User Guide Cost To Complete Module
User Guide Cost To Complete Module
• Click on create.
• Give the Job code, Order Number.
• By default the month will be Last month (if required change the Month).
• Click on GO.
• Draft / Insert: Here it will show the parameter wise estimated cost vs actual cost. And allow
to enter the expected cost to complete values against each parameter. Once the value is
entered click on Draft.
• Freeze: Once cost to complete Value entered and verified we need to Freeze the document
for approval. NOTE: once the document is freeze it cannot be edited.
• CTC View: With this Tab we can view the status of submitted document and print the
document.
• CTC Details: With this Tab we can view Order→ Product wise Estimated cost vs Actual
Cost , Accepted Cost, Sales against order, Margin .