Excavation for foundation in loose or soft soil upto 1.5 m - 3.0 m depth including sorting out and
2 stacking of useful materials and disposing of the excavated stuff upto 1 Km Lead and lift within premises. cmt. 400.00
Carting away outside of site, Surplus Material - debris, including loading at site, transportation to
outside of site and disposal and spreading if required and as directed by the Engineer-In-Charge, (80% of
3 cmt. 900.00
the full measurements of debris in truck shall be paid). Site selection will in contractor’s scope.
Back filling - Filling available excavated earth ( excluding rock). In trenches, plinth sides of foundations
4 etc. in layers not exceeding 20 cms. In depth consolidation each deposited layer by ramming and cmt. 190.00
watering.
Murrum - Providing and back filling work with approved quality of selected Murrum soil to be brought
5 from outside including watering, ramming, levelling and compacting by using compactor/roller. cmt. 1,100.00
Sand filling - Providing and filling approved River sand ( brought from outside ) in layers not exceeding
6 cmt. 1,450.00
300mm thk including watering and consolidation by using compactor/roller.
Metal/Rubble - Providing & laying 40 mm to 63 mm Metal Soling of consolidated thickness of 230mm
7 (in layer) filled with binding materials including watering at every layer and compacting by using cmt. 2,300.00
compactor/roller.
Concrete and allied works
M-10 PCC - Providing and laying cement concrete 1:3:6 and curing complete excluding cost of formwork.
8 cmt. 3,600.00
M-25 RCC below plinth - Providing and laying site/machine mixed M-25 Grade Concrete including all
scaffolds, platforms, dewatering ground water, vibrators, pumps, curing, etc. below plinth level complete
9 cmt. 5,900.00
as directed and instructed by Engineer. Min Cement consumption 350 kg/Cumt
BOQ - ARC Civil work
No. Description Unit Rate
M-25 RCC above plinth - Providing and laying site/machine mixed M-25 Grade Concrete including all
10 scaffolds, platforms, dewatering ground water, vibrators, pumps, curing, etc. above plinth level complete cmt. 5,800.00
as directed and instructed by Engineer.
RMC M - 10 - Providing and laying M-10 Ready mixed concrete of all heights in volumetric proportion
with 20-25mm and down stone aggregates of specified thickness, mix and gradation. Including laying,
11 cmt. 5,200.00
spreading, ramming consolidating, finishing, curing etc. complete as directed for all levels complete as
directed by EIC.
RMC M - 25 - Providing and laying M-25 Ready mixed concrete of all heights in volumetric proportion
with 20-25mm and down stone aggregates of specified thickness, mix and gradation. Including laying,
12 cmt. 7,100.00
spreading, ramming consolidating, finishing, curing etc. complete as directed for all levels complete as
directed by EIC.
IPS - Providing and laying damp proof course 50 to 75 mm thick cement concrete 1:2:4 and curing
13 smt. 950.00
complete
14 Trimix work - Labour charges for trimix work including all tools and machineries. smt. 270.00
Shuttering work - Providing, erecting and removing form-work/shuttering for concrete items, as per
15 specifications, as shown on drawings or as directed by Engineer/Owner. (Measurement to be paid for smt. 780.00
net surface to contact with RCC) for all concrete work.
Masonry and allied works
115 mm masonry - Providing and constructing 115/130 mm thick brick partition walls in super structure
16 at all floors using first quality bricks of approved manufacturer in cement mortar (1:4) including smt. 2,150.00
necessary scaffolding, racking of joints, watering etc.
230 mm masonry - Providing and constructing 230 thickness brick wall at all floors using first quality
17 bricks of approved manufacturer in cement mortar (1:4) including necessary scaffolding, racking of cmt. 5,900.00
joints, watering etc. as per specification.
Single coat plaster - Providing and doing cement plaster at all floors, locations & level in C.M 1:4 mix
18 smt. 500.00
including scaffolding, watering, hacking pointing, chiken mesh etc.
