0% found this document useful (0 votes)
25 views5 pages

4 Bedroom DR-4

Structural drawings

Uploaded by

dauda suleiman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views5 pages

4 Bedroom DR-4

Structural drawings

Uploaded by

dauda suleiman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

STRUCTURAL DRAWINGS

OF

PROPOSED
4 BEDROOM BUNGALOW
NOTES REVISIONS
project CIVIL/STRUCTURAL ENGINEERS: Dwg title
PROPOSED RESIDENTIAL
date by S-Tech S-Tech International
1-IF ANY STRUCTURAL DETAIL IS MISSING 2-CONTRACTOR TO VERIFY DIMENSIONS mk descriptions DEVELOPMENT
CHARTERED ENGINEERS & CONSULTANTS.
A U A NIGERIA TITLE SHEET
THEN PLEASE CONTACT DESIGN ENGINEER ON-SITE PRIOR TO BEGINNING
FOR PROVISION OF DETAILS. ANY DETAIL CONSTRUCTION. ANY DISCREPANCIES
SHOULD NEVER BE EXECUTED AT SITE SHOULD BE PRESENTED TO DESIGNER.
WITHOUT STRUCTURAL DRAWING. DESIGNER IS NOT LIABLE IF CONSTRUCTION Designed by: SULEIMAN I.D. project no Dwg no.
BEGINS PRIOR TO VERIFICATION. Drawn by: SULEIMAN I.D.
Architects: Scale
NEAT ARCHITECTS
Date MAY, 2025 MD/STR/2025/35 T.S
GENERAL CONSTRUCTION NOTES
GENERAL CONCRETE
BLOCKWORK
A1. ALL STRUCTURAL DRAWINGS AND SKETCHES MUST BE READ IN 25
D1. ALL STRUCTURAL CONCRETE TO BE GRADE ................... IN FOUNDATIONS.
25 E1. CAVITIES OF HOLLOW BLOCKWALLS BELOW GROUND SLAB LEVEL ARE TO
CONJUNCTION WITH RELEVANT ARCHITECTS AND SERVICES ENGINEERS ALL STRUCTURAL CONCRETE TO BE GRADE ................... IN COLUMNS.

AND SPECIALIST DRAWINGS. WHERE DISCREPANCIES OCCUR, THESE ARE 25


ALL STRUCTURAL CONCRETE TO BE GRADE ................... IN ALL OTHER BE FILLED WITH MASS CONCRETE. BACKFILLING TO EXCAVATED TRENCHES

TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECTS AND/OR SUPERSTRUCTURAL ELEMENTS, UNLESS OTHERWISE STATED. ARE TO BE CARRIED OUT SIMULTANEOUSLY ON BOTH SIDES OF WALL.

ENGINEERS FOR RESOLUTION PRIOR TO EFFECTING CONSTRUCTION. D2. MINIMUM CEMENT AGGREGATE RATIO TO BE 1:6. MAXIMUM SIZE OF COARSE E2. THE WALL THICKNESS OF THE BLOCKS SHOULD NOT BE MORE THAN 25mm.

