0% found this document useful (0 votes)
39 views32 pages

RCC Objective

The document is a study course for RCC and Pre-stressed Concrete, providing an objective practice set for civil engineering students preparing for IES, GATE, and PSUs. It covers various topics including concrete design, shear, bond, torsion, and prestressed concrete members, along with practice questions and answers. The content is structured into chapters with specific focus areas and includes references to IS codes for design standards.

Uploaded by

bishal KC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
39 views32 pages

RCC Objective

The document is a study course for RCC and Pre-stressed Concrete, providing an objective practice set for civil engineering students preparing for IES, GATE, and PSUs. It covers various topics including concrete design, shear, bond, torsion, and prestressed concrete members, along with practice questions and answers. The content is structured into chapters with specific focus areas and includes references to IS codes for design standards.

Uploaded by

bishal KC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 32
POSTAL STUDY COURSE 2015 RCC & Pre-stressed Concrete (Objective Practice Set) r= MADE EASY India’s Best Institute for IES, GATE & PSUs. Civil Engineering CONTENTS ME a aa 1. Introduction ————— 3-10 2. Concrete Design a 1-21 Shear, Development Length, Bond and Torsion eee 22-27 (nnn 28. 32 4. Prestressed Concrete Members Chapter Introduction 2 span of 12 meters, to satisty effective depth shall by @) 25% () 40% Q.4 Consider the following sta 1. Flexural strength ol 2 0.7 fhe N/mm Q8 Thelaplength in compression shall not be less 2. The creep coefficient at 7 days of loading than Is 1.6, . (a) 24 (b) 30> 3, Modulus of elasticity of concrete can be © 2 (@) 1% where $s the diameter of bar Q.9 The straight length of lap shall not be less than (a) 18§0r200mm (b) 2490r 240mm (©) 1880r240mm (4) 3040r 200mm expressed as 5000,/f, N/mm? Which of these statements is/are correct? (a) Both1and3 (b) Both 2and3 (©) Bothtand2 (d) 1,2and3 “3 RCC & Pre-stressed Concrete Objective Practice Set wwwmadeeasy.in MADE ERS [oe | noids | ehopal | Hyderabad | Jaipur | Lucknow | Indore | Bhubaneswar Pscce15| Inia ve eet oS GAS FE Q.10 The pitch of main bars ina slab should neither Q.17 Flat slab systems, designed by direct design be more than three times the effective depth of method shall fulfil the following conditions the slab nor exceed 1, There shall be minimum of three continuous. (@) 300mm (bv) 450mm spans in each direction (©) 400mm (d) 360mm 2. The design live load shall not exceed two times the design dead load 3, The panels shall be rectangular, and the ratio of the longer span to the shorter span Q.11 Percentage of reinforcement in either direction ofhigh strength deformed bars in slab shall not beless than (@) 0.15 (b) 0.16 within a panel shall not exceed 2.0 (©) 0.12 (@) none of theak Which of these statements is/are correct? ht and2 — (b) Both 2 and 3 nd3 (d) 1, 2and3 1. The size of the Jo inacolumns the cross-sectional area jot exceed SBSH 0] =| =) column is ementshall be spaced not (a) 6% more b) 10 spart than three times the thickness (© 5%more d iis nor 450 mm @se statements isfare correct? Both 1and2 (b) Both 2and3 (©) Bothtand3 (d) 1,2and3 / Q.15 Acontinuous beam shall be-de deep beam when the ratio of effective over-all depths less than @ 20 () 25 Q.20 The ratio of the permissible bearing stress in @ 3.0 15 working stress method of design and limit stata @.16 Asimply supported beam shall be deemed to method of design is beadeep beam when the ratio effective span 1). 