ECC800 Data Center Controller User Manual (SmartDC V100R022C10)
ECC800 Data Center Controller User Manual (SmartDC V100R022C10)
SmartDC V100R022C10
User Manual
Issue 01
Date 2022-06-15
and other Huawei trademarks are the property of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei
Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features
described in this document may not be within the purchase scope or the usage scope. Unless otherwise
specified in the contract, all statements, information, and recommendations in this document are
provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Futian,Shenzhen 518043
Website: https://e.huawei.com
Purpose
This document describes the ECC800-Pro data center controller in terms of
features, devices, user interfaces (UIs), and power-on commissioning, as well as
frequently asked questions (FAQ) and troubleshooting measures.
This document describes all the functions of the ECC800-Pro. Certain functions are
implemented by hardware such as the uninterruptible power system (UPS) and
power distribution unit (PDU), and may be unavailable if the hardware is not
connected to the ECC800-Pro.
The ECC800-Pro functions described in the user manual may be applicable to
either multiple or a few FusionModule solutions. For details, see the FusionModule
solution documentation.
Figures provided in this document are for reference only.
Intended Audience
This document is intended for:
● Sales engineers
● Technical support engineers
● Maintenance engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Description
Symbol Description
Change History
Issue Date Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. iii
ECC800 Data Center Controller
User Manual Contents
Contents
2 Overview................................................................................................................................. 11
2.1 Positioning............................................................................................................................................................................... 11
2.2 Features.................................................................................................................................................................................... 11
3 Device Description................................................................................................................ 13
3.1 ECC800-Pro............................................................................................................................................................................. 13
3.1.1 Product Configuration......................................................................................................................................................13
3.1.2 Main Control Module....................................................................................................................................................... 15
3.1.3 PSU......................................................................................................................................................................................... 25
3.2 Southbound Device Introduction..................................................................................................................................... 26
3.2.1 UIM20A Expansion Module........................................................................................................................................... 26
3.2.2 Rack Environment Unit.................................................................................................................................................... 29
3.2.3 Smart ETH Gateway......................................................................................................................................................... 31
3.2.4 Access Control System..................................................................................................................................................... 33
3.2.4.1 Aisle Access Control System....................................................................................................................................... 33
3.2.4.1.1 Access Actuator........................................................................................................................................................... 34
3.2.4.1.2 Fingerprint and Card Reader with a Keypad.....................................................................................................37
3.2.4.1.3 Fingerprint and Card Reader.................................................................................................................................. 38
3.2.4.1.4 Card Reader with a Keypad.....................................................................................................................................40
3.2.4.1.5 Magnetic Lock............................................................................................................................................................. 40
3.2.4.2 Cabinet Access Control System................................................................................................................................. 41
3.2.4.3 Cabinet Electronic Clasp Lock.................................................................................................................................... 43
3.2.5 Smart Module Actuator.................................................................................................................................................. 44
3.2.6 AC Actuator......................................................................................................................................................................... 48
3.2.7 Skylight Actuator............................................................................................................................................................... 50
4 UI Description.........................................................................................................................77
4.1 WebUI....................................................................................................................................................................................... 77
4.2 PAD App................................................................................................................................................................................... 86
5 Power-On Commissioning................................................................................................... 88
5.1 Preparations and WebUI Login........................................................................................................................................ 88
5.2 Initial Startup Password Authentication....................................................................................................................... 92
5.3 Cloud Service Access............................................................................................................................................................ 94
5.4 Commissioning Configuration Wizard........................................................................................................................... 95
5.5 Configuring Event Notifications....................................................................................................................................... 96
5.6 Commissioning the Smart Busbar................................................................................................................................ 103
5.6.1 Setting Parameters for the General Input Unit and Power Distribution Unit............................................103
5.6.2 Smart Busbar Networking (for FusionModule2000).......................................................................................... 105
5.7 Commissioning the eLight............................................................................................................................................... 106
5.8 Commissioning the eLight (for FusionModule500/800)....................................................................................... 109
5.9 Commissioning the PDU2000 (for FusionModule500/800).................................................................................111
5.10 Commissioning the Cabinet Electronic Clasp Locks (for FusionModule500/800)..................................... 114
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. vii
ECC800 Data Center Controller
User Manual Contents
7 Maintenance.........................................................................................................................256
7.1 Routine Maintenance........................................................................................................................................................ 256
7.2 Common Faults and Troubleshooting......................................................................................................................... 257
7.3 Component Replacement................................................................................................................................................ 260
7.3.1 Replacing an ECC800-Pro Main Control Module................................................................................................. 260
7.3.2 Replacing an ECC800-Pro PSU....................................................................................................................................262
7.3.3 Replacing ECC800-Pro Antennas............................................................................................................................... 263
7.3.4 Replacing a SIM Card.................................................................................................................................................... 263
8 FAQ......................................................................................................................................... 265
8.1 How Can I View Version Information?........................................................................................................................ 265
8.2 How Can I Upgrade the ECC800-Pro Software Version?...................................................................................... 265
8.3 How Can I Set the Date and Time?............................................................................................................................. 266
8.4 How Can I Check the System Type and Set the Smart Module Name?..........................................................266
8.5 How Do I Manage WebUI Users?................................................................................................................................. 267
8.6 How Do I Create a Smart Module Plan View?......................................................................................................... 271
8.7 How Can I Set and Add Devices?.................................................................................................................................. 273
8.7.1 How Can I Set Integrated UPS Parameters (Modbus-TCP)?............................................................................ 273
8.7.2 How Can I Set and Add a UPS2000G-A (Modbus-RTU)................................................................................... 273
8.7.3 How Can I Set and Add a UPS2000G_L (Modbus-RTU)?..................................................................................275
8.7.4 How Can I Set and Add a UPS5000 (Modbus-RTU)?......................................................................................... 276
8.7.5 How Do I Set and Add a UPS5000 (Modbus-TCP)?............................................................................................ 278
8.7.6 How Can I Set and Add a PDU8000 or Integrated PDU (over Modbus-TCP)?.......................................... 278
8.7.7 How Can I Set and Add a Transformer (Modbus-RTU)?...................................................................................279
8.7.8 How Can I Set and Add an SVG-In-Power (Modbus-RTU)?............................................................................ 280
8.7.9 How Can I Set and Add an Envicool Air Conditioner (Modbus-RTU)?........................................................ 282
8.7.10 How Can I Set and Add a DC PDF (Modbus-RTU)?......................................................................................... 284
8.7.11 How Can I Set and Add a SmartLi (Modbus-TCP)?.......................................................................................... 285
8.7.12 How Can I Add and Set the Smart Module Actuator (Modbus-MAC)?.................................................... 285
8.7.13 How Can I Set and Add a PDU8000 (Modbus RTU) (C41)?..........................................................................286
8.7.14 How Do I Set and Add a DC Power Supply (Modbus-RTU)?........................................................................ 288
8.7.15 How Can I Set and Add an rPDU?.......................................................................................................................... 289
8.7.16 How Can I Set and Add an ATS?............................................................................................................................. 292
8.7.17 How Do I Set and Add an Electricity Meter?...................................................................................................... 293
8.7.18 How Can I Set and Add a NetCol5000-A011/A025/A035/A042/A050/A065 (Modbus-TCP)?........... 295
8.7.19 How Can I Set and Add a NetCol5000-A025 (Modbus-MAC)?....................................................................296
8.7.20 How Can I Set and Add a NetCol5000-C(030, 032)/NetCol5000-C(065, 080) Parameters (over
Modbus TCP)?............................................................................................................................................................................. 297
8.7.21 How Can I Set and Add a NetCol5000-C030 (Modbus RTU)?......................................................................298
8.7.22 How Can I Set NetCol8000-A Parameters (Modbus-TCP)?............................................................................300
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. viii
ECC800 Data Center Controller
User Manual Contents
9 PLC Function.........................................................................................................................367
9.1 Linkage Control Introduction......................................................................................................................................... 367
9.2 Linkage Control Configuration Examples...................................................................................................................368
1 Safety Information
Ensure that the equipment is used in environments that meet its design
specifications. Otherwise, the equipment may become faulty, and the resulting
equipment malfunction, component damage, personal injuries, or property
damage will not be covered under the warranty.
