Enbridge - Vibration Assesment For Gas Pipeline
Enbridge - Vibration Assesment For Gas Pipeline
Enbridge - Vibration Assesment For Gas Pipeline
General Requirements Support of Gas Pipelines Blasting Requirements Pile Driving or Compaction Requirements Heavy Equipment Operation in the Vicinity of Gas Pipelines
October 2007
TABLE OF CONTENTS
1.0 2.0 DEFINITIONS GENERAL REQUIREMENTS 2.1 Working in the Vicinity of Gas Pipelines 2.2 Support of Pipelines Required at all times 2.3 Encroachment 2.4 Tree Planting 2.5 Minimum Clearance from other Structures 2.6 Minimum Cover Requirements 2.7 Points of Thrust 2.8 Repairs of Damaged Pipe and Pipe Coating 2.9 Blasting, Pile Driving or Compaction SUPPORT OF GAS PIPELINES 3.1 Trenching Parallel to Gas Pipelines 3.2 Minimum Requirements 3.3 Support of Pipelines Crossing Trench 3.3.1 Temporary Support 3.3.2 Cast Iron Pipelines 3.3.3 Steel and Polyethylene Pipelines 3.4 Support of Pipelines Parallel to trench 3.4.1 General 3.4.2 Cast Iron Pipelines 3.4.3 Steel and Polyethylene Pipelines BLASTING REQUIREMENTS 4.1 Policy 4.2 Notification Requirements 4.2.1 Surface Blasting Application 4.2.2 Tunnel Blasting Application 4.3 Evaluation by Enbridge Gas Distribution 4.3.1 Ground Water Monitoring 4.4 Guidelines for Blasting 4.5 Post Blasting Operations PILE DRIVING OR COMPACTION REQUIREMENTS 5.1 Policy 5.2 Pile Driving or Compaction Application 5.3 Evaluation by Enbridge Gas Distribution 5.4 Guideline for Pile Driving or Compaction 5.5 Post Piling or Compaction Operations 5.6 Soil Types
Page 4 5 5 5 6 6 7 8 8 8 8 10 10 10 10 10 12 12 12 12 14 14 17 17 18 18 18 19 20 20 21 23 23 23 24 25 27 30
3.0
4.0
5.0
TABLE OF CONTENTS
6.0 HEAVY EQUIPMENT OPERATION IN THE VICINITY OF GAS PIPELINES 6.1 General 6.2 Equipment Moving Across Pipeline 6.3 Equipment Moving Along the Pipeline 6.4 Compaction Equipment Restrictions 6.5 General Vehicles External Loading Restrictions TABLES Table No. 1 Table No. 2 Table No. 3 Table No. 4 Table No. 5 Table No. 6 Table No. 7 Minimum Cover Requirements Maximum Span Without Support Beam Support Beam Sizes Minimum Allowed Distance From Pipeline to Excavation Stand-Off Distance for Blasting Near Polyethylene and Steel Facilities Maximum Vibration Intensities Expected From Pile Driving in Dry and Wet Sand and Clay Weight/Axle Maximum Allowable Load DRAWINGS Dwg. No. 1 Dwg. No. 2 Dwg. No. 3 Support of Cast or Wrought Iron Gas Pipelines Crossing Excavations Support of Plastic or Steel Gas Pipelines Crossing Excavations Influence Lines for Gas Pipelines Adjacent to Excavations FIGURES Figure 1 Figure 2 Root Deflector Ground Vibrations from Pile Driving APPENDIX Appendix A REGIONAL CONTACT LIST
Page
31 31 31 32 32 32
8 11 11 13 22 29 32
15 15 16
7 28
33
1.0
DEFINITIONS
Terms used in the following Guideline are defined as follows unless otherwise specified: Company - Enbridge Gas Distribution Inc. or any of its representatives LDC Contractor or Excavator - Local Distribution Company - Any individual, partnership, corporation, public agency or other entity that dig, bore, trench, grade excavate or break ground with mechanical equipment or explosives in the vicinity of a gas pipeline or related facility. - Defined as any Enbridge Gas Distribution Inc. Company Pipeline (main or service), regulator station or storage facility and their related components - Any vertical or slightly slanted structural member introduced or constructed in the soil in order to transmit loads and forces from the superstructure to the subsoil; the structural member can also be used as a component of a retaining wall system - The placement of piles carried out by gravity hammer, vibratory hammer, auguring, pressing, screwing or any combinations of the above methods - An operation involving the excavation of rock foundations for various types of structures, grade construction for highways or railroads, canals (trenches) for water supply or collection purposes. - Operations involving the piercing of below ground (generally horizontal) opening in rock. - The person or persons responsible for setting the charges and performing the blast. - The owner of the proposed work - Any vibration generating operation which will result in a potential increase of the density of soils or controlled backfill materials. The means to increase the density may be static or dynamic
Facility
Pile
Pile Driving
Surface Blasting
- A Professional Engineer who is registered as a member of Engineer, the Professional Engineers of Ontario (PEO) and a holder Independent blasting of Certificate of Authorization (C of A) consultant Construction Operations Vicinity - Activities associated with excavation, blasting, piling or compaction - A horizontal distance of 30 meters, or less, from any Enbridge Gas Distribution Inc. natural gas facility (aboveground or below-ground)
4
2.0
2.1
GENERAL REQUIREMENTS
WORK IN THE VICINITY OF GAS PIPELINES All work in the vicinity of gas pipelines must be approved by Enbridge Gas Distribution (the Company). All work within 30.0 metres of an NEB operated pipeline right-of-way must have the approval from Enbridge. This is a requirement of all NEB pipelines, which are under the jurisdiction of the National Energy Board, and follows the NEB Pipeline Crossing Regulations. A stake out of the gas pipeline must be requested prior to any Construction. Call Ontario One Call at 1-800-400-2255 or 905-709-1717 at least 48 hours in advance of the proposed work. Mechanical equipment shall not be operated within 0.3 m of the pipeline. Hand Excavation shall be performed when locating and digging within 0.3 m of the pipeline. Mechanical excavation is not permitted within 3.0 m of the NEB or Vital pipelines without the approval of Enbridge. Hand held compaction equipment shall be used within 1.0 m of the sides or top of all gas pipelines. Spoil from excavation shall not be piled on the gas pipeline. This blocks access to the gas pipeline in the event that maintenance or operations activities are required on the pipeline. The gas pipeline must be inspected for damage before backfilling the excavation. It is the excavators responsibility, under Section 18 and 19 of the Energy Act to ensure the gas pipeline(s) is not undermined or endangered in any way.
