0% found this document useful (0 votes)
14 views42 pages

Material Procu Priority at Chabua & Titabor

The document details the construction project for a 132/33 KV, 2X50 MVA AIS substation at Chabua, Assam, for M/S Assam Electricity Grid Corporation, with M/S Badri Rai & Company as the contractor. It outlines the schedule for the supply of various materials, including earthing materials, insulators, circuit breakers, and fire protection systems, with specific quantities and specifications. The submission date for the project is set for May 17, 2025.

Uploaded by

Rahul Rakesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views42 pages

Material Procu Priority at Chabua & Titabor

The document details the construction project for a 132/33 KV, 2X50 MVA AIS substation at Chabua, Assam, for M/S Assam Electricity Grid Corporation, with M/S Badri Rai & Company as the contractor. It outlines the schedule for the supply of various materials, including earthing materials, insulators, circuit breakers, and fire protection systems, with specific quantities and specifications. The submission date for the project is set for May 17, 2025.

Uploaded by

Rahul Rakesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 42

CONSTRUCTION OF 132/33 KV ,2X50

NAME OF THE WORK AIS AT CHABUA ASSAM ELECTRICIT


ASSOCIATED TRANSMISSION LINE(P
CUSTOMER NAME M/S ASSAM ELECTRICITY GRID COR
CONTRACTOR NAME M/S BADRI RAI & COMPANY-M/S STE
DATE OF SUBMISSION 5/17/2025

SCHEDULE FOR SUPPLY OF MATERIALS PRIORITYWISE AT 132/33 KV,2X50 MVA AIS FOR M/S ASEG
Sl.
Item Description Quantity
No.
Earthing Material & Foundation Bolts(complete Set)
19.00
As per approved TS
Main earth mat conductor, GS risers, treated
19.01 /Untreated earth pit, equipment earth connections etc.

Main Earthing Conductor 40mm dia MS Rod


19.01 1

Earthing Conductor: 40mm dia MS Rod For Riser From


19.01 The Burial Earth Mat To Equipment,Structure Etc) 1

Earthing Conductor: 75X12mm GS Flat For Equipment


19.01 and Structure Earthing 1

Earthing Conductor: 65X12mm GS Flat For Columns and


19.01 Auxiliary Structure Earthing 1

Earthing Conductor: 50X6Mm GS Flat For Riser For


19.02 Console Box,Lt Panels,Dc Panels,Marshalling Boxes, 1
Cable Trenches Etc)

Earthing Device & Associated Accessories (50 Mm dia


19.02 Heavy Duty GS Perforated Pipe 3 Mtrs Long For Treated 1
Earth Pit with CI cover)

Earthing Device & Associated Accessories 40Mm dia MS


19.02 1
Rod 3 Mtrs Long For Non Treated Earth Pit with CI cover)

50x8 mm, 50x6 mm, 25x6mm, 25x4mm GS Flat as per


19.02 1
site requirement

Soil Resistivity Test And Soil Treatment As And When


19.02 1
Required

19.02 Separate Earthing For Control room building 1


19.02 Separate Earthing For Fencing Around The Substation 1

19.02 Auxiliary/Satellite Earth mat wherever applicable 1

Other Earthing Accessories ( reqd for complete earthing of


19.02 1
the entire switchyard and the buildings)

Foundation Bolts (Including nuts,checknut & washers for


20.05 1
lattice and pipe structures)

Fastners(nuts, bolts and washers) including step bolts for


20.06 1
lattice and pipe structures

20.00 Supply of Galvanised Lattice structures

20.01 132kV Column 24

20.02 132kV Beam 18

20.03 33kV Column 18

20.04 33kV Beam 9

14.00 Mounting Structures

14.01 145 kV Isolator with double earth switch 4

14.02 145 kV Isolator with single earth switch 4

14.03 145 kV Isolator without earth switch 8

14.04 145 kV Isolator (tandem type) 4

14.05 33 kV Isolator (with earth switch) 13


14.06 33 kV Isolator (without earth switch) 9

14.07 145 kV CVT 6

14.08 145 kV PI 54

14.09 120 kV LA 12

14.10 30 kV LA 33

14.11 145 kV CT 15

14.12 145 kV PT 6

14.13 36 kV CT 30

14.14 36 kV PT 6

14.15 36 kV PI 13

14.16 33kV IPS Tubular Bus Support Structure 1

2.00 Insulators, hardware & Conductors

132kV, 2 x160kN double tension string Antifog insulators


2.01 66
and hardwares suitable for Twin MOOSE conductors

132kV, 2 x120kN double suspension string Antifog


2.02 insulators and hardwares suitable for Twin MOOSE 42
conductors

132kV,120kN single suspension string Antifog insulators


2.03 9
and hardwares suitable for Single MOOSE conductors
33kV, 2 x160kN double tension string Antifog insulators
3.00 15
and hardwares suitable for Twin MOOSE conductors