Follow local laws and regulations when installing, operating, or maintaining the
equipment. The safety instructions in this document are only supplements to local
laws and regulations.
The Company will not be liable for any consequences of the following
circumstances:
General Requirements
● Do not install, use, or operate outdoor equipment and cables (including but
not limited to moving equipment, operating equipment and cables, inserting
connectors to or removing connectors from signal ports connected to outdoor
facilities, working at heights, and performing outdoor installation) in harsh
weather conditions such as lightning, rain, snow, and level 6 or stronger wind.
● Before installing, operating, or maintaining the equipment, remove any
conductive objects such as watches or metal jewelry like bracelets, bangles,
and rings to avoid electric shock.
● When installing, operating, or maintaining the equipment, wear dedicated
protective gears such as insulation gloves, goggles, and safety clothing,
helmet, and shoes, as shown in the following figure.
● All cable holes should be sealed. Seal the used cable holes with firestop putty.
Seal the unused cable holes with the caps delivered with the cabinet. The
following figure shows the criteria for correct sealing with firestop putty.
Personal Safety
● If there is a likelihood of personal injury or equipment damage during
operations, immediately stop, report the case to the supervisor, and take
feasible protective measures.
● To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits
to telecommunication network voltage (TNV) circuits.
● Do not power on the equipment before it is installed or confirmed by
professionals.
General Requirements
Use dedicated insulated tools when performing high-voltage operations.
AC and DC Power
DANGER
Do not connect or disconnect power cables with power on. Transient contact
between the core of the power cable and the conductor will generate electric arcs
or sparks, which may cause fire or personal injury.
Cabling
● When routing cables, ensure that a distance of at least 30 mm exists between
the cables and heat-generating components or areas. This prevents damage
to the insulation layer of the cables.
● Do not route cables behind the air intake and exhaust vents of the
equipment.
● Ensure that cables meet the VW-1 or ZB flame spread rating requirements or
higher.
● Bind cables of the same type together. When routing cables of different types,
ensure that they are at least 30 mm away from each other.
● If an AC input power cable is connected to the cabinet from the top, bend the
cable in a U shape outside the cabinet and then route it into the cabinet.
● When the temperature is low, violent impact or vibration may damage the
plastic cable sheathing. To ensure safety, comply with the following
requirements:
– Cables can be laid or installed only when the temperature is higher than
0°C. Handle cables with caution, especially at a low temperature.
– Cables stored at subzero temperatures must be stored at room
temperature for at least 24 hours before they are laid out.
ESD
NOTICE
The static electricity generated by human bodies may damage the electrostatic-
sensitive components on boards, for example, the large-scale integrated (LSI)
circuits.
● Wear ESD gloves or a well-grounded ESD wrist strap when touching the
device or handling boards or application-specific integrated circuits (ASICs).
● When holding a board, hold its edge without touching any components. Do
not touch the components with your bare hands.
● Package boards with ESD packaging materials before storing or transporting
them.
Neutral-Ground Voltage
It is recommended that the three-phase loads be equalized and the neutral-
ground voltage be kept at less than 2 V to meet power distribution requirements.
vents, or feeder windows of the equipment room. Ensure that no liquid enters
the equipment to prevent faults or short circuits.
● If any liquid is detected inside the equipment, immediately disconnect the
power supply and contact the administrator.
● Do not expose the equipment to flammable or explosive gas or smoke. Do
not perform any operation on the equipment in such environments.
● Ensure that the equipment room provides good heat insulation, and the walls
and floor are dampproof.
● Install a rat guard at the door of the equipment room.
Installation at Heights
● Working at heights refers to operations that are performed at least 2 meters
above the ground.
● Do not work at heights if the steel pipes are wet or other potential danger
exists. After the preceding conditions no longer exist, the safety director and
relevant technical personnel need to check the involved equipment. Operators
can begin working only after obtaining consent.
● When working at heights, comply with local relevant laws and regulations.
● Only trained and qualified personnel are allowed to work at heights.
● Before working at heights, check the climbing tools and safety gears such as
safety helmets, safety belts, ladders, springboards, scaffolding, and lifting
equipment. If they do not meet the requirements, take corrective measures or
disallow working at heights.
● Wear personal protective equipment such as the safety helmet and safety belt
or waist rope and fasten it to a solid structure. Do not mount it on an
insecure moveable object or metal object with sharp edges. Make sure that
the hooks will not slide off.
● Set a restricted area and eye-catching signs for working at heights to warn
away irrelevant personnel.
● Carry the operation machinery and tools properly to prevent them from
falling off and causing injuries.
● Personnel involving working at heights are not allowed to throw objects from
the height to the ground, or vice versa. Objects should be transported by
tough slings, hanging baskets, highline trolleys, or cranes.
● Ensure that guard rails and warning signs are set at the edges and openings
of the area involving working at heights to prevent falls.
