Assignment1 HS1
Assignment1 HS1
1. Check the stability of a concrete gravity dam for the Extreme Loading Condition-drains
functioning.
I. Data
Top width =8 m
Free board =3m
Maximum tail water depth =6m
Sediment level on u/s face =7m
Batter is starting at = 44 m
Projection from upstream = 4.5 m
Downstream slope:
- started at (from the top) = 12.5 m
- H:V = 0.7:1 (H:V)
Location of drainage gallery from the toe = 49 m
Note: