Project Reference
Date 10.03.2014
Rev : 3 / 20.02.2015
Editor : Selim Çokuğraş
Dep IC LMV MS
e-mail : [email protected]
Page 1/56
SIEMENS
IC LMV /MS
INDEX
a. Sources
b. Interlocks
c. Grounding
d. Notes Regarding the Methods of Operation
e. Protection Relays
2. Electrical Data
3. Short Circuit Calculation Study
4. Relay Protection Parameter
5. Protection Simulation & Tripping Diagrams
a. Sources
System has basically two 33/11,5 kV and 31,5 MVA transformers in order to feed the bus
sections of the 11 kV energy distribution station.
The short circuit power of the 132 kV grid was taken into the calculation as 5000 MVA.
b. Interlocks
An unexpected parallel operation between two transformer incoming on 11,5 kV busbar is
prevented by electrical interlock which controls incomings and bus tie circuit breaker
positions.
c. Grounding
The star points of the 11,5 kV windings of the 33/11,5 kV MVA transformers are grounded
via 22,13 Ω , 300 A grounding resistors.
d. Operating methods
There are two operation alternatives to feed to 11 kV distribution system from the 33 kV
station:
· One of the transformer incomings and bus tie circuit breaker is in operation
· Each transformer incoming circuit breakers are in operation and bus tie circuit
breaker is in open position.
e. Protection Relays
Relay types and their locations and protection functions which are used in the protection
system are listed below:
Electrical Data
All of the electrical data which were used into calculations are given on the “Electrical Data”
diagram
ELECTRİCAL DATA
GRID
Sk" = 5.000,0 MVA
R/X = 0,1 pu
1AK07/DIFF 1AK21/DIFF
1800/1 A 1800/1 A
11 kV BB1 11 kV BB2
N22
Type = N2XSY
1AK12
CT (P) = 1800/5 A
1AK01
CT (P) = 50/5 A
q = 240,0 mm²
1AK03
CT (P) = 300/5 A
1AK02
CT (P) = 300/5 A
Type = N2XSY
l = 0,10 km
1AK10
CT (P) = 300/5 A
1AK13
CT (P) = 300/5 A
1AK14
CT (P) = 300/5 A
1AK15
CT (P) = 300/5 A
1AK16
CT (P) = 300/5 A
1AK18
CT (P) = 300/5 A
1AK19
CT (P) = 300/5 A
1AK20
CT (P) = 300/5 A
1AK21
CT (P) = 300/5 A
1AK05
CT (P) = 300/5 A
1AK06
CT (P) = 300/5 A
1AK08
CT (P) = 300/5 A
1AK09
CT (P) = 300/5 A
1AK04
CT (P) = 300/5 A
q = 400,0 mm²
p = 1,0
Type = N2XSY Type = N2XSY Type = N2XSY Type = N2XSY Type = N2XSY Type = N2XSY Type = N2XSY Type = N2XSY l = 0,01 km Type = N2XSY Type = N2XSY Type = N2XSY Type = N2XSY Type = N2XSY
AUX. TR q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² p = 4,0 Type = N2XSY Type = N2XSY Type = N2XSY q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² q = 150,0 mm²
Sn = 0,25 MVA l = 0,15 km l = 10,00 km l = 1,00 km l = 1,00 km l = 1,00 km l = 1,00 km l = 1,00 km l = 1,00 km q = 150,0 mm² q = 150,0 mm² q = 150,0 mm² l = 1,00 km l = 1,00 km l = 1,00 km l = 1,00 km l = 1,00 km
vk = 4,0 % p = 1,0 p = 1,0 p = 1,0 p = 1,0 p = 1,0 p = 1,0 p = 1,0 p = 1,0 l = 1,00 km l = 1,00 km l = 1,00 km p = 1,0 p = 1,0 p = 1,0 p = 1,0 p = 1,0
p = 1,0 p = 1,0 p = 1,0
LV_CB
N23
CT (P) = 400/5 A
Type = NYY
q = 240,0 mm²
l = 0,10 km
p = 1,0
N21
SHC84 SHC87
P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW P = 0,0 MW
Sn = 3,6 MVA Sn = 3,6 MVA
Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar Q = 0,0 Mvar
Vdi = 0,0 kW Vdi = 0,0 kW
Ik" [kA] : The initial short circuit alternating current is the effective value
of the expected short circuit current at the beginning of the short circuit
Ip [kA] : The surge current is the largest peak value for the short circuit
current.
