Contoh Schedule Repair
Contoh Schedule Repair
7.11 7.12 7.13 7.14 7.15 7.16 7.17 7.18 7.19 8. 9. 1. 1.1 1.2 1.3 1.4 1.5 1.6 2. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 3. 4. 1.
Install Lower Half Bearing Housing to Casing Install lower half Sleeve Bearing, Dummy Thrust Collar Centering of Rotor and Concentricity Check Reaming Bearing Housing Pin Hole Set Rotor Endpay Install Mechanical Seal, Bearing Housings, Sleeve Bearings, Thrust Collar, K Mechanical Seal leak test Painting Boxing SHIPPING FIELD ACCEPTENCE TEST (WITNESSED) ADDITIONAL SCOPE Welding Casing Repair on Pitting Area Hand Profiling of casing Alignment and Flatness Check Machining of casing if required NDT Check Hydrotest Casing 1.5 Discharge Pressure RE-ASSEMBLY Install New Casing Gasket Install Rotor and Upper Half Casing Torquing of Casing Cap nuts Rotor Float Check Install Lower Half Bearing Housing, Lower Half Sleeve Bearing Centering of Rotor Concentricity Check Rotor Endplay setting Install Mechanical Seal, Bearings Seal Leak Test Painting Boxing SHIPPING FIELD ACCEPTANCE TEST (FAT) INSPECTION
REPAIR Casing Bearing Housing DE, NDE Sleeve Bearing DE, NDE Mechanical Seal PART REPLACEMENT/SUPPLY WITNESS CUSTOMER ASSEMBLING SHIPPING FIELD ACCEPTANCE TEST (FAT) : Schedule : Actual : In Progress
January, 2011 1 2 3 4 5
Remarks
Finish Finish Finish Finish Finish Finish Finish Finish Finish Finish Finish Finish Finish Finish Finish
Compatibility Report for Schedule Repair Oct.xls Run on 10/14/2010 20:05 The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format. Minor loss of fidelity This workbook contains worksheets that have even page or first page headers and footers. These page headers and footers cannot be displayed in earlier versions of Excel. Some cells or styles in this workbook contain formatting that is not supported by the selected file format. These formats will be converted to the closest format available. # of occurrences 1
No
II. 1. 1.1 1.2 1.3 1.4 1.5 1.6 2. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 3. 4. 5. 6. 7. 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.11 7.12 7.13 7.14
Item Works
MCTN (Pump 8x10x13 MSND 5stg, S/N. 98-W-D-0017) CASING REPAIR Repair on erosion area by welding at stuffing box area Run Out of Casing using CMM portable FARO Machining of casing if the result of run out out of tolerance NDT before/after repair Hydrotest Repair Hole Upper Casing IMPELLER REPAIR Rebabbitng of Sleeve Bearing to vendor -2ea Repair by welding stellite 6 on the impeller eye of the impeller 1st Stg -two a Repair by welding Stellite 6 on the impeller eye and impeller hub of the impeller Repair by welding stellite 6 on the impeller eye and impeller hub of the impeller Repair by welding 6 on the impeller eye of the impeller 3rd Stg Repair by welding stellite 6 on the impeller eye of the impeller 5th Stg Repair by welding stellite 1 on The ID of Stage Piece PROCUREMENT IMPELLER stage 4th MECHANICAL SEAL REPAIR DE/NDE NEW SPARE PARTS, SUPPLY WITNESS CUSTOMER RE-ASSEMBLY PROCESS QC Check Individual Balancing of Impellers Assemble Rotor Run Out check before Trimming Rotor trimming & Burnishing at Glitching area Rotor Run Out after trimming ( Mechanical Run Out & Electrical Run Out ) Dynamic balancing of Rotor Assembly Assemble Casing Studs & Install the Casing Gasket Install the rotor onto lowerhalf casing , Upper Casing and Torquing Rotor Float Check and Mark the Center by Masking Tape and Lift Drop Check Install Lower Half Bearing Housing to Casing Install lower half Sleeve Bearing, Dummy Thrust Collar Centering of Rotor and Concentricity Check Reaming Bearing Housing Pin Hole
7.15 7.16 7.17 7.18 7.19 8. 9. 1. 1.1 1.2 1.3 1.4 1.5 1.6 2. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 3. 4. 1. 2. 2.1 2.2 2.3 2.4 2.5 3. 4. 5. 6.
Set Rotor Endpay Install Mechanical Seal, Bearing Housings, Sleeve Bearings, Thrust Collar, K Mechanical Seal leak test Painting Boxing SHIPPING FIELD ACCEPTENCE TEST (WITNESSED) ADDITIONAL SCOPE Welding Casing Repair on Pitting Area Hand Profiling of casing Alignment and Flatness Check Machining of casing if required NDT Check Hydrotest Casing 1.5 Discharge Pressure RE-ASSEMBLY Install New Casing Gasket Install Rotor and Upper Half Casing Torquing of Casing Cap nuts Rotor Float Check Install Lower Half Bearing Housing, Lower Half Sleeve Bearing Centering of Rotor Concentricity Check Rotor Endplay setting Install Mechanical Seal, Bearings Seal Leak Test Painting Boxing SHIPPING FIELD ACCEPTANCE TEST (FAT) INSPECTION REPAIR Casing Bearing Housing DE, NDE Sleeve Bearing DE, NDE Mechanical Seal PART REPLACEMENT/SUPPLY WITNESS CUSTOMER ASSEMBLING SHIPPING FIELD ACCEPTANCE TEST (FAT)
Remarks
: Chevron Geothermal Salak Ltd : 4 x 6 x 10M DVMXD : 92 -DO -0695 : CIS - P - 04 Item Works Month Weeks April Mei Juni Juli ' 2012 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Install lower half bearing housing, lower half sleeve bearing. Centering of rotor Concentricity Check Reaming of bearing housing pin holes rotor endplay setting Install mechanical seal, bearings Seal leak test Painting Boxing Shipping FIELD ACCEPTANCE TEST (FAT)
Remarks