● Do not pile up scaffolding, springboards, or other sundries on the ground
under the area involving working at heights. Do not allow people to stay or
pass under the area involving working at heights.
● Inspect the scaffolding, springboards, and workbenches used for working at
heights in advance to ensure that their structures are solid and not
overloaded.
● Any violations must be promptly pointed out by the site manager or safety
supervisor and the involved personnel should be prompted for correction.
Personnel who fail to stop violations will be forbidden from working.
● Do not drag steel ropes and hoisting tools or bump hoisted objects against
hard objects during hoisting.
Using Ladders
● Use wooden or fiberglass ladders when you need to perform live working at
heights.
● When a step ladder is used, ensure that the pull ropes are secured and the
ladder is held firm.
● Before using a ladder, check that it is intact and confirm its load bearing
capacity. Do not overload it.
● Ensure that the ladder is securely positioned. The recommended angle for a
ladder against the floor is 75 degrees, as shown in the following figure. An
angle ruler can be used to measure the angle. Ensure that the wider end of
the ladder is at the bottom, or protective measures have been taken at the
bottom to prevent the ladder from sliding.
● When climbing a ladder, take the following precautions to reduce risks and
ensure safety:
– Keep your body steady.
– Do not climb higher than the fourth rung of the ladder from the top.
– Ensure that your body's center of gravity does not shift outside the legs
of the ladder.
Drilling Holes
When drilling holes into a wall or floor, observe the following safety precautions:
NOTICE
Do not drill holes into the equipment. Doing so may affect the electromagnetic
shielding of the equipment and damage components or cables inside. Metal
shavings from drilling may short-circuit boards inside the equipment.
● Obtain consent from the customer and contractor before drilling holes.
● Wear goggles and protective gloves when drilling holes.
● When drilling holes, protect the equipment from shavings. After drilling, clean
up any shavings that have accumulated inside or outside the equipment.
DANGER
1.6 Others
● Exercise caution when shutting down the smart cooling product. Doing so
may cause equipment and room overheating, which will damage the
equipment.
● Exercise caution when powering off the rPDU or PDU2000. Doing so may
affect the power supply to equipment, which will interrupt services.
● Exercise caution when manually shutting down the UPS inverter for
transferring to bypass mode, or when adjusting the UPS output voltage level
or frequency. Doing so may affect the power supply to equipment.
● Exercise caution when setting battery parameters. Incorrect settings will affect
the power supply and battery lifespan.
● To protect loads during UPS upgrade, set the output to maintenance bypass
mode. To avoid load power failure or damage, ensure that the bypass input is
within the specified power supply range.
2 Overview
2.1 Positioning
The ECC800-Pro manages the devices in the smart module. It is intelligent, flexible
in connection, easy to maintain, and reliable. It adopts the PoE bus for expansion
and allows all intelligent monitoring devices to be deployed flexibly.
2.2 Features
● Efficient
– Supports access of wireless devices and provides communication backup,
reducing cable layout workload and enhancing reliability.
– Supports unlocking through the access card, password, fingerprint, and
facial recognition.
– Supports remote alarm notifications by SMS and email.
– Supports power supply and communication over the power over Ethernet
(PoE) bus, providing rich bandwidth resources and high communication
efficiency.
– Supports remote upgrade, fault data export, and configuration parameter
synchronization.
– Eight access control devices and four cameras can be connected to a
single smart module.
– Cascades a maximum of three ECC800-Pros. The active alarms and power
usage effectiveness (PUE) data of cascaded ECC800-Pros can be displayed
on the WebUI of one ECC800-Pro.
– Collects statistics on the instantaneous PUE and average PUE of the
smart module and displays the statistics on a dashboard and in curves, so
that you can query the energy consumption of the smart module in real
time.
– Supports the function of transparent transmission over the RS485 port, so
that southbound components can communicate with the NetEco after
accessing the ECC800-Pro.
3 Device Description
3.1 ECC800-Pro
NOTE
(1) Slot 1: PSU (2) Slot 2: PSU (3) Slot 3: main control
module
Item Specifications
Item Specifications
Color Black
(4) AC_INPUT2 - -
Power Port
The ECC800-Pro provides four power ports, including two AC input ports
(AC_INPUT1 and AC_INPUT2) and two DC output ports (DC_OUT1 and
DC_OUT2). Table 3-3 provides the power port pin definitions.
AC Pin1 L
Pin2 PE
Pin3 N
DC Pin1 48V+
Pin2 48VGND
(13) AIDI_3 (14) DO/12V (15) RF_Z (802.15.4) (16) WLAN (reserved)
NOTE
The WLAN port is reserved and cannot be connected to a WLAN antenna for WLAN
communication.
Technical Specifications
Item Specifications
WAN port ● Supports two WAN ports. WAN1 is used to connect to the
management system, and WAN2 is used for maintenance.
The ports support autonegotiation of 10/100/1000 Mbit/s
communications rates.
● Connect shielded network cables to the WAN ports.
Item Specifications
PoE expansion Supports two PoE (GE) ports for expansion of the PoE bus, and
supports network isolation and ring network.
Fault isolation There are three groups of 12 V ports. Each group has a
maximum current of 660 mA, each route has a maximum
current of 800 mA, and the maximum total current is 2 A.
Group 1: AIDI_1 and DO/12V ports
Group 2: AIDI_2, COM1/AIDI_4, and COM3/12V ports
Group 3: AIDI_3 and COM2/AIDI_5 ports
Item Specifications
Item Specifications
Operating frequency ● 4G: LTE-FDD, covering frequency bands B1, B3, B5,
B7, B8, and B20; LTE-TDD, covering frequency
bands B38, B40, and B41
● 3G: WCDMA, covering frequency bands B1, B5, and
B8
● 2G: GSM, covering frequency bands 900 MHz/1800
MHz
Communications Ports
The ECC800-Pro provides the following communications ports. Figure 3-5 shows
the pins of the RJ45 port.
There are four GE ports, that is, two WAN ports (WAN1 and WAN2) and two LAN
ports (LAN1/PoE and LAN2/PoE).
Item Description
Pin 3 GE2+
Pin 4 GE3+
Pin 5 GE3–
Pin 6 GE2–
Pin 7 GE4+
Pin 8 GE4–
Item Description
Pin 4 RS485+
Pin 5 RS485–
Pin 6 DI–
Pin 7 DI+
Pin 8 GND
Pin 4 RS485+
Pin 5 RS485–
Pin 6 –
Pin 7 –
Pin 8 GND
Item Description
Item Description
Pin 3 –
Pin 4 RS485+
Pin 5 RS485–
Pin 6 –
Pin 7 CAN_H
Pin 8 CAN_L
The AIDI_1, AIDI_2, and AIDI_3 ports pin definitions are described as follows.
NOTE
Item Description
Pin 3 12 V DC
Pin 4 Type_3
Pin 5 Type_4
Pin 6 DI–
Pin 7 DI+
Item Description
Pin 8 GND
Pin Pin 1 –
sequence
Pin 2 –
Pin 4 –
Pin 5 –
Pin 6 DO_OUT+
Pin 7 DO_OUT–
Pin 8 GND
Pin 2 DM
Pin 3 DP
Pin 4 GND
Indicators
SW Button
Hold down the button for more than The RF_Z indicator is
8s to clear network parameters. blinking at super
short intervals.
3.1.3 PSU
Indicators
Output overvoltage
Hibernation
(1) DIP switch (reserved) (2) COM_OUT (reserved) (3) COM_IN (reserved)
Item Specifications
Width 120 mm
Depth 200 mm
Height 43 mm
Item Specifications
Operating -30°C~+65°C
temperature
Environmen RoHS5
tal
protection
Technical Specifications
Item Specifications
Communications Ports
The following table describes the pin definitions for ports COM1/AIDI_1 to COM8/
AIDI_8.
Item Description
Item Description
Pin 2 RS485–
Pin 3 12 V
Pin 4 RS485+
Pin 5 RS485–
Pin 6 D-
Pin 7 D+
Pin 8 GND
The following table describes the pin definitions for the COM_IN and COM_OUT
ports.
Table 3-20 Pin definitions for the COM_IN and COM_OUT ports
Item Description
Pin 4 RS485+
Pin 5 RS485–
Pin 6 -
Pin 7 -
Pin 8 GND
Blinking Blinking at super short intervals for 0.5s and then off for
0.5s; last 10s (blinking at super short intervals: 10 Hz,
on for 0.05s and then off for 0.05s)
Blinking Press the button for The RUN indicator blinks at super
less than 2s. short intervals for 0.5s and then off for
0.5s; last 10s (blinking at super short
intervals for 10 Hz, on for 0.05s and
then off for 0.05s).
(1) Ground port (2) 48 V DC power (3) PoE port (4) COM1/12V port
input port
(5) COM2/12V port (6) COM3 port (7) COM4 port (8) NTC1–3
(9) NTC4–6 (10) AI/DI_1 port (11) AI/DI_2 port (12) 12V_1 port
Specifications
12 V power Two 12 V DC power outputs with the rated output current of 250
output mA
RS485 serial ● Four RS485 ports with the default communications rate of
port 9600 bit/s
expansion ● Among the four RS485 ports, two support 12 V DC power
output with the rated current of 400 mA.
● The other two are isolated, with the default communications
rate of 9600 bit/s, and do not support power output.
AI/DI input Two active 12 V DC, 200 mA (rated) AI/DI input ports
Indicators
Table 3-24 describes the indicators for the rack environment unit.
(1) PWR_IN cascading (2) FE_1 cascading (3) PoE_1–2 ports (4) PoE_3–4 ports
power port signal port
(5) 48V_OUT1 power (6) 48V_OUT2 power (7) FE_2 cascading (8) PWR_OUT
output port output port signal port cascading power port
Specifications
Power input PWR_IN D-type power input terminal, for power cascading, input
voltage range: 45–55 V DC
Power of a single smart ETH gateway: max (2.7 A, 48 V DC);
power of cascaded smart ETH gateways: max (25 A, 48 V DC)
PoE port Four PoE ports, RJ45 terminal with an indicator, 10/100 Mbit/s
communications rate, complying with IEEE 802.3, IEEE 802.3u,
IEEE 802.3af/at
BLINK If you press the BLINK button, the RUN indicator blinks
button intermittently at super short intervals (blinking at super short
intervals for 0.5s and then off for 0.5s, lasting 5 seconds in total).
Indicators
The emergency button or emergency door release button is used to open a door in
emergencies.
● The emergency button can disconnect the power supply to the lock and
therefore unlock the door in case of emergency.
● In case of emergency, break the glass of the emergency door release button
to disconnect the power supply to the lock and therefore unlock the door.
(1) 48 V power port (2) PoE port (3) RS485 port COM2
(4) RS485 port COM1 (5) Address DIP switch (6) Status indicator
(7) BLINK button (8) WG_2 Wiegand interface (9) WG_1 Wiegand interface
(10) AI/DI_2 dry contact (11) AI/DI_1 dry contact (12) LOCK/GND/GATE/COM door
(reserved port for linkage (reserved port for exit status sensor and magnetic lock
control or third-party fire button) port
extinguishing system dry
contacts)
Specifications
AI/DI port Two AI/DI ports, can connect to the fire alarm and exit button
RS485 serial Two RS485 ports (one route) with the default communication
port rate of 9600 bit/s, physical port cascading supported (reserved
expansion function)
BLINK button ● Press the button for less than 1 second to start blinking.
● Hold down the button for 1–5 seconds to search for a
network and start networking.
● Hold down the button for more than 10 seconds to clear
network parameters.
E-label Supported
Indicators
PWR Green Power input ● Steady on: The power input is normal.
status ● Off: There is no power input.
indicator
Communications Ports
The access actuator provides one DO port (LOCK/GND) and one DI port (GATE/
COM). Table 3-30 lists the LOCK/GND/GATE/COM port pin definitions.
Item Description
Item Description
Table 3-31 Technical specifications of a fingerprint and card reader with a keypad
Item Specifications
Dimensions (L x W x H) 156 mm x 53 mm x 38 mm
Dimensions (L x W x H) 156 mm x 53 mm x 38 mm
Item Specifications
Dimensions (L x W x H) 114 mm x 63 mm x 25 mm
Item Specifications
(1) LED indicator (2) DIP switch (3) RJ45 power port
1 RS485+ RS485+
2 RS485- RS485-
4 RS485+ RS485+
5 RS485- RS485-
6 - -
7 - -
8 Ground GND
Appearance
(1) 48 V DC power (2) LAN port (3) RS485 ports (4) RS485 port
input port (COM1/COM2) (reserved)
(5) DIP switch (6) AC OUT power (7) Terminal cover (8) AC IN power input
output ports port
(9) Fuse (10) DO/DI ports (11) DO/12V port (12) AI/DI ports
(13) Wiegand ports (14) Spare fuse box (15) Indicators (16) BLINK button
Specifications
Item Specifications
Item Specifications
Wireless One wireless port that complies with IEEE 802.15.4, mutual
communication backup with FE communication
RS485 serial COM1/COM2: two RS485 ports (one route) with a default
port communication rate of 9600 bit/s, physical port cascading
(reserved)
COM3: southbound or northbound communication (reserved)
DO/DI port ● Access: One DO output port is used to control the power
output of the electronic door lock, and one DI input port is
used to connect to the door status switch. Both ports use
terminals.
● Skylight: One DO output port is used to control the power
output of the skylight magnetic lock, and one DI input port
is connected to the skylight open button. Both ports use
terminals.
AI/DI port Five AI/DI ports, in which one is for detecting one door open
button, two for detecting lighting buttons, and one for
detecting fire extinguishing linkage signal. One port is
reserved.
BLINK button ● Press the button for less than 1 second to start blinking.
● Hold down the button for 1–5 seconds to search for a
network and start networking.
● Hold down the button for more than 6 seconds to clear
network parameters.
Fuse 16 A, 250 V AC
E-label Supported
Indicators
3.2.6 AC Actuator
The AC actuator is used in a smart module to control the lighting inside the smart
module by receiving commands from the access control system or host, infrared
linkage information (disabled by default), or signals from the light button. It also
provides a charging port for the PAD (AC OUT2).
(1) AC OUT2 port (2) AC OUT1 port (3) AC IN port (4) Status indicator
(5) BLINK button (6) AIDI_1 and AIDI_2 (7) COM1 and COM2 -
Specifications
RS485 serial One route of dual RS485 ports, not isolated (reserved)
port
AI/DI detection Two AI/DI dry contacts, connecting to two light buttons
PAD intelligent Charging stops when the PAD battery level reaches 100%.
charging When the battery level is lower than 40% (default value,
which can be set to 30, 40, or 50), charging starts.
BLINK button ● Press the button for less than 1 second to start blinking.
● Hold down the button for 1–5 seconds to search for a
network and start networking.
● Hold down the button for more than 10 seconds to clear
network parameters.
Indicators
(1) LOCK/GND (2) BUTTON/GND (3) AI/DI_1 sensor (4) AI/DI_2 sensor
magnetic lock DO window open button DI input port input port
output port input port
(5) BLINK button (6) Status indicator (7) Address DIP (8) COM1 port
switch
Specifications
Item Specifications
Wireless One wireless port that complies with IEEE 802.15.4, mutual
communicatio backup with FE communication
n
AI/DI port Two AI/DI ports for detecting fire extinguishing linkage signals;
smoke detection signals also supported
DI input One DI input port for connecting to the skylight open button
Item Specifications
BLINK button ● Press the button for less than 1 second to start blinking.
● Hold down the button for 1–5 seconds to search for a
network and start networking.
● Hold down the button for more than 10 seconds to clear
network parameters.
E-label Supported
Indicators
Communications Ports
The skylight actuator provides one DO port (LOCK/GND) and one DI port
(BUTTON/GND). Table 3-45 lists the LOCK/GND/BUTTON/GND port pin
definitions.
NOTE
The infrared detection function is enabled only when the intelligent lighting function is
enabled.
(1) Address DIP switch (2) BLINK button (3) TEST button
Specifications
Item Specifications
PoE port One PoE port that complies with IEEE 802.3at
Item Specifications
E-label Supported
Indicators
Item Specifications
Item Specifications
Item Specifications
Item Specifications
Temperature detection ● ±1°C (≥ –10°C, < 25°C) & (> 25°C, ≤ 55°C)
tolerance ● ±2°C (≥ –20°C, < –10°C) & (> +55°C, ≤ +70°C)
● ±0.5°C (25°C)
Dimensions (H x W x 48 mm x 124.6 mm x 73 mm
D)
Item Specifications
Item Specifications
Power input RJ45 port; input voltage: 10–15 V DC; operating current:
≤ 300 mA
(1) Asset detection strip (2) Asset label (3) Main control box
Item Specifications
Item Specifications
The smart U space manager is designed for IT asset management of the data
center. The system automatically detects the physical location of IT devices in the
data center, and collects IT asset codes and the information about U space usage.
Item Specifications
Item Specifications
The eLight actuator has the function of associating alarms, access authorization
status, and atmospheres.
Green light Blinking Access authorization succeeds and the door can be
for 3 opened.
seconds
Item Specifications
Dimensions (L x W x 112 mm x 76 mm x 35 mm
H)
Operating 4°C–40°C
temperature
Item Specifications
Dimensions (L 70 mm x 58 mm x 86 mm
x W x H)
Impulse ≤ 450 mA
current
Power <2W
dissipation
Item Specifications
Indicator When the power supply is working properly, the green indicator
status is on. When a fault occurs, the yellow indicator is on. When
water leakage occurs, the red indicator is on.
(1) Water detector (2) Conversion cable end A, connected to (3) Conversion cable
the water detector
(4) Conversion cable (5) Water detection cable end A, (6) Water detection cable
end B, connected to the connected to the conversion cable
water detection cable
Item Specifications
Specifications
BLINK If you press the BLINK button, the RUN indicator blinks
button intermittently at super short intervals (blinking at super short
intervals for 0.5s and then off for 0.5s) for 10 seconds.
E-label Supported
Indicators
3.2.19 PAD
The PAD allows the wireless access from the data center management system. You
can monitor the equipment in the data center and environmental parameters in
real time over the app.
Pin1 A
Pin2 B
Pin3 V+
Pin4/5/6/7 Reserved
Pin8 V-
Output RS485
The RS485 communications ports of the T/H sensor are RJ11 (6P6C) ports.
Pin Description
Pin 3 RS485–
Pin 4 RS485+
Item Specifications
Item Specifications
Output RS485
NOTE
Pin 1 or Pin 4 A
Pin 2 or Pin 5 B
Pin 3 V+
Pin 6 or Pin 8 V–
Pin 7 Disconnected
Output RS485
Item Specifications
Output RS485
Output RS485
Number of supported ≤4
remote control
commands
Infrared emission ≤ 10 m
distance
Power ≤ 350 mA
IP rating IP20
Color Black
4 UI Description
4.1 WebUI
For data transmission security, the ECC800-Pro supports WebUI access through
TLS.
WebUI Introduction
Mobile Data – View mobile data Yes This menu is displayed only
Info information, such when Mobile data control
as the connection under System Settings >
status and System Parameters is set to
wireless signal Enable.
strength.