Isym 1c [kA] : Symmetrical Current First Cycle the maximum of the effective
Ik" = 22,60 kA Ik" = 22,60 kA values of the short circuit current of the individual conductors during the first
cycle following the moment the short circuit occurs
N2 I mom peak [kA] : The momentary value of the asymmetrical short circuit
Ik" = 21,87 kA 01AH Ik" = 0,00 kA 02AH Ik" = 0,00 kA current a half cycle following the moment the short circuit occurs.
ip = 54,00 kA GRID Ik" = 22,60 kA Ik" = 22,60 kA IL1a [kA] : L1 - Absolute, 1phase to ground circuit current
Ik" = 21,87 kA ip = 60,95 kA ip = 60,95 kA IL2a [kA] : L2 - Absolute, 2 phase short circuit current
IL3a [kA] : L3 - Absolute, 2 phase short circuit current
Ik" = 0,00 kA
N81
Ik" = 22,95 kA
ip = 62,50 kA Ik" = 0,00 kA Ik" = 0,00 kA
Ik" = 22,95 kA
Ik" = 22,46 kA
Ik" = 22,46 kA
Ik" = 35,23 kA
Ik" = 0,00 kA Ik" = 0,00 kA
Ik" = 13,70 kA
Ik" = 13,70 kA
Ik" = 0,00 kA
Ik" = 0,00 kA
11 kV BB1 11 kV BB2
Ik" = 13,65 kA Ik" = 13,65 kA
ip = 38,08 kA ip = 38,08 kA
Ik" = 13,65 kA Ik" = 13,65 kA
Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 13,63 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA
Ik" = 13,20 kA
N22
Ik" = 13,20 kA
ip = 35,94 kA
Ik" = 0,00 kA
Ik" = 9,48 kA
N23
Ik" = 9,48 kA
ip = 25,86 kA
Ik" = 0,00 kA
Ik" = 7,11 kA Ik" = 12,94 kA Ik" = 2,55 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA Ik" = 9,83 kA
N21
Ik" = 7,11 kA
ip = 15,10 kA
SHC84 LO46 LO56 LO58 LO60 LO62 LO64 LO66 LO68 LO70 LO72 LO74 LO76 LO78 LO80 SHC87
Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA Ik" = 0,00 kA
Ik" [kA] : The initial short circuit alternating current is the effective value
of the expected short circuit current at the beginning of the short circuit
Ip [kA] : The surge current is the largest peak value for the short circuit
current.
IL2a = 6,73 kA IL2a = 6,73 kA Isym 1c [kA] : Symmetrical Current First Cycle the maximum of the effective
IL3a = 6,73 kA IL3a = 6,73 kA values of the short circuit current of the individual conductors during the first
cycle following the moment the short circuit occurs
N2 I mom peak [kA] : The momentary value of the asymmetrical short circuit
IL2a = 18,94 kA GRID 01AH IL2a = 0,00 kA 02AH current a half cycle following the moment the short circuit occurs.
