Section 5.1

The document discusses PERT (Program Evaluation and Review Technique) and CPM (Critical Path Method) as project management tools for scheduling and staffing project activities. It explains the concepts of critical paths, slack time, and the calculations involved in determining project timelines and dependencies. Additionally, it provides examples of construction and software projects to illustrate the application of these techniques in real-world scenarios.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views22 pages

Section 5.1

The document discusses PERT (Program Evaluation and Review Technique) and CPM (Critical Path Method) as project management tools for scheduling and staffing project activities. It explains the concepts of critical paths, slack time, and the calculations involved in determining project timelines and dependencies. Additionally, it provides examples of construction and software projects to illustrate the application of these techniques in real-world scenarios.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

Chapter 3

PERT AND CPM

SECTION 5
PERT AND CPM
• PERT/CPM is used to plan the scheduling and optimal staffing of
individual activities that make up a project.
• Projects may have as many as several thousand activities and may
have to be broken up into simpler sub-projects.
• Usually some activities depend on the completion of other activities
before they can be started.
PERT AND CPM
• PERT/CPM Project managers rely on PERT/CPM to help them answer
questions such as: –
• What is the total time to complete the project? –
• What are the scheduled start and finish dates for each specific activity?
• Which activities are critical and must be completed exactly as scheduled to
keep the project on schedule?
• How long can noncritical activities be delayed before they cause an
increase in the project completion time?
• If activity times are uncertain (i.e., they are random variables), what is the
probability that the project will be finished in any given time-frame?
PERT AND CPM
PERT (Program Evaluation and Review Technique)
• PERT is a probabilistic project management tool used to analyze the time
required to complete each task and the entire project.
• It is useful for projects with uncertain activity durations
• Based on three time estimates for each activity:
o Optimistic time (O): The minimum possible time for an activity.
o Most likely time (M): The best estimate of time required under normal conditions.
o Pessimistic time (P): The maximum possible time under worst-case conditions.
o Expected time (TE) is calculated using the formula: TE= (O+4M+P)/6
CPM (Critical Path Method)
CPM is a deterministic technique used for scheduling project activities with
known fixed durations.
PERT AND CPM

Arcs indicate project activities

A D
1 3 4

B C

Nodes correspond to the beginning


and ending of activities
PERT AND CPM
• Dummy activities is used to identify precedence relationships
correctly and to eliminate possible confusion of two or more
activities having the same starting and ending nodes
A D
Activity Immediate 1 3 4
predecessors
A -
E
B - B
C B
C 5
D A, C
2
We need to introduce
E C a dummy activity
PERT AND CPM
Network concurrent activities
a a
2

1 2 1 Dummy

b 3
b
WRONG!!! RIGHT 

Activity c not WRONG !


required for e
a
a e
d
1
b 1 b
e
d
c
2
c
WRONG
RIGHT
!!!

RIGHT 
PERT AND CPM
• We are interested in the longest path through the network, i.e., the critical path.

forward pass calculation

• Earliest start time rule: The earliest start time for an activity leaving a particular node is equal to the
largest of the earliest finish times for all activities entering the node.

• Earliest finish (EF) => EF = ES + t

To find the critical path we need a backward pass calculation.

• Latest finish time (LF)

• latest start (LS) = LF – t


Calc Slack Time (Float):Slack defines how long non-critical activities can be delayed without delaying the
project
• Slack = LS−ES or LF−EF.
• If slack = 0, the activity is critical.
PERT AND CPM
EF = earliest finish time

ES = earliest start time

Activity

2
LF = latest finish time
LS = latest start time
PERT AND CPM
Q 1:
Construction Project
A construction project has the following activities and dependencies
Activity Immediate Predecessors Completion Time (weeks)
A - 5
B - 6
C A 4
D A 3
E A 1
F E 4
G D, F 14
H B, C 12
I G, H 2

Tasks:
 Construct the network diagram.
 Perform Forward and Backward Pass to determine the Early Start (ES), Early Finish (EF), Late Start (LS), and
Late Finish (LF).
 Identify the Critical Path and Project Completion Time.
 Determine the Slack Time for each activity
PERT AND CPM
• Network with ES & EF time

D[5,8] 5
2 3

7
4
Activity Immediate Completion
1 6 Predecessors Time (weeks)
A - 5
B - 6
C A 4
D A 3
E A 1
3 F E 4
G D, F 14
H B, C 12
I G, H 2
PERT AND CPM
• Network with LS & LF time