Syst System Site Set the system Yes Smart module name is
em Parameters Configuration type, site ID, and FusionModule by default.
Sett network security System type is
ings certificate. FusionModule2000 by
default.
NOTE
If System type is General, the
ECC800-Pro is a general
collector that collects device
data and reports the data to the
northbound NMS.
Security No –
Certification
Change
Parameter – ● Synchronize No –
Sync device
parameters to
quickly import
data of
southbound
devices (such
as the multi-
functional
sensor and
skylight
actuator).
● Support device
replacement. e
Screen Function
iPower Allows you to view the running status and alarm status of
all branches on the power supply and distribution links
page, and has the self-diagnosis function.
More Monitor Allows you to view details about devices under the
monitoring system, power distribution, aisle, cooling, and
cabinet types.
Software Allows you to upgrade the software using a USB flash drive
Upgrade or locally.
Paramet -
er Sync
Screen Function
Network -
Paramet
er
Operatio -
n Log
Access -
Event
5 Power-On Commissioning
Prerequisites
● The hardware and cable installation check is complete for controller
components according to data center specifications and requirements.
● The device and ECC800-Pro have been powered on.
● You have obtained the ECC800-Pro IP address as well as the user name and
password used for WebUI login.
● A PC with an IP address in the same network segment as the ECC800-Pro IP
address is prepared, and the PC has connected to the WAN1 port on the
ECC800-Pro.
Context
After installing or replacing the device or ECC800-Pro, set monitoring parameters
and add the device.
Procedure
Step 1 Connect a network cable between the PC network port and the WAN1 port
(protected by a security mechanism) on the ECC800-Pro.
Table 5-1 Default IP addresses for the WAN and LAN ports on the ECC800-Pro
WAN1 192.168.8.10
WAN2 192.168.0.10
192.168.248.10 (FusionModule500/800)
NOTICE
Step 2 Configure the PC IP address and the WAN1 IP address in the same network
segment.
If the WAN1 port IP address is 192.168.8.10, subnet mask is 255.255.255.0, and
default gateway is 192.168.8.1, set the PC IP address to 192.168.8.12, subnet mask
to 255.255.255.0, and default gateway to 192.168.8.1.
Step 3 Set LAN parameters.
NOTE
● If the ECC800-Pro connects to a LAN and a proxy server has been selected, perform Step
3.3 and Step 3.4.
● If the ECC800-Pro connects to the Internet, and the PC in a LAN accesses the Internet
over a proxy server, do not perform Step 3.3 and Step 3.4. Otherwise, you will fail to
access the ECC800-Pro.
1. Open the Internet Explorer and choose Tools > Internet Options.
2. Click the Advanced tab and select Use TLS1.2 and Use TLS1.3.
3. (Optional) Click the Connections tab and select LAN settings.
4. (Optional) On Proxy server, clear Use a proxy server for your LAN.
5. Click OK.
Step 4 Set Internet Explorer parameters.
1. When you use Internet Explorer for access, set Internet Explorer to ensure the
normal display of and operations on the WebUI. Choose Tools >
Compatibility View, and add the web access address to the compatibility
view.
2. Choose Tools > Internet Options > Security, and add the ECC800-Pro access
address to the list of trusted sites.
3. Enable file download and set the security level of the trusted site to low.
NOTE
When switching between different versions of the ECC800-Pro on your PC, you are
advised to clear the Internet Explorer cache. Failing to do so may cause information
missing or exception after login. The following provides the details:
1. Open Internet Explorer and choose Tools > Internet Options > General.
2. Select Delete browsing history on exit and click Delete.
3. In the Delete Browsing History dialog box, select all options except Password,
and click Delete.
2. On the login page, enter the user name and password, and select a language.
– Preset user name: admin
– Preset password: Changeme
3. Click Log In.
NOTE
----End
Context
● The initial startup password authentication is required only during initial
power-on commissioning. If the authentication has been performed
successfully, no authentication is required afterward.
● The startup password needs to be authenticated again when you switch the
system type, restore the default settings, and restore the factory settings on
the WebUI or by pressing keys.
● If the startup password authentication is not complete, the ECC800-Pro
WebUI and app cannot be used for commissioning.
Procedure
Step 1 Authenticate the startup password on the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Record the values of Barcode and Verify Code in the displayed Startup
Password dialog box.
3. Within 24 hours, inform the technical support of Barcode and Verify Code to
obtain the password. After obtaining the password, enter the password in the
Password text box and click Submit to complete the authentication of the
startup password.
NOTE
The verification code is valid for 24 hours by default. After the validity period, the
verification code is automatically updated. You can also click to update the verification
code.
Step 2 Use the Service Expert app to authenticate the startup password.
1. Download and install the Service Expert app from Huawei AppGallery.
NOTE
Before the installation, ensure that the PAD or mobile phone is connected to the
Internet and the network is running properly.
– Huawei AppGallery installed on the PAD or mobile phone
Log in to the Huawei AppGallery client, search for Service Expert, and
tap Install. Huawei AppGallery is preinstalled on Huawei PAD or mobile
phone by default.
– Huawei AppGallery not installed on the PAD or mobile phone
Table 5-2 Operation methods for the scenario where Huawei AppGallery
is not installed on the PAD or mobile phone
Method Procedure Installation
Verification
2. Hold down the SW button on the ECC800-Pro for 1s to enable the WiFi
function.
NOTE
– The preset password is Changeme. The password is valid only after you hold down
the button for the first time to enable the WiFi function. If you enable the WiFi
function on the WebUI, there is no preset password.
– After the WiFi function is enabled, the password for a mobile phone to connect to
the WiFi network is Changeme. When you log in to the app using the PAD, the
system prompts you to change the preset password.
– After you disable the WiFi hotspot function on the WebUI and press the button
again, the WiFi function is still enabled. In this case, the WiFi password is the one
you changed into last time.
– The WiFi function is disabled by default. When you enable the WiFi function,
change the WiFi password to ensure connection security.
– A password that has been used for a long time is more likely to be stolen or
cracked. The risk increases over time. Change the WiFi password periodically
(recommended: once half a year).
3. Use the Service Expert app to authenticate the startup password.
a. Open the app, and log in as an administrator.
Ensure that the IP address is 192.168.245.10, the default administrator
name is admin, and the preset password is Changeme.
b. If the message displayed on the page is changed from Initial startup
password authentication to Activated, the startup password
authentication is complete.
NOTE
– After the first login, change the preset password in time to ensure system access
security.
– A password that has been used for a long time is more likely to be stolen or cracked.