132kV, 2 x120kN double suspension string Antifog


3.01 insulators and hardwares suitable for Twin MOOSE 9
conductors

33kV,70kN single suspension string Antifog insulators and


3.02 27
hardwares suitable for Single PANTHER conductors

3.03 ACSR Moose Conductor 1

3.04 ACSR Panther Conductor 1

3 inch IPS Aluminium Tubular Conductor with Flexi


3.05 Connectors, expansion joints,T-Joints etc as per 1
requirement

Clamps, Connectors and Hardware fittings (as per site


3.06 1
requirement)

145KV, 1 phase Solid core bus post insulator (creepage


3.07 57
distance 31mm/kV)

36 KV, 1 phase Solid core bus post insulator (creepage


3.08 16
distance 31mm/kV)

Terminal connector on 132kV side bushing of Transformer


13.07 8
to suit Twin Moose conductor

Terminal connector on 33kV side bushing of Transformer


13.08 8
to suit Twin Moose conductor

Single phase HV side 3 core bushing phase CT (300/1A, 2


13.09 6
core) and 1 core for WTI

Single phase IV side 3 core bushing phase CT (1200/1A,


13.10 6
2 core) and 1 core for WTI

Single phase HV side bushing mounted NCT (300/1A, 2


13.11 2
core)

Single phase LV side bushing mounted NCT (1200/1A, 2


13.12 2
core)
Rail Track for Transformer
13.13 2

Pulling Block for Transformer


13.14 4

5.00 Surge Arrester

120kV, 10kA, LA complete with Surge Monitor, hardware


5.01 fittings, clamps & connectors as per specification 12

30kV, 10kA, LA with surge counter, hardware fittings,


5.02 33
clamps & connectors as per specification

6.00 CVT and Wave Trap

132kV, 4400pF, 3 Wdg CVT, complete with Junction Box,


6.01 6
hardware fittings, clamps & connectors

132KV, 800A Pedestal Mounted Wave Trap complete with


6.02 4
all accessories

7.00 Circuit Breaker

145 kV, 3150 A, SCR 40 kA for 3 sec, SF6 Circuit


Breaker, outdoor type, 3-Ph gang operated complete with
7.01 5
operating mechanism & support structure with 10 % spare
SF-6 gas.
36 kV 2500 A, SCR 31.5 kA for 3 sec, Vacuum Circuit
Breaker, outdoor type, 3-Ph gang operated complete with
7.02 3
operating mechanism & support structure as per
specification.
36 kV 1600 A, SCR 31.5 kA for 3 sec, Vacuum Circuit
Breaker, outdoor type, 3-Ph gang operated complete with
7.03 7
operating mechanism & support structure as per
specification.
Bay Marshalling Kiosk along with support structures
8.00

8.01 132 kV Bay Marshalling Kiosk 2

8.02 33 kV Bay Marshalling Kiosk 5

Instrument Transformers along with junction box and


9.00 all other accessories
132KV, 1200-800-400/1-1-1-1-1 A Current Transformer
9.01 6
(132 kV Line Bay)

132KV, 600-300/1-1-1-1-1 A Current Transformer (132 KV


9.02 6
Transformer Bay)

132KV, 1600-800/1-1-1-1 A Current Transformer (132kV


9.03 3
Bus Coupler)

10.00 132 kV Potential Transformer 6

33 kV 1200-1000/1-1-1-1-1 A Current Transformer (33 kV


10.01 6
Transformer Bay)

33 kV 600-300/1-1 A Current Transformer (33 kV Feeder


10.02 21
Bay)

33 kV 2500/1-1 A Current Transformer (33kV Bus


10.03 3
Section)

10.04 36 kV Potential Transformer 6

1.00 Isolators
145KV, 2000A, 40kA for 3 sec, Horizontal Double Break
type Isolator with double earth switch complete with
1.01 manual and motor driven operating mechanisms along 2
with Support Insulators, Clamps & Connectors and
Hardware Fittings

145KV, 1250A, 40kA for 3 sec, Horizontal Double Break


type Isolator with double earth switch complete with
1.02 manual and motor driven operating mechanisms along 2
with Support Insulators, Clamps & Connectors and
Hardware Fittings
145KV, 2000A, 40kA for 3 sec, Horizontal Double Break
type Isolator without earth switch complete with manual
1.03 and motor driven operating mechanisms along with 4
Support Insulators, Clamps & Connectors
145KV, 1250A, 40kA for 3 sec, Horizontal Double Break
type Isolator without earth switch complete with manual
1.04 and motor driven operating mechanisms along with 4
Support Insulators, Clamps & Connectors
145KV, 1600A, 40kA for 3 sec, Horizontal Double Break
type Isolator with one earth switch complete with manual
1.05 and motor driven operating mechanisms along with 4
Support Insulators, Clamps & Connectors
145KV, 2000A, 40kA for 3 sec, Horizontal Double Break
type Isolator with one earth switch (tandem type) complete
1.06 with manual and motor driven operating mechanisms 2
along with Support Insulators, Clamps & Connectors

145KV, 1250A, 40kA for 3 sec, Horizontal Double Break


type Isolator with one earth switch (tandem type) complete
1.07 with manual and motor driven operating mechanisms 2
along with Support Insulators, Clamps & Connectors

33 kV,1250A, 31.5kA for 3sec Horizontal Double Break


type Isolator without earth switch complete with manual
1.08 and motor driven operating mechanisms along with 7
Support Insulators, Clamps & Connectors and Hardware
Fittings

33 kV,1250A, 31.5kA for 3sec Horizontal Double Break


type Isolator with earth switch complete with manual and
1.09 11
motor driven operating mechanisms along with Support
Insulators, Clamps & Connectors and Hardware Fittings

33 kV,1600A, 31.5kA for 3sec Horizontal Double Break


type Isolator without earth switch complete with manual
1.10 and motor driven operating mechanisms along with 2
Support Insulators, Clamps & Connectors and Hardware
Fittings

33 kV,2500A, 31.5kA for 3sec Horizontal Double Break


type Isolator with earth switch complete with manual and
1.11 2
motor driven operating mechanisms along with Support
Insulators, Clamps & Connectors and Hardware Fittings
XLPE Armoured Cu, LT Power Cable (1.1kV grade)
17.00

17.01 2C, 6sqmm 1

17.02 4C, 16sqmm 1

17.03 3.5C, 35sqmm 1

17.04 3.5C, 70sqmm 1

17.05 3.5C, 400sqmm 1

17.06 Other Cables not covered above 1


Cable supports and other cable accessories like Lugs,
17.07 1
Glands etc.

1.00
17.08 Others ( Cable for Fire Fighting, Illumination, CCTV etc)

PVC Armoured Cu LT Control Cable (1.1 kV grade)


18.00

18.01 2C, 2.5sqmm 1

18.02 4C, 2.5sqmm 1

18.03 7C, 2.5sqmm 1

18.04 12C, 2.5sqmm 1

18.05 17C, 2.5sqmm 1

18.06 19C, 2.5sqmm 1

18.07 Other Cables not covered above 1

Cable supports and other cable accessories like Lugs,


18.08 1
Glands etc.

1.00
18.09 Others ( Cable for Fire Fighting, Illumination, CCTV etc)

Multi Modular Cable sealing system for all cable entries at


18.10 Control room, Kiosk building, FFPH building etc. as per 1
requirement.

22.00 Fire Alarm & Detection

Fire Alarm & Detection system for Control Room building


22.01 and other related rooms including Fire Alarm panel, Multi 1
Sensor detector, manual Call point, Hooter, Response
Indicators, Beam Detector, Cabling and ISOLATING
Portable and wheel/trolley mounted Fire Extinguishers for
Control Room Building and Switchyard as per specification
and Portable Fire Extinguisher for Control Room (5kg X
22.02 6Nos and 2kg X5 Nos), Officer Quarter (2kg X 6Nos), Staff 1
Quarter (2kg X 6Nos), Security Barrack (2kg X
6Nos),Guard room (Security Booth) (2kg X 3Nos), Store
Buildingmounted
Trolley (2kg x5)portable
as per specification.
fire exinguishers (Dry powder
22.03 chemical type) for 250 kVA transformers ( 10 Kg , DCP 2
Type)
Hydrant & HVWS (High Velocity Water Spray)
23.00 system/NIFPES

Hydrant system along with pumping arrangement &


23.01 associated Civil works for fire protection system for 2 No 1
of Transformer
2.00
HVWS system (Automatic Emulsifier and Manual Hydrant
23.02
Point both) for 50 MVA Transformer-2 No’s

2.00
NItrogen injection Fire protection and emergency service
23.03 with complete accessories and related Civil and Electrical
works for 50 MVA Transformers

50MVA, 132/33kV, ONAN/ ONAF, 3 Phase Transformer


13.00 along with all accessories as below:

50 MVA, 132/33 kV, Three phase Transformer with OLTC


13.01 2
(including Transformer oil)

13.02 Oil & winding temperature monitoring system (FO based) 2

13.03 Online DGA 2

13.04 Online insulating drying system 2

13.05 Digital RTCC Panel 2

13.06 10% Extra OIL for each transformer 1

4.00 Station Service Transformer


250 KVA, 33/0.433kV StationTransformer (Energy
4.01 2
Efficiency Level 3) , including Clamps & Connectors

Power receiving panel with 440V MCCB of adequate


4.02 2
rating for Station Service Transformer

4.03 33kV DO Fuse including Support Structure 2

Battery & Battery Chargers, DCDB & ACDB as per


15.00 specification

15.01 220V VRLA Battery, 600AH 2

15.02 220V, Dual Float Cum Boost Chargers, 150A 2

15.03 220V, DCDB 2

15.04 48V VRLA type Battery Bank, 300 AH 2

48V, 60A Modular SMPS based Dual Float cum Boost


15.05 2
Chargers

15.06 48V, DCDB 2

15.07 Main ACDB 2

15.08 Sub ACDB 2

15.09 MLDB with 415V/415V, 100kVA isolation transformer 1

15.10 ELDB with 415V/415V, 50kVA isolation transformer 1

15.11 HVAC DB 1
15.12 MCBDB 1

15.13 Auxiliary ACDBs, Sub DCDBs etc as per requirement 1

Power Line Carrier Communication Equipments (Twin


16.00 Channel, 8kHz)

HF armoured co-axial cable (ALONGWITH HDPE /GI


16.01 1
CONDUIT)

Digital Carrier Equipment Panel (Twin channel and should


16.02 support transmission band for line length 150 km ) for 4
132kV

IEC 61850 compliant Digital Tele- Protection Coupler, 16


command with redundant power supply card and CPU
16.03 4
along with relay, E1 interface card and optical interface
card to support 150 km(132kV)

EPAX system and telephone system with redundant


16.04 1
power supply card and CPU along with E1 interface card.

