07 Laboratory Exercise 1
07 Laboratory Exercise 1
Laboratory Exercise
SAP Controlling – Cost Center Accounting
Objective:
Requirement:
▪ Microsoft Word
Directions: Perform what is asked to provide the required information in the following items. (80 points)
You will take on different roles within the Global Bike Group to understand and perform a cost center accounting
process.
3. On the following screen, as Controlling Area, enter NA00, and as Cost Center, enter CAFE1###
(replace ### with your number, e.g. 012). The cost center should be valid from 01/01 of the current
fiscal year.
4. In the field Name, enter Cafeteria ### and as Description type in Cafeteria. As the Person Responsible,
enter your name. Select the cost center category H (Service cost center).
5. In the Organizational Units, assign your new cost center to Standard Hierarchy Node N1200 (Internal
Services). In addition, choose Company Code US00 (Global Bike Inc.), Business Area BI00 (Bikes),
and Currency USD.
6. In the lower-right corner, click to save your cost center. In the top-left corner, click on to go
back one screen. Repeat the process to create a maintenance cost center. Use the following data:
8. In the top-left corner, click on to go back one screen. Repeat the process to create an assembly cost
center. Use the following data:
3. In the screen that opens, in the field Statistical Key Figure, enter EMP### (replace ### with your three-
digit number), as Statistical Key Figure Name Number of employees, as Quantity Unit choose PRS
(Number of Persons) and as Category select 1 (Fixed values).
4. Click .
3. In the field G/L Account, enter 803###1 (again, replace ### with your three-digit number) and as Chart
of Accounts GL00. In the pull-down menu G/L Account Type, select Secondary Costs. For the Account
Group, choose 08 (Secondary Costs).
4. For both Short Text and G/L Acct Long Text, type in Plan Asm CAFE1###.
5. On the Company Code Data tab, assign your new secondary cost element to your company code. To
do so, in the Company Code Assignment area, click on .
6. In the field New Company Code Assignment, type in or select US00 (Global Bike Inc.).
7. On the CREATE/BANK/INTEREST tab, as Field Status Group, enter ZSEC (Secondary Cost
Elements).
8. In the bottom-right corner, click on to add the Company Code data to your secondary cost element.
12. In the top-left corner, click on to go back one screen. Repeat the process for the maintenance
allocation secondary cost element with the following data:
14. In the top-left corner, click on to go back one screen. Repeat the process for the assembly allocation
secondary cost element using the following data:
4. As Activity Type, enter M### (replace ### with your assigned number). The type should be valid from
01/01 of the current fiscal year. As Name, enter Maint. Hours ###. As Activity Unit, select H (Hour).
In the Cost Center Categories field, use the value help symbol to choose * (All Categories).
5. On the Allocation tab, in the Activity Type Category pull-down, choose 1 (Manual entry, manual
allocation) and assign it to your new maintenance Allocation Cost Element (803###2). Ensure that the
Price Indicator field is left blank. Compare to the following screenshot.
7. In the top-left corner, click on to go back one screen. Repeat the process to create the activity type
for the assembly cost center. Use the following data.
3. If the Controlling Area field is not filled, enter NA00. The new Cost Center Group is named GROUP1###
(replace ### with your assigned number). Compare your entries with the screenshot below and click
.
4. In the Name column of your GROUP1### line item, enter Cafeteria cost receivers.
6. In the Search: Cost Centers popup, in the field Cost Center Name, enter *###. Replace ### with your
three-digit number and do not forget the * right before your ID, so for example, *015 if your number is
015. Then, click . The system should display the three cost centers you created earlier.
7. Check all three and click . Your three cost centers should now have been added to your cost center
group GROUP1###.
8. In the upper-left corner, click the button .
2. Enter Version 0, From Period 1 and To Period 12. As the Fiscal Year, enter the current year. In the
field Cost Center, enter ASSY1###, and as Stat. key figure, type in EMP###.
3. At the bottom of the screen in the Entry area, choose Form-Based. Then, click .
4. In the Current Plan Value column, enter 15 and click . The system displays a success message.
5. Repeat the same process for cost center MAIN1### and enter 5 as current plan value.
6. Finally, repeat the process once again for cost center CAFE1### and plan 5 employees.
7. Click on to return to the SAP Fiori launchpad. Confirm any browser warning messages for
unsaved data with .
3. Fill the fields Version, Periods, and Fiscal Year with the same values as in the previous step, if they are
not already populated.
4. As Cost Center, enter MAIN1### and as Activity Type M###. Leave all other fields blank. Then, click
.
6. Repeat the process for Cost Center ASSY1### and Activity Type A### with a Plan Activity of 6000
hours.
7. Click on to return to the SAP Fiori launchpad. Confirm any browser warning messages for
unsaved data with .
2. Fill the fields Version, Periods, and Fiscal Year with the same values as in the previous step, if they are
not already populated.
3. As Cost Center, enter CAFE1### and choose Cost Element 6991000 (Cost of labor) using the value
help symbol . Leave all other fields blank.
4. Click .
5. On the following screen, enter Plan Fixed Costs of 60000 and click .
6. Repeat the process for Cost Center CAFE1### and Cost Element 5900000 (Purchased Services) with
Plan Fixed Costs of 90000.
7. On the Change Cost Element/Activity Input Planning: Initial Screen screen, change Cost Center to
MAIN1### and Cost Element to 6991000 (Cost of labor). Enter Plan Fixed Costs of 60000.
8. Finally, change Cost Center to ASSY1###, enter Activity Type A### and Cost Element 6991000 (Cost
of Labor). Now that you have added an activity type, the primary cost input can be planned activity-
dependent – that is, with a fixed and variable price. Then, click .
