CONSTRUCTION OF 132/33 KV ,2X50
NAME OF THE WORK AIS AT CHABUA ASSAM ELECTRICIT
ASSOCIATED TRANSMISSION LINE(P
CUSTOMER NAME M/S ASSAM ELECTRICITY GRID COR
CONTRACTOR NAME M/S BADRI RAI & COMPANY-M/S STE
DATE OF SUBMISSION 5/17/2025
SCHEDULE FOR SUPPLY OF MATERIALS PRIORITYWISE AT 132/33 KV,2X50 MVA AIS FOR M/S ASEG
Sl.
Item Description Quantity
No.
Earthing Material & Foundation Bolts(complete Set)
19.00
As per approved TS
Main earth mat conductor, GS risers, treated
19.01 /Untreated earth pit, equipment earth connections etc.
Main Earthing Conductor 40mm dia MS Rod
19.01 1
Earthing Conductor: 40mm dia MS Rod For Riser From
19.01 The Burial Earth Mat To Equipment,Structure Etc) 1
Earthing Conductor: 75X12mm GS Flat For Equipment
19.01 and Structure Earthing 1
Earthing Conductor: 65X12mm GS Flat For Columns and
19.01 Auxiliary Structure Earthing 1
Earthing Conductor: 50X6Mm GS Flat For Riser For
19.02 Console Box,Lt Panels,Dc Panels,Marshalling Boxes, 1
Cable Trenches Etc)
Earthing Device & Associated Accessories (50 Mm dia
19.02 Heavy Duty GS Perforated Pipe 3 Mtrs Long For Treated 1
Earth Pit with CI cover)
Earthing Device & Associated Accessories 40Mm dia MS
19.02 1
Rod 3 Mtrs Long For Non Treated Earth Pit with CI cover)
50x8 mm, 50x6 mm, 25x6mm, 25x4mm GS Flat as per
19.02 1
site requirement
Soil Resistivity Test And Soil Treatment As And When
19.02 1
Required
19.02 Separate Earthing For Control room building 1
19.02 Separate Earthing For Fencing Around The Substation 1
19.02 Auxiliary/Satellite Earth mat wherever applicable 1
Other Earthing Accessories ( reqd for complete earthing of
19.02 1
the entire switchyard and the buildings)
Foundation Bolts (Including nuts,checknut & washers for
20.05 1
lattice and pipe structures)
Fastners(nuts, bolts and washers) including step bolts for
20.06 1
lattice and pipe structures
20.00 Supply of Galvanised Lattice structures
20.01 132kV Column 24
20.02 132kV Beam 18
20.03 33kV Column 18
20.04 33kV Beam 9
14.00 Mounting Structures
14.01 145 kV Isolator with double earth switch 4
14.02 145 kV Isolator with single earth switch 4
14.03 145 kV Isolator without earth switch 8
14.04 145 kV Isolator (tandem type) 4
14.05 33 kV Isolator (with earth switch) 13
14.06 33 kV Isolator (without earth switch) 9
14.07 145 kV CVT 6
14.08 145 kV PI 54
14.09 120 kV LA 12
14.10 30 kV LA 33
14.11 145 kV CT 15
14.12 145 kV PT 6
14.13 36 kV CT 30
14.14 36 kV PT 6
14.15 36 kV PI 13
14.16 33kV IPS Tubular Bus Support Structure 1
2.00 Insulators, hardware & Conductors
132kV, 2 x160kN double tension string Antifog insulators
2.01 66
and hardwares suitable for Twin MOOSE conductors
132kV, 2 x120kN double suspension string Antifog
2.02 insulators and hardwares suitable for Twin MOOSE 42
conductors
132kV,120kN single suspension string Antifog insulators
2.03 9
and hardwares suitable for Single MOOSE conductors
33kV, 2 x160kN double tension string Antifog insulators
3.00 15
and hardwares suitable for Twin MOOSE conductors
132kV, 2 x120kN double suspension string Antifog
3.01 insulators and hardwares suitable for Twin MOOSE 9
conductors
33kV,70kN single suspension string Antifog insulators and
3.02 27
hardwares suitable for Single PANTHER conductors
3.03 ACSR Moose Conductor 1
3.04 ACSR Panther Conductor 1
3 inch IPS Aluminium Tubular Conductor with Flexi
3.05 Connectors, expansion joints,T-Joints etc as per 1
requirement
Clamps, Connectors and Hardware fittings (as per site
3.06 1
requirement)
145KV, 1 phase Solid core bus post insulator (creepage
3.07 57
distance 31mm/kV)
36 KV, 1 phase Solid core bus post insulator (creepage
3.08 16
distance 31mm/kV)
Terminal connector on 132kV side bushing of Transformer
13.07 8
to suit Twin Moose conductor
Terminal connector on 33kV side bushing of Transformer
13.08 8
to suit Twin Moose conductor
Single phase HV side 3 core bushing phase CT (300/1A, 2
13.09 6
core) and 1 core for WTI
Single phase IV side 3 core bushing phase CT (1200/1A,
13.10 6
2 core) and 1 core for WTI
Single phase HV side bushing mounted NCT (300/1A, 2
13.11 2
core)
Single phase LV side bushing mounted NCT (1200/1A, 2
13.12 2
core)
Rail Track for Transformer
13.13 2
Pulling Block for Transformer
13.14 4
5.00 Surge Arrester
120kV, 10kA, LA complete with Surge Monitor, hardware
5.01 fittings, clamps & connectors as per specification 12
30kV, 10kA, LA with surge counter, hardware fittings,
5.02 33
clamps & connectors as per specification
6.00 CVT and Wave Trap
132kV, 4400pF, 3 Wdg CVT, complete with Junction Box,
6.01 6
hardware fittings, clamps & connectors
132KV, 800A Pedestal Mounted Wave Trap complete with
6.02 4
all accessories
7.00 Circuit Breaker
145 kV, 3150 A, SCR 40 kA for 3 sec, SF6 Circuit
Breaker, outdoor type, 3-Ph gang operated complete with
7.01 5
operating mechanism & support structure with 10 % spare
SF-6 gas.