985 (©) 5:9 } to over-all depth is less than © 6:5 @) 5:6 i @ 20 (b) 2.5 Q.21 The values of partial safety factor fordead load | @ 30 15 and live load in limit state of collapse are ae ‘© Copyright: MADEEASY. www.madeeasy.in Civil Engineering -_ MADE EASY sy tore Fate on ES GATE E Paws | CMY | Noida | Bhopal | Hyderabad | Jaipur | Lucknow | Indore | Bhubaneswar | PSCCETS| @ 15and15 — (b) 1.5and1.0 Q.30 The nature of shrinkage stresses in concrete and ©) 10and15 — (d) 1.5and1.5 Steel in symmetrically reinforced sections are .22 Inthe limit state of collapse, the values of partial o ooo esshva safety factor for concrete and steel are © aneeea cadtandid (@) 1.67 and0.87 (b) 1.5and 1.15 (G0) cone tha above (©) 1.45and1.5 — (d) 0.87 and 1.67 ; , Q.31 Meridional thrust in a spherical dome subjected 0.28 The maximum strainin concrete athe outer most toa concentrated load or uniformly distributed Compression fibre in the limit state design of - load, is always flexure is (b) compressive (@ 0.003 () (a) none of the above (©) 0.0035 g) ported beam of compo: Q.24 Theareaotthe st for concrete is @) 036 On of lifting points folerances in construction The correct answeris | Q.28 In cantilever retaining walls, expansion and () 1.2and3 (0) 1,3anda | Contraction joints are provided at an interval of (© 23and4 (0) 1,2, 3and4 | aon ‘oon Q.35 Sinking of an intermediate support of a som (920m continuous beam | Q.29 In counterfort retaining walls, the counterforts 1. reduces the negative moment at support are provided at a spacing of 2. increases the negative moment at support (@) 3t035m (b) 1.51020m 3. reduces the positive moment at centre of © 4to5m (6) 5to6m span Ss j de RCC & Pre-stressed Concrete Objective Practice Set www.madeeasy.in [dre | Shuboneswar| PSCCET SYMRDE ERASE osm | oes | eon | iyentd | ore | wero’ res vt ence or ER GATE EF 3. Used for large spans 4, ine i treol sreases the positive moment at cent 3 atom lood water to pass over span Which of these statements is/are correct? Codes: (@) tand3 (b) 1and4 AB 3 (©) 2and3 (@ 2and4 @ 343 - wy 1234. Q.36 A beam whose effective span is /, effective 3142 depth is ‘d' and overall depth is ‘D’, shall be @i324 deemed to be a deep beam when the ratio of @.39 Which of the following are not dependenton the 1. 4 istess than 2.0 for a simply supporter applied load? a ic strain using the codes given 4, inclined ‘ s Wnts tatemer i intial agreement with the an (@) tand4 Q.38 Match List-I with List-Il and ‘answet.using the codes given below the iis ‘answer using the codes given (b) 1,2and3. List-l " (© 2and3 (@) 1and2 ‘A. Continuous bridge Q.41 A trapezoidal combined footing for two axially B. Causeways loaded columns is provided when . Economic span 1. Width of the footing near the heavier column D. eae is restricted, s ; 2. Length of the footing is restricted. 1. Used for deciding the number of piers 3. Projections ofthe ealng beyond the heavier 2. Bridge to enable road to pass over a cutting columns are restricted. Ce. copreee ‘www.madeeasy.in Civil Engineering MADE EASY Delhi | Noida | Bhopal | Hyderabad | Jaipur | Lucknow | Indore | Bhubanevor] PSCCE15: Reba sereeeterrchrrs=n Select the correct answer using the codes given below: (@) 1and2 (b) tends. (©) 2and3 (6) 1,2and3 Q.42 Consider the following statements: Q.47 As per IS : 456-2000 side face reinforcement, Under-reinforced concrete flexural members not less than 0.05% of web area, is provided on 1. aredeeper each side when the depth of web is not less 2. arestiter 3. _canundergo larger detlection {b) 400mm Which of these statements is/are.