Double coat plaster - Providing 20 mm thick SAND FACED/Mala cement PLASTER on walls above ground
19 level consisting 12 mm thick backing coat of C.M. 1: 3 and 8mm thick finishing coat of C.M. 1:1 etc. smt. 580.00
Complete for any height.
BOQ - ARC Civil work
No. Description Unit Rate
Structural steel and reinforcement work
Reinforcement work - P & F of steel work including unloading, storing, handling, straightening,
20 assembling, erecting, aligning position, in line and plumb including all labour tools, tackles, machinery, Mt. 18,500.00
cutting, bending, etc. as per drawing.
Fabrication work - Structural steel work including unloading, storing, handling, straightening,
fabricating, assembling, erecting, aligning position, in line and plumb including all labour tools, tackles,
21 machinery, cutting, welding, grinding, bending, drilling bolt holes. Built up sections made out of plates or Mt. 35,000.00
hollow sections, tubes, steel sections, pipes as specified in the drawings and as directed.
Waterproofing
Water proofing - Providing and applying cement based proprietary waterproofing treatment by filling
the sunken area with brick bat cement concrete, finishing the top suitably to receive the final
22 flooring & furnishing performance guarantee for 10 years on non-judicial stamp paper of smt. 2,100.00
appropriate value as per the proforma complete as directed. Complete as per Instructions of the
Engineer In Charge.
Water proofing plaster - Providing, waterproofing plaster to RCC gutters, walls of toilets, baths, WC's,
parapet to required height in cement and sand 1:3 mix 20 mm thick, with waterproofing materials
23 smt. 1,150.00
of approved make, finished smooth, made water tight including curing etc. Complete as per Instructions
of the Engineer In Charge.
Floor finishes work
Kota - Providing and laying at all heights polished green Kotah stone 25-30 mmt thick flooring over 30-35
mm thick cement mortar 1:6 with cement slurry at the rate of 4.4 kg of cement per Sq.M including edge
24 smt. 1,650.00
cutting, finishing, wastage, machine, machine, semi mirror polishing etc. complete as directed by
Engineer-In-Charge.
Epoxy joint - P & L Epoxy joint filling work in 6 mm wide and 10 mm deep joints in kota or tiles of desired
25 Rmt. 210.00
shade
Vitrified tiles - P & L 24" x 24" vitrified 8 to 10 mm thick tile flooring over 20 mm (average) base of
26 cement mortar 1:6 on new surface or fixing on existing flooring by including finished with flush pointing smt. 1,650.00
& cleaning the surface etc.
BOQ - ARC Civil work
No. Description Unit Rate
Vitrified tiles - P & L 24" x 24" vitrified 8 to 10 mm thick tile in dado with neat cement float including
27 smt. 1,750.00
finished with flush pointing & cleaning the surface etc.
Granite - Providing and Fixing Granite Telephonic Black Colour or eqi 15 to 18 mm thick for jambs and
sills of doors & windows using neat cement slurry laid over 20 mm average base of cement mortar 1:1
28 smt. 6,200.00
and jointed with grey cement slurry including polishing, scaffoldings, tools and tackles, etc.
Polish - Extra over and above for providing special mirror finish/Lather finish or as per provision polish on
marble/ kotah/granite/red agra or as per provision stone flooring over semi mirror polish with different
29 grades of emery like 800, 1200, 5x. All work to be carried out with polishing machine smt. 400.00
Gypsum false ceiling - Providing and Fixing metal frame Suspended Calcium Silicate board false ceiling
which includes G. I. Perimeter channels of size 0.55 mm thick along with perimeter of ceiling, screw fixed
to brick wall / partition with the help of nylon sleeves and screws, at 610 mm centers. Then suspending
G.I. intermediate channels of size 45 mm (0.9 mm thick with two flanges of 15 mm each) from the soffit
at 1220 mm centers with ceiling angles of width 25 mm x 10 mm x 0.55 mm thick fixes to soffit with G.I.
