About the authors
David Hillyard
David is a postgraduate-qualified teacher with a Bachelor of Science (Honours) in Computing with
Business Information Technology. David has over twenty years’ teaching experience in ICT and
computing in four comprehensive schools and one grammar school in Cheltenham, Gloucestershire.
He has been an assistant headteacher, head of department, chair of governors and founding member
of a multi-academy trust of primary schools.
Formerly subject leader for the Gloucestershire Initial Teacher Education Partnership (GITEP) at the
University of Gloucestershire, David has successfully led a team of PGCE/GTP mentors across the
county. His industry experience includes programming for the Ministry of Defence. A self-taught
programmer, he wrote his first computer program at ten years old.
Craig Sargent
Craig is a postgraduate-qualified teacher with a Bachelor of Science (Honours) in Computer Science
with Geography. Craig has over fourteen years’ teaching experience in ICT and computing in a large
comprehensive school in Stroud, Gloucestershire, at a grammar school and as a private tutor. A head
of department, examiner and moderator for awarding bodies in England, Craig has authored many
teaching resources for major publishers.
He also previously held roles as a Computing at School (CAS) Master Teacher and regional coordinator
for the Computing Network of Excellence. His industry experience includes freelance contracting for a
large high street bank and programming for the Ministry of Defence. He also wrote his first computer
program in primary school.
iii
Foreword
We have compiled all the latest advice, tips and guidance documents from OCR, cross-referenced the
clarification documents including moderator suggestions, examiner reports from past series and
distilled all this information into one comprehensive guide for documenting your unit 3 programming
project.
We also bring our many years of personal experience from our own classrooms to this document, we
know what makes a successful project, we recognise the pitfalls and mistakes students make and as a
result we know what advice to give our own students to make sure they are equipped to get the top
marks.
Every year the projects we submit receive high praise from moderators. Consistently since the
introduction of the 2015 specification, none of our marking has been adjusted and we have been
commended for the approach our students have taken by using this guide.
In addition, make sure to watch our playlist titled, “A level: OCR Unit 3 Project Advice” on our
CraignDave YouTube channel that contains a series of videos providing additional advice and
guidance.
This document has been written specifically for those students who are producing programming
projects that are not video games. If you are producing a computer game, please use our
“Documenting Defold programming projects OCR H446” book instead. Examples in that book are
based on Defold, but the guide is suitable for any language you might use.
iv
Contents
INITIAL IDEAS 6
Choosing a project 7
Programming paradigms 10
Working on your project 10
ANALYSIS 12
What to include 13
Project definition 13
Identifying suitable stakeholders 15
Researching the problem in-depth 16
Identifying essential features of the proposed solution 18
Identifying and explaining any limitations 19
Computational methods 20
Specifying hardware and software requirements 21
Identifying and justifying measurable success criteria 22
DESIGN 26
What to include 27
Breaking the problem down systematically 27
Defining the structure of the solution to be developed 29
Algorithms 32
Identifying the data structures and validation 37
Identifying test data to be used during iterative development 40
Identifying further data to be used post-development 42
What to include 45
An agile approach to development 45
EVALUATION 51
What to include 52
Testing to inform the evaluation 52
Evaluating your program 56
v
INITIAL IDEAS
There are specific examination board requirements you should be aware of before you start your
project. It is also important to scope your project to ensure it is manageable in the time you have
available.
Choosing a project
One of the considerations when embarking on a programming project is ensuring you choose a
project with sufficient scope to be of A Level standard; this is not easy to define, but it must be more
advanced than typical GCSE work. As a minimum, it must include:
Trivial problems, regardless of how well you solve them and write them up will not be able to provide
you with the right evidence to meet the criteria in the top mark band across the whole project.
Consider the complexity of the algorithms you study on the A Level Computer Science course as a
benchmark. These include linear search, binary search, hashing functions, bubble sort, insertion sort,
merge sort, quick sort, PageRank, Dijkstra and A* algorithm. SQL as a data definition and manipulation
language can also provide a good coded element. Also consider the data structures, arrays, lists,
graphs, has tables and trees. A project that does not make use of at least one of these is unlikely to
attract higher marks.
Small applications, teaching tools, simulations, a back-end database with a front-end website
interfaced with a high-level language are good ideas for a project. You should avoid simple multiple-
INITIAL IDEAS
choice quizzes, simple data retrieval systems and projects written in Microsoft Access or Excel with
VBA.
Remember you will only have a limited amount of time and therefore it is inadvisable to attempt to
learn a new language while completing the project. It is better to use one you have learned or been
taught prior to undertaking the work.
7
Getting the scope right
Students must choose their own project individually. You cannot ask your teacher for ideas (although
they can help you select from a list you have made) and although theoretically it could be a large group
project with each student contributing a significant part, this is unlikely to be successful and is not
recommended.
Your choice of program for your project is one of the most important choices you will have to make.
The size of the problem you undertake is known as its ‘scope’. Some features will fall within the scope
and others outside. Essentially you can solve almost any problem you wish; however, it is important
that you get the scope right. Too little scope and the project becomes easy and trivial. Too much scope
and it becomes unmanageable and unachievable. Your teacher can help you scope the project once
you present them with an idea. It is usually possible to take simple ideas and expand them through a
series of iterations to arrive at an appropriate scope.
Many of the best projects manipulate data. Stock control systems, booking systems, expert systems,
revision tools and simulations all make use of data sets. Programs that create, read, edit, write, and
delete data, especially from files usually have a good scope.
Robotics projects and programs that interface with hardware such as sensors are likely to require the
use of APIs or hardware-specific functions and can make excellent Computer Science projects. Using
INITIAL IDEAS
Raspberry Pi or Arduino computers can provide for interesting projects providing you can write plenty
of original code and not use drag and drop script builders. Raspberry Pi uses Python (that’s what the
Pi means) and Arduino uses C, so both are approved.
Networking projects can also be extremely fun, making use of interaction across a network.
Examiner’s advice
“The best projects tend to be more ambitious. A project that a candidate can complete
without encountering any challenges will give them little to write about. Conversely, a
candidate can still receive high marks for an ambitious project that does not achieve all its
aims.
8
Questions to think about
• Is it easy for me to research the problem?
• Will my project require me to use arrays, lists or other data structures beyond variables?
• Does my project use external data sets that must be researched or stored in either a database
management system (DBMS), serial, CSV, XML, JSON files?
• Will I be able to complete the work independently without asking for help?
Before you embark on your project it is important that you have had plenty of practice solving problems
and writing algorithms. Although the coursework is only worth 20% of your final grade it is a significant
undertaking that will require a lot of your time.
INITIAL IDEAS
guarantee success. A good write-up does!
Stakeholders
In the past it was a requirement that Computer Science projects had a real user with a real-world
problem that you were attempting to solve. Those were the days when there were few off-the-shelf and
online apps, so bespoke solutions were the norm. Today, A level projects do not require you to have
a single, identified user who has a need for your program. Instead, you will need to identify
stakeholders. This is a target audience or target market. A group of people who would have an interest
in using your product.
That said, it is extremely useful to have at least one person who can represent the stakeholders with
whom you can have regular contact. For example, if you were writing a Chemistry revision program for
15-year olds then it would be useful to talk to both a Chemistry teacher and a student 15 years of age.
Your stakeholders will be able to provide you with additional success criteria at the analysis stage,
insights at the design stage, provide feedback during the software development and an evaluation at
the end. Not having suitable stakeholders will severely limit your discussion resulting in a weak project.
9
Programming paradigms
You may choose any programming paradigm including procedural, object-oriented, or functional that
your chosen language supports. There is no requirement to use object-oriented techniques. It is a
misconception that OOP provides substantial algorithms, it often makes coding simpler! However, it
does usually indicate that a project has sufficient scope.
There may be language specific techniques you can make use of including external libraries to increase
functionality. For example, the program must have a graphical user interface so if you are planning to
use Python you may want to use Tkinter to provide this functionality.
There is no need to reinvent the wheel unnecessarily. If the language supports built in algorithms and
data structures you should make use of them. Why write a sorting algorithm in Java when it already
provides a Tim sort which is extremely efficient? You gain credit for using appropriate features.
It is sensible to structure your work into the four sections that match the mark scheme outlined in this
guide, although evidence to support assessment can be found anywhere within your submission. For
INITIAL IDEAS
example, if you include something in the design that should really be included in the analysis you will
not be penalised. The sub-sections in this guide provide you with a handy explanation of how marks
are awarded but you should use your own sub-headings.
You are permitted to work on your project outside of lesson time, including for homework but your
teacher will need to authenticate your work as your own and therefore will want to see a significant
proportion being completed in class too.
Your project report should be a word-processed document with a suitable cover page including your
name, candidate number, centre name, and centre number. Ensure each page is numbered so that
your teacher can use this for cross-referencing when marking. You must also include a bibliography or
page of references. There is no requirement to adhere to a specific referencing standard.
10
An initial proposal
Before embarking on your project, it is a good idea to submit an initial proposal to your teacher; this
will enable them to assess the scope and complexity of your project before you do too much work.
It is important to choose a project you will be interested in developing; this is a substantial piece of
work – you need to enjoy it!
• A title.
You do not need to submit your proposal in your final project. However, your teacher may decide to
submit it to the examination board before you seek their guidance on scope, complexity, and viability.
INITIAL IDEAS
work and clear guidelines for the role of the teachers assisting you.
• Support you in choosing an appropriate project without giving you a specific idea. For example,
your teacher could advise and help you choose from a list of your own ideas.
• Review your work and provide oral and written feedback at a general level.
• Provide detailed, specific advice on how to improve drafts to meet the assessment criteria.*
• Provisionally mark your work and then allow you to revise it.
11
ANALYSIS
Outlining the genre of your project, identifying the player needs and exploring ideas to scope
the success criteria.
In this section, you are discussing what problem you are solving.
10 marks
What to include
Project definition
You should start your project by providing a brief introduction to it. Set the scene so the examiner
knows what your project is about. This is not detailed research but simply a brief overview limited to a
few short paragraphs. It is not an essential section, but it will help give you the impetus to write more
detailed research later. Getting started with the report is often the hardest part. Once you get going,
ANALYSIS
it seems less daunting. It is important you do not use a template or simply copy the headings from
another student. How you structure your writing is completely up to you. However, you should use a
logical structure to make it easy for your teacher to mark and an examiner to moderate.
Things to consider:
• Your next steps, outlining how you will conduct further research.
13
An example of a project definition
In a multitasking operating system, processes that are ready for execution are held
Background
in a ready queue awaiting availability of the central processing unit. When the CPU
becomes available a process from the ready queue is executed. A number of
factors determine which process is chosen, how much processing time it is given
and what happens to it when it requires data in order to continue or an interrupt
occurs.
It is much easier for teachers to explain and for students to understand if they can
Why the
see a pictorial abstraction of process scheduling and what is happening at each solution is
stage. needed
My program will enable the user to create new processes to see their impact on
ANALYSIS
the simulation and it will generate data that can be used to plot the efficiency of
the algorithm and allow comparisons to be made.
The next step is to research the five algorithms in depth to fully understand how
Next steps
they work and discuss with a teacher of Computer Science what is important for
the simulation to achieve and what the scope of the development will be.
Examiner’s advice
“Well structured projects in a single document, with contents pages, page numbering and
subheadings are much easier to navigate and are particularly helpful in ensuring nothing
gets overlooked.”
14
Identifying suitable stakeholders
Make sure you clearly identify all the stakeholders or users for your system. Each different stakeholder
is likely to have a different set of needs. In the previous example we identified two broad stakeholders,
the teacher, and the students.
While it is not necessary to name individual users, it will be important that you can have regular contact
with someone representing each group of stakeholders. It is therefore advisable that you do identify a
named individual who can work with you throughout the project.
The weakest projects are often those that do not engage sufficiently with a stakeholder. It is a mistake
to be both the developer and the end-user of your system. While it is possible, it is much harder in this
situation to look at the problem objectively and not to make assumptions when you conduct your
research. Being “inside the problem” is not a good idea but it can also be easily overcome. For
example, if you are the student who requires the solution, surely other members of your class do too
and therefore you can use another member of your class to represent the stakeholder?
Describing your stakeholders and some of their requirements is essential for all projects. To gain higher
marks you will need to explain how they will make use of your proposed solution. For the top marks
you also need to explain why it is appropriate to their needs. Much of this detail will need to come after
your research when you decide on the features of your proposed solution. It would be easy to forget
ANALYSIS
this if your stakeholder is not an integral part of each stage of your project.
15
Researching the problem in-depth
As the examiner reads your project it should become increasingly more detailed. In your introduction
you simply outlined the nature of your project and outlined the stakeholders. In this section you must
forensically analyse the problem to derive a set of proposals. It is likely that this section of your analysis
will be the most extensive. Many projects fail to achieve their potential because they lack detail in the
research.
Things to consider:
• Existing systems.
this in as much detail as you can. For example, in the example project definition we outlined that our
project would simulate the five scheduling algorithms. Therefore, in this section it would be essential
to explain what these five algorithms are and how they work in detail. Diagrams and illustrations should
be used to make this easier to explain. Remember that your teacher and examiner will not necessarily
have an underlying knowledge of the context of your project.
