0% found this document useful (0 votes)
11 views1 page

PDF1

The document outlines the procedure for starting a program by switching the mode switch to RUN and monitoring it in 'OB1'. It includes references to various functions such as Forward, Notes, Commission, and Debug within the STEP 7 program. The training document is part of a module related to AS-Interface with the SIMATIC S7-300 and the CP342-2, last revised in February 2002.

Uploaded by

edlistianto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

PDF1

The document outlines the procedure for starting a program by switching the mode switch to RUN and monitoring it in 'OB1'. It includes references to various functions such as Forward, Notes, Commission, and Debug within the STEP 7 program. The training document is part of a module related to AS-Interface with the SIMATIC S7-300 and the CP342-2, last revised in February 2002.

Uploaded by

edlistianto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Automation– and Drive Technology- SCE

32. Through the switching of the mode switch to RUN, the program is started. The program can be

monitored in the ‘OB1‘ with a click on the symbol for monitoring (→ ).

Forward Notes Commission STEP 7- Program Debug

T I A Training document Page 32 of 32 Module D1


Last revision: 02/2002 AS- Interface with the SIMATIC S7-300 and the CP342-2

You might also like