The risk increases over time. Change the password once every three months.
– It is recommended that you use different user accounts to log in to the ECC800-Pro
WebUI and app concurrently. Otherwise, either of them will be logged out.
– The iDCService app supports only the Android system.
– The iDCService app is available only in Chinese.
----End
Context
● The cloud authorization has been signed on the Service Expert app.
● The initial startup password has been authenticated.
Procedure
Step 1 Complete the first startup password authentication. The Cloud service access
page is displayed.
Step 3 Set the Cloud service access mode. The default value is 4G. You can select FE
from the drop-down list box.
NOTE
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
NOTE
The configuration wizard is displayed when you log in to the ECC800-Pro WebUI for the first
time or the system type is switched.
Step 3 Configure related parameters on the page as instructed. For details, see the
function description on the left of the page.
NOTE
Step 5 After confirming that the commissioning Result is normal, enter the Checker
Name and Check Date, and click Configuration Completed.
NOTE
To export the configuration result, click Export Check Result. The export file format is csv.
----End
Prerequisites
To implement alarm notification by SMS, the following conditions must be met:
● The ECC800-Pro is configured with a 4G module and supports standard SIM
card access.
● The ECC800-Pro is connected to a network with an email server through a
WAN port. Both the Internet and local area network (LAN) are supported.
NOTE
● The prerequisite for using a SIM card is that the site has signal coverage.
● China: 2G and 4G networks support China Unicom or China Mobile SIM cards, and 3G
networks support only China Unicom SIM cards.
● Outside China: Select SIM cards according to the following RATs and frequency bands:
4G: LTE-FDD, covering frequency bands B1, B3, B5, B7, B8 and B20; LTE-TDD, covering
frequency bands B38, B40, and B41
3G: WCDMA, covering frequency bands B1, B5, and B8
2G: GSM, covering frequency bands 900 MHz and 1800 MHz
● To use the WeChat notification function, connect the ECC800-Pro to the EDCM system.
For details, see the user guide of the EDCM system.
Procedure
Step 1 Choose System Settings > Event Notification.
Step 2 Set related outbox parameters.
1. Set related parameters in the Outbox Settings area on the Mailbox Settings
page. If the address type of the outbox is Domain name, choose System
Settings > System Parameters, and set related parameters in the DNS
Server Address area on the Monitor IP page.
NOTE
NOTICE
If Test email sending failed is displayed, check whether the receiver's email
server requires CA certificate verification. If it is required, download the CA
certificate from the receiver's email website and upload it in the Mailbox
Certificate area.
NOTE
If the email encryption mode is set to TLS or SSL, TLSv1.2 or a later secure version is used
by default. Exercise caution when selecting TLSv1 or an insecure TLSv1.1 version based on
service requirements.
NOTE
The preceding email addresses are for reference only (the actual parameters apply) and are
used only for configuring the email function.
The email address is used only for configuring the email function and is not used for other
purposes. The address is encrypted during transmission in the ECC800-Pro to ensure that
the personal data of users is fully protected.
NOTE
Click Test to check whether the added mailbox is available. If it is available, Successfully to
send the test email. is displayed. If it is unavailable, Failed to send the test email. is displayed.
Check whether the receiver's mailbox parameters for receiving emails are correctly set.
NOTE
The mobile phone number is used only for configuring the SMS function and is not used for
other purposes. The phone number is encrypted during transmission in the ECC800-Pro to
ensure that the personal data of users is fully protected.
NOTE
Click Test to check whether the added mobile phone number is available. If it is available,
Successfully to send the test short message. is displayed. If it is unavailable, Failed to send
the test short message. is displayed. Check whether the mobile phone number is correctly set.
Step 5 Set the alarm notification delay parameter and the new alarm notification
parameter.
NOTICE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 100
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
Step 6 Click Confirm to access the re-authentication page. Enter Login password and
click Submit.
----End
Follow-up Procedure
To modify or delete the email parameter settings, click Modify or Delete.
If the email address fails to be set, rectify the fault based on the handling
suggestions of the error codes listed in the following table. If an error code is not
listed in the following table, provide the ECC run log and contact the customer
technical support.
Failed to connect 22 1. Try again later. This issue occurs when the domain
to the email name is just configured and the domain name
server. resolution is not complete.
2. Check whether the IP address of the DNS server is
correct.
3. Check whether the domain name of the email server is
correctly configured.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 101
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
Failed to send the 504 Check whether the outbox address matches the user
test email. name for logging in to the email server.
535 1. Log in to the email box of the email sender and start
the SMTP service.
2. Check whether the user name and password for
logging in to the email server are correct.
3. Log in to the email box of the email sender and start
the third-party client license code function.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 102
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
451 Provide ECC run logs and contact the service center to
reduce the email sending frequency.
Procedure
Step 1 Set parameters for general input units on the ECC800-Pro WebUI.
1. Set parameters for general input unit 1.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 103
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
2. Set the parameters for other general input units in the same way or by
synchronizing parameters.
Path: Maintenance > Parameter Sync
Step 2 Set parameters for power distribution units on the ECC800-Pro WebUI.
1. (Optional) To modify the branch signal name of the power distribution unit,
choose System Settings > Signal Name Modify and access the Batch Signal
Configuration to modify the name, and then tap Submit.
2. The following is an example of how to display two branches for power
distribution unit1.
Choose Monitoring > Power Distribution > General Input Unit > Power
Distribution Unit > Display Configuration, select Branch Information
Display corresponding to QF1 and QF2, and then tap Submit.
3. Configure the power distribution settings for power distribution unit 1.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 104
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
4. Set the parameters for other power distribution units in the same way or by
synchronizing parameters.
Path: Maintenance > Parameter Sync
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 105
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
Context
By identifying the MAC address set of adjacent ports of smart busbars, the system
automatically identifies the link relationship and implements intelligent
networking of smart busbars.
NOTE
● The link relationship can be automatically identified only when the software version of
both the general input units and power distribution units of smart busbars is V304 or
later.
● When a dense busway connector box (equivalent to the general input unit in functions)
is used, it is connected to ports COM1–COM4 on the UIM20A expansion module. The
Modbus protocol addresses of the corresponding devices are 1–4. Devices need to be
manually added.
Procedure
Step 1 Go to the FusionModule2000 view, click Modify Device, select any general input
unit or power distribution unit, and click Automatic identification.
NOTE
You can set Power supply branch to manually change the link relationship.
----End
Procedure
Step 1 Ensure that the device address of the eLight actuator is the default value 2.