Another example may be a planetary orbit simulation project. In this example you would want to
explain the Newtonian physics and calculations that would be necessary to design your solution later.
Existing systems
If there are existing systems already available, it would be useful to examine in detail how these work.
What are the features, what are the issues? Why doesn’t this system provide a solution to your problem?
You may be able to think creatively about what constitutes an existing system. In our project example
there may be videos on YouTube that explain the concept of scheduling algorithms or exercises that
you completed in class that our solution aims to improve upon.
If there is documentation such as data sets, import files or hardcopy outputs you should collect these
and document or scan them into your work.
16
Stakeholder and user needs
Having a detailed discussion with a stakeholder to ascertain their needs is a very good idea. Think in
advance about the questions you will ask about all aspects of the system. There is no need to provide
transcripts of these meetings, just an outline of the discussion and its outcomes. The discussion should
focus on what the system needs to do rather than how it is going to do it. This is about gathering the
requirements, not about the algorithms.
• What data needs to be input into the system and how will this happen?
ANALYSIS
• What data needs to be output from the system and in what format?
This is not an exhaustive list; it provides you with a framework to structure your discussion. You may
also find that some of these questions are not appropriate to your project. What is important is that by
the end of your analysis you should have included sufficient detail so that if you were to get an
experienced programmer to read your work, there is nothing more they would need to ask before
designing the solution. This is incredibly hard to achieve and there is an expectation that this will not
be perfect. During the design and coding stages it is certain you will need to ask further questions as
things you did not initially consider come to light. The really fine details may not be entirely known and
will be picked up in the development process.
Examiner’s advice
“Interviews are not essential. Typing out interview transcripts is an unnecessary use of
candidates’ time. A summary of the interview’s key points is sufficient.”
17
Your ideas and approaches
You will also have several ideas about what you would like to achieve. Your stakeholders are unlikely
to think of everything and they may not know what is possible either. This is where you can bring your
creativity and knowledge of computer science to the process by making suggestions. As with all
aspects of the project, there is no set format your should be following in your report, providing you
meet the requirements of the mark scheme. Therefore you could include your ideas within a discussion
of existing systems or stakeholder needs.
Remember that as a developer you are making your solution for someone else. It is important that your
user needs are met as well as your own!
As you consider the ideas, to gain marks in the top mark band you will want to outline some suitable
approaches you could take to achieve the aims without providing too much of the design at this stage.
Having concluded your research there will be several features that you identified that must be
implemented to solve the problem. There will also be some ideas that could be implemented, but
perhaps these are unnecessary, too time consuming or too complex and therefore fall outside of the
ANALYSIS
scope of the solution. There will also be ideas that need to be rejected for these reasons too.
Look back carefully through your research and provide a summary of each feature of your proposed
solution, explaining and justify your choice for including it in your project.
18
This diagram is a useful way to visualise what you are trying to achieve when identifying essential
features:
Analysis means breaking down
Your ideas
features
Decisions…
Synthesis means building up
Proposed
solution
ANALYSIS
Features rejected with justifications
Although the project should be a challenge and it is acceptable not to fully complete the work, it is
often better to have a smaller number of features implemented well than a large number unfinished.
This demonstrates you can scope a solution well. You should identify the limitations imposed on the
project with a justification for not including these features.
For example, you may also be limited by your hardware and available libraries. You may have to
simulate the input and output of your target device during development, especially if you are targeting
the tablet or mobile market. There may be limitations on the accuracy of your model due to the
complexity of the calculations. For example, in a planetary orbit simulation it would be more accurate
if the sun or a planet wobbled on its orbit due to the barycentre. However, this may be considered an
acceptable limitation because it has little bearing on the purpose of the simulator.
19
Computational methods
A problem is defined as being amenable to a computational approach if there are algorithms that can
solve it within a finite number of steps. Problems exist that can theoretically be solved in a finite number
of steps but would take far too long with today’s technology to solve, so they are also not considered
amenable to computation. Cracking 256-bit encryption is an example. It is possible but would take
over 3x1052 years! Given infinite computing power and infinite time you cannot detect all metamorphic
malware. The halting problem is a perfect illustration of a problem that is not amenable to a
computational approach. A computer can never know if it is stuck in an infinite loop.
In this section you must explain what the features of your problem are that make it suitable to be solved
by a computer rather than other methods.
• Abstraction allows the removal of unnecessary details to reduce the complexity of the problem.
• Concurrency allows more than one process to happen at the same time.
20
Specifying hardware and software requirements
You need to discuss the hardware and software requirements for both development and deployment.
• State what IDE and programming language you will be using and the key features that make it
suitable for your development. E.g. event driven, object-oriented, runs in a browser etc.
• State any additional libraries you intend to use and discuss why they are needed.
• State which operating system are you using – e.g., Windows, macOS or Linux.
• State the hardware required. This may simply be a keyboard, mouse, monitor and secondary
storage or for robotics projects may also include actuators and sensors.
Examiner’s advice
“It is recognised that some projects lend themselves more to discussion of hardware and
software requirements. As such, some candidates will have little to write on this aspect.”
ANALYSIS
Remember it is important to justify your
choices for top marks. Why is the language
suitable? Why do you need to include library
functions?
21
Identifying and justifying measurable success criteria
In the concluding section of the analysis, you are summarising what you intend to achieve. It is
important your criteria are specific, measurable, and numbered for easy identification.
1. An agreement about the scope of the solution – exactly what will be included in the program.
Statements such as “must be easy to use” are too subjective. For it to be a proper success criterion, you
need to detail how it would be achieved rather than writing broad statements.
Examiner’s advice
“Where candidates only have vague objectives like, “My interface must be attractive,” they
ANALYSIS
tend to not only drop marks in the analysis but also later in the project. Time spent on good-
quality, measurable objectives pays dividends further down the line, as they form the
backbone of strong testing and evaluation sections.”
Analysts consider volumetrics, which means “how many and how often.” Using numbers makes your
objectives specific and easily measurable. For example, the simulation will only include four process
states: ready, running, blocked and finished.
There is no need to state what you will not include in your program. You considered this in the
limitations section. The success criteria are a simplistic reference point for the rest of the project.
You should briefly justify each of your choices. You are not completely rewriting the features of the
proposed solution section but summarising the key reason for including the feature in the scope.
A good approach is to number each of your criteria so you can use the same number system later when
discussing them in the testing and evaluation section. Aim for between 12 and 30 criteria. Too few, and
you probably do not have sufficient scope and complexity for an A Level project. Too many, and you
risk giving yourself too much work to do in the time available.
The example below is presented in a table, simply to illustrate the numbering of the criteria and how
they can be justified more easily. There is no requirement for you to present your criteria in this way.