2.2
SUPPORT OF PIPELINES REQUIRED AT ALL TIMES It is the responsibility of the Contractor to ensure that existing underground plant is properly supported. Precautions must be taken to support underground plant at all times and to prevent damage to gas pipelines due to excavation activities. Inadequate support damages underground plant and can result in the escape of natural gas, constituting a hazard to persons and property. When excavation is necessary over, under, near or parallel to underground Gas plant, the support is the responsibility of the excavator. The methods of support
Third Party Requirements in the Vicinity of Natural Gas Facilities
5
vary from case to case depending on the characteristics of the excavation, adjacent soil and the pipeline material. Failure to provide proper support will render the excavator responsible for all consequential damage or loss. (Refer to Section 3.0, Support of Gas Pipelines, for details on supporting the gas pipeline.) 2.3 ENCROACHMENT Permanent awnings and roof structures are prohibited above gas pipelines within the public right-of-way, or within the Companys right-of-way. Enbridge Gas Distribution will not accept responsibility for any damages to the encroaching structure within the public right-of-way, or within the Companys right-of-way, if it is necessary for the maintenance or operation of the existing underground plant or to install new underground facilities in the future. 2.4 TREE PLANTING For pipelines regulated by the NEB and Vital Mains (identified as critical pipelines), trees or large shrubs must have a minimum lateral clearance between the edge of the root ball or open bottom container and adjacent edge of the existing pipeline of not less than 2.5 m (8 feet). For all other pipelines, a minimum clearance of 1.2 m (4 feet) horizontally must be maintained between the edge of the root ball or open bottom container and adjacent edge of the existing gas pipeline In cases where 1.2 m (4 feet) clearance cannot be maintained, a minimum clearance of 0.6 m (2 feet) can be permitted provided a root deflector is installed on the sides of the root ball adjacent to the gas pipeline. Final location of the trees must be confirmed with Enbridge Gas Distribution to avoid interference with the existing gas pipelines. Root Deflectors A root deflector is a mechanical barrier placed between tree roots and pipelines to prevent damage to the pipelines. A root deflector can be made from 1/4-inch rigid plastic, fiberglass or a non-degradable material. As the root tip of a tree travels out from the root ball the tip will contact the barrier, unable to penetrate to the barrier, the root will turn. Root deflectors must be installed 0.6 meters (2 feet) from the pipeline on the side of the tree facing the pipeline and must extend 1.2 meters (4 feet) from the center of the tree trunk, parallel to the pipeline, at both directions; or the deflector must circle the tree.
Root deflectors usually have a collar to keep the top of the deflector at ground level, and they should extend down to the bottom of the root-ball as shown in Figure 2.4.
2.5
MINIMUM CLEARANCE FROM OTHER STRUCTURES The following clearances must be maintained between the outside wall of the gas pipeline and other underground structures: Horizontal Vertical Vertical 0.6 m minimum 0.3 m minimum 0.6 m minimum for pipelines 16 inches in diameter and larger
Excavations for permanent structures (i.e. pools, root cellars, septic tanks etc.) must be at least 10.0 m from the limit of the existing right-of-way of the NEB pipeline. Any work performed within 30.0 meters of an NEB pipeline right-of-way must be approved by Enbridge. 2.6 MINIMUM COVER REQUIREMENTS (Table No. 1) Location Mains Below traveled surfaces (roads), Road Crossings, General, Rightsof-way (roads) Water crossings Controlled Access Highways crossings, Below base of rails (cased) Rights-of-way (railroads), Drainage, Irrigation Ditches Services Private property Streets and Roads Wet Gas Areas @ Main/Building Minimum cover (m) 1.2/0.9 * 1.5 1.7 1.0 0.3 0.45 1.2 / 0.9
* 1.2m is required for Transmission Lines 0.9m is required for Distribution Lines
2.7
POINTS OF THRUST Precautions must be taken when working in the immediate vicinity of points of thrust. Points of thrust occur at pipeline fittings such as Elbows (45 or 90), End Caps, Weld Tees, Reducer Couplings and closed Valves. In the event that the excavation involves exposing a point of thrust, or exposing an area near a point of thrust, specific instructions provided by the Company must be followed. Failure to follow these instructions can result in significant harm to persons and property.
2.8
REPAIR OF DAMAGED PIPE AND PIPE COATING In all cases where the pipe or the pipe coating is damaged by the construction operation, contact the Company immediately and leave the excavation open until Company personnel have made the necessary repairs.
2.9
BLASTING, PILE DRIVING OR COMPACTION Blasting, Pile Driving, or Compaction activities in the vicinity of natural gas pipelines requires the prior approval by the owner of the pipeline. (TSSA Act 2001).
Written notification from the owner of the proposed work (municipality, etc.) shall be submitted to the Manager Distribution Planning. The request shall be submitted a minimum of four (4) weeks prior to blasting, pile driving or compaction to allow sufficient time to ensure the Company requirements are followed. (Refer to Section 4.0, Blasting Requirements, and Section 5.0, Pile Driving and Compaction Requirements, for specific responsibilities.)
3.0
3.1
3.2
MINIMUM REQUIREMENTS Support methods specified by the Company are minimum requirements. Excavators shall not depart from these unless a Professional Engineer working for or on behalf of the excavator has designed an alternative method. Any alternative method must ensure support comparable to these specifications and be, in the opinion of the Professional Engineer, consistent with good engineering practices. Where that is the case, the alternative specification shall be documented and approved by the Professional Engineer and sent to the Companys Engineering Department for acceptability. The following specifications deal with the support of gas pipelines in the vicinity of excavations. Two typical field situations are covered: support of gas pipelines crossing the trench and support of gas pipelines parallel to the trench.
3.3
SUPPORT OF PIPELINES CROSSING TRENCH 3.3.1 Temporary Support Temporary support refers to the support of gas pipelines prior to or at the time of excavation to protect the pipeline from deflection due to its own weight while it is exposed. Temporary support shall remain in place until the backfill material underneath the pipeline is compacted adequately to restore support of pipeline. Prior to trenching beneath a pipeline or service, temporary support shall be erected for pipelines if the unsupported span of pipeline in the trench exceeds the length indicated in Table No. 2, page 11. When temporary support is required, Table No. 3, page 11, below, indicates the required beam for a given span. The beam shall be a continuous length grade No. 1 Spruce-Pine-Fir (S-P-F) or equivalent. For spans exceeding 4.5 m, contact the Companys Engineering Department for approval.
10
Table No. 2 Maximum Span Without Support Beam Pipe Size Steel PE (polyethylene) CI (cast iron) (NPS) (m) (m) (m) 2.0 1.0 2.5 1.25 - 1 2 3.0 1.5 3 to 4 4.5 1.75 1.0 6 6.0 2.0 1.0 8 7.0 2.0 1.0 12 10.0 1.0 16 11.5 1.0 20 13.0 1.0 24 15.0 1.0 Table No. 3 Support Beam Sizes Given: max. span between Beam Supports Steel PE Cast Iron 2m 4.5 m 2 m 4.5 m 2m Nil 4x6 4x4 4x6 4x4 Nil Nil 4x4 6x6 4x4 Nil Nil 4x4 8x8 6x6 Nil Nil Nil Nil 8x8
-2
36 8 12 16 24
4.5 m 6x8 8 x8 10 x 10 12 x 12
The beam shall be placed above the pipeline with the ends of the beam resting on firm undisturbed soil. The beam shall not bear directly on the gas pipeline. The pipeline shall be supported from the beam with rope, chain or equivalent in a manner that will prevent damage to the pipeline and pipeline coating, and eliminate sag. The spacing between the rope, canvas sling or equivalent, shall not exceed 1.0 m (see Drawing No. 1, page 15, for details). Backfill material underneath the exposed pipeline shall be compacted to a minimum of 95% Standard Proctor density. Sand padding shall be placed to a level 150 mm above and below the pipeline. Perform compaction with the loose lift height not exceeding 200 mm or one-quarter of the trench width, whichever is less. Injecting water into the backfill beneath the pipeline is not an acceptable method of compaction. Mechanical equipment shall not be operated within 0.3 m of the pipeline. Hand Excavation shall be performed when locating and digging within 0.3 m of the pipeline. Hand held compaction equipment shall be used within 1.0 m of the sides or top of all gas pipelines.
11
3.3.2 Cast Iron Pipelines Any cast iron pipeline NPS 8 or less which is completely exposed crossing a trench for a length greater than 1.0 m must either be replaced or temporarily supported and properly backfilled. Any cast iron pipeline NPS 12 or greater that is completely exposed for greater than 1.0 m must be referred to the Companys Engineering Department for analysis. (See Drawing No. 1, page 15, for details) If the pipeline is to be replaced, the replacement section shall extend to beyond the two 45 lines projected upward from the trench bottom (see Drawing No. 3, page 16, for details). If the pipeline is to be temporarily supported, the spacing of the rope, canvas sling or equivalent, shall be a maximum of 1.0 m. Any exposed joint shall be supported by canvas sling or rope at either side of the joint and at 1.0 m spacings along the pipelines length (see Drawing No. 1, page 15, for details). 3.3.3 Steel and Polyethylene Pipelines All steel and polyethylene pipelines exposed to a length greater than indicated in Table No. 1 shall be temporarily supported and backfilled as shown in Drawing No. 2, page 15, and as outlined in Section 3.3.1, Temporary Support. NOTE: All temporary support on polyethylene pipes must be removed prior to permanent backfill. Adequate support shall remain in place until the backfill material has restored support. 3. 4 SUPPORT OF PIPELINES PARALLEL TO TRENCH 3.4.1 General Two cases exist for pipelines parallel to an excavation; i) trench < 1.2 m deep, ii) trench 1.2 m deep. In either instance, the pipeline is not to be exposed unless it is necessary to provide direct support. Trench wall support is not required for excavations provided the pipeline meets the following criteria: depth is less than 1.2 metres, the pipeline is at least 0.6 metres from the edge of excavation or is outside the shaded area as indicated in Drawing No. 2 and, soil is stable (TYPE 1or 2, refer to Soil Types, page 30)
12
Trench wall support is required for excavations if one of the following conditions exists: depth is equal to or greater than 1.2 metres, the pipeline is closer to the edge of the excavation than the minimum allowed distance as indicated in Table No. 4, page 13 depth is less than 1.2 metres and the soil is unstable (TYPE 3 or 4, refer to Soil Types, page 30)
NOTE: Adequate support shall remain in place until the backfill material has restored support. Table No. 3 gives minimum distances from the edge of the trench to the pipeline in which the excavation influences pipelines for the given soil types.
Table No. 4 Minimum Allowed Distance from Pipeline to Excavation (m) Trench Depth Soil Types Soil Types (m) 1 & 2* 3 & 4* >1.2 0.9 0.9 0.9 0.9 1.5 0.9 0.9 1.8 0.9 0.9 2.1 0.9 0.9 2.4 0.9 1.0 2.7 0.9 1.5 3.0 0.9 1.8 3.3 0.9 2.2 3.6 0.9 2.5 3.9 0.9 3.0 4.2 1.0 3.4 4.5 1.5 3.8 4.8 2.0 4.1 5.1 2.5 4.6 5.4 3.0 5.0 5.7 3.4 5.5 6 *as defined in the Occupational Health and Safety Act
13
3.4.2 Cast Iron Pipelines If a cast iron pipeline lies within the 45 line projected upward from the bottom of the trench, the trench shall be suitably shored to support the pipeline. A sliding trench box does not provide adequate support. If a cast iron pipeline lies within the 45 line projected upward from the trench bottom and the bottom of the trench is below the water table, a field assessment of the situation is required to determine if this pipeline must be replaced. For cast iron pipelines within the minimum distances given in Table No. 4, page 13, above, the support shall be abandoned in place. If any cast iron pipeline becomes exposed for a length greater than 1.0 m it shall be replaced. Replacement limits shall be determined in the field. 3.4.3 Steel and Polyethylene Pipelines In the case of a steel or polyethylene pipeline within the limits of 3.4.1, and the trench bottom is below the water table, the trench shall be suitably supported as required in 3.4.1. For steel and polyethylene pipelines within the minimum distances given in Table No. 4, page 13, support shall remain in place until backfill material restores support. Any steel or polyethylene pipeline that is unsupported for a length greater than indicated in Table No. 2, page 11, shall require field assessment by the Company.
14
DWG NO. 1:
NOTE: BEAM SHALL EXTEND TO 1.0 m BEYOND THE SIDE OF THE TRENCH ON
DWG NO. 2:
NOTE: BEAM SHALL EXTEND TO 1.0m BEYOND THE SIDE OF THE TRENCH ON
15
DWG NO. 3:
1.2
NOTE: IF PIPE IS LOCATED IN THE SHADED AREA, IF SOIL IS UNSTABLE (TYPE 3 or 4),
THE TRENCH IS REQUIRED TO BE SUPPORTED
16
4.0
4.1
BLASTING REQUIREMENTS
POLICY Prior to any blasting operation in the vicinity of a gas pipeline, the hazard to Enbridge Gas Distribution Inc. plant will be evaluated to ensure the uninterrupted operation and long-term safety of its underground facilities. Responsibility for the design of the blast and any resultant damage is born entirely by the party using the explosives. A recognized independent blasting consultant shall be retained at the applicants expense to evaluate and validate the risks for blasting under any of the following conditions: a) b) c) d) e) Explosive charge weight per delay in Table 5, page 22, is exceeded. Blasting requirements less than 3 meters from Company facilities. Blasting in the vicinity of cast iron and wrought iron pipelines. Any tunnel blasting operation in the vicinity of Company facilities. Surface blasts less than 10 meters from a Company pipeline where the excavation depth of the first blast hole is equal to the depth of the top of the pipeline and subsequent blast hole depths are greater than one half the horizontal distance to the closest portion of the pipeline. Any time if in the opinion of Enbridge Gas Distribution Inc., it is felt the integrity of Company facilities may be affected by the blast.
f)
The Independent Blasting Consultant shall be a Registered Professional Engineer and a holder of a Certificate of Authorization (C of A), specializing in blasting. A copy of the consultants report shall be forwarded to Enbridge Gas Distribution Inc. Engineering Department for review. If in the opinion of Enbridge Gas Distribution Inc. or an independent blasting consultant, blasting cannot be carried out without affecting the facility's integrity, alternatives shall be considered, including the replacement or relocation of the affected facility at the applicants' expense. In these situations, additional time must be allowed to obtain the necessary permits and to complete the necessary construction work.