IL3a = 18,94 kA IL2a = 18,94 kA IL2a = 6,73 kA IL3a = 0,00 kA IL2a = 6,73 kA IL1a [kA] : L1 - Absolute, 1phase to ground circuit current
IL3a = 18,94 kA IL3a = 6,73 kA IL3a = 6,73 kA IL2a [kA] : L2 - Absolute, 2 phase short circuit current
IL3a [kA] : L3 - Absolute, 2 phase short circuit current
IL2a = 0,00 kA
IL3a = 0,00 kA
N81
IL2a = 18,51 kA IL2a = 0,00 kA IL2a = 0,00 kA
IL3a = 18,51 kA IL3a = 0,00 kA IL3a = 0,00 kA
IL2a = 18,51 kA
IL3a = 18,51 kA IL2a = 0,00 kA
IL3a = 0,00 kA IL2a = 6,71 kA
IL2a = 28,08 kA IL3a = 6,71 kA
IL3a = 28,08 kA
IL2a = 8,14 kA
IL3a = 8,14 kA
IL2a = 0,00 kA
IL3a = 0,00 kA
11 kV BB1 11 kV BB2
IL2a = 8,11 kA IL2a = 8,10 kA
IL3a = 8,11 kA IL2a = 8,11 kA IL3a = 8,10 kA
IL3a = 8,11 kA
IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 8,10 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA
IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 8,10 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA
IL2a = 7,89 kA
IL3a = 7,89 kA
N22
IL2a = 7,89 kA
IL3a = 7,89 kA
IL2a = 0,00 kA
IL3a = 0,00 kA
IL2a = 7,04 kA
IL3a = 7,04 kA
N23
IL2a = 7,04 kA
IL3a = 7,04 kA
IL2a = 0,00 kA
IL3a = 0,00 kA
IL2a = 5,22 kA IL2a = 7,75 kA IL2a = 1,77 kA IL2a = 6,13 kA IL2a = 6,13 kA IL2a = 6,13 kA IL2a = 6,13 kA IL2a = 6,13 kA IL2a = 6,13 kA IL2a = 6,12 kA IL2a = 6,12 kA IL2a = 6,12 kA IL2a = 6,12 kA IL2a = 6,12 kA IL2a = 6,12 kA IL2a = 6,12 kA IL2a = 6,12 kA
IL3a = 5,22 kA IL3a = 7,75 kA IL3a = 1,77 kA IL3a = 6,13 kA IL3a = 6,13 kA IL3a = 6,13 kA IL3a = 6,13 kA IL3a = 6,13 kA IL3a = 6,13 kA IL3a = 6,12 kA IL3a = 6,12 kA IL3a = 6,12 kA IL3a = 6,12 kA IL3a = 6,12 kA IL3a = 6,12 kA IL3a = 6,12 kA IL3a = 6,12 kA
N21
IL2a = 5,22 kA
IL3a = 5,22 kA
SHC84 LO46 LO56 LO58 LO60 LO62 LO64 LO66 LO68 LO70 LO72 LO74 LO76 LO78 LO80 SHC87
IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA IL2a = 0,00 kA
IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA IL3a = 0,00 kA
Ik" [kA] : The initial short circuit alternating current is the effective value
of the expected short circuit current at the beginning of the short circuit
Ip [kA] : The surge current is the largest peak value for the short circuit
current.
Isym 1c [kA] : Symmetrical Current First Cycle the maximum of the effective
IL1a = 1,05 kA IL1a = 1,05 kA values of the short circuit current of the individual conductors during the first
cycle following the moment the short circuit occurs
I mom peak [kA] : The momentary value of the asymmetrical short circuit
N2 01AH IL1a = 0,00 kA 02AH current a half cycle following the moment the short circuit occurs.
IL1a = 7,20 kA GRID IL1a = 1,05 kA IL1a = 1,05 kA IL1a [kA] : L1 - Absolute, 1phase to ground circuit current
IL1a = 4,80 kA IL2a [kA] : L2 - Absolute, 2 phase short circuit current
IL3a [kA] : L3 - Absolute, 2 phase short circuit current
IL1a = 2,40 kA
N81
IL1a = 1,24 kA IL1a = 0,08 kA IL1a = 0,08 kA
IL1a = 1,18 kA
IL1a = 0,00 kA
IL1a = 1,05 kA
IL1a = 0,00 kA
IL1a = 0,30 kA
IL1a = 0,02 kA
11 kV BB1 11 kV BB2
IL1a = 0,31 kA IL1a = 0,31 kA
IL1a = 0,30 kA
IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,01 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,01 kA IL1a = 0,30 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA
IL1a = 0,30 kA
N22
IL1a = 0,30 kA
IL1a = 0,00 kA
IL1a = 8,35 kA
N23
IL1a = 8,35 kA
IL1a = 0,00 kA
IL1a = 4,80 kA IL1a = 0,30 kA IL1a = 0,26 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA IL1a = 0,30 kA
N21
IL1a = 4,80 kA
SHC84 LO46 LO56 LO58 LO60 LO62 LO64 LO66 LO68 LO70 LO72 LO74 LO76 LO78 LO80 SHC87
IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA IL1a = 0,00 kA
Short circuit currents are calculated on the model of distribution network by using relevant
module of the SİNCAL ®
In order to calculate minimum and maximum short circuit currents of the system, different
operating scenarios given in the table below, have been taken into consideration:
Results of Short Circuits Calculations based on scenarios which given above are presented
in tabular form below:
Relay Protection Parameters and over are presented in tabular form below.