Cleat and steel expansion fasteners. Ceiling section of 0.55 mm thickness having knuried web of 51.5
mm and two flanges of 26 mm each with lips of 10.5 mm are then fixed to the intermediate channel with
the help of connecting clip and in direction perpendicular to the intermediate channel at 457 mm
30 centers. 10mm tapered edge Calcium Silicate Board (conforming to IS : 2095 – 1982) is then screw fixed smt. 1,100.00
to ceiling section with 25 mm drywall screws at 230 mm centers. Screw fixing is done mechanically by
self drilling screws with suitable attachment.(All sections should have "Gypsteel"/Saint Gobain mark.)
Finally the Calcium Silicate Board Ceiling are to be jointed and finished so as to have a flush look which
includes filling and finishing the tapered and square edges of the boards with jointing compound, joint
paper tape and two coats of Drywall Topcoat suitable for Calcium Silicate Board Ceiling Complete as per
Drawings and Instructions of the Engineer In Charge.
Painting work
BOQ - ARC Civil work
No. Description Unit Rate
Inside Paint with putty - Finishing Wall with Plastic Emulsion Paint on Wall Surface (two coats) to give
an required shap even shade after thoroughly brushing the surface to remove all dirt and remains of
loose powered material etc. complete. Rate are inclusive of applying two coat of lapy (Putty) and one
coat of primer on new wall surface to give and even shade including thoroughly brushing the surface
free from mortar dropping and other foreign matter and sand papered smooth. Fine Putty Shall be
31 Bison Wall Putty of Berger Paint India Ltd or Trucare Wall Putty of Asian Paint or Dulux Polly Putty of smt. 340.00
Dulux Paint Only & Primer shall be BP White Primer of Berger Paint India Ltd or Asian Paint Trucare
Interior Primer of Asian Paint or Interior Sealer A 500 of Dulux Paint only and Plastic Emulsion paint Shall
be Rangoli Total Care of Berger Paint India Ltd or Apcolite Premium Emulsion of Asian Paint or Dulux
Interior A 900 of Dulux Paint only.
Inside Paint - Finishing Wall with Plastic Emulsion Paint on old wall Surface (two coats) by touching up
32 smt. 280.00
the surface by putty and paint after it.
Outside Paint with primer - Finishing wall with weather proof exterior emulsion paint on wall surface
(two coats) over and above applying One Coat Of Primer to give an required shape even shade after
thoroughly brushing the surface to remove all dirt, and remains of loose powdered materials.etc
complete. Primer Shall be Weather Coat Exterior Primer of Berger Paint India Ltd or Asian Paint Trucare
33 smt. 240.00
Exterior Primer of Asian Paint Or Exterior Sealer E 900 of Dulux Paint only and exterior emulsion paint
Shall be Weather Coat Smooth of Berger Paint India Ltd or Apex Weather Proof Emulsion of Asian Paint
or Dulux Weather Shield Projects of Dulux Paint Only
Outside Paint - Finishing wall with weather proof exterior emulsion paint on old wall surface (two
34 smt. 230.00
coats)
PU Paint - Providing and applying 2 coat of water based polyurethane paint of approved make and
shade, over & including 1 coat of primer on wall, ceiling, Hilux partions etc. including surface
35 preparation, two coat of acrylic based spray plaster, scaffolding etc. all complete & as per smt. 450.00
manufacturer's specification and as per Instruction of the Engineer In charge.
BOQ - ARC Civil work
No. Description Unit Rate
Structural steel Primer - Painting to structural steel work with One site coat of Zinc Chromate primer
36 Mt. 11,000.00
after erection is completed and approved by Engineer.
Structural steel painting -Painting to structural steel work with two coats of approved shade of synthetic
37 Mt. 16,000.00
enamel paint of 'Berger' or 'Asian' make or equivalent make.
