LV Switchgear Final
LV Switchgear Final
LV Switchgear Final
,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
10 11 12 13 14 15 16 17 18 19 20 21
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
REMARK
value.
b) IR values between phase to phase and phase to
ground. 7.2. 2 Current Transformer: a) Winding resistance measurement b) Terminal marking correctness. c) Polarity of terminals. d) Insulation resistance between primary and secondary, primary to earth and secondary to earth. e) Magnetization characteristic and knee point voltage test. f) Ratio test. Voltage Transformer : 7.2. 3 a) Terminal markings b) Polarity checks of terminals
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
7.2. 4
b) Insulation resistance of contacts and relay coil. c) Time delay (if relay is not instantaneous),
energisation of relay.
f) See if plug-shorting contacts are correct. g) Burden check of relay h) Primary injection test i) Secondary injection test.
415V Breaker: a) Mili-volt drops test between the interrupting contacts and between the isolator contacts. Signature (GKEL(O&M)) (Contractor) ( GKEL PROJECT)
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
11.3- CHARGING PROCEDURE 415V MCC CHARGING PROCEDURE Task Description 1. Confirm that Pre-commissioning checks are completed for MCC and upstream PMCC Feeder(s) 2. Confirm that Relay settings are adopted as per recommendation for upstream PMCC Feeder(s), Bus Coupler and Bus PT relays if applicable 3. Ensure availability of Fire Extinguisher 4. Obtain clearance from working parties 5. Test & record final IR of Incomer Power cables. Confirm proper termination at both ends 6. Test & record final IR of MCC Bus 7. Confirm that all covers are closed on MCC and upstream PMCC 8. Ensure that all outgoing feeders of MCC are Isolated 9. Ensure that PTs and Auxiliary transformers of MCC are racked in, with all fuses intact 10. Ensure that MCC Incomers and Bus Coupler are Racked out / OFF 11. Rack in the upstream CB, if applicable 12. Note the bus voltage of upstream PMCC and confirm that it is within normal range (415V 10%) 13. Close the upstream PMCC Feeder, thereby charging the Power cable 14. Check the voltages at MCC Incomer PT voltmeter. Record PT secondary voltages in the table below. 15. Close the Incomer 1 ACB / SFU / Isolator, thereby charging Bus-1 of the MCC 16. Check the voltages at Bus-1 PT voltmeter. Record PT secondary voltages in the table below. Confirm the positive phase sequence from outgoing feeder. 17. Close the Bus Coupler ACB / SFU, thereby charging Bus-2 Signature (GKEL(O&M)) (Contractor) ( GKEL PROJECT) Inc 1 Inc 2
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
Vb Vc
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET
Energy ltd.,
STATION: GKELUnit # - 1 350 MW Sub-critical SHEET