16.05 LMU and LMDU 8

16.06 Armoured Audio Cable 1

16.07 CAT 6 armoured cable. 1

Walkie talkie handset to operate seamlessly within a


16.08 5
radius of 1km using license free band. (Motorola or better)

16.09 Two wire telephone set 4

125 KVA, Silent DG Set with AMF including Panel &


24.00 Accessories including earthing arrangement 1

Lighting System
25.00

Indoor
25.01
Lighting System including Lighting panel, Cabling,
25.01 Conduiting, Switches, Socket, Junction boxes,
auxiliary receptacle

25.01 Control Room Building 1

25.01 FFPH Building 1

25.01 Pump House 1

25.02 Security booth 1

25.02 Security barrack 1

Staff Quarter, Officer Quarter, store building & open store


25.02 1
shed

Outoor Lighting
25.02

Outdoor LED lighting for Switchyard, Road area, Car


parking, Security outpost including Lighting panel,
25.02 1
Distribution Boards, Cabling, Switches, Socket, auxiliary
receptacle, complete with GI Poles etc.

25.02 Public Addressing System, CCTV 1

Lightning protection (lightning masts 50 metres high,


25.02 Lightning Spike, shield wires (7/4 mm GI shield wire), 1
down conductors etc.)

Miscellaneous item(like MS Channel,Angle, Rail,


Chequered plate,MS Grill plate, Lugs and Glands,
25.02 Switchyard and Bay Identification Name board, Anchor 1
fastner and Display for Overall single line diagram photo
with frame.etc…as per site requirement)

HVAC & VENTILATION


21.00

Industrial Air conditioning system for 132kV Control room


21.01 building SCADA Room, having N+1 or N+2 Standby 1
Requirements
2 TON CAPACITY SPLIT AIR CONDITIONING UNITS for
21.02 Battery Room, Engineer Room , JE Room, Electrical 1
room, Conference room.
RUCTION OF 132/33 KV ,2X50 MVA GIS AT TITABOR AND 132/33 KV,2X50 MVA
CHABUA ASSAM ELECTRICITY GRID CORPORATION LIMITED ALONGWITH
IATED TRANSMISSION LINE(PKG:P-II-B)
SAM ELECTRICITY GRID CORPORATION LIMITED
DRI RAI & COMPANY-M/S STELMEC LIMITED(M/S BRC-STELMEC JV)
25

,2X50 MVA AIS FOR M/S ASEGCL AT CHABUA LOCATION,ASSAM(INDIA)


Supply item at site on
Units Remarks
priority

Lot

Lot

Lot

Lot

Lot

Lot
Earthing Material
such as MS Rod,GS
Flat,GI Perforated
Lot Pipe to be supplied at
Site as per the RFC
approved BOM.
Ist Lot of Material to be
Lot arranged at Site

JOB

JOB
JOB

Lot

Lot

LS
Foundation Bolts
With required
nut/Checknuts,
Spring washers
LS

Nos.

Nos.

Nos.

Nos.

Set

Set

Set

Set

Set
GI Lattice & mounting
Structure for 145 KV
and 33 KV
Equipments to be Supply in 2nd Lot
Supplied at Site as
per approved RFC
Drawing
GI Lattice & mounting
Structure for 145 KV
and 33 KV
Set Equipments to be Supply in 2nd Lot
Supplied at Site as
per approved RFC
Drawing
Set

Set

Set

Set

Set

Set

Set

Set

Set

Lot

Set

Set

Set
Set

Set

Set

lot

lot

lot

132 KV and 33 KV
Supply in 3rd Lot
Side insulators,
LS Hardware &
conductors to be
arranged at Site
No.

No.

No.

Nos.

Nos.

Nos.

Nos.

Nos.
Set

Civil Works for Site/Not a


Set
Supplied Item

No.

No.

No.

No.

Sets

Sets

Sets

Nos

Nos
No.

No.

No.

No.

No.
145 KV and 33 KV
Supply in 4th Lot
Supply of
Equipments,BMK with
complete fitting
No.
accessories to be
arranged at site

No.

No.

Set

Set

Sets

Sets

Sets
Sets

Sets

Set

Set

Set

Set

Lot

Lot

Lot

Lot

Lot

LS
Lot

LS

Power & control


cables as per RFC
Quantity along with
Lugs/gland &
accessories to be
Lot Supply in 5th Lot
arranged at Site

Lot

Lot

Lot

Lot

Lot

LS

Lot

LS

Lot

Lot
Lot

Nos

Supply in 6th Lot

Lot

Set

Set

Set

Set

Set

Set
Power Transformer
&Station Transformer
along with all related
Set Supply in 7th Lot
accessories to be
Supplied at site
including Oil Drums.
LS
No.

