Report Jsa
Report Jsa
Report Jsa
DEPARTMENT OF ARCHITECTURE,
COURSE INFORMATION Code: ARK 536 Course: Industrial Training Level: Bachelor of Science in Architecture Credit Unit: 3 Semester: 06 / 07 Course Status: Non-Core
COURSE OBJECTIVE At the end of training students would be able to: have the basic understanding on the operation of a private Architects office. acquire some experience in architectural office environment. apply knowledge and theory into practice. instill positive working culture which includes work ethics and attitude. gain the experience working on site.
COURSE DESCRIPTION Students are required to work in a selected architectural firms to gain the knowledge and experience from the practice for duration of about 3 months. The students will be exposed to the following scope of task: Office organizational set-up and management The actual process of designing. Working on site- site visit. Working with Autocad and 3D software. Attend meeting which also involve other consultants in the building construction. A Log Book and a Practical Experience Report are required to be submitted at the end of the Practical Training period.
ARK 536: INDUSTRIAL TRAINING REPORT SYLLABUS CONTENT During the Training Period, the students are expected to be exposed in the following scope of work: The organization and management of the firm including staffing and administration. The actual working process including the process of designing, preparation of drawings until the submission of the drawings. Working on sites which include site visits with supervisors. TEACHING METHOD Gain the experience through working in the office environment.
DEPARTMENT OF ARCHITECTURE,
INDUSTRIAL TRAINING LOG BOOK PART A: TRAINEE PROFILE Name: Nur Izzati Bt Sebri Matrix No: 2008215874 Course Programme: AP213- Bachelor of Science in Architecture Training Period: 1st June 2011- 26th August 2011 Supervisors Name: Ar. Juliah Bt Sabri Coordinators Name: En. Amran B Abd Rahim
THE LOG BOOK The purpose of the logbook is to enable the candidates to present his or her practical training experience in a sequential order. The logbook will also assist the lecturer to determine whether the practical experience is adequate and provide an easy reference to any aspect of the training undergone. The logbook should be a compilation of diary sheets, time sheets and log sheets. The sheets must be completed every week and log sheets every month. All entries should be clear and concise and the supervisor/ architect must sign the sheets. The logbook must be submitted to the Institution on completion of the approved practical training.
DEPARTMENT OF ARCHITECTURE,
PART B: THE ARCHITECTURAL FIRMS PROFILE Architectural Firm: Juliah Sabri Architects Sdn. Bhd. Firms Address: 321, 1st Floor Lorong 12, Jalan Satok, 93400 Kuching, Sarawak. Type of Firm: Partnership Contacts No.: 082-247906/ 422314 Fax No.: 082-424314 Employers Name: Ar. Juliah Bt Sabri Partners Name: Ar. Chan Jian Hong, Ar. Kevin Wong No. of Workers: 10- 15 workers
Signature of Supervising Architect / Designer: ______________________________________ Name in Block Letters: Date: 24th August 2011 STUDENTS CERTIFICATION I hereby certify that to the best of my knowledge, the information supplied in the following pages is true and correct. Signature of Student: ________________________________________ Name of Student: NUR IZZATI BT SEBRI Date: 24th August 2011
DEPARTMENT OF ARCHITECTURE,
PART C: DAILY ATTENDANCE DATE WEEK 1 01/06/2011 02/06/2011 03/06/2011 04/06/2011 05/06/2011 WEEK 2 06/06/2011 07/06/2011 08/06/2011 09/06/2011 10/06/2011 11/06/2011 12/06/2011 WEEK 3 13/06/2011 14/06/2011 15/06/2011 16/06/2011 17/06/2011 18/06/2011 19/06/2011 WEEK 4 20/06/2011 21/06/2011 22/06/2011 23/06/2011 24/06/2011 25/06/2011 26/06/2011 WEEK 5 27/06/2011 28/06/2011 29/06/2011 30/06/2011 01/07/2011 02/07/2011 03/07/2011 WEEK 6 04/07/2011 05/07/2011 06/07/2011 DAY Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday NOTES Gawai Dayak Holiday Gawai Dayak Holiday Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend
ARK 536: INDUSTRIAL TRAINING REPORT 07/07/2011 08/07/2011 09/07/2011 10/07/2011 WEEK 7 11/07/2011 12/07/2011 13/07/2011 14/07/2011 15/07/2011 16/07/2011 17/07/2011 WEEK 8 18/07/2011 19/07/2011 20/07/2011 21/07/2011 22/07/2011 23/07/2011 24/07/2011 WEEK 9 25/07/2011 26/07/2011 27/07/2011 28/07/2011 29/07/2011 30/07/2011 31/07/2011 WEEK 10 01/08/2011 02/08/2011 03/08/2011 04/08/2011 05/08/2011 06/08/2011 07/08/2011 WEEK 11 08/08/2011 09/08/2011 10/08/2011 11/08/2011 12/08/2011 13/08/2011 14/08/2011 WEEK 12 15/08/2011 16/08/2011 17/08/2011 18/08/2011 Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Attend Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend Attend Attend Weekend Weekend Attend Attend Attend Attend
ARK 536: INDUSTRIAL TRAINING REPORT 19/08/2011 20/08/2011 21/08/2011 WEEK 13 22/08/2011 23/08/2011 24/08/2011 25/08/2011 26/08/2011 Students Name: Nur Izzati Bt Sebri Students Signature: Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday Attend Weekend Weekend Attend Attend Attend Attend Attend Supervisor/ Architect: Ar. Juliah Bt Sabri Supervisor/ Architects Signature:
_____________________________________
DEPARTMENT OF ARCHITECTURE,
Employers Name: Ar. Juliah Bt Sabri Firms Address: 321, 1st Floor Lorong 12, Jalan Satok, 93400 Kuching, Sarawak.