AGGREGATE TO BE 20MM. E3. THE MINIMUM CRUSHING STRENGTH OF THE NON-LOAD BEARING HOLLOW
A2. WORK TO FIGURED DIMENSIONS ONLY. ALL DIMENSIONS ARE TO BE
D3. ALL AGGREGATE TO BE SUITABLY GRADED AND APPROVED BY THE SANDCRETE BLOCKS IS TO BE 2.1 N/mm2 OF THE GROSS AREA OF BLOCK AT 28 DAYS.
CHECKED ON SITE.
ENGINEER PRIOR TO USE IN CONSTRUCTION.
E4. BLOCKWORK TIES BETWEEN BLOCKWALLS AND COLUMNS/STANCHIONS ARE TO
A3. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. D4. ALL CONCRETE TO BE SUITABLY AND FULLY COMPACTED AND CURED IN
BE PROVIDED AT EVERY COURSE. TIES TO BE 6mm BAR STRAPS 700mm
AN APPROVED MANNER TO THE SATISFACTION OF THE ENGINEER.
LONG INTO THE BLOCKWORK.
A4. FOR DETAILS OF FLOOR SCREED AND FINISHES, WATERPROOFING E.T.C.
D5. MINIMUM CONCRETE COVER TO MAIN REINFORCEMENT TO BE AS FOLLOWS: E5. MAXIMUM POUR HEIGHT FOR ALL FILLED BLOCKWORK TO BE 2 COURSES AT A TIME.
AND CONCRETE FINISHES, SEE ARCHITECTS DETAILS.
FOUNDATION : ............... 50MM, COLUMNS : ............... 25MM, E6. ALL LOAD-BEARING SANDCRETE HOLLOW BLOCKWALLS TO HAVE A MINIMUM STRENGTH
A5. THE STRUCTURAL ENGINEER SHALL NOT BE HELD LIABLE/RESPONSIBLE BEAMS : ............... 25MM, SLABS : ............... 20MM, OF 2.76 N/MM2 OF NETT AREA OF BLOCKWALL AT 28 DAYS.
FOR ANY DRAWINGS NOT SUPERVISED BY HIM. STAIRCASES, ETC.............. 20MM, UNLESS OTHERWISE STATED.
E7. BLOCKWORK INDICATED THUS ON THESE DRAWINGS ARE LOAD BEARING
D6. ALL MASS CONCRETE TO BE 1 : 3 : 6 MIX (CEMENT - SAND - COARSE AGGREGATE) AND ARE TO BE CONCRETE FILLED TO THE SPECIFIED OR SHOWN LEVEL(S) WITH
REINFORCEMENT ALL BLINDING TO BE 1 : 6 MIX (CEMENT- SAND AGGREGATE). CONCRETE AS IN D1 WITH 10MM MAXIMUM COARSE AGGREGATE SIZE.
B1. STEEL TO HAVE A MINIMUM YIELD STRESS OF BAR AS DESIGNATED: D7. IN WATER-TIGHT CONSTRUCTION, JOINTS IN CONCRETE WORK ARE TO HAVE
2
Y = 410 N/mm WATER BAR AND CONTRACTOR IS TO TAKE SPECIAL CARE WITH THE E8. BLOCKWORK INDICATED THUS ON DRAWINGS ARE LOAD BEARING,

BARS DESIGNATED "Y" TO BE THE DEFORMED TYPE BARS. CONCRETE SO AS TO PRODUCE A WATER-TIGHT CONSTRUCTION. CONCRETE FILLED AS IN D1 WITH 10MM MAX. COARSE AGGREGATE SIZE,

ACCORDING TO BS 4449 AND BARS ARE IN MILLIMETER SIZE. AN ADMIXTURE OF A PROPRIETARY BRAND MAY BE USED IF AGREED BY THE AND WITH CAVITIES REINFORCED AS SPECIFIED.

"Y" DENOTES DEFORMED HIGH BOND HOT-ROLLED HIGH YIELD STRESS ENGINEER. HOWEVER, IF USED ADEQUATE CARE SHOULD BE EXERCISED THAT IT IS
E9. CONCRETE FILLED LOAD-BEARING BLOCKWORKS ARE TO ACHIEVE A MINIMUM
REINFORCEMENT TO BS 4449 AND 4461. PLACED STRICTLY IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS.
CRUSHING STRENGTH OF 6.5 N/MM2.
B2. NOTATIONS USED AS FOLLOWS: 11 - Y10 - 09 - 150 c/c B, IMPLY D8. ALL CONSTRUCTION JOINT POSITIONS ARE TO BE APPROVED BY THE ENGINEER PRIOR TO

11 - NUMBER OF BARS CASTING WHERE NOT INDICATED ON THE DRAWING. THESE SHOULD NOT EXCEED 10.0m APART.

Y10 - TYPE AND DIAMETER OF BARS


EARTHWORK
D9. CONCRETE SHALL NOT BE POURED THROUGH REINFORCING STEEL SO AS TO CAUSE
09 - BAR MARK SEGREGATION OF AGGREGATES. HOPPERS, VERTICAL CHUTES OR TRUNKS SHALL BE G1. CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR SHORING AND BRACING OF
150 C/C - SPACING OF BARS IN MILLIMETRES USED IN SUFFICIENT NUMBERS SO THAT THE FREE UNCONFINED FALL OF CONCRETE THE BUILDING EXCAVATIONS & EMBANKMENTS, INCLUDING EXCAVATION FOR
B - LOCATION OF BAR E.G. B - BOTTOM, T - TOP. SHALL NOT EXCEED 1800mm & TO ENSURE THAT THE CONCRETE IS KEPT LEVEL AT ALL TIMES. UTILITIES, AND IS ALSO FULLY RESPONSIBLE FOR THE DESIGN & PERFORMANCE
B3. WHERE HOLES, FIXING, ETC. ARE REQUIRED, BARS MAY BE
OF SHORING AND BRACING DURING CONSTRUCTION.
D10. BEFORE FRESH CONCRETE IS POURED AGAINST CONCRETE IN-PLACE, THE CONTACT SURFACES
DISPLACED SLIGHTLY TO ACCOMODATE THESE BUT THEY
OF CONCRETE IN-PLACE SHALL BE THOROUGHLY CLEANED, ALL LAITANCE SHALL BE REMOVED
MUST NOT BE CUT OR REMOVED. G2. CONTRACTOR SHALL COORDINATE THE EXTENT OF THE EXCAVATION, SHORING
& THE CONTACT SURFACES SHALL BE THOROUGHLY SLOSHED WITH GROUT CONSISTING OF
B4. WHERE TOP REINFORCEMENTS ARE REQUIRED ON SLABS, AND THERE EXISTS AND BRACING WITH CIVIL DRAWINGS. CONTRACTOR SHALL ALSO REFER TO
ONE PART SAND TO ONE PART CEMENT WITH A MINIMUM AMOUNT OF WATER.
NO SPECIFICATIONS ON THE SLAB DETAILS, THE CIVIL DRAWINGS, SPECIFICATIONS & GEOTECHNICAL REPORT FOR DEWATERING

FOLLOWING GUIDES SHALL BE FOLLOWED: D11. CONCRETE CAST ON SLOPED SURFACES SHALL BEGIN AT THE LOWEST ELEVATION & CONTINUE AND RELATED INFORMATION NOT COVERED IN THE STRUCTURAL DRAWINGS.

B4.1. FOR MAIN TOP BARS, USE DIA. 12mm BARS SPACED MONOLITHICALLY TOWARD THE HIGHER ELEVATION UNTIL THE INTENDED POUR IS COMPLETED.
G3. EARTHWORK COMPACTION SHALL BE IN ACCORDANCE WITH CIVIL DRAWINGS
AT 150mm c/c

B4.2. FOR SECONDARY TOP BARS, USE DIA, 12mm BARS SPACED
FOUNDATION AND SPECIFICATIONS AS WELL AS WITH THE GEOTECHNICAL REPORT.

120 kN/M2. FROM THE


H1. THE ALLOWABLE SOIL BEARING CAPACITY IS ............
AT 200mm c/c
SOIL REPORT.
SITE PREPARATION
H3. SITE PREPARATION AND TREATMENT TO BE CONFIRMED ON SITE BY
J1. REMOVE ALL EXISTING TOPSOIL UNDER SLABS, PROVIDE 150mm WELL RAMMED
SUPERVISING ENGINEER AT COMMENCEMENT OF FOUNDATION CONSTRUCTION.
J2. WHERE BAD GROUND IS ENCOUNTERED BELOW FOUNDATION LEVEL, THE
H4. RELATIONSHIP OF THE GROUND FLOOR SLAB, EXISTING GROUND LEVEL AND
DIFFERENCE IN LEVEL BETWEEN APPROVED BEARING STRATUM AND ORIGINAL
THE FOUNDATION FORMATION LEVEL ARE TO BE CONFIRMED ON SITE AND
LEVEL IS TO BE MADE UP USING MASS CONCRETE TO THE APPROVAL OF THE
APPROVED PRIOR TO CONSTRUCTION OF THE FOUNDATION.
SUPERVISING ENGINEER.

NOTES REVISIONS
project CIVIL/STRUCTURAL ENGINEERS: Dwg title
PROPOSED RESIDENTIAL
date by S-Tech S-Tech International
1-IF ANY STRUCTURAL DETAIL IS MISSING 2-CONTRACTOR TO VERIFY DIMENSIONS mk descriptions DEVELOPMENT
CHARTERED ENGINEERS & CONSULTANTS.
A U A NIGERIA GENERAL NOTICE
THEN PLEASE CONTACT DESIGN ENGINEER ON-SITE PRIOR TO BEGINNING
FOR PROVISION OF DETAILS. ANY DETAIL CONSTRUCTION. ANY DISCREPANCIES
SHOULD NEVER BE EXECUTED AT SITE SHOULD BE PRESENTED TO DESIGNER.
WITHOUT STRUCTURAL DRAWING. DESIGNER IS NOT LIABLE IF CONSTRUCTION Designed by: SULEIMAN I.D. project no Dwg no.
BEGINS PRIOR TO VERIFICATION. Drawn by: SULEIMAN I.D.
Architects: Scale
Date MAY, 2025 MD/STR/2025/35 00
NEAT ARCHITECTS
13900