Sets

Sets

Set

Set

Set

Set

Set

ACDB and DCDB


Set
Panels With Battery
Bank set up with the
Supply in 8th Lot
required set up
accessories (as per
Set
specification)

Set

Set

Set

Set
Lot

Lot

LOT

No

NO

NO

Set Approved make PLCC


along with related
Supply in 9th Lot
accessories to be
arranged at site
Lot

Lot

No

No

Lot
Lot

Lot

Lot

Lot

Lot

Lot
Area and Building
illumination items to
be arranged at site
FINAL LOT SUPPLIED
ITEMS AT SITE

Lot

Lot

Lot

Lot

Lot
Lot
CONSTRUCTION OF 132/33 KV ,2X50 MVA
NAME OF THE WORK CHABUA ASSAM ELECTRICITY GRID CORP
TRANSMISSION LINE(PKG:P-II-B)

CUSTOMER NAME M/S ASSAM ELECTRICITY GRID CORPORA


CONTRACTOR NAME M/S BADRI RAI & COMPANY-M/S STELMEC
DATE OF SUBMISSION
SCHEDULE FOR SUPPLY OF MATERIALS PRIORITYWISE AT 132/33 KV,2X50 MVA GIS FOR M/S AS
Sl.
Item Description Quantity
No.
Supply of Items for 132/33kV Titabor GIS
162 Earthing
Main earth mat conductor, GI risers, treated
163 /Untreated earth pit, equipment earth connections
etc.
164 Main Earthing Conductor 40mm dia MS Rod 1
Earthing Conductor: 40mm dia MS Rod For Riser From
165 The Burial Earth Mat To Equipment,Structure Etc) 1

Earthing Conductor: 75X12mm GS Flat For Equipment


166 and Structure Earthing 1

Earthing Conductor: 50X10Mm GS Flat For Riser For


167 Console Box,Lt Panels,Dc Panels,Marshalling Boxes, 1
Cable Trenches Etc)
Earthing Device & Associated Accessories (50 Mm dia
168 Heavy Duty MS Perforated Pipe 3 Mtrs Long For Treated 1
Earth Pit with CI cover)

Earthing Device & Associated Accessories 40Mm dia Ms


169 1
Rod 3 Mtrs Long For Non Treated Earth Pit with CI cover)

50x8 mm, 50x6 mm, 25x6mm GS Flat as per site 1


170
requirement
Soil Resistivity Test And Soil Treatment As And When 1
171
Required
Separate Earthing For 145 Kv GIS Modules (including 1
172
multi-point earthing)
Separate Earthing For 145 kV GIS Building (with Cu flat 1
173
of adequate size for GIS earth mat)
174 Separate Earthing For Control room building 1
175 Separate Earthing For Fencing Around The Substation 1
176 Auxiliary/Satellite Earth mat wherever applicable 1
Other Earthing Accessories ( required for complete 1
177
earthing of the entire switchyard and the buildings)
Foundation Bolts (Including nuts,checknut & washers for
1
183 lattice and pipe structures)
Fastners(nuts, bolts and washers) including step bolts for
1
184 lattice and pipe structures

Supply of Galvanised Lattice structures


178
132kV Column 7
132kV Beam 4
33kV Column 12
33kV Beam 8
105 Mounting Structures (Lattice/pipe)
145 kV Isolator with double earth switch 10
36 kV Isolator (with earth switch) 8
36 kV Isolator (without earth switch) 12
145 kV CVT 6
120 kV LA 12
30 kV LA 30
36 kV CT 27
36 kV PT 6
145 kV PI 18
36 kV PI 12
36kV DO Fuse 2
33kV IPS Tubular Bus Support Structure 1

8 Insulators, hardware & Conductors

132kV, 2X90kN Twin tension string Antifog insulators and


hardwares suitable for single AAAC Panther conductors
9 8
132kV, 2 x120kN double suspension string Antifog
insulators and hardwares suitable for Twin MOOSE
10 conductors 8
33kV, 2 x120kN double suspension string Antifog
insulators and hardwares suitable for Twin MOOSE
11 conductors 14
33kV, 2X160kN Double tension string Antifog insulators
12 and hardwares suitable for Twin MOOSE conductors 14
33kV,120kN single suspension string Antifog insulators
13 and hardwares suitable for single MOOSE conductors 20
14 ACSR Moose Conductor 1
3 inch IPS Al Tubular Conductor with Flexi Connectors,
15 expansion joints,T-Joints etc as per requirement 200
Clamps, Connectors and Hardware fittings (as per site
16 requirement) 1
145 KV, 1 phase Solid core bus post insulator (creepage
18
17 distance 31mm/kV)
36 kV , 1 phase Solid core bus post insulator (creepage
12
18 distance 31mm/kV)
5 Ton EOT Crane (Double Girder) for 145kV GIS
81 Building 1
103 Rail Track for Transformer 2
104 Pulling Block of transformer(Civil Works) 4
73 Supply of 145 kV & 33 KV GIS Equipments
145kV, 40kA for 3 second, SF6 gas-insulated metal
74 enclosed Line bay module as per technical specification 2.00