PART D: DAILY REPORTS DATE DAY PROJECT REF. A PROJECT TITLE AND WORKDONE DURATION (HOUR) 2
Cadangan AVTC & Subdivision pada Lot 115, blok 216, Kuching North Land District di stapok, Jln Batu Kawa, untuk pembangunan perumahan, surau dan kemudahan masyarakat. Title block photoshop
Monday Tuesday
B B
08/08/2011
Wednesday
Juliah House Room Renovation Sketches Sketch up Juliah House Room Renovation Sketches Sketch up Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Renovation Smart Reader Kindergarden, Jalan Muhibbah, Kuching. Site visit: Measuring Stairs Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Plan Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad
6 8
09/06/2011
Thursday
10/06/2011
Friday
WEEK 3 13/06/2011 Monday C Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad 8
14/06/2011
Tuesday
15/06/2011 Wednesday C
Accompanying Architect to the Saland and Survey Office and District Officer office Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Folding Drawings for Klinik Kesihatan Bintulu. Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad
2 6
F 16/06/2011 Thursday C
2 8
17/06/2011
Friday
WEEK 4 20/06/2011 Monday G Proposed Surau Gersik, Kuching, Sarawak. Accompanying Architect to the Site Meeting and Site Visit Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad 2
21/06/2011
Tuesday
ARK 536: INDUSTRIAL TRAINING REPORT H Proposed Renovation To Ground Floor of Lot 122,123,124,section 51,KTLD, Jln Song Thain Cheok, Kuching Colouring drawing Proposed Renovation To Ground Floor of Lot 122,123,124,section 51,KTLD, Jln Song Thain Cheok, Kuching Colouring drawing Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad 2
22/06/2011 Wednesday H
23/06/2011
Thursday
24/06/2011
Friday
WEEK 5 27/06/2011 Monday D Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad 8
28/06/2011
Tuesday
29/06/2011 Wednesday D
30/06/2011
Thursday
01/07/2011
Friday
ARK 536: INDUSTRIAL TRAINING REPORT WEEK 6 04/07/2011 Monday D Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Juliah House Room Renovation Autocad Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Masjid Baru Kpg. Sri Arjuna, Batu 11, Jln Puncak Borneo, Kuching. Site Meeting Binding drawing WEEK 7 11/07/2011 8
05/07/2011
Tuesday
B 06/07/2011 Wednesday D
3 8
07/07/2011
Thursday
08/07/2011
Friday
Monday
Proposed Tadika Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad Proposed Dewan Kompleks Darul Iman Kpg Sri Arjuna Jln Puncak Borneo, Kuching Autocad
12/07/2011
Tuesday
13/07/2011 Wednesday C
14/07/2011
Thursday
15/07/2011
Friday
ARK 536: INDUSTRIAL TRAINING REPORT WEEK 8 18/07/2011 19/07/2011 Monday Tuesday J J Proposed Colour Scheme for Juliah House Adobe Photoshop Proposed Colour Scheme for Juliah House Adobe Photoshop Proposed Colour Scheme for Juliah House Adobe Photoshop Proposed Double-Storey Terrace House Design Plan Proposed Double-Storey Terrace House Design Plan 6 8 8 8 8
Monday Tuesday
K K
Proposed Double-Storey Terrace House Autocad Plan Proposed Double-Storey Terrace House Autocad Plan Proposed Double-Storey Terrace House Autocad Plan KPM Proposed School Project for SK Pantu Sri Aman, Sarawak Site Inspection Proposed Double-Storey Terrace House Autocad Elevation
8 8 8 8 8
Monday Tuesday
K K
Proposed Double-Storey Terrace House Autocad Elevation Proposed Double-Storey Terrace House Autocad Elevation Proposed Double-Storey Terrace House Sketch Up 3D Proposed Double-Storey Terrace House Sketch Up 3D Proposed Double-Storey Terrace House Sketch Up 3D
8 8 8 8 8
ARK 536: INDUSTRIAL TRAINING REPORT WEEK 11 08/08/2011 09/08/2011 Monday Tuesday K K Proposed Double-Storey Terrace House Autocad Roof Proposed Double-Storey Terrace House Autocad Plan Proposed Double-Storey Terrace House Sketch Up 3D Proposed Double-Storey Terrace House Sketch Up 3D Proposed Double-Storey Terrace House Sketch Up 3D 8 8 8 8 8
Monday Tuesday
K K
Proposed Double-Storey Terrace House Sketch Up 3D Proposed Double-Storey Terrace House Sketch Up 3D Proposed Double-Storey Terrace House Sketch Up 3D Proposed Double-Storey Terrace House Sketch Up 3D Proposed Colour Scheme for Juliah House Adobe Photoshop
8 8 8 8 3
WEEK 13 22/08/2011
Monday
J K
Proposed Colour Scheme for Juliah House Adobe Photoshop Proposed Double-Storey Terrace House Sketch Up 3D Proposed Double-Storey Terrace House Sketch Up 3D
2 6 8
23/08/2011
Tuesday
ARK 536: INDUSTRIAL TRAINING REPORT Signature of Supervising Architect/ Designer Signature of School Adviser Date: Date: