0% found this document useful (0 votes)
16 views2 pages

PLC - Timers

This document outlines a job sheet for PLC programming focused on sequence control of timers using the Micrologix 1000 series PLC. It includes objectives such as understanding hardware configuration, constructing ladder diagrams for ON delay, OFF delay, and Retentive ON delay timers, and precautions for program editing. The procedure details the steps for establishing communication between the PLC and PC, preparing ladder diagrams, and verifying outputs.

Uploaded by

sreejith KB
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

PLC - Timers

This document outlines a job sheet for PLC programming focused on sequence control of timers using the Micrologix 1000 series PLC. It includes objectives such as understanding hardware configuration, constructing ladder diagrams for ON delay, OFF delay, and Retentive ON delay timers, and precautions for program editing. The procedure details the steps for establishing communication between the PLC and PC, preparing ladder diagrams, and verifying outputs.

Uploaded by

sreejith KB
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JOB SHEET/EXPERIMENT SHEET

OUTCOME No: 34 JOB No: 34.3


DATE : TIME : 4.40 hrs

SKILL : PLC programming for sequence control of timers.

OBJECTIVES :
Understand the wiring, hardware configuration and preparation of input-output addresses for I/O
1 modules in micrologix 1000 series PLC.
2 Construct the ladder diagram for the operation of ON delay timer.

3 Construct the ladder diagram for the operation of OFF delay timer.

4 Construct the ladder diagram for the operation of Retentive ON delay timer.

PRECAUTIONS :
1 Do not edit the program while PLC in RUN mode.

OPERATIONS TO BE CARRIED OUT /TASKS:

1 Identify the PLC hardware configuration.


2 Prepare and execute ladder diagram for ON delay, OFF delay and Retentive ON delay timers.

TOOLS & EQUIPMENTS REQUIRED :


No. Name Specification Quantity

1 Allen bradley’s 1
PLC trainer kit Micrologix 1000 series
RS-232 serial
2 port,Windows OS, RS 1
Desktop PC linx, RS logix 500
MATERIALS REQUIRED :
No. Name Specification Quantity

1 Data cable RS-232 connector 1

2 Extension board 1

ON Delay timer OFF Delay timer


RETENTIVE ON DELAY TIMER

PROCEDURE:

1 Switch on the PLC trainer kit and desktop PC.

2 Start the RS linx classic and establish the communication between PLC and PC.

( Communications >Configure Drivers > Add New/configure )

3 Start the RS lolgix 500 and open new file.

5 Select PLC model to micro logix 1000 series.

6 Prepare ladder diagram different type timers and save the program in present working directory.

7 Go to online mode and download the ladder program to PLC.


8 Switch PLC to running mode and verify the ladder diagram output.

Result : Constructed ladder diagram for sequence control of timers and verified the output.

You might also like