0% found this document useful (0 votes)
17 views3 pages

Robotics Timetable With Dates

The document outlines an 8-week project plan for building various types of robots, starting with a Bristle Bot and culminating in a Cardboard Human Robot. Each week includes specific tasks for each day, focusing on different robotic concepts and construction techniques. The timetable emphasizes hands-on learning and experimentation with components like motors, sensors, and programming.

Uploaded by

syedakiranzahid9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views3 pages

Robotics Timetable With Dates

The document outlines an 8-week project plan for building various types of robots, starting with a Bristle Bot and culminating in a Cardboard Human Robot. Each week includes specific tasks for each day, focusing on different robotic concepts and construction techniques. The timetable emphasizes hands-on learning and experimentation with components like motors, sensors, and programming.

Uploaded by

syedakiranzahid9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Robotics Weekly Timetable (8 Weeks Project Plan with Dates)

Week 1: Bristle Bot (09 Jun 2025 - 12 Jun 2025)

Day Task

Monday (09 Jun 2025) Introduction to vibration robots. Gather materials, explain circuit basics.

Tuesday (10 Jun 2025) Assemble the toothbrush base and attach motor using tape.

Wednesday (11 Jun 2025) Connect battery and test motor vibration.

Thursday (12 Jun 2025) Decorate bot (googly eyes), test movements, troubleshoot issues.

Week 2: Art Bot (Scribble Bot) (16 Jun 2025 - 19 Jun 2025)

Day Task

Monday (16 Jun 2025) Discuss center of gravity, art-bot movement. Review motor basics.

Tuesday (17 Jun 2025) Build body with plastic container, attach legs with markers.

Wednesday (18 Jun 2025) Wire battery and off-center cork weight.

Thursday (19 Jun 2025) Test drawing patterns, decorate with stickers/feathers.

Week 3: Walking Robot (23 Jun 2025 - 26 Jun 2025)

Day Task

Monday (23 Jun 2025) Explore walking mechanism, demo ice cream stick linkage.

Tuesday (24 Jun 2025) Begin chassis with straws/sticks and bottle cap feet.

Wednesday (25 Jun 2025) Attach DC motor and wiring with battery.

Thursday (26 Jun 2025) Test walking, adjust alignment, add design elements.

Week 4: Dancing Robot (30 Jun 2025 - 03 Jul 2025)

Day Task

Monday (30 Jun 2025) Intro to dual motor motion & vibration. Explain mini breadboard use.

Tuesday (01 Jul 2025) Build base, attach popsicle arms and corks to motors.

Wednesday (02 Jul 2025) Connect motors to breadboard, test symmetrical balance.
Robotics Weekly Timetable (8 Weeks Project Plan with Dates)

Thursday (03 Jul 2025) Final dancing test, adjust cork weights, decorate.

Week 5: Line Following Robot (07 Jul 2025 - 10 Jul 2025)

Day Task

Monday (07 Jul 2025) Discuss IR sensors, line following logic. Intro Arduino Uno.

Tuesday (08 Jul 2025) Build chassis, attach DC motors and wheels.

Wednesday (09 Jul 2025) Wire L298N driver, sensors, and Arduino. Upload code.

Thursday (10 Jul 2025) Test on black tape line, debug sensor readings.

Week 6: Light Tracing Robot (14 Jul 2025 - 17 Jul 2025)

Day Task

Monday (14 Jul 2025) Explain LDRs, light direction concept. Servo motor basics.

Tuesday (15 Jul 2025) Connect LDRs to proto board, place servos on chassis.

Wednesday (16 Jul 2025) Wire circuit, add LED and resistor, upload code.

Thursday (17 Jul 2025) Test with flashlight, calibrate light sensitivity.

Week 7: Obstacle Avoiding Robot (21 Jul 2025 - 24 Jul 2025)

Day Task

Monday (21 Jul 2025) Discuss ultrasonic sensors, obstacle logic. L293D shield overview.

Tuesday (22 Jul 2025) Assemble chassis with DC motors and wheels.

Wednesday (23 Jul 2025) Wire Arduino, L293D shield, HC-SR04. Upload avoidance code.

Thursday (24 Jul 2025) Test with obstacles, refine code and behavior.

Week 8: Cardboard Human Robot (28 Jul 2025 - 31 Jul 2025)

Day Task

Monday (28 Jul 2025) Intro to human motion simulation. Plan arm/leg structure.
Robotics Weekly Timetable (8 Weeks Project Plan with Dates)

Tuesday (29 Jul 2025) Cut cardboard body, attach geared motors for joints.

Wednesday (30 Jul 2025) Connect ON/OFF switch, 9V battery, secure wiring.

Thursday (31 Jul 2025) Final testing of limb motion, decorate with markers/buttons.