@ (d) 750mm (@) 1,2and3 ——(b) (©) 2only Reason (R) : Ifa uniform rate of strain is not adopted it is not possible to obtain the descending portion of stress and strain curve beyond maximum stress. allowing statements: ty for steel should be based Directions: The follp statements; one labs Assertion (A) : greater than that ford Reason (R) : The live oad ET with List-ll and select the correct than dead loads. sWer using the codes given below the lists : 0.45 List! Assertion (A) : For determining uniaxial ; compressive strength of concrete, cube is a ‘A. Moment and shear coefficients better test specimen as compared to cylinder. . Fire resistance D. Reason (A): Stress distribution is more uniform Sidiog over the cross-section of acyiinder as compared Span to depth ratiocot beam tocubs, Lista 1. Durabiity Q.46 Assertion (A) : The stress block used in the 2. Stability limitstate design method is obtained by testing 3. Analysis of structure of concrete cylinder under uniform rate of strain, 4, Deflection limits RCC & Pre-stressed Concrete Objective Practice Set www.madeeasy.in nF TIDE ERSES ox a | mato | pu |tadoow | de | meron FSET MARE aso nee Q.55 Compressive strength of concret '8 taken ag ABCD 0.67 f,, and not 1, because of @4213 1. size factor which is constant for a cube (oe) 3 2 1 4 size greater than 450 mm, O4123 2. size factor which is constant for a cube gy @ 3 124 size greater then 550 mm, end friction zone which acts throughout tig Q.52 Thetemperature reinforcementtin the vertical slab length of cube. of a shaped RC. retaining wall is end friction zone which acts thre : (@) Notneeded onto . length of cylinder, Hy Provided equally on inner and {ron hof these statements are correct? () e (b) 1and4 (6) 2and4 (0) lab onslopeisSkNing, | eCepmight:MADEEASY ‘wwwamadeeasyin ‘Civil Engineering Gamave EASY ere Ear | Det | Noida | hops! | Hyderabad | Jaipur | Lucknow | Indore | Bhubaneswar Introduction 12 @) 2. @) 3. @ 4. @ 5. (2) 6. ©) 7. (@) 8 (a) 9. @) 10. (a) 11. 12. (b) 13.(@) 14. ©) 15. (b) 16. (a) 17. ©) 18. (b) 19. d) 20. (b) 21. (0) 22. (6) 23. (©) . (2) 27.) 28. @) 29. (a) 30. 34. (0) 35. (b) 36. (b) 37. 41. 42. &) 43. (a) 48. (b) 49. (b) 50. (b) -@ 56. 57. MADE EAS. for Fe 250 Feats 4. (a) Creep costficient SCording to clause 26.26.1 of IS 456 : 2000 at Tdays = 22 : eee ts the lap length in compression shall be equal to 2 jel the development length in compression butnot 5. (a) less than 249. L For cantilever beam =7 for L< 10m 9. @) According to clause 26.2.5.1 (c) of IS 456: 2000. for L> 10m tL. 10 10. (a) S*aer "7 According to clause 26.3.30f IS 456: 2000, the apa horizontal distance between the parallel main = d= 143mm rainforcement bars shall notbe more than three RCC & Pre-stressed Concrete ‘Objective Practice Set wwwmadeeasyin = ° 9 TIE ESS ocr: nous | eons | Hyco | opr | tuhnow | lode | hubanesnr| PSCCETE say feet hottie A GEE PE — times the effective depth of solid slab or 300 strength of concrete since restraing effect of mm whichever is smaller. plates is less in case of oylinder as compar tocube. 11. (e) i 7 48. (b) According toclause 26.5.2.10f 's 456: 2000, Abeam collapses when st # e the mild steel reinforcement in either direction cay tvarcih ora evess’ nee a a in slabs shall not be less than 0.15% of total gee re aueaesh Concrete. cross-sectional area. However, this value can feu: 7 be reduced to 0.12%, when high strength 49. (b) Geformed bars are used. = Vinimum (b) grade of Spacing of longitudinal b reinforced the periphery of the .