22
An example of success criteria for the scheduling simulator
1 Allow the user to select between five The data produced by the program should
scheduling algorithms: FCFS, SJF, RR, SRT & allow the fair comparison between the
MLFQ. algorithms using the same simulation. These
are the algorithms studied on the course.
2 Show the user a visual representation of four Understanding how the algorithms work
process states: ready, running, blocked and requires the user to see how a process is
finished. managed by the operating system.
3 Allow the user to manually enter processes into This allows the simulation to be set up in a
the ready queue including their time to execute particular way by the teacher to simulate certain
between 1 and 100 cycles. scenarios.
ANALYSIS
4 The user can choose an automatic simulation This will provide larger, more interesting data
where processes are added to the ready queue sets for comparisons to be made that would be
randomly with a random time to execute too time consuming for the user to generate
between 1 and 20 cycles. manually.
5 For automatic simulations, a seed can be saved This allows the same random sequence to be
by the user. used again in the future.
6 The number CPU cycles required for the This allows the student to more easily see what
currently executing process is updated during happens with time-slicing.
execution and displayed.
7 The simulation can be stopped at any time. This allows the user to restart the simulation
very easily which is useful if the simulation is
continuing for too long.
8 Processes move from the ready to the running This allows the simulation to accurately
state according to the rules of each scheduling illustrate the algorithm.
algorithm.
23
9 Processes move from the running to the This allows the simulation to accurately
blocked state randomly, but in a illustrate the algorithm.
predetermined way using the seed.
10 Processes move from the blocked state to the This allows the simulation to accurately
ready state after between 2 and 5 cycles, but in illustrate the algorithm.
a predetermined way using the seed.
11 Processes move from the running state to the This allows the simulation to accurately
ready state if the time slice expires when illustrate the algorithm.
simulating the RR algorithm.
12 Processes move from the running state to the This allows the simulation to accurately
ready state if a new process requires fewer illustrate the algorithm.
cycles of execution than the running process
when simulating the SRT algorithm.
ANALYSIS
13 The user can set the time slice for processes This allows the user to see the effect of different
when the RR simulation is chosen. time slices on the throughput.
14 The user can speed up, slow down and pause This allows the teacher to explain what is
the simulation. happening more easily.
15 The simulation should output a CSV data set: This allows comparisons between the
algorithm, number of cycles, number of algorithms and different data sets to be made.
finished processes & average wait time.
Examiner’s advice
“The requirements and success criteria are part of the key to a good project. An ideal set of
requirements should be detailed enough to pass onto a third party to design the system.”
24
SECTION DO’s DON’Ts
Project definition 1 Set the scene for the examiner Assume the examiner will
understand your problem.
2 Outline why the program is needed
Identifying suitable 3 Identify the user groups or individuals why Be both the developer and user
stakeholders will use your program. of your product. Make sure you
have someone else representing
4 Involve a representative from your
the target market to give you
stakeholders throughout your project using a
objective feedback.
RAD approach to development.
Research 5 Provide detailed research into existing Rely on your own input only for
solutions to similar problems. the solution to your problem.
6 Include any related knowledge and Rely on an interview with and
calculations necessary to understand the end user for all your research
problem. into the problem.
7 Include a summary of the discussion with a Write up interviews as a Q&A
stakeholder. session.
8 Include a references or bibliography at the Forget you need a bibliography.
end of your project report.
Features of the 9 Identify the features you are going to include Attempt to solve a problem that
proposed solution in your program. is too complex in the time
allowed.
10 Identify any limitations of your proposed
solution. Settle for a problem that is not
going to have some challenges
11 Be realistic about what can be achieved in
you can discuss later.
the time allowed.
Computational 12 Explain why the problem is suited to being Explain the theory of
methods solved by a computer. computational methods from
unit 2.
Hardware and 13 Specify the hardware requirements for your Forget there are requirements
software solution. for both development and
requirements deployment.
14 Specify the software requirements for your
solution including the operating system. Simply identify the
programming language you are
15 Identify any additional utilities or libraries
using without justification.
that will be required to implement your
solution.
Success criteria 16 Specify the measurable requirements of State vague subjective criteria
what your program must do. that are difficult to measure.
17 Justify why the requirement is necessary.
DESIGN
The plan for your development.
In this section, you are discussing how you are going to solve the problem.
15 marks.
What to include
This section of your report explains the structure of your intended solution. In the analysis section, you
explored ideas and described your intentions; this was about what you were going to do. In the design
section, you are writing about how you are going to realise these intentions.
DESIGN
Start with a structure diagram, which will illustrate the subroutines you intend to develop. Below is an
example of a structure diagram for the scheduling simulator.
Schedulng
simulator
Run
Title screen Settings Reports
Simulation
Change Finished
settings processes
Change
process state
27
Notice how the number of boxes underneath the ones above increase; this shows the problem being
broken down into increasingly smaller parts. There is no right answer to producing this diagram – it
depends on how you visualise the program you are going to make.
• The green boxes underneath the name of the program identify the key interface screens the
user will see.
• The blue boxes identify the main modules or components of the solution, each associated with
an interface.
• The orange boxes identify the processes and subroutines for a module. These are the routines
you are likely to need to pseudocode later in the design section.
DESIGN
The colours are not important. Choose your own style, providing it is easy to read. Using SmartArt
hierarchy objects in your word processing application is acceptable. Avoid using 3D shapes, as these
will be difficult to read.
Top down design diagrams, JSP diagrams and UML diagrams are all good examples of how you can
demonstrate problem decomposition. You do not need to adhere to a particular standard use the
diagram that best fits your type of project.
This diagram becomes a handy reference because the examiner should be able to follow each box to
later sections of your report – e.g., algorithms, coded solution and testing.
28
Defining the structure of the solution to be developed
Take each box from your structure diagram and explain what is happening at each stage.
Interfaces
You should draw a technical sketch of what your interfaces will look like. You can either hand draw this
with a pencil and ruler and scan or photograph it into your work, or use the shapes provided by your
word processing software. While it is possible to also create a non-working form design in your chosen
IDE and crop it into this section, care must be taken that this does not look like a screen shot from your
coded solution. The examiner must be in no doubt this is a design.
Providing annotations on your proposed interface designs will be useful to highlight key features and
you should discuss the usability features you have included explaining why they are necessary.
Algorithm
DESIGN
Ready Queue
Speed
5 3 6 2
Time Slice
Running Blocked
Add process 3 3
Randomise
Completed
Reports
D C B A
It is obvious that this is not a screen shot from the actual development, but a concept design. You can
see how a few additional annotations would be helpful to explain aspects of the interface, and usability
conventions such as the play, pause and stop buttons. This is unlikely to be the final design that is
implemented, and it is acceptable to change your mind later when coding the solution without
updating your design sketches.