17
4.2
NOTIFICATION REQUIREMENTS 4.2.1 Surface Blasting Applications The written request for surface blasting shall include the following information: Name of the owner of the project, general contractor and design engineer. Name of the blasting contractor and person in charge of the blast. Date for the blasting operation. A copy of a construction drawing or sketch drawn to scale indicating: i Details of the proposed drilling and loading pattern for explosives. ii Diameters of drilled holes, relative to Company facilities. iii Location of other public utilities, i.e. Bell, hydro, water etc. Number and timing of delays. Total explosive weight to be detonated per delay. Specifications for the type of explosives to be used. Predicted vibration levels anticipated at the pipeline and controls to be used to confirm vibration levels (i.e. Seismographs). Potential stabilization of rock face and type of potential stabilization techniques i.e.: rock anchors, shot crete, ribs, etc. Geological parameters (Borehole logs or Geological reports) which indicate the design of the blast are acceptable. Written confirmation that the blasting operation will be carried out by qualified personnel with appropriate engineering supervision.
4.2.2 Tunnel Blasting Applications The written request for tunnel blasting shall include all information required in the surface blasting application as set out above in 4.2.1. In addition, the required independent blasting consultants report shall include: Location plans and profile views with construction drawing or sketch, drawn to scale. Evaluation of geo-technical data. Exact stand-off distances horizontal and direct (radial)
18
Type of advancement proposed and type of tunnel method proposed; full face, top of heading and bench, pilot tunnel Type of tunnel lining proposed. The use of preventative blasting techniques such as line drilling, cushion blasting, etc. Other pertinent information specific to tunneling techniques.
To assist with the preparation of the written request, locates to determine the location of the pipeline can be requested, or mark-ups of drawings can be obtained by contacting the Manager Distribution Planning, Enbridge Gas Distribution. Lists of Regional addresses and phone numbers are outlined at Appendix A. 4.3 EVALUATION BY ENBRIDGE GAS DISTRIBUTION Enbridge Gas Distribution will conduct a record search on the facilities in the vicinity of the blast to determine the material, location and maintenance history. Enbridge Gas Distribution will evaluate the impact of the blast on the facilities, assessing the charge weight to be detonated in relation to the stand off distance. If, in the opinion of Enbridge Gas Distribution, a hazardous condition may result if the charges are fired as outlined in the application, the applicant shall be notified in writing. The applicant shall not commence operations and shall retain the services of an independent blasting consultant to evaluate and validate the application. A copy of the required consultants report shall be forwarded to Enbridge Gas Distribution Engineering Department for approval. Enbridge Gas Distribution shall conduct a leak survey (flame ionization unit) of the pipeline prior, during and after the blasting and independently of its normal leak-monitoring program to establish satisfactorily that the pipeline is not leaking. Enbridge Gas Distribution shall prepare a contingency plan to respond in the event that isolation of the pipeline becomes necessary. Blasting operations shall not commence until all Enbridge Gas Distribution procedures have been implemented and the applicant has received written notification of it. Enbridge Gas Distribution shall locate all control valves within the vicinity of the approved blast area. Check all valves involved in the contingency plan to ensure accessibility and proper operability. In the event a third party is affected as a result of the blasting operations, all expenses associated therewith incurred by Enbridge Gas Distribution shall also be at the applicant's expense
19
4.4
GROUND WATER MONITORING Where there is a potential for damage to nearby wells, the blaster shall conduct an evaluation designed and implemented to minimize adverse impacts on potentially affected wells. Generally, all water wells within 100 meters of proposed blasting locations should be monitored for quality and quantity prior to construction. Blasting in a watercourse requires Department of Fisheries and Oceans (DFO) authorization.
4.5
GUIDELINES FOR BLASTING The information provided in this section is not to be construed as an exhaustive list of performance specifications, but rather a guide for conducting blasting in the vicinity of Enbridge Gas Distribution pipelines. The applicant is responsible for ensuring that all blasting work is performed in a good and workmanlike manner in accordance with all applicable laws, codes, by-laws, and regulations. The contractor shall be liable for and indemnify Enbridge Gas Distribution in relation to any and all damage directly or indirectly caused or arising as a result of blasting operations carried out by the applicant, its employees, contractors or those for whom the applicant is responsible at law. Prior to blasting operations, a site meeting shall be arranged with an authorized representative of the applicant and an Enbridge Gas Distribution representative to confirm details of the location of Company facilities and the proposed blast. Enbridge Gas Distribution pipelines shall not be excavated prior to blasting. If excavation is unavoidable, then the pipeline shall be properly supported according to current Enbridge Gas Distribution requirements as outlined in this booklet. The applicant shall take suitable precautions to protect the exposed pipeline from fly-rock. Blasting mats shall be used to minimize the risk of fly-rock. Explosives shall be of a type that will not propagate between holes nor desensitize due to compression pressures. No explosives shall be left in the drill hole overnight. For surface blasts located at distances of 10 meters or less from a pipeline and when the excavation of the first blast hole has attained a depth equal to the top of the buried natural gas pipeline, the vertical depth of subsequent blast holes shall be restricted to one half of the horizontal distance to the closest portion of the natural gas pipeline. The required independent blasting consultants report shall specifically address the impact of these conditions. This condition is not applicable for tunnel blasting operations. Horizontal stand-off distances for surface blasting and directs stand-off distances for tunnel blasting of less than 3 meters are not permitted.
Third Party Requirements in the Vicinity of Natural Gas Facilities
20
If the applicant insists that blasting is necessary, the required independent blasting consultants report shall evaluate and validate the proposal. The applicant shall comply with the Ontario Provincial Standard Specification OPSS 120 - General Specification for the Use of Explosives, in addition to these Enbridge Gas Distribution blasting requirements. Monitoring of blasting vibrations with a portable seismograph capable of producing on site print outs in the vicinity of Company facilities is mandatory to confirm that predicted vibration levels are respected. At the completion of the blasting operation, a copy of the seismographic report shall be provided to Enbridge Gas Distribution. Table 5, page 22, shall be used to guide explosive charge weights. Peak Particle Velocity (PPV) shall be limited to 50 mm/sec and maximum amplitude shall be limited to 0.1524 mm. 4.6 POST BLASTING OPERATION Upon completion of daily blasting operations and within 30 days after the final blasting, Enbridge Gas Distribution shall conduct a leak survey (flame ionization) of the pipeline at the applicants expense. Leak survey shall also be completed at the end of each day of blasting. Damage that has resulted from the blast will be repaired at the applicants expense. A summary of all blasting operations including blasting logs, vibration control, seismograph reports and other pertinent information shall be provided to Enbridge Gas Distribution by the applicant at the completion of blasting operations.
21
TABLE NO 5 Stand-off Distance for Blasting Near Polyethylene and Steel Facilities STAND-OFF DISTANCE FROM FACILITY (m) 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00 30.00 MAXIMUM ALLOWABLE EXPLOSIVE CHARGE WEIGHT PER DELAY (kg) 0.18 0.33 0.51 0.73 1.00 1.31 1.65 2.04 2.94 4.00 5.22 6.61 8.16 9.87 11.75 13.79 16.00 18.36
The chart above is based on a Peak Particle Velocity (PPV) of 50 mm/sec. No greater velocity shall be allowed. Maximum amplitude shall be limited to 0.1524 mm.
22
5.0
5.1
All costs incurred will be covered by the Contractor undertaking the proposed work with final approval being granted by Enbridge Gas Distribution. 5.2 PILE DRIVING OR COMPACTION APPLICATION The application must include the following information: Name of project owner, general contractor and relevant sub-trades; A copy of the permits, certificates or other forms required by municipal bylaws; Name of design engineer and a copy of plans issued for construction with detailed drawings identifying all affected natural gas facilities; The type of piles and equipment used; including the methods of control to prevent the deviation of the piles; Geo-technical reports and other pertinent information; A copy of the location of other public utilities such as telephone, cable TV, sewer and water mains, electrical services, etc.;
23
If required, a technical report with appropriate analysis and prediction of the vibration levels according to the opinion of an independent Engineer specialized in vibration control and analysis; A clause stating that the work will be carried out by qualified personnel with appropriate experienced supervision; A clause stating that all vibration testing results, or other preventative control testing, will be submitted to Enbridge Gas Distribution on a regular basis, or upon request.
To help with the preparation of the written request, locates to determine the location of the pipeline can be requested by calling Ontario One Call listed in Regional Contact List on Appendix A, and appropriate markups of drawings can be obtained by contacting Distribution Planning listed in Regional Contact List on Appendix A. 5.3 EVALUATION BY ENBRIDGE GAS DISTRIBUTION Enbridge Gas Distribution shall conduct a record search on the natural gas facilities in the vicinity of the proposed work to identify their materials, location and maintenance history. Enbridge Gas Distribution shall assess the impact of the proposed operation on the pipeline or related facility versus the stand-off distance. If it is determined that the proposed operation and/or method of work may be detrimental, the Contractor must retain the services of an independent Engineer. This Engineer must be specialized in vibration control, analysis and soil movement in order to evaluate and validate the proposed method of work and operation. Enbridge Gas Distribution shall conduct leak surveys (flame ionization unit) of the pipelines and other related natural gas facilities prior, during and after the start of work. Leak surveys shall be conducted at any time during the project notwithstanding any delays or costs incurred by the Contractor responsible for proposed work. Enbridge Gas Distribution shall prepare a contingency plan in case the isolation of the line or shut down of the related facility becomes necessary. This may not be possible without affecting a large number of customers and all operations may be suspended until Company investigations are completed notwithstanding any delays or costs incurred by the Contractor responsible for proposed work. Enbridge Gas Distribution shall locate all control valves within the vicinity of the approved location and check all valves involved in the contingency plan to ensure accessibility and proper operability.