145kV, 40kA for 3 second, SF6 gas-insulated metal


75 enclosed Transformer bay module (HV of 50MVA 2.00
Transformer) as per technical specification
145kV, 40kA for 3 second, SF6 gas-insulated metal
76 enclosed Bus Coupler bay module as per technical 1.00
specification
145kV, One number, 3-phase encapsulated, SF6 gas
77 insulated metal enclosed 3150 A, 40kA for 3 sec, Bus Bar 2.00
module as per technical specifications
145kV extension module complete with all requirements
78 for necessary bus extension 4.00
145kV, 3150A, 40 kA for 3 sec, 3- phase SF6 to air
bushings along with termination module & support
79 structure for outdoor connections to connect GIS with 4.00
145kV side of Power transformer and overhead lines
145kV, 3150A, 40kA for 3 second, 3-Ph, SF6 Gas
Insulated Bus Duct (GIB) (including inside the GIS hall)
80 including Bus Duct support structure and associated 1.00
accessories and jointing elements
2 Isolators
145KV, 2000A, 40kA for 3 sec, Horizontal Double Break
type Isolator with double earth switch complete with
3 manual and motor driven operating mechanisms along 2
with Support Insulators, Clamps & Connectors

33 kV,1250A, 31.5kA for 3sec Horizontal Double Break


type Isolator with earth switch complete with manual and
4 6
motor driven operating mechanisms along with Support
Insulators, Clamps & Connectors and Hardware Fittings

33 kV,1250A, 31.5kA for 3sec Horizontal Double Break


type Isolator without earth switch complete with manual
5 and motor driven operating mechanisms along with 10
Support Insulators, Clamps & Connectors and Hardware
Fittings

33 kV,1600A, 31.5kA for 3sec Horizontal Double Break


type Isolator with earth switch complete with manual and
6 2
motor driven operating mechanisms along with Support
Insulators, Clamps & Connectors and Hardware Fittings

33 kV,2500A, 31.5kA for 3sec Horizontal Double Break


type Isolator without earth switch complete with manual
7 and motor driven operating mechanisms along with 2
Support Insulators, Clamps & Connectors and Hardware
Fittings

23 Surge Arrester
120kV, 10kA, LA complete with Surge Monitor, hardware
24 fittings, clamps & connectors as per specification 12

30kV, 10kA, LA with surge counter, hardware fittings,


25 30
clamps & connectors as per specification
26 CVT and Wave Trap
132kV, 4400pF, 3 Wdg CVT, complete with Junction Box,
27 6
hardware fittings, clamps & connectors
132KV, 800A Pedestal Mounted Wave Trap complete
28 4
with all accessories
29 Circuit Breaker
36 kV 1600 A, SCR 31.5 kA for 3 sec, Circuit Breaker,
30 outdoor type, 3-Ph gang operated complete with 6
operating mechanism & support structure
36 kV 2500 A, SCR 31.5 kA for 3 sec, Circuit Breaker,
31 outdoor type, 3-Ph gang operated complete with 3
operating mechanism & support structure
Bay Marshalling Kiosk along with support structures
32
33 132 kV Bay Marshalling Kiosk 1
Instrument Transformers along with junction box and
34 all other accessories
35 33KV, 1200-1000/1-1-1-1-1 A Current Transformer 6
36 33KV, 600-300/1-1A Current Transformer 18
37 33KV, 2500-1200/1-1A Current Transformer 3
38 33 kV Potential Transformer (3 Core) 6
CABLES
142 XLPE Armoured Cu, LT Power Cable (1.1kV grade)
143 2C, 6sqmm 1
144 4C, 16sqmm 1
145 3.5C, 35sqmm 1
146 3.5C, 70sqmm 1
147 3.5C, 400sqmm 1
Other Cables as per technical specification not covered
148 1
above
Cable supports and other cable accessories like Lugs,
149 1
Glands etc.
1.00
150 Others ( Cable for Fire Fighting, Illumination, CCTV etc)
PVC Armoured Cu LT Control Cable (1.1 kV grade)
151
152 2C, 2.5sqmm 1
153 4C, 2.5sqmm 1
154 7C, 2.5sqmm 1
155 12C, 2.5sqmm 1
156 17C, 2.5sqmm 1
157 19C, 2.5sqmm 1
Other Cables as per technical specification not covered
158 1
above
Cable supports and other cable accessories like Lugs,
159 1
Glands etc.
1
160 Others ( Cable for Fire Fighting, Illumination, CCTV etc)

Multi Modular Cable sealing system for all cable entries


161 at GIS building, Control room, Kiosk building, FFPH 1
building etc. as per requirement.
10 Fire Alarm & Detection
Fire Alarm & Detection system for 145kV GIS Building
and related rooms, Control Room building and other
related rooms including Fire Alarm panel, Multi Sensor
190 detector, manual Call point, Hooter, Response Indicators, 1
Beam Detector, Cabling and ISOLATING MODULE as
per specification.