¢ ed concrete (a) In flexure, the 45. to.cube for determinining uniaxial compressive 2 ee www.madeeasyiin Civil Engineering Chapter Concrete Design Qi flat slab, the absolute sum of wverage negative bending tion shall be taken as ViADE EASY It in any given plane one unsupported then its unsupported “The radial moment at the centre of a simply shall not exceed supported circular slab carrying a uniformly be rt distributed load is (a) 100 (©) 100=- 0 D Bye 2y2 > 5 @ 76" ©) ye" b' (©) 100 (a) 100=, we we i ° ote Og where b is width of the cross-section and D is the depthot te cross-section measured inplane 9 The final deflection in beams dus to all loads under consideration including the effects of temperature, creep and RCC & Pre-stressed Concrete ‘Objective Practice Set ‘www.madeeasy.in au es ve cei tr £3 GATE 6 PO ‘shrinkage measured from the as cast level of the support of the floors, roofs and all other horizontal members shall not normally exceed L il © 3 (©) 365 Z i 3 © 25 where /is the span of the beam © Q.10 The deflection including temperature, creep ai indetermina (@) 15% (©) 30% Q.14 Incircular tanks witha wall and the base 1. the thickness of the wall should not be less than 150mm TRADE EASES cts | ncida | enor | Hyderabod | Jsipur | Lucknow | Indore | Bhubaneswar} Bg @.16 According to whitneys stress block in ultimatg Q.21 The depth of footing for an isolated column is Q.15 Acurved beamis designed for 1. bending moment 2, shear 3. tension The correct answer is (@ bothtand3 — (b) only3 () both2and3 (a) 1,2and3 load design method, the depth of stress for a balanced section is limited to (b) 0.67d ect answeris 2) Only 1 (©) Both 4 and2 (©) Both1 ands (d) 1, 2and3 2, tensile stress in concrete shall not exceed Gatsby 1.2 Nimm? 3. bottom slab may be 150 mm to 200 mm z ee cpedlamoment thick : ; 3. punching shear Which of these statements islare correct? : Which of ect? (@) Both tand2 — (b) Both 1 and 3 @ oi res — sie carn (©) Bolh2and3 (d) 1,2and3 (© tand3 (@) 1,2and3 12+ Ccopranemoensr www.madeeasyin Civil Engineering MADE EASY oem | noida | shopat | Hyderabad | Jaipur | Lucknow | Indore | Bhubaneswar sal ont Yt fo ES GATE Pe Q.22 For a continuous R.C. beam, match List-I List-I (Condition) with List-II (Placement of live load) 1. Serviceability and select the correct answer using the codes 2. Durability given below the lists: 3. Reduction in sectional depth List- 4, Ultimate moment capacity ‘A, Formaximum sagging moment in a span Codes: B. Formaximum hogging momentat a support AB C,_Formaximum hogging moment in a span 1 List-I 1. The spans adjoining the span alternate span ynerwo aanaO lowing statements: prced (singly reinforced) less than that for a MADE EASY. ts of contraflexureis3.60 m be considered of resistance of the 58 Which of these statements are CO (@ tand2 (b) 1and4 Q.27 Match List-! with List-II regarding the minimum (e) 3and4 (@) 2and3 concrete cover to reinforcing steel and select Q.24 Match List-! with List-lI and select the correct the correct answer using the codes given below answer using the codes given below the lists: the lists: List-1 List-I ir A. For longitudinal reinforcement in columns: ‘A. Doubly reinforced sectior i B, Limit ances : cof size 200 mm and less, with 12 mm. C. Minimum cover diameter bars as longitudinal steel. D. Spandepthratio B. Forlongitudinal reinforcement in beams. (b) 1900 mm RCC & Pre-stressed Concrete ‘Objective Practice Set www.madeeasy.in ats : a a i Tan | Rade | Bhopal | Hyderbad |8pur | Lucknow | ndoe | Bhubareny MADE EASS ar ee somite | of these statements are . For longitudinal bars in slabs. e For! ential barsincolumnsof sizemmore (@) Sand4 Otani than 200 mm. (©) 2and3 (6) tand2 | tee Q.30 The specified span to de | 1, 40mmor diameter ofbar whichever is more satisfying the limits of sari a ott 2. 