The selective time interval of consecutive protection relays has been taken as 200 msec in
this study.
Current and time settings for phase and earth failure protection has been determined with
considering
· The maximum short circuit durability of the distribution network equipments
· The minimum short circuit current which can be sensed by protection relay
· Current carrying capacities of power cables which are used in the distribution
network of the substation.
Due to lack of information, some protection parameters have been estimated according to
previously experiences.
01AHA02
600/5A 600/1A 1800/1A 1800/5A
01,2AH01,02
02AHA02
VME42 01AK07,17
33 kV 11,5 kV
7SR11
300/5A
300 A, 30 sec
21 Ω
SIEMENS
IC LMV MS
THE REPUBLIC OF IRAQ
TOYOTA TSUSHO CO.
Planner Selim Çokuğraş
Date 01.04.2014 33/11,5 kV ENERGY DISTRIBUTION
Revision A / 01.10.2014 Relay Settings
(4) G77550-C0xxx-L900-A 2
300 A, 30 sec
21 Ω
Relay Configuration
SIEMENS
IC LMV MS
THE REPUBLIC OF IRAQ
TOYOTA TSUSHO CO.
Planner Selim Çokuğraş
Date 01.04.2014 33/11,5 kV ENERGY DISTRIBUTION
Revision A / 01.10.2014 Relay Settings
(4) G77550-C0xxx-L900-A 3
300 A
21 Ω
SIEMENS
IC LMV MS
THE REPUBLIC OF IRAQ
TOYOTA TSUSHO CO.
Planner Selim Çokuğraş
Date 01.04.2014 33/11,5 kV ENERGY DISTRIBUTION
Revision A / 01.10.2014 Relay Settings
(4) G77550-C0xxx-L900-A 4
01AK07
600/5A 600/1A 1800/1A 1800/5A
01,2AH01,02
01AK17
VME42 01AK07,17
33 kV 11,5 kV
7SR11
300 A
21
IC LMV MS
THE REPUBLIC OF IRAQ
TOYOTA TSUSHO CO.
Planner Selim Çoku ra
Date 01.04.2014 33/11,5 kV ENERGY DISTRIBUTION
Revision B / 19.02.2015 Relay Settings
(4) G77550-C0xxx-L900-B 6
PROTECTION PARAMETERS_V0 .xlsx
S.COKU RAS
7SJ62
INC .
1AK12
1800/5A
01AK11 01AK12
11,5 kV 11,5 kV
SIEMENS
IC LMV MS
THE REPUBLIC OF IRAQ
TOYOTA TSUSHO CO.
Planner Selim Çokuğraş
Date 01.04.2014 33/11,5 kV ENERGY DISTRIBUTION
Revision 0 Relay Settings
(4) G77550-C0xxx-L900 7
CAPACITOR OUTGOING
Protection Relay: 7SR2103-1AA87-0CA0
11,5/√3/0,11/√3 kV
7RW80 7SR21
INC .
01AK02
300/5A 3,6 MVA
1AKxx
11,5 kV
CAPACITOR OUTGOING
Protection Relay: 7RW8010-5EB90
11,5/√3/0,11/√3 kV
7RW80 7SR21
INC .
01AK02
300/5A 3,6 MVA
1AKxx
11,5 kV
01AK01
50/5A 7SR11
1AKxx
11,5 kV
01AK01
50/5A 7SR11
1AKxx 1000/5A
11,5 kV
Relay Configuration
Short circuit currents are calculated on the model of distribution network by using relevant
module of the SİNCAL ®
In order to calculate minimum and maximum short circuit currents of the system, different
operating scenarios given in the table below, have been taken into consideration:
Results of Short Circuits Calculations based on scenarios which given above are presented
in tabular form below:
In order to test the response of protection relays in case of electrical failures, electrical
faults has been simulated at various locations of the distribution network by the protection
simulation function of SINCAL® which are specified and described by the following table.
In this study,
· Maximum failure currents have been considered as 3 phase sc at the beginning of
the cable in case of feeding from grid.
· Minimum failure currents have been considered as 2 phase sc at the end of cable in
case of feeding by from grid.
