Amendment No. 1
Amendment No. 1
01
Please modify the following, under Section X - Qualification Questionnaire - I. Technical
Evaluation Criteria
2) Specific experience as a Prime Contractor over the last five years in the construction of:
a. at least two new or maintenance of building projects with a project cost of greater
than or equal to ETB 200,000,000.00 (Two Hundred Million Birr) and one airfield or
two major asphalt concrete roads projects with construction cost greater than and
equal to ETB 500,000,00.00 (Five Hundred Million Birr) each (25 points).
b. At least one new or maintenance building projects with a project cost of greater than
or equal to ETB 200,000,000.00 (Two Hundred Million Birr) and one airfield or two
major asphalt concrete roads projects with construction cost greater than and equal to
ETB 500,000,000.00 (Five Hundred Million Birr) each (15 points).
------End of Amendment 01----
Page 1 of 1