29
Validation of inputs
If your interface includes text entry boxes, combo boxes, list boxes, file selection boxes or sliders you
should explain the validation you are applying to these. Typical validation checks include:
Format check The data is the correct data If an integer is expected, then
type and follows an expected characters should be rejected.
pattern. Date of birth is dd/mm/yyyy
Ensuring an @ is in an email
address.
Presence check Data has been entered into a In most situations it is unlikely
field. that no input is a valid input.
DESIGN
Range check Data must be within a valid The month cannot be less than
range. one or more than twelve.
Lookup table Combo boxes and list boxes Choosing from a list of options.
restrict the input to valid inputs.
Check digit / checksum Checks the input is an Credit card number is valid.
acceptable entry before This doesn’t mean it exists, just
that it is a valid number.
attempting to look up in a
database.
Giving the user buttons to click instead of commands to enter not only makes the interface more user
friendly, but it also ensures only valid actions can be taken.
Sanitisation is the process of taking what otherwise might be an invalid input and converting it into a
valid input before it is processed. For example, if the data entry must be in uppercase, instead of
rejecting lowercase characters you could simply convert them after they are input. Data sanitisation
provides a better user experience and more for you to write about.
30
Modules and processes
If the box on your structure diagram is a module or process you should describe the purpose of the
routine and explain what the code in that section will achieve. Remember to justify the approaches you
are taking. You may not need to describe every box on the diagram if many routines on the same
branch can be discussed together.
The user can add a new process to the ready queue at any time by clicking the ‘add Explaining
process’ button. This will show a simple pop-up box asking the user how many what
cycles the process will require. Once selected the process will be added to the happens in
detail
queue.
If the randomise option has been selected the program will create 2-6 random
processes for the queue before the simulation starts using a for loop. The number
of cycles to execute will also be randomised between 1 and 20. While the
simulation is running, random processes may also be added to the queue no more
than one per cycle. Although the simulation will be random from the user
DESIGN
perspective, the numbers generated will be based on a seed generated from
Justification
another random number between 1 and 10000 to ensure they are deterministic.
This will allow the user to save the seed in a text file run the program again in the
future with the same settings to generate the same output. The processes in the
ready queue will be stored in an array and will largely operate as a queue as this
data structure is the best fit for the operation here.
It is important to remember the design section is not as much about what you are going to do (this was
discussed in the analysis) but more about how you are going to do it. Be careful not to repeat what you
have written in the analysis too much. If you get this section right, you should be able to write basic
pseudocode from it in the next section of your report.
For top marks, you will need to justify your design decisions. These are not justifications of the inclusion
of features – you did this in the analysis section. You are justifying how these features will be
implemented.
31
Algorithms
This section of your report is not the actual code but, instead, the algorithms you intend to write. It is a
decomposition of the subroutines you identified in the systems diagram for the modules.
Although you can use flowcharts, they get unwieldy very quickly when algorithms become more
complex and are time-consuming to produce. It is advised that you use pseudocode in this section.
Algorithms are represented with pseudocode so they can be interpreted by programmers, irrespective
of the programming languages they are familiar with. Pseudocode, as the name suggests, is a false
code or a representation of code that can be understood by most people.
At this stage, you might feel you do not have the confidence to write your algorithms. Perhaps you’re
not entirely sure what you are going to do – in which case, your analysis and the first part of your project
may be weak – or you’re not sure how to write the code because of insufficient experience with your
chosen language. If you hit a brick wall here, go back and make sure you have been decisive about
what your program needs to achieve in the previous section.
Once you have done that, remember – pseudocode is not real code. Have a go at identifying the logical
steps, invent commands as you need to and use variables as you write the commands.
32
Pseudocode
There is no requirement to use the examination board reference language. These are for writing
examination questions only.
You should use indenting with pseudocode, just like with real code.
It may not be obvious why you have approached a specific routine in the way you have. There are often
hundreds of different ways to write an algorithm, each delivering the same output. Therefore, you
should justify your approach where appropriate. Consider space and time complexity, readability and
maintainability of the code, and thinking ahead as areas that could lead to good justifications.
Example pseudocode
Pseudocode Justification
DESIGN
WHILE index2 > 0 AND queue[index2 -1] > queue[index1]
queue[index2] = queue[index2 -1] which is efficient with a
index2 = index2 -1 small data set of less than
END WHILE 64 items.
queue[index2] = queue[index1]
It will be needed to
END FOR
prioritise processes in the
RETURN queue
ready queue.
END FUNCTION
Note how this routine is not written in any particular programming language, although it has clear
similarities with BASIC. This allows you to use commands that may not exist in your target language to
make it easier to produce the pseudocode.
You do not need to adhere to the standard illustrated, use a pseudocode approach you are familiar
with.
Students usually struggle at this point of the project so if you feel daunted do not worry. Consider
everything you have learned about programming and using the list of simple commands on the next
page, just have a go. It is acceptable for your real code not to match this algorithm design. If it looks
like you have copied and pasted real code retrospectively you will not gain any credit in this section.
33
Commands you could use in pseudocode
Command Purpose
SUBROUTINE name (parameter1, parameter2) Subroutines structure your program into logical
sections. Use a subroutine for each major part of
END SUBROUTINE
your code so that you do not have one long
code listing.
function.
ELSE = equals
< less than
ENDIF <= less than or equal to
> greater than
>= greater than or equal to
DIV integer division
MOD modulus
END FOR Use a for loop when you know how many
iterations need to be performed.
34
WHILE variable operator value WHILE is used to repeat lines of code.
OPEN FILE filename Files are used to read and write data from
secondary storage. All files need to be opened
WHILE NOT filename.EOF
and closed before data can be read and written
READLINE string to them.
DESIGN
The linear search iterating over an array is one of the most common algorithms:
END WHILE
Note you can use either parenthesis () or square brackets [] for indexes.
Remember you can invent commands in pseudocode, so for example, if you were really stuck writing
this algorithm you could simplify it to: IF value IN array THEN
Try to avoid simplifying your algorithms too much because you want to gain some credit for your logical
thinking, but do so when necessary.
35
You should have a pseudocode routine for each major module or algorithm in your program. There is
no need to design trivial algorithms used for pressing buttons on GUIs. For example, you may have an
interface where the user clicks a button to open another user interface. The pseudocode to achieve
this could be:
It is not necessary to include these minor algorithms. Equally, if you are likely to have many repeating
code elements, it would be appropriate to show these only once – but remember, if this is the case,
you would be better off using a subroutine anyway.