24
Enbridge Gas Distribution shall be responsible for isolating the area of the pipeline in the direct vicinity of the operations as required. The Contractor will be responsible for all Company costs during piling operations. In the event a third party is affected as a result of the pile driving and/or compaction operations, all expenses associated therewith incurred by Enbridge Gas Distribution shall also be at the Contractors expense. 5.4 GUIDELINE FOR PILE DRIVING OR COMPACTION The information provided in this section is to be viewed as a guideline only and is not intended to remove Contractor responsibility for damages caused by the piling and/or compaction operations. The contractor is responsible for ensuring that all pile driving and/ or compaction work is performed in a good and workmanlike manner in accordance with all applicable laws, codes, bylaws and regulations. Prior to pile driving and/or compaction work, a site meeting shall be arranged with an authorized representative of the Contractor and an Enbridge Gas Distribution representative to confirm details of the location of Company facilities and the proposed work. The pipeline should not be excavated prior to the piling or compaction operation. If the particular situation warrants the excavation of the pipeline, then it must be properly supported in accordance with Section 3.0 Standard Procedures. If in the assessment of Enbridge Gas Distribution, the soil cover is deemed to be insufficient, Enbridge Gas Distribution shall require that a protective ramp be constructed and maintained above the pipeline in accordance with Company guidelines. Construction vehicles or equipment will not be allowed to pass over a pipeline without the authorization of a Company representative. The following situations will require the opinion of an independent Engineer. This Engineer must be specialized in vibration control, analysis and soil movement in order to evaluate and validate the proposed method of work and operation. a) Compaction of soils or backfill rated at 10,000 ft-lbs or higher at a stand-off distance of 6 meters or less from the pipeline Pile driving at a stand-off distance of 10 meters or less from the pipeline or other natural gas facility.
b)
c)
High-energy dynamic compaction for the rehabilitation of soils at a distance of 30 meters or less from the pipeline.
25
d)
Soil types fitting the description of Type 4 soil as defined in Article 226 of the Occupational Health and Safety Act and Regulations for Construction Projects (Refer to Section 5.6 Soil Types, page 30).
For all these situations, monitoring of vibrations, with the appropriate number of seismographs, is mandatory. The seismographs shall be the portable types with the capability of producing on site printouts. This control will confirm the intensity of the vibrations generated by the pile driving or compaction work as projected. Furthermore, reports of recorded intensities shall be provided on a regular basis or at the request of Enbridge Gas Distribution. Should a situation with low energy compaction operations with a soil cover of less than 1.5 meters above the pipeline at a stand-off distance of 3 meters or less from a pipeline be encountered, Enbridge Gas Distribution may require the opinion of an independent Engineer. In addition, if a Type 3 soil (refer to Section 5.6 Soil Types, page 30) is present on site, Enbridge Gas Distribution may, again, require the opinion of an independent Engineer. For the start of the construction operations, the equipment and method used for pile driving shall comply with the guidelines presented in Figure 2, page 28, and Table 6, page 29, which identify the maximum vibration intensities expected from pile driving in dry and wet sand and clay. These guidelines can be replaced by actual vibration testing (portable seismograph) on site. The Peak Particle Velocity (PPV) measured on the pipeline, or at the closest point of the related structure with respect to the work, shall not exceed 50 mm/s. Furthermore, the maximum displacement for the vertical and/or horizontal component corresponding to the above stated vibration intensity shall not exceed 50 mm at any given length of the pipeline in question. For all operations, if the Peak Particle Velocity (PPV) and/or the displacement limit are surpassed, all operations must stop notwithstanding any delays or costs incurred by the contractor or owner of the proposed work. Enbridge Gas Distribution will require that the cause of these higher vibrations or displacement be investigated. The operations shall resume only when the cause and remedy are established and with the approval of Enbridge Gas Distribution's Engineering Department. Should any subsequent recordings indicate vibration intensities or displacements above the prescribed limits all operations shall immediately stop. Enbridge Gas Distribution shall require that the work be carried out according to methods it judges to be acceptable to the integrity of the pipeline or related structure notwithstanding any delays or costs incurred by the Contractor responsible for the proposed work.
26
No operations shall be permitted within a standoff distance of 1.5 meters from the pipeline or other natural gas facility unless approved by Enbridge Gas Distribution. Auguring of the soil up to the base of the pipeline may be required in order to avoid deviation of the piles within a distance of 1.5 m from the pipeline. All operations must comply with the Provincial Occupational Health and Safety Act and Regulations for Construction Projects as well as all applicable Company specifications, standards and guidelines. Leak surveys (flame ionization) shall be conducted at any time following the higher vibration intensities or displacements notwithstanding any delays or costs incurred by the contractor or authority responsible for the proposed work. 5.5 POST PILING OR COMPACTION OPERATIONS A summary of all operations including pile driving and compaction logs, vibration control, seismographs and other pertinent information shall be provided to Enbridge Gas Distribution by the Contractor responsible for the proposed work no later than 5 business days after work has been completed. On completion of the daily operations, and approximately 30 days after the end of the operations, Enbridge Gas Distribution shall conduct a leak survey (flame ionization) of the pipeline. The resulting damages will be repaired at the expense of the Contractor responsible for the proposed work.