3700 2650 550 600 3050 3350

2450
2450

450
1200
1200

400
400

690

1200
350
2150
2150
10850

10850

230
SECTION 1-1

2300
2300

450
1500
1500

850
850

690

1200
3700 2650 550 600 3050 3350

230
13900
SECTION 2-2

NOTES REVISIONS
project CIVIL/STRUCTURAL ENGINEERS: Dwg title
PROPOSED RESIDENTIAL
date by S-Tech S-Tech International
1-IF ANY STRUCTURAL DETAIL IS MISSING 2-CONTRACTOR TO VERIFY DIMENSIONS mk descriptions DEVELOPMENT
CHARTERED ENGINEERS & CONSULTANTS.
A U A NIGERIA FOUNDATION PLAN
THEN PLEASE CONTACT DESIGN ENGINEER ON-SITE PRIOR TO BEGINNING
FOR PROVISION OF DETAILS. ANY DETAIL CONSTRUCTION. ANY DISCREPANCIES
SHOULD NEVER BE EXECUTED AT SITE SHOULD BE PRESENTED TO DESIGNER.
WITHOUT STRUCTURAL DRAWING. DESIGNER IS NOT LIABLE IF CONSTRUCTION Designed by: SULEIMAN I.D. project no Dwg no.
BEGINS PRIOR TO VERIFICATION. Drawn by: SULEIMAN I.D.
Architects: Scale
Date MAY, 2025 MD/STR/2025/35 01
NEAT ARCHITECTS
750

01 01

230
02
4-Y1201b
600

3150
01 01
12-Y0801-200c/c
4-Y1201b SECTION 1-1
5-Y0803@250c/c
1,200

1 1
1 1
250
01 01 01
02
Col: 1. COL:1
A1 - A1
[8Nos]
500
500

A1 A1

500 500

BT 1 [8Nos]

NOTES REVISIONS
project CIVIL/STRUCTURAL ENGINEERS: Dwg title
PROPOSED RESIDENTIAL
date by S-Tech S-Tech International
1-IF ANY STRUCTURAL DETAIL IS MISSING 2-CONTRACTOR TO VERIFY DIMENSIONS mk descriptions DEVELOPMENT
CHARTERED ENGINEERS & CONSULTANTS.
A U A NIGERIA FOUNDATION DETAILS
THEN PLEASE CONTACT DESIGN ENGINEER ON-SITE PRIOR TO BEGINNING AND COLUMN SECTION
FOR PROVISION OF DETAILS. ANY DETAIL CONSTRUCTION. ANY DISCREPANCIES DETAILS
SHOULD NEVER BE EXECUTED AT SITE SHOULD BE PRESENTED TO DESIGNER.
WITHOUT STRUCTURAL DRAWING. DESIGNER IS NOT LIABLE IF CONSTRUCTION Designed by: SULEIMAN I.D. project no Dwg no.
BEGINS PRIOR TO VERIFICATION. Drawn by: SULEIMAN I.D.
Architects: Scale
Date MAY, 2025 MD/STR/2025/35 02
NEAT ARCHITECTS
13900

3700 2650 550 600 3050 3350

BM 1 - (230 x 230)

2450

2450
BM 15 - (230 x 230)
BM 13 - (230 x 230)
BM 2 - (230 x 230)

230
1200

1200
BM 3 - (230 x 230)
Y12 Y12
BM 4 - (230 x 230)
400

400
Y08@250C/C

230
BM 11 - (230 x 230)

BM 12 - (230 x 230)

BM 17 - (230 x 230)
BM 16 - (230 x 230)
Y16 Y16
2150

2150
TYPICAL FOR ALL 230X230 U/S
10850

10850
ROOF BEAMS
BM 5 - (230 x 230) BM 6 - (230 x 230)
2300

2300
BM 7 - (230 x 230)

BM 14 - (230 x 230)
1500

1500
BM 8 - (230 x 230) BM 9 - (230 x 230)
850

850
BM 10 - (230 x 230)

3700 2650 550 600 3050 3350

13900

NOTES REVISIONS
project CIVIL/STRUCTURAL ENGINEERS: Dwg title
PROPOSED RESIDENTIAL
date by S-Tech S-Tech International
1-IF ANY STRUCTURAL DETAIL IS MISSING 2-CONTRACTOR TO VERIFY DIMENSIONS mk descriptions DEVELOPMENT
CHARTERED ENGINEERS & CONSULTANTS.
A U A NIGERIA ROOF GENERAL ARRANGEMENT
THEN PLEASE CONTACT DESIGN ENGINEER ON-SITE PRIOR TO BEGINNING & UNIVERSAL SECTION DETAILS
FOR PROVISION OF DETAILS. ANY DETAIL CONSTRUCTION. ANY DISCREPANCIES
SHOULD NEVER BE EXECUTED AT SITE SHOULD BE PRESENTED TO DESIGNER.
WITHOUT STRUCTURAL DRAWING. DESIGNER IS NOT LIABLE IF CONSTRUCTION Designed by: SULEIMAN I.D. project no Dwg no.
BEGINS PRIOR TO VERIFICATION. Drawn by: SULEIMAN I.D.
Architects: Scale
Date MAY, 2025 MD/STR/2025/35 03
NEAT ARCHITECTS

You might also like