D[5,8] 5
2 3[7,10]

7
4

1 6

3
PERT AND CPM
• Slack
2

D[5,8] 5
2 3[7,10]
0 0
0
0 7
4

1 6
3 0

6 3 3
PERT AND CPM
• The critical path is one with Slack=0
2

D[5,8] 5
2 3[7,10]
0 0
0
0 7
4

1 6
3 0

6 3 3

• The critical path is AEFGI


• The duration time =26
PERT AND CPM
Activity schedule for our example
Activity Earliest Latest Earliest Latest Slack Critical
start (ES) start (LS) finish (EF) finish (LF) (LS-ES) path

A 0 0 5 5 0 Yes
B 0 6 6 12 6
C 5 8 9 12 3
D 5 7 8 10 2
E 5 5 6 6 0 Yes
F 6 6 10 10 0 Yes
G 10 10 24 24 0 Yes
H 9 12 21 24 3
I 24 24 26 26 0 Yes
PERT AND CPM
Q 2:
A software company is working on a new application. The project consists of the following activities
Activity Immediate Predecessor Optimistic Time Most Likely Time Pessimistic Time

a - 10 22 22
b - 20 20 20
c - 4 10 16
d a 2 14 32
e b, c 8 8 20
f b, c 8 14 20
g b, c 4 4 4
h c 2 12 16
i g, h 6 16 38
j d, e 2 8 14

Tasks
 Construct a network diagram and determine the dependencies.
 Compute the Expected Time (TE) for each activity using the PERT formula.
 Identify the Critical Path and the expected project duration.
 Assess the probability of completing the project within 50 days.
PERT AND CPM
Activity Immediate Optimistic Time Most Likely Time Pessimistic Time Expected Value Variance
Predecessor

a - 10 22 22 (10+(4*22)+22)/6 ((22-10)/6)^2
m= most likely time estimate, mode.
=20 =4
o = optimistic time estimate,
b - 20 20 20 20 0
b = pessimistic time estimate, and
c - 4 10 16 10 4
Expected Value (TE) = (o + 4m + b) /6
Variance (V) = ( ( b –o) / 6 ) 2
d a 2 14 32 15 25
Std Deviation (δ) = SQRT (V)
e b, c 8 8 20 10 4

f b, c 8 14 20 14 4

g b, c 4 4 4 4 0

h c 2 12 16 11 5.4

i g, h 6 16 38 18 28.4

j d, e 2 8 14 8 4
PERT AND CPM
• Network with ES & EF time Activity Immediate Expected Value
Predecessor
a - 20
d[20,35] b - 20
2 6
15 c - 10
d a 15
e b, c 10
f b, c 14
g b, c 4
b[0,20] f[20,34] h c 11
1 3 7
20 14 i g, h 18
j d, e 8

4 h[10,21] 5
11
PERT AND CPM
• Network with LS & LF time Activity Immediate Expected Value
Predecessor
a - 20
d [20,35] b - 20
2 6
15[20,35] c - 10
d a 15
e b, c 10
f b, c 14
g b, c 4
B [0,20] F [20,34] h c 11
1 3 7
20[1,21] 14[29,43] i g, h 18
j d, e 8

4 H [10,21] 5
11[14,25]
PERT AND CPM
• Slack Activity Immediate Expected Value
Predecessor
0 a - 20
d [20,35] b - 20
2 6
15[20,35] c - 10
0
d a 15
e b, c 10
f b, c 14
1 9 g b, c 4
B [0,20] F [20,34] h c 11
1 3 7
20[1,21] 14[29,43] i g, h 18
j d, e 8

4
4 H [10,21] 5
11[14,25]
PERT AND CPM
• Slack
0
d [20,35] The critical path is one with Slack=0
2 6
15[20,35] The critical path is a,d,j
0
The duration time =43

1 9
B [0,20] F [20,34]
1 3 7
20[1,21] 14[29,43]

4
4 H [10,21] 5
11[14,25]
PERT AND CPM
PM promised to complete the project in the fifty days.
Calculate Z, where

Z= (T−TE) / σ
Example,
T = 50; TE =43; Var = (4+25+4) =33
Z = (50 – 43) / 5.745 = 1.22

The probability value of Z = 1.22, is 0.888

1.22