It is not essential to justify every line of code. It is acceptable to justify blocks of code instead. For
example, if you decide to implement a linear search, hashing or a sorting algorithm, it would be
acceptable to justify the algorithm itself and why alternatives are not suitable rather than justifying
DESIGN
You will know you have achieved a good report if the examiner can “follow the thread” of small aspects
of your project, from the initial proposals, to success criteria, to a description of the modular nature of
the solution to the actual algorithm design. Everything needs to be coherent and easy to follow
throughout your project report.
Examiner’s advice
“Reverse-engineered code is given no credit.”
36
Identifying the data structures and validation
Now that you have written your algorithms, you should be able to identify all the constants, variables,
data structures and files you need. If you are taking an object-oriented approach you will need to
include class diagrams.
Class diagrams
There are three rectangular sections to each class diagram.
Name of the class
1. The name of the class
You will have several small class diagrams. If you are using
inheritance remember to illustrate this with an arrow between
the classes. Child classes point to their parent class.
Methods
Remember, to achieve the top mark band, you need to justify
DESIGN
your choices. If you are using an array, perhaps this is because
you want to iterate through the structure with a loop or maybe you have chosen a list because it is
dynamic and items can easily be added and removed at run-time.
Boolean data types have two states, making them an ideal choice for when situations need to be stored
as true or false, on or off. In modern developments, programmers often avoid using a Boolean so a
third and fourth state can be introduced later if a future iteration of the project requires it.
Remember, if your program’s values do not change, using constants is more efficient, as the compiler
can use immediate instead of relative addressing, speeding up the execution of your program.
In addition to the classic data structures, you should consider the need for higher-order data structures
such as graphs and trees.
Examiner’s advice
“Candidates who opted to take an object-oriented approach tended to fare particularly well
in the design section, having a clear idea as to how their project can be decomposed.”
37
An example class diagram
Ready_queue
Add_process
Sort_processes
Execute_next
IsFull
IsEmpty
If you have adequately described each subroutine and produced pseudocode for it, the purpose of
the methods should be clear.
Each variable, constant and attribute should now be identified. A table is a useful way to do this.
DESIGN
Do not forget to justify any decisions you make about the data structures here.
38
It may seem odd to justify your variables,
especially if you name them appropriately.
However, justifications are a key requirement of
achieving marks in the top mark band.
As programmers we are making lots of decisions about how to code the algorithms. For example,
should you use an array, or would a list be better? Do you need to store all the data in memory, or
would it be better to use a file? This is why justifications are important to achieve a mark in the top mark
band because it demonstrates your thinking process.
Files
If your program uses external files, it is important to illustrate the structure of
7318523
how the data is being stored because it will be an abstraction – i.e., the
4
relationship between the data and the program will not be immediately
120
obvious.
For example, consider the data file to the right, named “sim1.txt”. It is not
obvious what the values represent. What is the number 7318523? Why is it
DESIGN
needed?
Using structured files like JSON can help alleviate this. However, if you are using
files to load and save data, you should describe one record of the structure.
sim1.txt
39
Encoding
Using characters or values to represent string data is common in programming. For example, in our
scheduling algorithms program we could choose the four characters “FCFS” to represent “first come,
first serve” or simply assign it the number 1, with the shortest job first algorithm being option 2. You
must explain all the encoding you are using so it is obvious what any values in your code represent.
At this point, it is worth reflecting on your systems diagram and algorithms. From this, identify six to
ten key milestones you will need to achieve. You will use these later in the coded solution.
Example milestones
1. Creating the main interfaces
For each of these key milestones, identify the test conditions you will need for that milestone and
present them in a table.
40
A development test example
1 The user can select the “add A number between 1 and 100 is accepted.
process” button and a pop-up box Clicking cancel aborts the operation.
prompts them to enter the All other inputs are rejected.
number of cycles.
The process is added to the ready queue.
Test -5, 0, 1, 12, 100, 230, H, #
3 New random processes are added New processes are always added to the
DESIGN
at the correct position in the back of the queue.
queue for FCFS and RR.
4 If the SJR or SRT algorithm is The processes are in the correct order
selected the queue is sorted with numerically by cycles.
the process with the lowest
Queue contains: 6, 8, 8, 9, 12.
number of cycles being placed at
the front.
5 New random processes are added New processes always cause the ready
at the correct position in the queue to be sorted.
queue for SJF and SRT.
Note how it is necessary to test valid inputs, invalid, inputs and boundary inputs. The test data should
consider a wide range of input possibilities. The test data here is far from comprehensive even for this
small part of the program. In addition to this, developers also perform white-box tests where each of
the program paths are explored. For example, an IF statement has two possible outcomes. It is entirely
possible that the test data chosen does not explore this sufficiently and therefore further tests are
required when you know how the algorithms are working.
41
Identifying further data to be used post-development
Alpha testing includes looking at the success criteria to determine if the solution works as intended
before releasing the software to the stakeholders.
You may also decide to offer your stakeholders a beta test opportunity so they can suggest any final
refinements and test it meets their needs.
In the post-development phase you are able to test that all the individual modules work together. This
is known as integration testing. You should prepare scenarios in advance to be used post-development
to check the output from the entire program matches expectations.
The FCFS algorithm with the processes 5, 12, 8, 4 should The program should correctly illustrate
execute in 29 cycles with the processes being output to a a process moving from the ready
finished state in the same order they arrived. queue to running to finished states and
calculate the average wait time for the
The average wait time should be calculated as 11.75:
processes.
(5+17+25) / 4
42
SECTION DO’s DON’Ts
Structure of the 18 Provide an overview of the structure of your Be concerned about using a
solution solution using a diagram to illustrate JSP/UML standard.
breaking the problem down into smaller
parts.
Breaking the 19 Provide evidence of problem decomposition Reverse engineer your
problem down by explaining each component of your completed program. Your code
systematically intended program. will likely deviate from these
initial design ideas.
20 Include sketches of interface designs.
Include screen shots from your
21 Explain the validation and input sanitisation
finished program.
that will be necessary.
Spend too much time on
22 Consider the usability features of your
graphics and colourful
program and expected UI conventions.
illustrations.
23 Justify your approaches to all the above.
Algorithms 24 Provide a set of language independent Use flowcharts, they are too
algorithms to describe each of the cumbersome for large
subroutines and methods. problems.
25 Use your own pseudocode standard if you Provide code or reverse
need to use commands you are not familiar engineered code as an
with. algorithm.
Data structures 26 Provide class diagrams if you are taking an Forget to include descriptions of
object-oriented approach. any encoding.
27 Explain and justify the variables and data Forget to include a file structure
structures that you will use. reference.
28 Justify your choice of data structures.
Test data for 29 Identify 6-10 milestones for the Do this retrospectively. Test
development development. data should be drawn up in
advance of development.
30 Identify the tests that need to be performed
for each milestone before it can be Forget that good testing
considered complete. includes a variety of valid,
invalid and boundary tests.
