0% found this document useful (0 votes)
3 views4 pages

Weekly Accomplishment Report Week 8

The weekly activity report for Mark Stephen R. details his practicum activities from February 3 to February 7, including assisting in an Arduino Bootcamp, reviewing switch gears, and inspecting wiring for a church renovation. He logged a total of 48 hours, with activities focused on engineering tasks and inspections. The report is approved by Engr. Agnes M. Idio, the practicum supervisor.

Uploaded by

agcaoilimarkr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views4 pages

Weekly Accomplishment Report Week 8

The weekly activity report for Mark Stephen R. details his practicum activities from February 3 to February 7, including assisting in an Arduino Bootcamp, reviewing switch gears, and inspecting wiring for a church renovation. He logged a total of 48 hours, with activities focused on engineering tasks and inspections. The report is approved by Engr. Agnes M. Idio, the practicum supervisor.

Uploaded by

agcaoilimarkr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PRACTICUM WEEKLY ACTIVITY REPORT

Covered Date: (February 3 – February 7)

PRACTICUMER: Mark Stephen R.


ON-SITE Agcaoili Karl Kevin
SUPERVISOR: Auxillos BSEE Practicum
DESIGNATION: College of Engineering
DEPARTMENT:

TIME TIME WFH NO. OF


DATE DAY SPECIFIC
ACTIVITY IN OUT HOURS
Assisting Engr. Jovert I.
Cubangbang for the
February 3 Monday Arduino Bootcamp at 8:00am 7:00pm 10
Tanza National High
School
Review for types of
switch gears as per
February 4 Tuesday requested by Engr. Edwin 8:00am 5:00pm 8
L. Astorga, CEO of
Integritech Builder’s
Solutions Inc. Inspection
of the wiring and coming
up with renovation
February 5 Wednesday recommendation for the 8:00am 5:00pm 8
Client’s Church within
Dasmariñas, Barangay
San Andres 1.
Making of the Load
Schedule and the Bill of
February 6 Thursday Materials for the 8:00am 5:00pm 8
renovation of the
assigned Church
Onsite inspection of the
CCTV and FDAS installed
February 7 Friday 8:00am 11:00pm 14
in the Batangas City
Sports Complex
48
Total No. of Hours
Hours

Approved by:

ENGR. AGNES M. IDIO


___________________________
Practicum Supervisor
(Signature over printed name)
OJT Schedule (February 3 – February 7)

February AM PM OT TOTAL REMARKS


3 4 4 2 10
4 4 4 8
5 4 4 8
6 4 4 8
7 4 4 6 14
Total Monthly Hours 48
February 3, 2025
Assisting Engr. Jovert I. Cubangbang for the Arduino Bootcamp at Tanza National High School

February 4, 2025
Review for types of switch gears as per requested by Engr. Edwin L. Astorga, CEO of Integritech Builder’s Solutions Inc.

February 5, 2025
Inspection of the wiring and coming up with renovation recommendation for the Client’s Church within Dasmariñas,
Barangay San Andres 1.
February 6, 2025
Making of the Load Schedule and the Bill of Materials for the renovation of the assigned Church

February 7, 2025
Onsite inspection of the CCTV and FDAS installed in the Batangas City Sports Complex

You might also like