9. The Plan Variable Cost field should now be ready for input. Enter 150000 and save with .
10. Click on to return to the SAP Fiori launchpad. Confirm any browser warning messages for
unsaved data with .
3. Fill the fields Version, Periods, and Fiscal Year with the same values as in the previous step, if they are
not already populated.
4. As Cost Center, enter ASSY1###, as Sender Cost Center, enter MAIN1### and as Sender Activity,
type M###. Leave all other fields blank.
5. Go to the overview screen by clicking on , and then as Plan fixed consumption enter 600
hours. Save by clicking .
2. If not already filled in, as Report Parameters, enter Cost Center ASSY1###, the current fiscal year,
Period 1 to 12, and Version 0. Click on .
3. In the bottom-right corner, click and review the planning reports for Cost Centers MAIN1###
and CAFE1### as well.
4. Provide the screenshots of the planning reports of MAIN1### and CAFE1###. (Two (2) screenshots)
Task 11: Creating assessment for cafeteria costs as Head of Accounting (15 minutes)
1. To assess cafeteria costs, in the Controlling area, use the app Create Actual Assessment Cycle.
2. In the Execute Plan Assessment: Initial Screen, choose More ► Extras ►Cycle ►Create. In the Cycle
field, enter C1###, and as Start Date, select 01/01 of the current fiscal year. Then, click .
3. As Text, type in Cycle CAFE1### and uncheck the Iterative field. Then, click .
4. As Segment Name, enter SEG### and as a description (box next to the segment name) - Segment
###. On the Segment Header tab, as Assessment CElem, type in 803###1.
5. On the Senders/Receivers tab, as Sender Cost Center in the From column, enter CAFE1###, and as
Receiver Cost Center in the Group column, enter GROUP1###.
6. On the Receiver Tracing Factor tab, in the Var. portion type pull-down menu, choose the value Plan
Stat. Key Figures.
7. An information popup indicates that new fields are displayed. Close the popup by clicking (Continue).
In the Selection Criteria section, in the From column, choose 0 (Plan/Act) for Version and enter Stat.
key fig. EMP###.
9. In the top-left corner of the screen, click three times to go back, and confirm the subsequent
confirmation .
10. On the Execute Plan Assessment: Initial Screen, for Period, enter 1 To 12 and as Fiscal Year the
current year. In the Cycle field, enter C1### and press Enter. In the Section Processing Options,
uncheck Test Run. Then, click .
11. The system should notify you that processing was completed without errors. The number of Senders
should be 1 and the Number of Receivers 3.
12. In the top-left corner, click and then select to exit the list.
13. Click on to return to the SAP Fiori launchpad. Confirm any browser warning messages for
unsaved data with .
2. On the Planning Report: Initial Screen, as Cost Center select ASSY1###. If not already populated, in
the Fiscal Year field, enter the current year, type in Period 1 To 12, and Version 0. Click on
and view the results of the assessment.
3. In the top-left corner, click and then repeat the process above to review the assessment results for
the maintenance and cafeteria cost centers.
The maintenance and assembly cost centers were charged with a cafeteria assessment of 30,000 and
90,000, and the cafeteria cost center was credited with 120,000. The amount of cafeteria costs
remaining in the CAFE1### cost center is 30,000.
You may have noticed that the activity inputs and activity allocations of cost centers ASSY1### and
MAIN1### are still evaluated with zero, even though all the quantity information has been entered. This
is because no prices have been planned yet for the involved activity types. You will do this in the next
step.
4. Click on to return to the SAP Fiori launchpad. Confirm any browser warning messages for
unsaved data with .
2. On the following screen, choose the first radio button (Cost center group) and enter your cost center
group GROUP1###. Again, use the parameters Version 0, Period 1 To 12, and the current year.
3. Click on (Continue) to look at the calculation. If everything worked correctly, the SAP system reports
that the processing was completed without errors.
4. Provide a screenshot showing the calculated prices for your activity types (ASSY1### and MAIN1###).
(Two (2) screenshots)
5. Click on to return to the SAP Fiori launchpad. Confirm the popup with .
2. On the Planning Report: Initial Screen, as Cost Center select CAFE1###. If not already populated, in
the Fiscal Year field, enter the current year, type in Period 1 To 12 and Version 0. Click on
and review the results.
3. In the top-left corner, click and then repeat the process above to review the results for the
maintenance and assembly cost centers.
4. Provide the screenshot of the assembly cost center report. It should look like this.
5. The cafeteria costs and assessment of the maintenance cost center amount to 120,000. Labor costs in
the amount of 150,000 are also incurred. If the total input is 6,000 hours, this results in a price of 45.00
for one assembly hour.
6. Click on to return to the SAP Fiori launchpad. Confirm any browser warning messages for
unsaved data with .
Conclusion:
In at least three (3) sentences, provide a conclusion that would detail your impression and comment on the SAP
Controlling (CO) processes.
Reminders:
• There are a total of five (5) screenshots required throughout the exercise.
• Consolidate the screenshots with labels and the conclusion in an MS Word file.
• Call on the instructor to check your outputs before submitting a PDF copy on eLMS.
GRADING RUBRIC:
Excellent Good Fair Poor
Criteria Points
4 3 2 1
The student
The student missed The student missed
Completeness The student did all the missed all of
requirements.
a few of the most of the
the
___/40
(x10) requirements. requirements.
requirements.
The student
The student provided The student provided The student provided
provided
Screenshots correct and correct but incorrect but
complete incomplete complete
incorrect and ___/20
(x5) incomplete
screenshots. screenshots. screenshots.
screenshots.
The explanation is
The explanation is The explanation
The explanation is somewhat clear,
Conclusion clear, with mostly is unclear, with
clear, with coherent
coherent
with only a few
no supporting
___/20
(x5) supporting details. coherent
supporting details. details.
supporting details.
Total Score ___/80