36 kV 2500 A, SCR 31.5 kA for 3 sec, Vacuum Circuit
Breaker, outdoor type, 3-Ph gang operated complete with
7.02 3
operating mechanism & support structure as per
specification.
36 kV 1600 A, SCR 31.5 kA for 3 sec, Vacuum Circuit
Breaker, outdoor type, 3-Ph gang operated complete with
7.03 7
operating mechanism & support structure as per
specification.
Bay Marshalling Kiosk along with support structures
8.00
8.01 132 kV Bay Marshalling Kiosk 2
8.02 33 kV Bay Marshalling Kiosk 5
Instrument Transformers along with junction box and
9.00 all other accessories
132KV, 1200-800-400/1-1-1-1-1 A Current Transformer
9.01 6
(132 kV Line Bay)
132KV, 600-300/1-1-1-1-1 A Current Transformer (132 KV
9.02 6
Transformer Bay)
132KV, 1600-800/1-1-1-1 A Current Transformer (132kV
9.03 3
Bus Coupler)
10.00 132 kV Potential Transformer 6
33 kV 1200-1000/1-1-1-1-1 A Current Transformer (33 kV
10.01 6
Transformer Bay)
33 kV 600-300/1-1 A Current Transformer (33 kV Feeder
10.02 21
Bay)
33 kV 2500/1-1 A Current Transformer (33kV Bus
10.03 3
Section)
10.04 36 kV Potential Transformer 6
1.00 Isolators
145KV, 2000A, 40kA for 3 sec, Horizontal Double Break
type Isolator with double earth switch complete with
1.01 manual and motor driven operating mechanisms along 2
with Support Insulators, Clamps & Connectors and
Hardware Fittings
145KV, 1250A, 40kA for 3 sec, Horizontal Double Break
type Isolator with double earth switch complete with
1.02 manual and motor driven operating mechanisms along 2
with Support Insulators, Clamps & Connectors and
Hardware Fittings
145KV, 2000A, 40kA for 3 sec, Horizontal Double Break
type Isolator without earth switch complete with manual
1.03 and motor driven operating mechanisms along with 4
Support Insulators, Clamps & Connectors
145KV, 1250A, 40kA for 3 sec, Horizontal Double Break
type Isolator without earth switch complete with manual
1.04 and motor driven operating mechanisms along with 4
Support Insulators, Clamps & Connectors
145KV, 1600A, 40kA for 3 sec, Horizontal Double Break
type Isolator with one earth switch complete with manual
1.05 and motor driven operating mechanisms along with 4
Support Insulators, Clamps & Connectors
145KV, 2000A, 40kA for 3 sec, Horizontal Double Break
type Isolator with one earth switch (tandem type) complete
1.06 with manual and motor driven operating mechanisms 2
along with Support Insulators, Clamps & Connectors
145KV, 1250A, 40kA for 3 sec, Horizontal Double Break
type Isolator with one earth switch (tandem type) complete
1.07 with manual and motor driven operating mechanisms 2
along with Support Insulators, Clamps & Connectors
33 kV,1250A, 31.5kA for 3sec Horizontal Double Break
type Isolator without earth switch complete with manual
1.08 and motor driven operating mechanisms along with 7
Support Insulators, Clamps & Connectors and Hardware
Fittings
33 kV,1250A, 31.5kA for 3sec Horizontal Double Break
type Isolator with earth switch complete with manual and
1.09 11
motor driven operating mechanisms along with Support
Insulators, Clamps & Connectors and Hardware Fittings
33 kV,1600A, 31.5kA for 3sec Horizontal Double Break
type Isolator without earth switch complete with manual
1.10 and motor driven operating mechanisms along with 2
Support Insulators, Clamps & Connectors and Hardware
Fittings
33 kV,2500A, 31.5kA for 3sec Horizontal Double Break
type Isolator with earth switch complete with manual and
1.11 2
motor driven operating mechanisms along with Support
Insulators, Clamps & Connectors and Hardware Fittings
XLPE Armoured Cu, LT Power Cable (1.1kV grade)
17.00
17.01 2C, 6sqmm 1
17.02 4C, 16sqmm 1
17.03 3.5C, 35sqmm 1
17.04 3.5C, 70sqmm 1
17.05 3.5C, 400sqmm 1
17.06 Other Cables not covered above 1
Cable supports and other cable accessories like Lugs,
17.07 1
Glands etc.
1.00
17.08 Others ( Cable for Fire Fighting, Illumination, CCTV etc)
PVC Armoured Cu LT Control Cable (1.1 kV grade)
18.00
18.01 2C, 2.5sqmm 1
18.02 4C, 2.5sqmm 1
18.03 7C, 2.5sqmm 1
18.04 12C, 2.5sqmm 1
18.05 17C, 2.5sqmm 1
18.06 19C, 2.5sqmm 1
18.07 Other Cables not covered above 1
Cable supports and other cable accessories like Lugs,
18.08 1
Glands etc.
1.00
18.09 Others ( Cable for Fire Fighting, Illumination, CCTV etc)
Multi Modular Cable sealing system for all cable entries at
18.10 Control room, Kiosk building, FFPH building etc. as per 1
requirement.
22.00 Fire Alarm & Detection
Fire Alarm & Detection system for Control Room building
22.01 and other related rooms including Fire Alarm panel, Multi 1
Sensor detector, manual Call point, Hooter, Response
Indicators, Beam Detector, Cabling and ISOLATING
Portable and wheel/trolley mounted Fire Extinguishers for
Control Room Building and Switchyard as per specification
and Portable Fire Extinguisher for Control Room (5kg X
22.02 6Nos and 2kg X5 Nos), Officer Quarter (2kg X 6Nos), Staff 1
Quarter (2kg X 6Nos), Security Barrack (2kg X
6Nos),Guard room (Security Booth) (2kg X 3Nos), Store
Buildingmounted
Trolley (2kg x5)portable
as per specification.
fire exinguishers (Dry powder
22.03 chemical type) for 250 kVA transformers ( 10 Kg , DCP 2
Type)
Hydrant & HVWS (High Velocity Water Spray)
23.00 system/NIFPES
Hydrant system along with pumping arrangement &
23.01 associated Civil works for fire protection system for 2 No 1
of Transformer
2.00
HVWS system (Automatic Emulsifier and Manual Hydrant
23.02
Point both) for 50 MVA Transformer-2 No’s
2.00
NItrogen injection Fire protection and emergency service
23.03 with complete accessories and related Civil and Electrical
works for 50 MVA Transformers
50MVA, 132/33kV, ONAN/ ONAF, 3 Phase Transformer
13.00 along with all accessories as below:
50 MVA, 132/33 kV, Three phase Transformer with OLTC
13.01 2
(including Transformer oil)
13.02 Oil & winding temperature monitoring system (FO based) 2
13.03 Online DGA 2
13.04 Online insulating drying system 2
13.05 Digital RTCC Panel 2
13.06 10% Extra OIL for each transformer 1
4.00 Station Service Transformer
250 KVA, 33/0.433kV StationTransformer (Energy
4.01 2
Efficiency Level 3) , including Clamps & Connectors
Power receiving panel with 440V MCCB of adequate
4.02 2
rating for Station Service Transformer
4.03 33kV DO Fuse including Support Structure 2
Battery & Battery Chargers, DCDB & ACDB as per
15.00 specification
15.01 220V VRLA Battery, 600AH 2
15.02 220V, Dual Float Cum Boost Chargers, 150A 2
15.03 220V, DCDB 2
15.04 48V VRLA type Battery Bank, 300 AH 2
48V, 60A Modular SMPS based Dual Float cum Boost
15.05 2
Chargers
15.06 48V, DCDB 2
15.07 Main ACDB 2
15.08 Sub ACDB 2
15.09 MLDB with 415V/415V, 100kVA isolation transformer 1
15.10 ELDB with 415V/415V, 50kVA isolation transformer 1
15.11 HVAC DB 1
15.12 MCBDB 1
15.13 Auxiliary ACDBs, Sub DCDBs etc as per requirement 1
Power Line Carrier Communication Equipments (Twin
16.00 Channel, 8kHz)
HF armoured co-axial cable (ALONGWITH HDPE /GI
16.01 1
CONDUIT)
Digital Carrier Equipment Panel (Twin channel and should
16.02 support transmission band for line length 150 km ) for 4
132kV
IEC 61850 compliant Digital Tele- Protection Coupler, 16
command with redundant power supply card and CPU
16.03 4
along with relay, E1 interface card and optical interface
card to support 150 km(132kV)
EPAX system and telephone system with redundant
16.04 1
power supply card and CPU along with E1 interface card.
16.05 LMU and LMDU 8
16.06 Armoured Audio Cable 1
16.07 CAT 6 armoured cable. 1
Walkie talkie handset to operate seamlessly within a
16.08 5
radius of 1km using license free band. (Motorola or better)
16.09 Two wire telephone set 4
125 KVA, Silent DG Set with AMF including Panel &
24.00 Accessories including earthing arrangement 1
Lighting System
25.00
Indoor
25.01
Lighting System including Lighting panel, Cabling,
25.01 Conduiting, Switches, Socket, Junction boxes,
auxiliary receptacle
25.01 Control Room Building 1
25.01 FFPH Building 1
25.01 Pump House 1
25.02 Security booth 1
25.02 Security barrack 1
Staff Quarter, Officer Quarter, store building & open store
25.02 1
shed
Outoor Lighting
25.02
Outdoor LED lighting for Switchyard, Road area, Car
parking, Security outpost including Lighting panel,
25.02 1
Distribution Boards, Cabling, Switches, Socket, auxiliary
receptacle, complete with GI Poles etc.
25.02 Public Addressing System, CCTV 1
Lightning protection (lightning masts 50 metres high,
25.02 Lightning Spike, shield wires (7/4 mm GI shield wire), 1
down conductors etc.)
Miscellaneous item(like MS Channel,Angle, Rail,
Chequered plate,MS Grill plate, Lugs and Glands,
25.02 Switchyard and Bay Identification Name board, Anchor 1
fastner and Display for Overall single line diagram photo
with frame.etc…as per site requirement)
HVAC & VENTILATION
21.00
Industrial Air conditioning system for 132kV Control room
21.01 building SCADA Room, having N+1 or N+2 Standby 1
Requirements
2 TON CAPACITY SPLIT AIR CONDITIONING UNITS for
21.02 Battery Room, Engineer Room , JE Room, Electrical 1
room, Conference room.
RUCTION OF 132/33 KV ,2X50 MVA GIS AT TITABOR AND 132/33 KV,2X50 MVA
CHABUA ASSAM ELECTRICITY GRID CORPORATION LIMITED ALONGWITH
IATED TRANSMISSION LINE(PKG:P-II-B)
SAM ELECTRICITY GRID CORPORATION LIMITED
DRI RAI & COMPANY-M/S STELMEC LIMITED(M/S BRC-STELMEC JV)
25
,2X50 MVA AIS FOR M/S ASEGCL AT CHABUA LOCATION,ASSAM(INDIA)
Supply item at site on
Units Remarks
priority
Lot
Lot
Lot
Lot
Lot
Lot
Earthing Material
such as MS Rod,GS
Flat,GI Perforated
Lot Pipe to be supplied at
Site as per the RFC
approved BOM.
Ist Lot of Material to be
Lot arranged at Site
JOB
JOB
JOB
Lot
Lot
LS
Foundation Bolts
With required
nut/Checknuts,
Spring washers
LS
Nos.
Nos.
Nos.
Nos.
Set
Set
Set
Set
Set
GI Lattice & mounting
Structure for 145 KV
and 33 KV
Equipments to be Supply in 2nd Lot
Supplied at Site as
per approved RFC
Drawing
GI Lattice & mounting
Structure for 145 KV
and 33 KV
Set Equipments to be Supply in 2nd Lot
Supplied at Site as
per approved RFC
Drawing
Set
Set
Set
Set
Set
Set
Set
Set
Set
Lot
Set
Set
Set
Set
Set
Set
lot
lot
lot
132 KV and 33 KV
Supply in 3rd Lot
Side insulators,
LS Hardware &
conductors to be
arranged at Site
No.
No.
No.
Nos.
Nos.
Nos.
Nos.
Nos.
Set
Civil Works for Site/Not a
Set
Supplied Item
No.
No.
No.
No.
Sets
Sets
Sets
Nos
Nos
No.
No.
No.
No.
No.
145 KV and 33 KV
Supply in 4th Lot
Supply of
Equipments,BMK with
complete fitting
No.
accessories to be
arranged at site
No.
No.
Set
Set
Sets
Sets
Sets
Sets
Sets
Set
Set
Set
Set
Lot
Lot
Lot
Lot
Lot
LS
Lot
LS
Power & control
cables as per RFC
Quantity along with
Lugs/gland &
accessories to be
Lot Supply in 5th Lot
arranged at Site
Lot
Lot
Lot
Lot
Lot
LS
Lot
LS
Lot
Lot
Lot
Nos
Supply in 6th Lot
Lot
Set
Set
Set
Set
Set
Set
Power Transformer
&Station Transformer
along with all related
Set Supply in 7th Lot
accessories to be
Supplied at site
including Oil Drums.
LS
No.
Sets
Sets
Set
Set
Set
Set
Set
ACDB and DCDB
Set
Panels With Battery
Bank set up with the
Supply in 8th Lot
required set up
accessories (as per
Set
specification)
Set
Set
Set
Set
Lot
Lot
LOT
No
NO
NO
Set Approved make PLCC
along with related
Supply in 9th Lot
accessories to be
arranged at site
Lot
Lot
No
No
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Area and Building
illumination items to
be arranged at site
FINAL LOT SUPPLIED
ITEMS AT SITE
Lot
Lot
Lot
Lot
Lot
Lot
CONSTRUCTION OF 132/33 KV ,2X50 MVA
NAME OF THE WORK CHABUA ASSAM ELECTRICITY GRID CORP
TRANSMISSION LINE(PKG:P-II-B)
CUSTOMER NAME M/S ASSAM ELECTRICITY GRID CORPORA
CONTRACTOR NAME M/S BADRI RAI & COMPANY-M/S STELMEC
DATE OF SUBMISSION
SCHEDULE FOR SUPPLY OF MATERIALS PRIORITYWISE AT 132/33 KV,2X50 MVA GIS FOR M/S AS
Sl.
Item Description Quantity
No.
Supply of Items for 132/33kV Titabor GIS
162 Earthing
Main earth mat conductor, GI risers, treated
163 /Untreated earth pit, equipment earth connections
etc.
164 Main Earthing Conductor 40mm dia MS Rod 1
Earthing Conductor: 40mm dia MS Rod For Riser From
165 The Burial Earth Mat To Equipment,Structure Etc) 1
Earthing Conductor: 75X12mm GS Flat For Equipment
166 and Structure Earthing 1
Earthing Conductor: 50X10Mm GS Flat For Riser For
167 Console Box,Lt Panels,Dc Panels,Marshalling Boxes, 1
Cable Trenches Etc)
Earthing Device & Associated Accessories (50 Mm dia
168 Heavy Duty MS Perforated Pipe 3 Mtrs Long For Treated 1
Earth Pit with CI cover)
Earthing Device & Associated Accessories 40Mm dia Ms
169 1
Rod 3 Mtrs Long For Non Treated Earth Pit with CI cover)
50x8 mm, 50x6 mm, 25x6mm GS Flat as per site 1
170
requirement
Soil Resistivity Test And Soil Treatment As And When 1
171
Required
Separate Earthing For 145 Kv GIS Modules (including 1
172
multi-point earthing)
Separate Earthing For 145 kV GIS Building (with Cu flat 1
173
of adequate size for GIS earth mat)
174 Separate Earthing For Control room building 1
175 Separate Earthing For Fencing Around The Substation 1
176 Auxiliary/Satellite Earth mat wherever applicable 1
Other Earthing Accessories ( required for complete 1
177
earthing of the entire switchyard and the buildings)
Foundation Bolts (Including nuts,checknut & washers for
1
183 lattice and pipe structures)
Fastners(nuts, bolts and washers) including step bolts for
1
184 lattice and pipe structures
Supply of Galvanised Lattice structures
178
132kV Column 7
132kV Beam 4
33kV Column 12
33kV Beam 8
105 Mounting Structures (Lattice/pipe)
145 kV Isolator with double earth switch 10
36 kV Isolator (with earth switch) 8
36 kV Isolator (without earth switch) 12
145 kV CVT 6
120 kV LA 12
30 kV LA 30
36 kV CT 27
36 kV PT 6
145 kV PI 18
36 kV PI 12
36kV DO Fuse 2
33kV IPS Tubular Bus Support Structure 1
8 Insulators, hardware & Conductors
132kV, 2X90kN Twin tension string Antifog insulators and
hardwares suitable for single AAAC Panther conductors
9 8
132kV, 2 x120kN double suspension string Antifog
insulators and hardwares suitable for Twin MOOSE
10 conductors 8
33kV, 2 x120kN double suspension string Antifog
insulators and hardwares suitable for Twin MOOSE
11 conductors 14
33kV, 2X160kN Double tension string Antifog insulators
12 and hardwares suitable for Twin MOOSE conductors 14
33kV,120kN single suspension string Antifog insulators
13 and hardwares suitable for single MOOSE conductors 20
14 ACSR Moose Conductor 1
3 inch IPS Al Tubular Conductor with Flexi Connectors,
15 expansion joints,T-Joints etc as per requirement 200
Clamps, Connectors and Hardware fittings (as per site
16 requirement) 1
145 KV, 1 phase Solid core bus post insulator (creepage
18
17 distance 31mm/kV)
36 kV , 1 phase Solid core bus post insulator (creepage
12
18 distance 31mm/kV)
5 Ton EOT Crane (Double Girder) for 145kV GIS
81 Building 1
103 Rail Track for Transformer 2
104 Pulling Block of transformer(Civil Works) 4
73 Supply of 145 kV & 33 KV GIS Equipments
145kV, 40kA for 3 second, SF6 gas-insulated metal
74 enclosed Line bay module as per technical specification 2.00
145kV, 40kA for 3 second, SF6 gas-insulated metal
75 enclosed Transformer bay module (HV of 50MVA 2.00
Transformer) as per technical specification
145kV, 40kA for 3 second, SF6 gas-insulated metal
76 enclosed Bus Coupler bay module as per technical 1.00
specification
145kV, One number, 3-phase encapsulated, SF6 gas
77 insulated metal enclosed 3150 A, 40kA for 3 sec, Bus Bar 2.00
module as per technical specifications
145kV extension module complete with all requirements
78 for necessary bus extension 4.00
145kV, 3150A, 40 kA for 3 sec, 3- phase SF6 to air
bushings along with termination module & support
79 structure for outdoor connections to connect GIS with 4.00
145kV side of Power transformer and overhead lines
145kV, 3150A, 40kA for 3 second, 3-Ph, SF6 Gas
Insulated Bus Duct (GIB) (including inside the GIS hall)
80 including Bus Duct support structure and associated 1.00
accessories and jointing elements
2 Isolators
145KV, 2000A, 40kA for 3 sec, Horizontal Double Break
type Isolator with double earth switch complete with
3 manual and motor driven operating mechanisms along 2
with Support Insulators, Clamps & Connectors
33 kV,1250A, 31.5kA for 3sec Horizontal Double Break
type Isolator with earth switch complete with manual and
4 6
motor driven operating mechanisms along with Support
Insulators, Clamps & Connectors and Hardware Fittings
33 kV,1250A, 31.5kA for 3sec Horizontal Double Break
type Isolator without earth switch complete with manual
5 and motor driven operating mechanisms along with 10
Support Insulators, Clamps & Connectors and Hardware
Fittings
33 kV,1600A, 31.5kA for 3sec Horizontal Double Break
type Isolator with earth switch complete with manual and
6 2
motor driven operating mechanisms along with Support
Insulators, Clamps & Connectors and Hardware Fittings
33 kV,2500A, 31.5kA for 3sec Horizontal Double Break
type Isolator without earth switch complete with manual
7 and motor driven operating mechanisms along with 2
Support Insulators, Clamps & Connectors and Hardware
Fittings
23 Surge Arrester
120kV, 10kA, LA complete with Surge Monitor, hardware
24 fittings, clamps & connectors as per specification 12
30kV, 10kA, LA with surge counter, hardware fittings,
25 30
clamps & connectors as per specification
26 CVT and Wave Trap
132kV, 4400pF, 3 Wdg CVT, complete with Junction Box,
27 6
hardware fittings, clamps & connectors
132KV, 800A Pedestal Mounted Wave Trap complete
28 4
with all accessories
29 Circuit Breaker
36 kV 1600 A, SCR 31.5 kA for 3 sec, Circuit Breaker,
30 outdoor type, 3-Ph gang operated complete with 6
operating mechanism & support structure
36 kV 2500 A, SCR 31.5 kA for 3 sec, Circuit Breaker,
31 outdoor type, 3-Ph gang operated complete with 3
operating mechanism & support structure
Bay Marshalling Kiosk along with support structures
32
33 132 kV Bay Marshalling Kiosk 1
Instrument Transformers along with junction box and
34 all other accessories
35 33KV, 1200-1000/1-1-1-1-1 A Current Transformer 6
36 33KV, 600-300/1-1A Current Transformer 18
37 33KV, 2500-1200/1-1A Current Transformer 3
38 33 kV Potential Transformer (3 Core) 6
CABLES
142 XLPE Armoured Cu, LT Power Cable (1.1kV grade)
143 2C, 6sqmm 1
144 4C, 16sqmm 1
145 3.5C, 35sqmm 1
146 3.5C, 70sqmm 1
147 3.5C, 400sqmm 1
Other Cables as per technical specification not covered
148 1
above
Cable supports and other cable accessories like Lugs,
149 1
Glands etc.
1.00
150 Others ( Cable for Fire Fighting, Illumination, CCTV etc)
PVC Armoured Cu LT Control Cable (1.1 kV grade)
151
152 2C, 2.5sqmm 1
153 4C, 2.5sqmm 1
154 7C, 2.5sqmm 1
155 12C, 2.5sqmm 1
156 17C, 2.5sqmm 1
157 19C, 2.5sqmm 1
Other Cables as per technical specification not covered
158 1
above
Cable supports and other cable accessories like Lugs,
159 1
Glands etc.
1
160 Others ( Cable for Fire Fighting, Illumination, CCTV etc)
Multi Modular Cable sealing system for all cable entries
161 at GIS building, Control room, Kiosk building, FFPH 1
building etc. as per requirement.
10 Fire Alarm & Detection
Fire Alarm & Detection system for 145kV GIS Building
and related rooms, Control Room building and other
related rooms including Fire Alarm panel, Multi Sensor
190 detector, manual Call point, Hooter, Response Indicators, 1
Beam Detector, Cabling and ISOLATING MODULE as
per specification.