Sanitary and plumbing work
38 P/l & Fixing 4" Dia 6 kg PVC pipe line work incl T, bend, coupler, support, etc. Rmt. 870.00
39 P/l & Fixing 6" Dia 6 kg PVC pipe line work incl T, bend, coupler, support, etc. Rmt. 1,450.00
40 P/l & Fixing 8" Dia 6 kg PVC pipe line work incl T, bend, coupler, support, etc. Rmt. 1,750.00
41 P/l 3" dia HDPE pipe line work (6kg) incl T, bend, coupler, support, etc. Rmt. 910.00
42 P/l 4" dia HDPE pipe line work (6kg) incl T, bend, coupler, support, etc. Rmt. 1,200.00
43 P/l 6" mm dia HDPE pipe line work (6kg) incl T, bend, coupler, support, etc. Rmt. 1,400.00
44 P/l & Fixing 1" Dia 6 kg UPVC pipe line work incl T, bend, coupler, support, etc. Rmt. 330.00
45 P/l & Fixing 2" Dia 6 kg UPVC pipe line work incl T, bend, coupler, support, etc. Rmt. 425.00
46 P/l & Fixing 3" Dia 6 kg UPVC pipe line work incl T, bend, coupler, support, etc. Rmt. 485.00
47 P/l & Fixing 1" Dia 6 kg CPVC pipe line work incl T, bend, coupler, support, etc. Rmt. 425.00
48 P/l & Fixing 2" Dia 6 kg CPVC pipe line work incl T, bend, coupler, support, etc. Rmt. 520.00
49 P/l & Fixing 3" Dia 6 kg CPVC pipe line work incl T, bend, coupler, support, etc. Rmt. 700.00
RCC manhole - Constructing RCC man hole with RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : grated
stone aggregate 20 mm nominal size) foundation concrete 1:3:6 (1 cement:3 coarse sand finished with
floating coat of neat cement & making channels in CC 1:2:4 mix ( 1 cement :2 coarse sand:grated stone
aggregate 20mm nominal size) finished smooth complete including curing & testing (I) inside size
1000*1000 mm and 900mm deep (A) with 150mm thick RCC walls, Providing and fixing precast RCC
50 Nos. 10,500.00
cover & finishing concrete with CM (1:3) etc. complete. Rate are also inclusive of finished work, RRC top
slab M25 mix, foundation concrete 1:3:6 P.C.C., 150 mm RCC walls M-25, plastered smooth with cement
mortar 1:4 15 mm thick on inner faces and open external surfaces above ground, provided with precast
man hole RCC cover 10 T capacity, etc. completed as per EIC.
Miscellaneous work
BOQ - ARC Civil work
No. Description Unit Rate
Rebar - Providing and fixing reinforcement using HILTI Chemical cartage (RE 500) or equivalent including
drilling holes for anchor dowels bars 1.0 M length tor steel bars, making hole dia as per requirements,
depth of holes and chemical grouting, pull out testing required, as per manufacturers specification and
as directed. (Steel bar weight shall be considering in reinforcement item)
PCC breaking - Removing the existing PCC, IPS, kota or any type of tiled flooring & dado, levelling the
surface, cleaning the site including sorting out serviceable tiles and stacking the same within the site and
61 cmt. 3,500.00
stacking the debris outside the premises as directed by the Engineer In Charge.
BOQ - ARC Civil work
No. Description Unit Rate
Brick breaking - Breaking, demolishing & removing existing Brick / Block masonry, any size / thickness
including plaster including scaffolding, supporting existing structure with props and removing the debris
& stacking the all type of materials including useable /saleable or scrap material at the scrap yard within
62 premises(if specified) with carting and properly stacking/ segregating as per type of scrap/material, cmt. 2,200.00
including finishing the broken surface to match with the surrounding, and removing the unusable debris
to outside of site or as directed by Engineer-In-Charge.
Core cutting - Carefully making holes in RCC slab /pardi/beam, including reinforcement with the help of
diamond core cutting or blade/ saw cutting machine without disturbing adjacent structure. Rate is
inclusive of removing & shifting the cut part of concrete, including scaffolding, supporting, lifting, shifting
Nos.
at all floors, protecting existing structure with props, supports etc. as per drawing, design, and
instruction complete as per direction of Engineer-In-Charge
Note :-
1 Cement and steel will be free supplied by client.
2 No space will be provided for labour colony inside plant premises.