1Smmor diameter of bar whichever is more wren unin Bm, clonal 3. 25mmor diameter of bar whichever is more 4. Forhigher spans, these aeto be 4. 25mm by multiplying the ratios by (Y0fpan ~~ metres) a For higher spans, these areto be med | multiplying the ratios by (spaninety | member are computed for factored 28 gest Q.29 Consider the following statements: Reason (RA) : In the working st ‘The reinforcement in reinforced concrete shall method itis ensured that he interme! an have concrete cover, the thickness of such cover due to working loads are less nant shall be not less than aseees. 4, 25mm ave dose 2. thediameter of bar Q.32 Assertion (A) : All columns sh pote 3, thespacing betweenbars for aminimumeccertticty SFE rset of colurnn vided by 500, PSION yao led by 30subj toa! nd cartoon Th + econttiMADEEASY wwwamadeeasy. MADE EASY [cet | nas | shopat | Hyderabad | Jpur | wcknow | indore | Bhubeneswar ae fet eke rE GATE Reason (R) : Assertion refers to the design of concrete is 50 kg/cm? and the modular ratio is axially loaded column and it may not be possible 18, then the stress developed in steel would be to build a perfectly axially loaded column in (a) 1800kg/om? — (b) 1600 kg/em? practice. (©) 1350ka/om? — (¢) 1300kg/em? Q.33 Assertion (A) : According to IS: 456-2000, over-_ Q.39 The radial moment at the boundary of a simply reinforced sections are not permitted supported circular slab of radius R, subjected Reason (R) : There is ductile failure of over- to a uniformly distribution load of w will be reinforced sections. (@) wR8 (b) wR Q.34 A240 mm x 500 mm rectangular sa (0) swrene Qin with M25 grade conctete i ying capacity of a column designed The cracking momen} (@) 35kN-m (©) 7.0KN- (b) 662.5 kN id) 1100.0 kN in fig. span rviceabilty limit then it will be found that Q.37 Aconerete colt and a bending ma Pv codnrevi Anisolated footing of side along the plane of the B provided under the column, cent: a of column and footing coincide. The net maximum and the minimum pressures in kN/m? on soil under the footing are respectively ‘Column, esection is sale itcan not be judged from the given data Q.42 (@) 95and55 (b) 95 and 75 (©) 75and55 (@) 7S and 75 Q.38 The effective depth of a singly reinforced Pedestal rectangular beam is 30 cm. The section is over reinforced and the neutral axis is 12cm below the top. If the maximum stress attained by q=3MPa RCC & Pre-stressed Concrete ‘Objective Practice Set wwmmadeeasyin = 15 TIADE EASY [oon | noida | short | yerabad | Fair | wucknow | Indore | Bhubaneswar |. ‘Aconcrete pedestal made of M20 mixis shown in fig. The tan a value in this case will be (@) notless than 3.6 (b) less than or equal to 3.6 (©) greaterthan3.6 (@)_ greater than or equal (03.6 Q.43. The reduction coefficient of a reinforced concrete column with an effective length of 4.8,m,and size 250 x300 mm is (@) 0.80 {b) 0.85 a6 Arei following B Dead load 20 kN Live load 30 KNm’ Seismic load 10 kN The design bending collaps¢ is (a) 6OkKNm- (b) 75 kN () 72m (6) 80kNm Q.47 An R.C. short column with 300 mm x300 mm ‘square cross-section is made of M20 grade concrete and has 4 numbers, 20 mm diameter longitudinal bars of Fe415 steel. It is under the action of a concentric axial compressive load, Ignoring the reduction in the area of concrete 0.48 ase ue tosteel bars, the ultimate axial load carrying capacity