Portable and wheel/trolley mounted Fire Extinguishers for
Control Room Building and Switchyard as per
specification and Portable Fire Extinguisher for GIS Hall
191 (5kg X 6Nos and 2kg X5 Nos), Officer Quarter (2kg X 1
6Nos), Staff Quarter (2kg X 6Nos), Security Barrack (2kg
X 6Nos),Guard room (Security Booth) (2kg X 3Nos),
Store Building (2kg x5) as per specification.
Trolley mounted portable fire exinguishers (Dry powder
192 chemical type) for 250 kVA transformers ( 10 Kg , DCP 2
Type)
Hydrant & HVWS (High Velocity Water Spray)
193 system/NIFPES
Hydrant system along with pumping arrangement &
194 associated Civil works for fire protection system for 2 No 1
of Transformer
HVWS system (Automatic Emulsifier and Manual Hydrant
195 2.00
Point both) for 50 MVA Transformer-2 No’s
NItrogen injection Fire protection and emergency service
196 with complete accessories and related Civil and Electrical 2.00
works for 2 Nos ICT
50MVA, 132/33kV, ONAN/ ONAF, 3 Phase Power
90 Transformer along with all accessories as below:
50 MVA, 132/33 kV, Three phase Power Transformer
91 2
with OLTC (including Transformer oil)
92 Oil & winding temperature monitoring system (FO based) 2
93 Online DGA 2
94 Online insulating drying system 2
95 Digital RTCC Panel 2
96 10% Extra OIL for each transformer 1
Terminal connector on 132kV side bushing of 132/33 kV
97 8
Transformer to suit Single Moose conductor
Terminal connector on 33kV side bushing of 132/33kV
98 8
Transformer to suit Twin Moose conductor
Single phase HV side 3 core bushing phase CT (300/1A,
99 6
2 core) and 1 core for WTI
Single phase LV side 3 core bushing phase CT (1200/1A,
100 6
2 core) and 1 core for WTI
101 Single phase bushing mounted HV NCT (300/1A, 2 core) 2
Single phase bushing mounted LV NCT (1200/1A, 2
102 2
core)
19 Station Service Transformer
250 KVA, 33/0.433kV StationTransformer (Energy
20 2
Efficiency Level 3) , including Clamps & Connectors
21 33kV DO Fuse 2
Power receiving panel with 440V MCCB of adequate
22 2
rating for Station Service Transformer
Battery & Battery Chargers, DCDB & ACDB as per
118 specification
119 220V VRLA Battery, 600AH 2
120 220V, Dual Float Cum Boost Chargers, 150A 2
121 220V, DCDB 2
122 48V VRLA type Battery Bank, 300 AH 2
48V, 60A Modular SMPS based Dual Float cum Boost
123 2
Chargers
124 48V, DCDB 2
125 Main ACDB 2
126 Sub ACDB 2
127 MLDB with 415V/415V, 100kVA isolation transformer 1
128 ELDB with 415V/415V, 50kVA isolation transformer 1
129 HVAC DB 1
130 MCBDB 1
131 Auxiliary ACDBs, Sub DCDBs etc as per requirement 1
Power Line Carrier Communication Equipments
132 (Twin Channel, 8kHz) 1
HF armoured co-axial cable (ALONGWITH HDPE /GI
133 4
CONDUIT)
Digital Carrier Equipment Panel (Twin channel and
134 should support transmission band for line length 150 km ) 4
for 132kV
IEC 61850 compliant Digital Tele- Protection Coupler, 16
command with redundant power supply card and CPU
135 1
along with relay, E1 interface card and optical interface
card to support 150 km(132kV)
EPAX system and telephone system with redundant
136 8
power supply card and CPU along with E1 interface card.
137 LMU and LMDU 1
138 Armoured Audio Cable 1
139 CAT 6 armoured cable. 5
Walkie talkie handset to operate seamlessly within a
140 radius of 1km using license free band. (Motorola or 4
better)
141 Two wire telephone set
198 Lighting System
199 Indoor Lighting
Lighting System including Lighting panel, Cabling,
Conduiting, Switches, Socket, Junction boxes,
200 auxiliary receptacle, High bay fixtures for GIS rooms
201 145 kV GIS Building 1
202 Control Room Building 1
203 FFPH Building 1
204 Pump House 1
205 Security booth 1
206 Security barrack 1
Staff Quarter, Officer Quarter, store building & open
207
store shed
1
208 Outoor Lighting
Outdoor LED lighting for Switchyard, Road area, Car
parking, Security outpost including Lighting panel,
209
Distribution Boards, Cabling, Switches, Socket, auxiliary
1
receptacle, complete with GI Poles etc.
210 Public Addressing System, CCTV 1
Lightning protection (lightning masts 50 metres high,
211 Lightning Spike, shield wires (7/4 mm GI shield wire), 1
down conductors etc.)
