85.10 79.00 88.90 79.40 74.80 126.70 110.50 101.90 116.20 103.50 96.60 160.00 141.70 131.60 149.50 133.40 125.40 178.90 156.80

SOR CIVIL WORK 2010/Page 16 of 18

E
Item No.

PILING...(CONT'D) Description Unit Rate (RM)

Precast Concrete Spun Piles (Cont'd)

77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99

Ditto 12.00m long. Supply, handle & pitch 450mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 600mm diameter initial/head pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Supply, handle & pitch 600mm diameter extension pile 6.00m long (Class B). Ditto 9.00m long. Ditto 12.00m long. Drive 250mm diameter pile. Ditto 300mm ditto. Ditto 350mm ditto. Ditto 400mm ditto. Ditto 450mm ditto. Ditto 600mm ditto. Drive 250mm diameter pile as raker pile. Ditto 300mm ditto. Ditto 350mm ditto. Ditto 400mm ditto. Ditto 450mm ditto. Ditto 600mm ditto.
Butt weld connection 0.8m girth between edges of mild steel extension head and base cap plates including coated heavily with bituminuos compound (for 250mm diameter Spun piles).

M M M M M M M M M M M M M M M M M M M M M M

145.20 164.50 147.20 138.00 303.00 266.50 250.00 282.90 253.00 239.20 16.00 18.00 30.00 35.00 45.00 50.00 20.80 23.40 39.00 45.50 58.50 65.00

NO NO NO

100.00 120.00 150.00

100 101

Ditto 300mm diameter Spun piles. Ditto 350mm diameter Spun piles.

SOR CIVIL WORK 2010/Page 17 of 18

E
Item No.

PILING...(CONT'D) Description Unit Rate (RM)

Precast Concrete Spun Piles (Cont'd)

102 103 104 105

Ditto 400mm diameter Spun piles. Ditto 450mm diameter Spun piles. Ditto 600mm diameter Spun piles. Cut off 250mm diameter precast concrete spun pile to the required level and roughen the inner surface to detail. Ditto 300mm diameter ditto. Ditto 350mm diameter ditto. Ditto 400mm diameter ditto. Ditto 450mm diameter ditto. Ditto 600mm diameter ditto. Supply and install 12mm diameter high yield steel reinforcement in pile head to detail. Ditto 16mm diameter ditto. Provide and weld 6mm thick mild steel plates to detail for 250mm diameter piles. Ditto 300mm diameter piles. Ditto 350mm diameter piles. Ditto 400mm diameter piles. Ditto 450mm diameter piles. Ditto 600mm diameter piles. Supply, place and compact grade 30/20 concrete in pile hollow section as specified. Provide all equipment, hydraulic jack, deflection gauges, kentledge, temporary staging, etc. and test a test pile of any size to a vertical load test including all extra cost before commencement of the main piling works.

NO NO NO

180.00 220.00 280.00

NO NO NO NO NO NO

30.00 35.00 40.00 45.00 50.00 75.00

106 107 108 109 110 111

KG KG

4.00 3.90

112 113

NO NO NO NO NO NO M
3

38.00 45.00 58.00 68.00 85.00 125.00 300.00

114 115 116 117 118 119

120

Tonne

120.00

SOR CIVIL WORK 2010/Page 18 of 18