Portable and wheel/trolley mounted Fire Extinguishers for


Control Room Building and Switchyard as per
specification and Portable Fire Extinguisher for GIS Hall
191 (5kg X 6Nos and 2kg X5 Nos), Officer Quarter (2kg X 1
6Nos), Staff Quarter (2kg X 6Nos), Security Barrack (2kg
X 6Nos),Guard room (Security Booth) (2kg X 3Nos),
Store Building (2kg x5) as per specification.

Trolley mounted portable fire exinguishers (Dry powder


192 chemical type) for 250 kVA transformers ( 10 Kg , DCP 2
Type)
Hydrant & HVWS (High Velocity Water Spray)
193 system/NIFPES
Hydrant system along with pumping arrangement &
194 associated Civil works for fire protection system for 2 No 1
of Transformer
HVWS system (Automatic Emulsifier and Manual Hydrant
195 2.00
Point both) for 50 MVA Transformer-2 No’s
NItrogen injection Fire protection and emergency service
196 with complete accessories and related Civil and Electrical 2.00
works for 2 Nos ICT
50MVA, 132/33kV, ONAN/ ONAF, 3 Phase Power
90 Transformer along with all accessories as below:
50 MVA, 132/33 kV, Three phase Power Transformer
91 2
with OLTC (including Transformer oil)

92 Oil & winding temperature monitoring system (FO based) 2


93 Online DGA 2
94 Online insulating drying system 2
95 Digital RTCC Panel 2
96 10% Extra OIL for each transformer 1
Terminal connector on 132kV side bushing of 132/33 kV
97 8
Transformer to suit Single Moose conductor
Terminal connector on 33kV side bushing of 132/33kV
98 8
Transformer to suit Twin Moose conductor
Single phase HV side 3 core bushing phase CT (300/1A,
99 6
2 core) and 1 core for WTI
Single phase LV side 3 core bushing phase CT (1200/1A,
100 6
2 core) and 1 core for WTI

101 Single phase bushing mounted HV NCT (300/1A, 2 core) 2

Single phase bushing mounted LV NCT (1200/1A, 2


102 2
core)
19 Station Service Transformer
250 KVA, 33/0.433kV StationTransformer (Energy
20 2
Efficiency Level 3) , including Clamps & Connectors
21 33kV DO Fuse 2
Power receiving panel with 440V MCCB of adequate
22 2
rating for Station Service Transformer
Battery & Battery Chargers, DCDB & ACDB as per
118 specification
119 220V VRLA Battery, 600AH 2
120 220V, Dual Float Cum Boost Chargers, 150A 2
121 220V, DCDB 2
122 48V VRLA type Battery Bank, 300 AH 2
48V, 60A Modular SMPS based Dual Float cum Boost
123 2
Chargers
124 48V, DCDB 2
125 Main ACDB 2
126 Sub ACDB 2
127 MLDB with 415V/415V, 100kVA isolation transformer 1
128 ELDB with 415V/415V, 50kVA isolation transformer 1
129 HVAC DB 1
130 MCBDB 1
131 Auxiliary ACDBs, Sub DCDBs etc as per requirement 1
Power Line Carrier Communication Equipments
132 (Twin Channel, 8kHz) 1

HF armoured co-axial cable (ALONGWITH HDPE /GI


133 4
CONDUIT)

Digital Carrier Equipment Panel (Twin channel and


134 should support transmission band for line length 150 km ) 4
for 132kV
IEC 61850 compliant Digital Tele- Protection Coupler, 16
command with redundant power supply card and CPU
135 1
along with relay, E1 interface card and optical interface
card to support 150 km(132kV)

EPAX system and telephone system with redundant


136 8
power supply card and CPU along with E1 interface card.

137 LMU and LMDU 1


138 Armoured Audio Cable 1
139 CAT 6 armoured cable. 5
Walkie talkie handset to operate seamlessly within a
140 radius of 1km using license free band. (Motorola or 4
better)
141 Two wire telephone set
198 Lighting System
199 Indoor Lighting
Lighting System including Lighting panel, Cabling,
Conduiting, Switches, Socket, Junction boxes,
200 auxiliary receptacle, High bay fixtures for GIS rooms

201 145 kV GIS Building 1


202 Control Room Building 1
203 FFPH Building 1
204 Pump House 1
205 Security booth 1
206 Security barrack 1
Staff Quarter, Officer Quarter, store building & open
207
store shed
1
208 Outoor Lighting
Outdoor LED lighting for Switchyard, Road area, Car
parking, Security outpost including Lighting panel,
209
Distribution Boards, Cabling, Switches, Socket, auxiliary
1
receptacle, complete with GI Poles etc.
210 Public Addressing System, CCTV 1
Lightning protection (lightning masts 50 metres high,
211 Lightning Spike, shield wires (7/4 mm GI shield wire), 1
down conductors etc.)