Test data for post- 31 Identify and justify testing that needs to be Avoid issues where your
development performed when all the modules have been program fails. These are good to
developed. talk about even if they are not
resolved.
32 Identify data that is designed to test the
robustness of the solution; good testing Forget that post development
should attempt to break the program. includes integration, alpha and
beta testing.
DEVELOPING A CODED
SOLUTION
The iterative development process.
In this section, you are discussing how you have made a solution to the problem.
At the end of the design section, you identified six to ten key milestones. In this section, you need to
provide evidence of developing each of those milestones. The development must be an iterative
process. That means you cannot just provide a code listing of your finished product. Instead, you must
document the story of how the development evolved as it was being coded.
In this section of your report, you will be including parts of your code. If it is practical to do so, it is
helpful to include a full code listing in an appendix at the end of your project. In this section, you will
provide only parts of the code that are relevant to each milestone.
When developing a milestone, you will frequently need to return to previous aspects of the code to
make changes or add new routines. Do not include code sections you have already included in your
report previously – just the new parts.
Examiner’s advice
“At the top end, candidates have clear and discrete iterations. Each iteration has stated
objectives, which were tested and evaluated at the end of the iteration.”
45
Documenting the milestones
For each milestone, include the following:
1. Objective of the milestone: In one or two sentences, describe what this milestone achieves.
2. Code listing: Provide a listing of the code for this milestone. Code must be commented with
appropriate variable and data structure names.
3. Explanation of the code: Explain what the code section does and justify algorithms or
approaches. It might not be immediately obvious to an examiner how the code works or why
problems have been solved in the way they have. Remember, the examiner may not be familiar
with the language you are using. If input validation is required, explain that too.
4. Module testing: Explain the tests you performed for this section of code and the outcome of
those tests. You must provide evidence of this process. A few simple screen shots for each
milestone will be enough.
5. User feedback: Your user should tell you what they like and dislike about this aspect of the
development so far, with ideas for future development. Your user must be an integral part of
DEVELOPING A CODED SOLUTION
6. Reflections: As a result of testing and user feedback, discuss what needs to be changed.
Rapid application development (RAD) where a series of evolutionary prototypes are developed, shown
to the user, and further developed until eventually the final product is delivered is how your project is
intended to be documented. Try to avoid a simplistic life-cycle approach and instead describe your
journey of development. This should be more like a dev-diary and less like a linear explanation of
achievements.
46
Example of part of one milestone
Adding items to the ready queue – sorting the queue for SJF/SRT.
Sub sort()
For index = 1 To n - 1
current = queue(index)
index2 = index
queue(index2) = queue(index2 - 1)
index2 = index2 – 1
queue(index2) = current
End While
Next
End Sub
Examiner’s advice
“Care must be taken that code shown in screenshots is big enough and of a high enough
resolution. Ideally, syntax highlighting should be preserved. It is the responsibility of
candidates to ensure that their final PDF or printed copy is readable. Credit cannot be given
for code that cannot be read.”
47
Explanation of the code
When an item is added to the ready queue the tail pointer is increments and the new item is appended
to the end of the array at the position pointed to by the tail pointer. I could have inserted the new
process directly into its correct position using a linear search to find the position and then moving all
the other items up one index before inserting it. This would work fine, but I wanted to create a routine
that would sort the ready queue no matter what state it was in. For example, processes that arrived
back from a blocked state and new processes can be handled at the same time. This would enable the
simulation to show the ready queue being evaluated before a process is chosen for execution which
seemed better for teaching how the algorithms work.
I did consider using a few sorting algorithms because they would all work, but I knew how to code an
insertion sort and the number of items to sort is very small, so efficiency wasn’t a concern.
When I ran the code, it would fail in the line that finds the correct position for the process.
This is because index2 – 1 could be reading past the end of the bounds of the array. I needed the
execution of the condition to stop if index > 2 without evaluating the second part of the expression. I
DEVELOPING A CODED SOLUTION
noticed that this seemed to happen automatically in other languages I had used.
After researching the while loop I found that you could use AndAlso to prevent the second part of the
statement being executed if the first part was not met. This solved my problem.
Module testing
I manually added some processes to the array before executing the routine to check it was working. I
tested the following data sets:
• 6 – only one item in the array and zero items in the array.
Once the program is written I will need to test this routine again without using manual inputs to check
it still functions.
48
Evidence
Examiner’s advice
“There is no need to exhaustively demonstrate each test, but there should be enough evidence
to convince the reader that substantial testing took place. The best projects focus on the more
unusual problems that cropped up during developmental testing (getting libraries to work,
User feedback
I showed one of my stakeholders the implementation of this algorithm on the interface form. She
commented that the ordering happened so quickly that it was hard to tell what had actually happened.
She suggested that maybe a log feature would be useful to output what was happening at each stage
but also agreed that the simulation speed slider to be implemented later may also help.
Reflections
I decided it was important to research exactly how and when the order of new processes was handled
in scheduling algorithms to decide how important the visual aspect of this was to understand the
scheduling process. Whether this happened dynamically as soon as a process arrives at the queue or
if it happens before the operating system chooses the process to execute matters.
49
SECTION DO’s DON’Ts
Agile development 33 Provide evidence of developing each Provide one code listing as
milestone using a development diary. evidence of the coded solution
without a discussion of the
34 Include a code listing for the milestone and
development process.
highlight interesting routines.
Go back and change your design
35 Explain how the milestone was
section.
implemented, discussing approaches that
were taken and how they deviate from the
original design.
Code 36 Produce modular code using procedures, Assume that a data structure or
functions and/or methods. approach you used is obvious to
the examiner.
37 Use comments at the beginning of routines
and for selection and iterations as a Create code for the sake of it if
minimum. there are suitable library
functions you can use.
38 Use sensible variable and data structure
names. Copy and paste code without
references.
Development 39 Test each module for function including the Forget the full range of
DEVELOPING A CODED SOLUTION
50
EVALUATION
Reviewing the project.
In this section, you are discussing how effective your project was.
15 marks Evaluation
What to include
• Evidence of your program being tested for both function and robustness, ideally
with a video.
• Discussion of each of the success criteria and whether they were full, partially or
not met including how unmet criteria could be addressed.
• Discussion of the usability features and whether they were successful, a partial
success or a failure including how any issues could be addressed.
• Consideration of the limitations and improvements that could be made.
In the coded solution section, you performed what is known as “bottom-up” testing. Each module or
milestone was tested independently for functionality as it was being developed, but at that stage, you
did not test the program as a complete product. Towards the end of a project, a post-development
testing phase takes place before the product is shipped.
EVALUATION
• Integration testing checks all the individual components work together as a whole.
• Alpha testing assesses to what extent the final product achieves the success criteria.