The meanings of symbols and their colors which are seen on the simulation diagrams are
described below:
Figure 1 Descriptions of symbols and their colors on the protection simulation diagram
Results of protection simulation study and related tripping diagrams are given below.
The protection simulation study proves, that the response of protection relays which
parameterized according to given values in chapter “relay protection parameter table” are
selective and correct.
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 4,58 kA
Not started 0,00 kA
None
0,00 s
1,15 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Pickup outside selective tripping time Not started Not started Pickup outside selective tripping time
Phase None None Phase
Ip 0,00 s 0,00 s I>
2,73 s 0,00 kA 0,00 kA 1,00 s
4,58 kA 4,58 kA
1AK07 1AK21
7SR22 7SR22
Not started Pickup outside selective tripping time
None Phase
0,00 s I>>
0,00 kA 0,80 s
13,14 kA
100A
SC3
0,23 s 1AK12
13.144,83 A 7SJ62_5
13.144,83 A Pickup outside selective tripping time
13.144,83 A Phase
I>
0,60 s
13,14 kA
LV_CB
3VF6
Not started
None
0,00 s
0,00 kA
100
10
0,1
0,01
1AK01 - Tripping Curve (Phase) 2AHA02/C - Tripping Curve (Phase) R1 - Tripping Curve (Phase)
1AK12 - Tripping Curve (Phase) 1AK21 - Tripping Curve (Phase)
Page 32/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 0,07 kA
Not started 0,00 kA
None
0,00 s
0,02 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Not started Not started Not started Not started
None None None None
0,00 s 0,00 s 0,00 s 0,00 s
0,07 kA 0,00 kA 0,00 kA 0,07 kA
1AK07 1AK21
7SR22 7SR22
Not started Pickup outside selective tripping time
None Ground
0,00 s I>>
0,00 kA 0,80 s
0,33 kA
100A
SC3
0,23 s 1AK12
336,00 A 7SJ62_5
0,00 A Pickup outside selective tripping time
0,00 A Ground
I>
0,60 s
0,33 kA
LV_CB
3VF6
Not started
None
0,00 s
0,00 kA
100
10
1AK01 - Tripping Curve (Ground) 1AK12 - Tripping Curve (Ground) 1AK21 - Tripping Curve (Ground)
Page 34/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 4,49 kA
Not started 0,00 kA
None
0,00 s
1,12 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Pickup outside selective tripping time Not started Not started Pickup outside selective tripping time
Phase None None Phase
Ip 0,00 s 0,00 s I>
2,79 s 0,00 kA 0,00 kA 1,00 s
4,49 kA 4,49 kA
1AK07 1AK21
7SR22 7SR22
Not started Pickup outside selective tripping time
None Phase
0,00 s I>>
0,00 kA 0,80 s
12,88 kA
1AK12
7SJ62_5
Pickup outside selective tripping time
Phase
I>
0,60 s
12,88 kA
LV_CB
3VF6 101A
Not started SC3
None 0,23 s
0,00 s 12.883,61 A
0,00 kA 12.883,61 A
12.883,61 A
100
10
0,1
0,01
1AK02 - Tripping Curve (Phase) 1AK12 - Tripping Curve (Phase) 1AK21 - Tripping Curve (Phase)
2AHA02/C - Tripping Curve (Phase) R1 - Tripping Curve (Phase)
Page 36/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 2,24 kA
Not started 0,00 kA
None
0,00 s
0,56 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Pickup outside selective tripping time Not started Not started Pickup outside selective tripping time
Phase None None Phase
Ip 0,00 s 0,00 s I>
2,79 s 0,00 kA 0,00 kA 1,00 s
2,24 kA 2,24 kA
1AK07 1AK21
7SR22 7SR22