Miscellaneous item(like MS Channel,Angle, Rail,


Chequered plate,MS Grill plate, Lugs and Glands,HDPE
212 Pipes Switchyard and Bay Identification Name board, 1
Anchor fastner and Display for Overall single line diagram
photo with frame.etc…as per site requirement)

185 HVAC & VENTILATION

Industrial Air conditioning system for 132kV GIS Building


186 C&R Panel Room, Control room building (SCADA 1
Room), having N+1 or N+2 Standby Requirements

2 TON CAPACITY SPLIT AIR CONDITIONING UNITS


for Battery Room, Engineer Room , JE Room, Electrical
187 room, Conference room. 1

Ventilation system for 145kV GIS Building (Ventilation


System with Centrifugal Fan and related Accessories
188 should comprise of Pre and Fine air filter,Air Purifier, 1
centrifugal fan, ducting network, air supply grilles, gravity
dampers, electrical and instrumentation etc.)

Complete Substation System Automation System (As


51 per specification )
52 Bay Control Units for 132kV Bays
53 Bay Control Units for 33 kV Bays
54 Station HMI (Main, Redundant and Metering)
55 Maintenance HMI (DR Workstation)
56 Gate way with PLCC and Fibre Optic Modem and Panel
57 5 kVA SAS Inverter
58 UPS with separate 220 V Battery Bank
59 Colour Laser Printer
60 Line Printer
61 GPS Clock System
62 Bay Ethernet Switch
63 Station Ethernet Switch
64 All interphase equipment for Gateway to SLDC
All other accessories like FO armoured cables, HDPE
65 Conduit/GI conduit Patch cords,furnitures for HMIs and
printers, cables etc as per requirement
66 LIU
67 RTU Panel
68 75" VDU
SAMAST compliant ABT meters including DCU, modems,
69 FO cables, AMR and other related accessories etc.as
per specification.
70 27 Inch LCD Monitor (Industrial)
ON OF 132/33 KV ,2X50 MVA GIS AT TITABOR AND 132/33 KV,2X50 MVA AIS AT
AM ELECTRICITY GRID CORPORATION LIMITED ALONGWITH ASSOCIATED
N LINE(PKG:P-II-B)

LECTRICITY GRID CORPORATION LIMITED


I & COMPANY-M/S STELMEC LIMITED(M/S BRC-STELMEC JV)

V,2X50 MVA GIS FOR M/S ASEGCL AT TITABOR LOCATION,ASSAM(INDIA)


Supply item at site on
Units Remarks
priority

Lot

Lot

Lot

Lot

Lot

Earthing Material such as


Lot MS Rod,GS Flat,GI
Perforated Pipe to be
supplied at Site as per
the RFC approved BOM. 1st Lot Supply of material at
Lot
Site

JOB

JOB

JOB
JOB
JOB
Lot
Lot

LS Foundation Bolts With


required nut/Checknuts,
LS Spring washers

Nos.
Nos.
Nos.
Nos.

Set
Set
Set GI Lattice /Pipe Mounting
Set Structure to be supplied 2nd Lot supply of material
Set at Site
Set
Set
Set
Set
Set
Set
Lot

Set

Set

Set

Set
132 KV and 33 KV Side
insulators, Hardware &
Set
conductors to be 3rd Lot Supply of Material
lot arranged at Site

LS

No.

No.

Set
Set
Set

Sets

Sets
Sets

Sets

Sets

Sets

Lot

Sets

Set

Set

132 KV and 33 KV
electrical equipments to 4th Lot Supply of Material
be supplied at site
Set

Set

No.

No.

No.
No.

Sets

Sets

Nos

No.
No.
No.
No.

Lot
Lot
Lot
Lot
Lot
LS

Lot

LS

Power & control cables 5th Lot Supply of Material at


Lot with required Lugs & Site
Lot gland to be supplied at
Lot site
Lot
Lot
Lot
LS

Lot

LS

Lot
Lot

Lot

FF and High Velocity


Water Spray System & its 6th Lot Material to be Supplied at
accessories Supply at Site
Site
Nos

Lot

Set

Set

Set

Set
Set
Set
Set
LS
No. Xmer With Oil drums and
its accessories to be
Nos. supplied for Site
Equipment with all its related
Nos. accessories to be supplied at
site in 7th Lot.
Nos.

Nos.

Nos.

Nos.
Sets
Sets

Set
Set
Set
Set
Set
Battery Chargers with
Set Stand and Wires to be Material to be arranged at Site
Set Supplied at site as per by 8th Lot
Set BOQ
Set
Set
Set
Lot
Lot
LOT

No

NO

NO Approved make PLCC


alongwith related Material to be arranged at Site
accessories to be by 9th Lot
arranged at site
Set

Lot
LOT
No

No

Lot
Lot
Lot
Lot
Lot
Lot
Lot

Lot

Lot

Lot
Lighting & Area Illumination
Area & Building
material to be supplied at site
Illumination Material
once the civil works of GIS
alongwith PAS and
building is ready.The same
accessories to be
Lot may be supplied at site in 10th
supplied
Lot

Lot

Lot

Lot

Complete Substation
Automation System to be Final Lot Supply of Material
supplied in last lot.
supplied in last lot.

You might also like