Miscellaneous item(like MS Channel,Angle, Rail,
Chequered plate,MS Grill plate, Lugs and Glands,HDPE
212 Pipes Switchyard and Bay Identification Name board, 1
Anchor fastner and Display for Overall single line diagram
photo with frame.etc…as per site requirement)
185 HVAC & VENTILATION
Industrial Air conditioning system for 132kV GIS Building
186 C&R Panel Room, Control room building (SCADA 1
Room), having N+1 or N+2 Standby Requirements
2 TON CAPACITY SPLIT AIR CONDITIONING UNITS
for Battery Room, Engineer Room , JE Room, Electrical
187 room, Conference room. 1
Ventilation system for 145kV GIS Building (Ventilation
System with Centrifugal Fan and related Accessories
188 should comprise of Pre and Fine air filter,Air Purifier, 1
centrifugal fan, ducting network, air supply grilles, gravity
dampers, electrical and instrumentation etc.)
Complete Substation System Automation System (As
51 per specification )
52 Bay Control Units for 132kV Bays
53 Bay Control Units for 33 kV Bays
54 Station HMI (Main, Redundant and Metering)
55 Maintenance HMI (DR Workstation)
56 Gate way with PLCC and Fibre Optic Modem and Panel
57 5 kVA SAS Inverter
58 UPS with separate 220 V Battery Bank
59 Colour Laser Printer
60 Line Printer
61 GPS Clock System
62 Bay Ethernet Switch
63 Station Ethernet Switch
64 All interphase equipment for Gateway to SLDC
All other accessories like FO armoured cables, HDPE
65 Conduit/GI conduit Patch cords,furnitures for HMIs and
printers, cables etc as per requirement
66 LIU
67 RTU Panel
68 75" VDU
SAMAST compliant ABT meters including DCU, modems,
69 FO cables, AMR and other related accessories etc.as
per specification.
70 27 Inch LCD Monitor (Industrial)
ON OF 132/33 KV ,2X50 MVA GIS AT TITABOR AND 132/33 KV,2X50 MVA AIS AT
AM ELECTRICITY GRID CORPORATION LIMITED ALONGWITH ASSOCIATED
N LINE(PKG:P-II-B)
LECTRICITY GRID CORPORATION LIMITED
I & COMPANY-M/S STELMEC LIMITED(M/S BRC-STELMEC JV)
V,2X50 MVA GIS FOR M/S ASEGCL AT TITABOR LOCATION,ASSAM(INDIA)
Supply item at site on
Units Remarks
priority
Lot
Lot
Lot
Lot
Lot
Earthing Material such as
Lot MS Rod,GS Flat,GI
Perforated Pipe to be
supplied at Site as per
the RFC approved BOM. 1st Lot Supply of material at
Lot
Site
JOB
JOB
JOB
JOB
JOB
Lot
Lot
LS Foundation Bolts With
required nut/Checknuts,
LS Spring washers
Nos.
Nos.
Nos.
Nos.
Set
Set
Set GI Lattice /Pipe Mounting
Set Structure to be supplied 2nd Lot supply of material
Set at Site
Set
Set
Set
Set
Set
Set
Lot
Set
Set
Set
Set
132 KV and 33 KV Side
insulators, Hardware &
Set
conductors to be 3rd Lot Supply of Material
lot arranged at Site
LS
No.
No.
Set
Set
Set
Sets
Sets
Sets
Sets
Sets
Sets
Lot
Sets
Set
Set
132 KV and 33 KV
electrical equipments to 4th Lot Supply of Material
be supplied at site
Set
Set
No.
No.
No.
No.
Sets
Sets
Nos
No.
No.
No.
No.
Lot
Lot
Lot
Lot
Lot
LS
Lot
LS
Power & control cables 5th Lot Supply of Material at
Lot with required Lugs & Site
Lot gland to be supplied at
Lot site
Lot
Lot
Lot
LS
Lot
LS
Lot
Lot
Lot
FF and High Velocity
Water Spray System & its 6th Lot Material to be Supplied at
accessories Supply at Site
Site
Nos
Lot
Set
Set
Set
Set
Set
Set
Set
LS
No. Xmer With Oil drums and
its accessories to be
Nos. supplied for Site
Equipment with all its related
Nos. accessories to be supplied at
site in 7th Lot.
Nos.
Nos.
Nos.
Nos.
Sets
Sets
Set
Set
Set
Set
Set
Battery Chargers with
Set Stand and Wires to be Material to be arranged at Site
Set Supplied at site as per by 8th Lot
Set BOQ
Set
Set
Set
Lot
Lot
LOT
No
NO
NO Approved make PLCC
alongwith related Material to be arranged at Site
accessories to be by 9th Lot
arranged at site
Set
Lot
LOT
No
No
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lot
Lighting & Area Illumination
Area & Building
material to be supplied at site
Illumination Material
once the civil works of GIS
alongwith PAS and
building is ready.The same
accessories to be
Lot may be supplied at site in 10th
supplied
Lot
Lot
Lot
Lot
Complete Substation
Automation System to be Final Lot Supply of Material
supplied in last lot.
supplied in last lot.