of the column is () 1659 kN {b) 1548KN () 1198kN (6) 1069kN ‘An RC. square footing of side length 2m and uniform effective depth 200 mm is provided for 2300 mm x00 mm column. The line of action ofthe vertical compressive load passes through the centroid of the footing as well as of the olumn, If the magnitude of the load is 320 KN, ial transverse (one way) shear stress 20 mm What is tho effective span of the beam as per 6? (2) 5300mm (b) 5400mm_ (c) 5200mm (d) 5150mm Which one of the following statements about the Percentage of tensile steel required to produce a balanced reinforced concrete section is correct? 16 + eceppigt naDEEAsy ‘wwormadeeasyiin Civil Engineering MADE ERsg Ine bert Ea er ES GATE ‘Delhi | Noids | Bhopal | Hyderabad | Jaipur | Lucknow | Indore | Bhubaneswar /PSCCE15 The required percentage of steel (@) Reduces as the increases Id strength of steel ) - (©) Remains unchanged irrespective of the yield strength of steel 's the same for a given quality of steel irrespective of whether working stress ‘method is followed or ultimate load method is used (2) _Isonly a function of the modu of steel, (©) Q.53 Beam sections ‘as compared to (b)_ maximum tensile stress in steel reaches its permissible value while maximum compressive stress in concrete is less than its permissible value (©) maximum compressive strain in concrete reaches the ultimate crushing value while tensile strain in steel is less than its yield value ()_ maximum compressive stress in concrete reaches its permissible value while tensile in steel is less than its permissible MADE EAS) the widths of colur (@) 30mand 1.5m () 1.5mand3.0m (©) 3.0mand 3.0m (6) 15mand 1.5m Q.57 Inlimitstate design, under reinforced section is, ‘one inwhich (@ tensile strain in steel reaches yield value while maximum compressive strain in concrete Is less than its ultimate crushing strain RCC & Pre-stressed Concrete ‘Objective Practice Set te and Fe 250 (©) 10.00bD (@) 17.26bD aUare column section of size 350 mm 350 ‘mis reinforced with four bars of 25 mm diameter and four bars of 16 mm diameter. Then the transverse steel should be (@ Smmdia @240 mmole (©) 6mm dia @250 mm c/e (©) 8mm dia @250 mmole (d) 8mm dia @350 mm cle wwwmadeeasyin — * 17 yeknow | Indore | Chubar [MADE ESE omen! Tod | nr |e Lins | Drie [SCETS] mADE ERE al lk ANSWERS | Concrete Design 5. (@) 60) 72e ) 4, (0) » 1, (0) 2, (b) 2 1 12, (0) 13. (0) 8. (a) 9.) 10. (@) . 49. (a) 20. (0) - re 7. @ 1s 15. (d) ©) il 25. (b) 26. (a) 27. (a) 22. (2) 23. - . () 34, (@) 41. @) 48. 5. based on elastic theory (working According to clause 26.5.1.1 of IS Ms a Ss) minimum area of tension reinforcement shal no Maximum redistribution of moment = 15% be less than that given by 26. (d) fon - De Tho otfoctive width, b, of the flange is given bk by = by +2460, 9. (b) . i si500 7 According to clause 23.2 of IS 456 : 2000, ja Jy = 3600mm D, = 100mm t * Song je Carnipe Okt, www.madeeasy.in Civil Engineering —————————————— mei ‘ Joe | hubsreswar | PSCCETS TIDE RSS oct nace | chopa | viet | npr | anon | Indore | hs [ese] SD rete tet tia nS CATE Fe 450 , 60x6 oi b= 200+ 229 45100 = 2x3” 2x3" a = 75 +20= 95K = 300 + 600 + 600 ene = 1500mm i £3 30. (a) = 75-20 = 55 kNim? The permissible value of spanieffective depth Tatio depends on: 38. (c) (@) The basic’vatue, that is, span and support conditions (6) The type and amount of te (©) The amount of comp (6) The type of be; 33. (c) ‘Thereis sO kglomt MADE EASY ¥ 0.9, 00x 3 09, +1 36. (c) * 20 £09%4 £36 43. (b) Reduction coefficient Jett = 125-38 ACC & Prestressed Concrete ‘Objective Practice Set [mabe EAsy| ll fe Pte ee GATE GON 44. (c) Foracantilever In this case L W357 500 Hence it fails in deflection, For lateral stabilly L shall not exceed 25 b nor 100b7/d Now, 25b = 25 x 150 =. But L Henes it fails in lateral (a) = 1256.64 mm? A, = 30? P, = 0.4 x20 x300? + 0.67 x415 x1256.64N = 1069 KN 48, (a) Uniform soil pressure on footing a To Deiht | Noida | thopet | Hiydea | J" | tu % 1» 2204 80 KNin? 2 Now nocton for ono way shone 1 ata det ‘arom tho forco of tho column 0) 1000 “0? 