Ups Status at Pec
Ups Status at Pec
1 Adobe Lab
2 IBM Lab
3 Oracle Lab
Ground
Floor
4 Microsoft Lab
Second
8 Library Reading Section
Floor
Third
9 Digital Library
Floor
Third
10 AV Hall
Floor
Third
11 Software Engg Lab
Floor New 30nos of
Numeric 30nos & 12V batteries
IT Dept 1
Third 40KVA 100Ah-Quanta replaced on
12 Cloud Computing Lab 18-06-2015
Floor
No.of UPS
S.No Name of the Lab Block Name Location Battery Service Status
Equipment Configuration
Ground
16 Networks Lab
Floor
New 30nos of
Sir.C.V.Raman 30nos & 12V batteries
17 AI&DS Lab 1 Consul 20KVA
(AI&DS Dept) 42Ah-Quanta replaced on
23-09-2022
18 Big Data Analytics Lab First Floor
Second
26 PG Lab
Floor
No.of UPS
S.No Name of the Lab Block Location Battery Service Status
Equipment Configuration
New 1no of
Second 20nos & 12V battery replaced
27 Bio Informatics Lab Main Block 1 Consul 10KVA
Floor 42Ah-Quanta on
09-02-2024
UPS
Second Remodification
28 Bio R&D Lab Main Block 1 Numeric 5KVA Nil
Floor without battery
on 23-09-2022
Other Dept
New 30nos of
(Accounts,Office,Principal,Di
30nos & 12V batteries
29 rector,PD,S&H, Main Block First Floor 1 Nutech 15KVA
42Ah-Quanta replaced on
Reception,Admission,IQAC,
23-09-2022
VC,Chariman)
New batteries
Digital Power 10nos & 12V
30 Exam Cell Main Block First Floor 1 replaced on
5KVA 42Ah-Quanta
11-09-2023
UPS
Remodification
Ground 30nos & 12V and New 30nos
34 Robotics & Automation Collaboration 1 Nutech 15KVA
Floor 42Ah-Quanta of batteries
replaced on
25-05-2023
New batteries
30nos & 12V
35 AIML MoU Block First Floor 1 Marsun 15KVA installed on
42Ah-Quanta
07-10-2023
Total 13