Not started Pickup outside selective tripping time
None Phase
0,00 s I>>
0,00 kA 0,80 s
0,00 kA
1AK12
7SJ62_5
Pickup outside selective tripping time
Phase
I>
0,60 s
0,00 kA
LV_CB
3VF6 101A
Not started SC3
None 0,23 s
0,00 s 0,00 A
0,00 kA 11.157,54 A
11.157,54 A
100
10
0,1
0,01
1AK02 - Tripping Curve (Phase) 1AK12 - Tripping Curve (Phase) 1AK21 - Tripping Curve (Phase)
2AHA02/C - Tripping Curve (Phase) R1 - Tripping Curve (Phase)
Page 38/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 0,07 kA
Not started 0,00 kA
None
0,00 s
0,02 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Not started Not started Not started Not started
None None None None
0,00 s 0,00 s 0,00 s 0,00 s
0,07 kA 0,00 kA 0,00 kA 0,07 kA
1AK07 1AK21
7SR22 7SR22
Not started Pickup outside selective tripping time
None Ground
0,00 s I>>
0,00 kA 0,80 s
0,33 kA
1AK12
7SJ62_5
Pickup outside selective tripping time
Ground
I>
0,60 s
0,33 kA
LV_CB
3VF6 101A
Not started SC3
None 0,23 s
0,00 s 335,69 A
0,00 kA 0,00 A
0,00 A
100
10
1AK02 - Tripping Curve (Ground) 1AK12 - Tripping Curve (Ground) 1AK21 - Tripping Curve (Ground)
Page 40/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 4,73 kA
Not started 0,00 kA
None
0,00 s
1,18 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Pickup outside selective tripping time Not started Not started Pickup outside selective tripping time
Phase None None Phase
Ip 0,00 s 0,00 s I>
2,63 s 0,00 kA 0,00 kA 1,00 s
4,73 kA 4,73 kA
1AK07 1AK21
7SR22 7SR22
Not started Pickup outside selective tripping time
None Phase
0,00 s I>>
0,00 kA 0,80 s
13,59 kA
1AK12
7SJ62_5
Pickup outside selective tripping time
A102 Phase
SC3 I>
0,39 s 0,60 s
13.585,08 A 13,59 kA
13.585,08 A
13.585,08 A
LV_CB
3VF6
Not started
None
0,00 s
0,00 kA
100
10
0,1
0,01
1AK03 - Tripping Curve (Phase) 1AK12 - Tripping Curve (Phase) 1AK21 - Tripping Curve (Phase)
2AHA02/C - Tripping Curve (Phase) R1 - Tripping Curve (Phase)
Page 42/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 0,44 kA
Not started 0,00 kA
None
0,00 s
0,11 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Pickup outside selective tripping time Not started Not started Pickup outside selective tripping time
Phase None None Phase
Ip 0,00 s 0,00 s Ip
47,91 s 0,00 kA 0,00 kA 39,92 s
0,44 kA 0,44 kA
1AK07 1AK21
7SR22 7SR22
Not started Pickup outside selective tripping time
None Phase
0,00 s Ip
0,00 kA 42,10 s
0,00 kA
1AK12
7SJ62_5
Pickup outside selective tripping time
Phase
I>
0,60 s
0,00 kA
LV_CB
3VF6 102B
Not started SC3
None 0,43 s
0,00 s 0,00 A
0,00 kA 2.206,42 A
2.206,42 A
100
10
0,1
0,01
1AK03 - Tripping Curve (Phase) 1AK12 - Tripping Curve (Phase) 2AHA02/C - Tripping Curve (Phase)
1AK21 - Tripping Curve (Phase) R1 - Tripping Curve (Phase)
Page 44/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 0,06 kA
Not started 0,00 kA
None
0,00 s
0,01 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Not started Not started Not started Not started
None None None None
0,00 s 0,00 s 0,00 s 0,00 s
0,06 kA 0,00 kA 0,00 kA 0,06 kA
1AK07 1AK21
7SR22 7SR22
Not started Pickup outside selective tripping time
None Ground
0,00 s I>>
0,00 kA 0,80 s
0,29 kA
1AK12
7SJ62_5