• Beta testing allows the user to test the program for usability before release.
Your testing to inform the evaluation should consider all these types of tests.
Evidence
It is important to provide evidence of fully testing your program beyond the simple screenshots you
have produced to evidence the completion of a milestone. The examiner will not run your project code.
The only evidence they will see of your program being used is what you present here. The best way to
evidence your solution is to create a video of your program being used.
52
Windows 10 has a built-in feature called Game Bar that will allow you to record your screen. Go to
Settings > Gaming on your PC to control the settings for the Game Bar and see the keyboard shortcuts.
Alternatively, there are plenty of other products you can use too.
• Function: The program being used with a comprehensive selection of its features.
• Robustness: Demonstrating that the majority of syntax, logic and run-time errors are handled.
This includes validation checks and error messages.
• Usability: That the product can be used with the interfaces designed and that the on-screen
text and messages are useful.
A good approach is to copy your test tables from the design section and add two extra columns to the
end of each table; one to record a timestamp of where the test is performed in the video and a second
to indicate whether the test was passed or failed. Your product does not need to pass every test. What
matters more is that you have good evidence of tests being carried out.
EVALUATION
Providing a voice-over that explains what is being tested will help the examiner follow what they are
being shown in your video. There is no need to include a script in your project.
Although this section is only worth five marks, it is the evidence of testing for the coded solution and
the basis of the evaluation, so its importance should not be under-estimated.
53
Example of a test table
Test no. What is being tested and inputs Expected output Timestamp Pass/Fail
1 The user can select the “add A number between 1 0:30 Pass
process” button and a pop-up and 100 is accepted.
box prompts them to enter the Clicking cancel
number of cycles. aborts the operation.
All other inputs are
Test -5, 0, 1, 12, 100, 230, H, #
rejected.
Examiner’s advice
“It is important that evidence is provided of tests. Where there are several similar tests, it is
not necessary to provide a screenshot of all of them, but there should be sufficient evidence
to demonstrate the extent to which the system functions.
54
There is no “correct” number of tests you should perform; it will vary hugely from project to project.
Your testing needs to be comprehensive. For example, you should be testing valid, invalid and
boundary data at the very least, but invalid data can also include invalid characters, no data and data
out of range. Consider some of the more unusual actions that could also crash your program. These
are known as extreme tests.
Examiner’s advice
“Many candidates provide video evidence of their testing, giving appropriate time codes for
each test in their documentation; this worked extremely well and left the moderator in no
doubt that the system worked as claimed.”
Remember, as is the case with all sections of the project, how you evidence your work is up to you.
There is no requirement to produce a video. You could choose to use a series of screenshots instead,
but that makes it more difficult to illustrate some of the tests you are performing.
EVALUATION
For top marks, you should explain how your
evidence shows that the success criteria have
been met.
Examiner’s advice
“Candidates should aim to take each objective listed in their analysis, cross-reference it with
the tests they have carried out and discuss how successfully the objective has been met.”
55
Evaluating your program
It is very easy to overlook the importance of the evaluation. Remember, it is worth more marks than the
analysis, equal to the design and, combined with the testing, almost as much as the coded solution.
Therefore, you need to leave yourself enough time to do this section justice.
At this point, all your development and testing work is complete. It may not be 100% how you
envisaged it at the analysis and design stage, but the program is ready to ship! In the software
development industry, there are very tight deadlines to meet to get a product to market. Sometimes,
features need to be held back to be released later in patches and updates.
Consider asking a stakeholder to provide you with a review. That will often give you more to write
about because they will see your project from a different perspective, and it can be hard to be truly
objective about your project when you have poured your heart and soul into its development.
You should copy your success criteria from the analysis section and provide commentary about how
successful you were in achieving each of those goals. For each criterion, state whether it was fully met,
partially met or not met at all. Also, explain how well the criteria was achieved in each case.
Consider the criticisms from your stakeholders. How could you address these if you had more time?
What approaches would be required?
Consider the usability and interface of your product. How could you make the user experience even
better? Ideas might include enabling a responsive form design on a variety of device resolutions.
Would your product be better as an app or as a web-app to make better use of that platform or to
increase interoperability?
56
Limitations
You should discuss your limitations in detail. In addition to the time limitations you have already
discussed that impact on the features you can include, there may also be limitations of the language
you are using. For example, in the scheduling simulator we might conclude that it is a reasonable
compromise to output the data to a text file and allow a spreadsheet to produce the charts because
there is only limited charting support in the programming language chosen. Had we developed our
program in JavaScript we could have made use of JS Charts to achieve this.
It is acceptable not to have met criteria and even to state that you do not know how to approach coding
something that proved to be too difficult.
1 Allow the user to select Partially met The user can select between FCFS, SJF, RR and
between five scheduling SRT. The program accurately simulates these
algorithms: FCFS, SJF, RR, algorithms with a wide range of data sets. MLFQ
EVALUATION
SRT & MLFQ. was not implemented because of the requirement
to have multiple queues. Since I implemented the
ready queue as a class it would be easy to create
multiple instances of the class to overcome this.
2 Show the user a visual Fully met The interface shows the four process states on the
representation of four screen in four different coloured areas. The user
process states: ready, can see the processes changing between these
running, blocked and states.
finished.
14 The user can speed up, slow Not met The user can stop and reset the simulation, but
down and pause the they cannot speed it up, slow it down and pause it.
simulation. Pause would be easy to implement with a Boolean
flag. Having a condition that the next stage in the
process is not executed until the pause flag is false.
I could slow the simulation down by having a for
loop causing the simulation to wait until the loop
finishes, however this will execute at a different
speed on different machines so it is not ideal.
57
SECTION DO’s DON’Ts
Post development 45 Provide evidence of testing against the test Produce pages and pages of
testing plans you created in the design section. screenshots. Find a more
efficient way of presenting your
46 Use efficient ways of evidencing the testing.
evidence.
A video is an ideal alternative to screen
shots. Forget that robustness is as
important as function.
47 Provide evidence that the system is robust
and does not crash too easily. Forget to cross reference to
your success criteria, this is
48 Consider using a beta test and asking your
known as alpha testing.
stakeholder for a review.
49 Cross-reference the test evidence against
the success criteria from the analysis section
to evaluate how well the solution meets
these criteria.
Usability features 50 Show how the usability features have been Use evaluative comments that
tested to make sure they meet the are subjective.
stakeholder needs.
Evaluation 51 Provide a commentary on how well the Include a simple tick list to state
solution matches each of the success each criterion was met.
criteria.
Make comments about how
52 Comment on any unmet criteria and how much you enjoyed the project.
these might be approached. Forget to say how you might
53 Comment on any limitations and address any of the weaknesses