10003200 = 0.26 inn? tor of tho bars shall not oxceed one a} thicknoss of tho slab, Bait integrally wis akon as clear span plus the Of slab or beam or contre to Upports, whichover is less. = 5400 mm and offective span = § x 1000 300 , 300 22 = 6300 mm 52. (a) For a balanced section 0.36 fbx = 0.87 fy Ay Cop MADEEAST ‘wwwimadeeasyin Civil Engineering G3MADE EAs Deis | tsida | Bhopal | Hyderabod | Jaipur | Lucknoer | Indore | Bhubaneswar Do Fat fr RYE ie = Ay = 226 babe Oa7t, AS |, increases A, decreases, 54, (d) L q % 28 simply supported stab i. q 32 continuous slab Lis the short span of slab For continuous beam, lever arm is given by z = 0.2(1+1.5D) 1 For 106 58 and z= 051 net ra D wurth of the diameter of the din no case less than MADE EAS ‘Objective Practice Set RCC & Prestressed Concrete wwwmadeeasy.in +21 Chapter Bacluisl cee hear, Developme! Tho avorago pormissl bars is moro tha a4 stross shal (a) 1.6Ninm (0) 28Nimm? Minimum shear roinforcementis) (a) nominal shear stress fs oss th shear stross nominal shoar stress: is mort pormissible shear stress (0). nominal shoar stress oxcoeds half tho value of pormissiblo shear stross (6) none of tho above @.6 Tho contribution of bent up bars towards shoar resistance shall not be more than as (b) than 22 + © ConpyitsMADEEASY nt Length, Bond and Torsion shear reinforcement yar reinforcement reinforcement infggcement ay be used without ond nfavided development lena! ents satisfied. ‘eso staternantsisfare correct? (b) Both 1 and 3 (d) 1, 2and3 ing of shear renforoamer '@ member shal () Both 1and2 The maximum spaci moasured along the axis of th notexceed (a) 0.75d for vertical stirrups (b) 0.75d for inclined stirrups () 200 mm for vertical stirrups (d) 250 mm‘or inclined stitups Git Engineeti"d asy.In Te i CON ————V UU GSU ERASE oan ce tna ocd | np | edn | ee | eta] PSCCETS) erie Q.10 Study the following statements: Godse= 1. Inno case, the spacing of stirups ina beam A 8} GD shall exceed 300 mm, wee’ i 2 Shear reinforcement in the form of stirups 4-3 214 04523 Shall not be less than, 24S were, is 134 6 O87 i Which of these, @ © aig M Q.14 Inaring beam subjected to uniformly distributed load 1 Stirrup spacing, b is breadth of the beam and f, is the characteristic strength of stirrups. The characteristic not exceed 4: shear force at mid spanis zero shear force at mid span is maximum | ion at mid span is zero j mid span is maximum atements are correct? (b) 1and4 Both 1 af MADE EASY‘ select the below.the lists dinto a simple support must be = p their full strength at a designated ne (eondiaiee So that their moment capacity is more B) Tempel sess: an the bending moment at that point. The C. Hoop stress clauses of the code require that D. Torsional stress shear 1.3m, List-Il 1 tgs SM, 1, Zeroatcentre of cross-section 2. Circumferential stress 2 $98 13M +g 3, Linear stress 4% OV 4. Longitudinal stress 5, Zeroonthesurtace 3 osu) RCC & Pre-stressed Concrete Objective Practice Set www.madeeasy.in +23 .dore | Bhubaneswar seers] MADE EASY)! ans CAE BS 7 reinforcement in beams and slabs is sulk Which ofthese