Esquisse - Space Programming - College Department
Esquisse - Space Programming - College Department
TOTAL OVERALL
SPACE NO.OF MANUAL PEDAL PIVOTAL TOTAL AREA FURNITURES/FIXTURES/ UNIT DIMENSION TOTAL AREA CIRCULATION MULTIPLIER APPROXIMATE
SPACE COUNT NO. AREA AREA
DESCRIPTION USERS (0.42) (0.96) (2.56) (sqm.) EQUIPMENT OF EQUIPMENT (m) PER ROOM (ALLOW. 25% / 50% / 75%) ROOM SIZE (m)
(sqm.) (sqm.)
TOTAL OVERALL
SPACE NO.OF MANUAL PEDAL PIVOTAL TOTAL AREA FURNITURES/FIXTURES/ UNIT DIMENSION TOTAL AREA CIRCULATION MULTIPLIER APPROXIMATE
SPACE COUNT NO. AREA AREA
DESCRIPTION USERS (0.42) (0.96) (2.56) (sqm.) EQUIPMENT OF EQUIPMENT (m) PER ROOM (ALLOW. 25% / 50% / 75%) ROOM SIZE (m)
(sqm.) (sqm.)
TOTAL OVERALL
SPACE NO.OF MANUAL PEDAL PIVOTAL TOTAL AREA FURNITURES/FIXTURES/ UNIT DIMENSION TOTAL AREA CIRCULATION MULTIPLIER APPROXIMATE
SPACE COUNT NO. AREA AREA
DESCRIPTION USERS (0.42) (0.96) (2.56) (sqm.) EQUIPMENT OF EQUIPMENT (m) PER ROOM (ALLOW. 25% / 50% / 75%) ROOM SIZE (m)
(sqm.) (sqm.)
MULTI- PURPOSE Versatile lab for scale modelling, utilities CHAIRS 200 .5 X .5 0.25 50.00
4 50 2.56 128.0 395.8 75% 297 692.7 173.2 12 x 15
LABORATORY(ARCHI. DEPT.) and building technology. COMPUTERS 100 .5 X .5 0.25 25.00
TOTAL OVERALL
SPACE NO.OF MANUAL PEDAL PIVOTAL TOTAL AREA FURNITURES/FIXTURES/ UNIT DIMENSION TOTAL AREA CIRCULATION MULTIPLIER APPROXIMATE
SPACE COUNT NO. AREA AREA
DESCRIPTION USERS (0.42) (0.96) (2.56) (sqm.) EQUIPMENT OF EQUIPMENT (m) PER ROOM (ALLOW. 25% / 50% / 75%) ROOM SIZE (m)
(sqm.) (sqm.)
HYDRAULICS LABORATORY (C.E Focuses on fluid mechanics and CHAIRS 51 .5 X .5 0.25 12.75
1 30 2.56 76.8 134.5 75% 101 235.4 12 x 20
DEPT.) hydraulic systems. HYDRAULIC PUMPS 1 1 X .6 0.60 0.60
GEO- TECH LABORATORY (C.E Dedicated to soil mechanics and CHAIRS 51 .5 X .5 0.25 12.75
1 30 2.56 76.8 136.6 75% 102 239.1 12 x 20
DEPT.) geotechnical engineering. SOIL TESTING MACHINES 1 1 X .6 0.60 0.60
CONSTRUCTION MATERIAL Tests the strength and quality of CHAIRS 30 .5 X .5 0.25 7.50
2 30 2.56 76.8 132.0 75% 99 231.0 115.5 12 x 10
AND TESTING LABORATORY construction materials. COMPUTER AND SOFTWARE 2 .5 X .5 0.25 0.50
TOTAL OVERALL
SPACE NO.OF MANUAL PEDAL PIVOTAL TOTAL AREA FURNITURES/FIXTURES/ UNIT DIMENSION TOTAL AREA CIRCULATION MULTIPLIER APPROXIMATE
SPACE COUNT NO. AREA AREA
DESCRIPTION USERS (0.42) (0.96) (2.56) (sqm.) EQUIPMENT OF EQUIPMENT (m) PER ROOM (ALLOW. 25% / 50% / 75%) ROOM SIZE (m)
(sqm.) (sqm.)
PHYSICS LABORATORY (C.E Facilitates physics experiments relevant DESK 1 1.2 X .6 0.72 0.72
1 30 2.56 76.8 134.2 75% 101 234.9 12 x 20
DEPT.) to engineering principles. CHAIRS 50 .5 X .5 0.25 12.50
SHELVES 10 1 X .3 0.30
TOTAL OVERALL
SPACE NO.OF MANUAL PEDAL PIVOTAL TOTAL AREA FURNITURES/FIXTURES/ UNIT DIMENSION TOTAL AREA CIRCULATION MULTIPLIER APPROXIMATE
SPACE COUNT NO. AREA AREA
DESCRIPTION USERS (0.42) (0.96) (2.56) (sqm.) EQUIPMENT OF EQUIPMENT (m) PER ROOM (ALLOW. 25% / 50% / 75%) ROOM SIZE (m)
(sqm.) (sqm.)
QUANTITY SURVEYING Teaches cost estimation and material SHELVES 10 1 X .3 0.30 3.00
1 30 0.96 28.8 80.8 75% 61 141.3 12 x 12
LABORATORY (C.E. DEPT.) quantification DESK 1 1.2 X .6 0.72 0.72
BUILDING SYSTEM DESIGN Explores building systems and their CHAIRS 30 .5 X .5 0.25 7.50
1 30 0.96 28.8 86.6 75% 65 151.5 12 x 12
LABORATORY(C.E. DEPT.) integration. COMPUTER AND SOFTWARE 1 .5 X .5 0.25 0.25