27
28
Table No. 6
MAXIMUM VIBRATION INTENSITIES EXPECTED FROM PILE DRIVING IN DRY AND WET SAND AND CLAY
E/D 0.10 0.22 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 E/D 0.10 0.22 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Particle Velocity in/s DRY SAND WET SAND 0.02 0.03 0.04 0.06 0.05 0.08 0.07 0.11 0.08 0.13 0.10 0.18 0.11 0.20 0.13 0.23 0.16 0.27 0.18 0.29 0.33 0.56 0.70 0.88 1.05 1.10 1.40 1.75 1.85 0.59 0.88 1.10 1.40 1.85 2.01 2.30 2.80 2.90 CLAY -----0.01 0.02 0.04 0.04 0.05 0.06 0.08 0.09 0.10 0.30 0.58 0.89 1.10 1.80 Acceptable 2.01 Unacceptable 2.40 3.10 3.40 CLAY -----0.25 0.43 0.66 1.02 1.27 1.52 1.96 2.29 2.54 7.62 14.73 22.61 27.94 45.72 Acceptable 50.80 Unacceptable 60.96 78.74 86.36
Particle Velocity mm/s DRY SAND WET SAND 0.43 0.74 0.97 1.50 1.27 1.27 1.75 2.80 2.06 3.30 2.54 4.57 2.80 5.08 3.30 5.84 4.06 6.86 4.57 7.37 14.99 8.38 14.22 22.35 17.78 27.94 22.35 35.56 26.67 46.99 27.94 50.80 35.56 58.42 44.45 71.12 46.99 73.66
29
5.6
SOIL TYPES (Occupational Health and Safety Act And Regulations for Construction Projects)
(1)
For the purposes of this Part, soil shall be classified as Type 1, 2, 3, or 4 in accordance with the descriptions set out in this section. Type 1 Soil a) b) c) d) is hard, very dense and only able to be penetrated with difficulty by a small sharp object; has a low natural moisture content and a high degree of internal strength; has no signs of water seepage; and can be excavated only by mechanical equipment.
(2)
(3)
Type 2 Soil a) b) c) is very stiff, dense and can be penetrated with moderate difficulty by a small sharp object; has a low to medium natural moisture content and a medium degree of internal strength; and has a damp appearance after it is excavated.
(4)
Type 3 Soil a) b) c) d) e) is stiff to firm and compact to loose in consistency or is previously excavated soil; exhibits signs of surface cracking; exhibits signs of water seepage; if it is dry, may run easily into a well-defined conical pile; and has a low degree of internal strength.
(5)
Type 4 Soil a) b) c) d) e) is soft to very soft and very loose in consistency, very sensitive and upon disturbance is significantly reduced in natural strength; runs easily or flows, unless it is completely supported before excavating procedures; has almost no internal strength; is wet or muddy, and exerts substantial fluid pressure on its supporting system.
30
6.0
6.1
6.2
EQUIPMENT MOVING ACROSS THE PIPELINE Crossing locations for heavy equipment are to be kept a minimum. The crossing locations shall be determined between the Enbridge Gas Distribution representative and the excavator/constructor. The crossing location shall be based on the following: Nature of the construction operations The types and number of equipment involved Pipeline material and depth
Once the predetermined crossing locations have been established, heavy equipment must be restricted to crossing at these locations only. It is the responsibility of the excavator/constructor to inform their personnel of the crossing location restrictions. Gas plants shall be protected from possible damage at crossing locations at all times. The protection can be provided by constructing berms over the staked lines unless minimum cover of twice the pipe diameter or 1.0 m (whichever is greater) has been verified. Equipment shall be operated at dead slow speeds when crossing pipelines to minimize impact loading.
31
6.3
EQUIPMENT MOVING ALONG THE PIPELINE Heavy equipment may be operated parallel to existing pipelines provided that a minimum offset of 1.0 m is maintained on pipeline sizes less than NPS 12 and 2.0 m on pipelines NPS 12 and larger unless otherwise directed by Enbridge Gas Distribution. Only lightweight rubber tired equipment shall be operated directly over existing gas pipelines unless a minimum pipe cover of twice the pipe diameter or 1.0 m (whichever is greater) can be verified. When working directly over existing gas pipelines, all equipment movements shall be transverse to the staked location rather than parallel to it.
6.4
COMPACTION EQUIPMENT RESTRICTIONS Mechanical equipment shall not be operated within 0.3 m of the pipeline. Hand held compaction equipment shall be used within 1.0 m of the sides or top of all gas pipelines. Heavier compaction equipment may be used once the pipe cover equals the greater of twice the diameter or 1.0 m.
6.5
GENERAL VEHICLE EXTERNAL LOADING RESTRICTIONS For most vehicles, other than heavy construction equipment discussed above, external loading will not be factor because the standard Enbridge Gas Distribution pipeline cover requirements provide sufficient protection. In cases where extreme loading is likely to occur, the following table provides vehicle load restrictions based on the depth of cover of pipe. If the loads exceed these, or if there are additional concerns, the contact name listed in the permit application should be contacted to specify required precautions and/or perform any loading calculation. Since the depth of cover is important, if the depth is questionable, the pipeline should be located by hand. During wet weather conditions, increasing the amount of cover should be considered due to the rutting over the main. Table No. 7 Weight / Axle Maximum Allowable Load (kg) Cast Iron (CI) Steel (ST) Plastic (PE) 12,000 12,000 7,000 Vehicle Load Restrictions Based on Minimum Depth of 0.6 m.
Third Party Requirements in the Vicinity of Natural Gas Facilities
32
ENBRIDGE GAS DISTRIBUTION 500 Consumers Road North York, ON M2J 1P8
Markups [email protected] Mail to: Distribution Planning Ontario One Call Locates: 1 (800) 400-2255 Damage Prevention: 1 (866) 922-3622 Emergency: 1 (866) 763-5427
ENBRIDGE GAS STORAGE P. O. Box 520 3595 Tecumseh Road Mooretown ON N0N 1M0
Ontario One Call Locates: 1 (800) 400-2255 Engineering Dept.: 1 (519) 862-6015 Emergency: 1 (800) 255-1431
ST. LAWRENCE GAS COMPANY LTD. 33 Stearns Street, P.O. Box 270 Massena, NY. 13662
33