statements ar comet rite rack. ent tO ands o 12. and 3 Reason (R):A large number of smaller diameter ie) eae sls pars, well aistriputed inthe tension zone, redvcs 0.17, Thecoda provisions recommend minimum shear bars mc nicnmoreefecivey analogs forcementin he form stirUps nme beams: iameter bars of the same area. in the beamsection . ‘9.22 Consider the following statements: 4. tocaterfor any torsion 2. toimprove ductility oft 3. to improve dowel acti he oross-section ds ion -of longitudinal 1. Reinforcement thatis nolonger requredtor tension bars flexure beyond a certain section, shall Which of these statements is/2r060 however be extended by d or 12, (@ 1.2and3 nichever is greater, before curtaling. (©) Onlyt ) aif the bars should be bentupat " point. Directions: The follo¥ veity at cut point the shear force at hat provided local bond stress. , Q.20: Assertion (A) : The development length " ; for HYSD Fed15 bars isless than that for mil oi . plain bars. — @ : (c) 4 Reason (R) : The permissible bond stress HYSD Fe 415 bars is more than that for aa a” steel plain bars. plain bars : 024 A beam of rectangular cross-seeth @.21 Assertion (A) : Dolalling of bars as per the Did Bec ec Ae san) ag of us apr be maim tenn d/6 (@) 25Poh —(b) 3.0PalL o ra dis andas (©) 35Poh. (@) 4.0PQIL 143-1980 limits the minimum characteristic Q.15 If a simply supported coneett ai prestressed withaforceg N,isdesign gstressed concrete for post tersoned of 10 mand toca central dip of thé: 2 (2 3 4 Inthe PS.C. beam shown in fig. fy = 45 MPa @4 1 2 and it supports a ud. of 15 kNin including Q.21. Ancidinary mild steel barhas been prestressed self weight Itis prestressed by a paraoblic cable to a workin ‘s ; 19 stress of 200 MPa. Young’ carrying an effective prestress of 200 kN, The ‘Modulus of steel is 200 GPa. Permanentnegalve shear rektance of uncracked section at the strain due to shrinkage and creep is 0.0008, HOW ‘support wil ao ‘ a 8 ast ‘much is the effective stress loft In stoo!? (©) 94.2kN (6) 95.4kN o eiiea oo 7 (© 40MPa (@) 16 MPa z 30 + © Otoppimammneusy www.madeeasy.in Civil Engineering mADE EEFASS Tens | woida | oropat | ryserabod | Jopur | Lucknow | indore | Bhubaneswar] PSCCE15. ren fet atte ES GATE @ Pa Q.22 A prestressed concrete b eam has a cross- ici seclert with the following properties: toe ©) of elasticity and creep values are = 46,400 mm, | = ¢ i '=75.8 x 107 mm, (d) of high modulus of elasticity and low creep Yootom = 244 MM, Yigg = 156 mm. lis subjected to a prestressing force at an 2-24 lHpercentage gain instioss due to UDL in tendon eccentricity e' so as to have a zero stress at zero} lhepieccenireny Wl” the top fibre. The value of 'e is given by wi E, wi 4 (@) 66.66mm (6) 66.9mm © BEE ©) 1aP Ee (© 10472mm — (4) 183.33mm ° For prestressed structura = oe strength concrete is use 12P (2) both shrinkag cestrossing force in tendon, w is is of elasticity of concrete and sticity of steel. 1_Po Re eon | Pel? w? 40x10? | = (upwards) 2 we er Wovens) = 8? BP” 8x 2506 4. (d) = 0.2m= 200mm Tobalancethe concentratedtoad, the maximum 16. (3) Ae BM due to the concentrated load should be = 150x300 = 45000 mm? ‘equal to the moment due to the prestressing iz 150x300 zane force ‘P'. 12 RCC & Pre-stressed Concrete ‘Objective Practice Set www.madeeasy.in 31 Delhi | Noida | Bhopal | Hyderabad | Jaipur | Lucknow | indore | Phubeneswar MADE ERS! b> MADE FASS LPS - kN/m using small wedding gr ™ 25 x0.18 x0.80 = 1.125 ANH Each grip consists of imo LA In Lee Mc Call system anchoring ab we Ee agknem done by screwing special treageyy te

You might also like