0% found this document useful (0 votes)
4 views2 pages

Software Development Quotation

This document is a software development quote from Ing. Paolo Muñoz Pacheco for a Reports Module for the Maternity of Lima, priced at 3800 Soles with a delivery date of March 31. It outlines various execution indicators, costs, requirements, and supplier management metrics related to the project. The quote includes a warranty for development errors for 3 months and specifies that any changes to the specifications will incur additional costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views2 pages

Software Development Quotation

This document is a software development quote from Ing. Paolo Muñoz Pacheco for a Reports Module for the Maternity of Lima, priced at 3800 Soles with a delivery date of March 31. It outlines various execution indicators, costs, requirements, and supplier management metrics related to the project. The quote includes a warranty for development errors for 3 months and specifies that any changes to the specifications will incur additional costs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Software development quote

Mr. Mauricio Córdova Torres.


I am pleased to address you to greet you and at the same time to send you my
quote attending to your request, thanking you in advance for the
preference for my services.

Project
Reports Module for the Maternity of Lima

Execution Indicators
oTime
. Availability
. Total availability
. Availability due to breakdown
. Mean time between failures
. Average attention time of SOT
. OTM numbers generated
. Finished OTM number
. Pending OTM number
. Number of unaddressed OTM
. Job applications generated
. Job applications attended
. Unattended job applications
. Pending job applications
. Average response time
. Compliance with planning
. Planned time mean deviation
. Mean deviation of planned time
. Average resolution time of OTM
Costs
. Labor cost
. Labor cost per hour
. Maintenance cost
. emergency index
. Current equipment cost
Write-off of assets
Reason for equipment decommissioning
The number of casualties generated
The number of casualties attended to
The number of pending cancellations
The number of unattended deaths
Cost of attended low labor
Requirements
Requirement time
Order fulfillment efficiency
Average purchase time
Percentage difference between consumption estimates and
real consumption
Percentage of services that experienced
shortage
Percentage of absolute error measured between consumption
estimated and actual consumption
Supplier Management
Execution efficiency of OTM
Percentage of unmet jobs
Assigned jobs

Component Time (days) Price (Soles)


Reports Module 30 days 3800
for Maternity
from Lima

Deliverables

Source code

Delivery Date

March 31

General Conditions

Any change or modification to the specifications will be quoted.


separately.
A warranty is offered for development errors of 3 months.
CTA Continental Account No: 0011 0120 0200262096 (Paolo Muñoz
Pacheco

Sincerely.
Ing. Paolo Muñoz Pacheco

You might also like