Pickup outside selective tripping time
Ground
I>
0,60 s
0,29 kA
LV_CB
3VF6 102B
Not started SC3
None 0,43 s
0,00 s 292,30 A
0,00 kA 0,00 A
0,00 A
100
10
1AK03 - Tripping Curve (Ground) 1AK12 - Tripping Curve (Ground) 1AK21 - Tripping Curve (Ground)
Page 46/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
1AH02/DIFF 7UT6_1
7UT6_1 Not started
Not started None
E04 None 0,00 s
7SJ62_5 0,00 s 22,12 kA
Not started 0,00 kA
None
0,00 s
5,53 kA R1 R2 1AHA02/C 2AHA02/C
7SJ62_5 7SJ62_5 7SR22 7SR22
Pickup outside selective tripping time Not started Not started Tripping
Phase None None Phase
I> 0,00 s 0,00 s 103A I>>
0,60 s 0,00 kA 0,00 kA SC3 0,40 s
22,12 kA 0,43 s 22,12 kA
22.121,51 A
22.121,51 A
22.121,51 A
1AK07 1AK21
7SR22 7SR22
Not started Not started
None None
0,00 s 0,00 s
0,00 kA 0,00 kA
1AK12
7SJ62_5
Not started
None
0,00 s
0,00 kA
LV_CB
3VF6
Not started
None
0,00 s
0,00 kA
100
10
0,1
0,01
Page 48/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
7UT6_1
Not started
None
E04 0,00 s
7SJ62_5 1,22 kA
Not started
None
0,00 s
0,20 kA R1 2AHA02/C
7SJ62_5 7SR22
Pickup outside selective tripping time Tripping
Ground Ground
I> 103A I>
0,80 s SC3 0,40 s
1,22 kA 0,43 s 1,22 kA
1.223,77 A
0,00 A
0,00 A
1AK21
7SR22
Not started
None
0,00 s
0,00 kA
1AK12
7SJ62_5
Not started
None
0,00 s
0,00 kA
LV_CB
3VF6
Not started
None
0,00 s
0,00 kA
100
10
Page 50/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
7UT6_1
Not started
None
E04 0,00 s
7SJ62_5 4,74 kA
Not started
None
0,00 s
1,18 kA R1 2AHA02/C
7SJ62_5 7SR22
Pickup outside selective tripping time Pickup outside selective tripping time
Phase Phase
Ip I>
2,63 s 1,00 s
4,74 kA 4,74 kA
1AK21
7SR22
Pickup outside selective tripping time
103C Phase
SC3 I>>
0,63 s 0,80 s
13.589,97 A 13,59 kA
13.589,97 A
13.589,97 A
1AK12
7SJ62_5
Tripping
Phase
I>
0,60 s
13,59 kA
LV_CB
3VF6
Not started
None
0,00 s
0,00 kA
100
10
0,1
0,01
1AK12 - Tripping Curve (Phase) 1AK21 - Tripping Curve (Phase) 2AHA02/C - Tripping Curve (Phase)
R1 - Tripping Curve (Phase)
Page 52/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
7UT6_1
Not started
None
E04 0,00 s
7SJ62_5 2,37 kA
Not started
None
0,00 s
0,59 kA R1 2AHA02/C
7SJ62_5 7SR22
Pickup outside selective tripping time Pickup outside selective tripping time
Phase Phase
Ip I>
2,63 s 1,00 s
2,37 kA 2,37 kA
1AK21
7SR22
Pickup outside selective tripping time
103C Phase
SC3 I>>
0,63 s 0,80 s
0,00 A 0,00 kA
11.769,26 A
11.769,26 A
1AK12
7SJ62_5
Tripping
Phase
I>
0,60 s
0,00 kA
LV_CB
3VF6
Not started
None
0,00 s
0,00 kA
100
10
0,1
0,01
1AK12 - Tripping Curve (Phase) 1AK21 - Tripping Curve (Phase) 2AHA02/C - Tripping Curve (Phase)
R1 - Tripping Curve (Phase)
Page 54/56
Document No: L OT4- COM- E- 0 113- 0 3
SIEMENS THE REPUBLIC OF IRAQ 01.04.2014
2AH02/DIFF
7UT6_1
Not started
None
E04 0,00 s
7SJ62_5 0,07 kA
Not started
None
0,00 s
0,02 kA R1 2AHA02/C
7SJ62_5 7SR22
Not started Not started
None None
0,00 s 0,00 s
0,07 kA 0,07 kA
1AK21
7SR22
Pickup outside selective tripping time
103C Ground
SC3 I>>
0,63 s 0,80 s
336,40 A 0,33 kA
0,00 A
0,00 A
1AK12
7SJ62_5
Tripping
Ground
I>
0,60 s
0,33 kA
LV_CB
3VF6
Not started
None
0,00 s
0,00 kA
100
10
Page 56/56