Toggle switches 1 to 4 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 106
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
3 ON ON OFF OFF
Choose Maintenance > Configuration The eLight is lit up in red, green, blue,
Wizard > Linkage Test > eLight and white in sequence for 3 seconds
Actuator Commissioning and click respectively, and then turns off.
Test.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 107
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
Access authorization fails and the Red light, blinking for 3 seconds
aisle door cannot be opened.
NOTE
– The eLight actuator is automatically associated with the nearest access actuator in the
smart module view.
– If there are one access actuator and two eLight actuators in an aisle, the access
actuator is automatically associated with the two eLight actuators.
----End
Follow-up Procedure
To modify the parameters of a single eLight, do as follows:
1. Choose Monitoring > Aisle > eLight Actuator Group > eLight Actuator. The
Running Parameters page is displayed.
2. Select the Associated alarm severity as required and click Submit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 108
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
Procedure
Step 1 Ensure that the device address of the eLight actuator is the default value 2.
Toggle switches 1 to 4 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.
3 ON ON OFF OFF
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 109
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
Communicati COM1/COM2
ons Port
3. Click Test Connect to check whether the eLight Actuator connects properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the cable is properly connected to
the device, whether the device is running properly, and whether the
parameter settings are consistent with the device parameters.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 110
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
The eLight can be used to commission the cabinet light only when the cabinet
electronic clasp lock or cabinet electronic lock is used, not when the mechanical
lock is used.
----End
Prerequisites
One end of the straight-through cable has been connected to the COM port on
the PDU2000 and the other end has been connected to the COM port on the ETH
converter.
Context
PDU2000-M(C) FT
PDU2000-M(H) 6B
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 111
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
Procedure
Step 1 Set the PDU2000 monitoring parameters.
● Set the PDU2000-M (C) monitoring parameters.
NOTE
The parameter settings take effect only if you press MENU and then the
PDU2000-M (C) buzzes and restarts. If you do not press MENU, the PDU2000-M
(C) buzzes and restarts automatically after 30s and the settings are not saved.
● Set the PDU2000-M (H) monitoring parameters.
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 112
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
is displayed:
Communicat COM1/COM2
ions Port
3. Click Test Connect to check whether the PDU2000 connects to the ECC800-
Pro properly.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 113
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
----End
Prerequisites
● COM1–COM3 on the ECC800-Pro are connected to cabinet electronic clasp
locks.
● The smart module view has been deployed. The layout type is single-row
view.
● The cabinet door can be opened and closed properly. If the cabinet door
cannot be opened and closed properly, adjust the position of the cabinet
electronic clasp lock by performing steps 1 and 2.
Procedure
Step 1 (Optional) Check whether the cabinet door lock is leveled to 2000 (+3) mm. If
not, adjust it.
Step 2 (Optional) If the cabinet door still cannot be opened after step 1 is performed,
adjust the position of the cabinet electronic clasp lock by using the slotted holes
until the cabinet door can be opened and closed properly.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 114
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
4. Click Test Connect to check whether the connection between the cabinet
electronic clasp lock and the ECC800-Pro is normal.
– If the connection succeeds, click Confirm. The device connection
information is displayed in the Number of connected devices list.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 115
ECC800 Data Center Controller
User Manual 5 Power-On Commissioning
Open Choose Monitoring > Cabinet, Select Open front door, Open
cabinet and click the Controls tab. back door, or Open all doors
electroni from the Open the door drop-
c clasp down list box, select the setting,
locks in and click Submit. The cabinet
batches electronic clasp locks unlock the
doors in batches based on the
signal value.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 116
ECC800 Data Center Controller
User Manual 6 Feature Description
6 Feature Description
Procedure
Step 1 Choose System Settings > Performance Parameters. The Performance
Parameters page is displayed.
Step 2 Click the Performance Parameters(enable) tab, select a device in Device Type,
and click OK.
All enabled performance indicators are displayed in the result list.
NOTE
If the Device Type is ECC800, the Total electrical energy of system IT load output signal
supports the Threshold/Period mode. You can select the parameter as required.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 117
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 3 You can set the status of enabled performance indicators to Disable as required.
Disable one 1. Select Disable on the row of a performance indicator in the Collecting
Data column.
2. Click Submit in the lower part of the page.
NOTE
● is displayed on the row where the performance parameter is located in the Setting
Result column, and the numbers of success and failure records are displayed near
Submit.
● The disabled performance indicators are displayed on the Performance
Parameters(disable) tab page.
Step 4 On the Performance Parameters(disable) tab page, you can set the status of
disabled performance indicators to Enable as required. The operations are similar
to Step 2–Step 3.
Step 5 Click the All Configured Data tab to view all the performance parameters
configured for the device.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 118
ECC800 Data Center Controller
User Manual 6 Feature Description
Prerequisites
Cascaded ECC800-Pros communicate with each other properly.
Context
A maximum of three ECC800-Pros can be cascaded. After the IP addresses of other
smart module ECC800-Pros in the room are added to an ECC800-Pro, their active
alarms and PUE data can be displayed and viewed.
You can click links on the cascading management page of the master ECC800-Pro
to display the login pages of the other ECC800-Pros. Then, you can log in to view
the details.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 3 Click Add. In the displayed New Smart Module Cascading dialog box, enter the
IP addresses of the ECC800-Pros to be cascaded.
Step 5 Choose Home > Multi-Module Monitoring. The information about the cascaded
ECC800-Pros is displayed.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 119
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 6 (Optional) Click the alarm bubble in the Active alarms area in a smart module to
view the corresponding active alarm information.
Step 7 (Optional) Click the pencil icon next to a smart module name, and the Edit Smart
Module Title dialog box is displayed. Change the smart module name and click
Confirm.
Step 8 (Optional) Click Link in a smart module on the cascading page to access the
corresponding ECC800-Pro login page.
Step 9 (Optional) Filter and query the details of each alarm by smart module, device, or
alarm severity in the Active alarms area.
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Device Management, and click Auto Discover Device
to add the device. Devices connected to the UIM can be identified.
rPDU-MPDU MD-1324-2004
rPDU-PN PN1-32I10-20E4G-AV4
rPDU ZFIF-112-0800
PN1-16X18-8E-AH4W
ZZIF-130-2004
PN1-32I15-20E4G-AV4W
PDU2000-M(C) PDU2000-32-1PH-20/4-M1/CLEVER
PDU2000-M(H) PDU2000-32-1PH-20/4-M1/HPX
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 120
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
If the intelligent device does not support self-identification, perform step 5 to manually add
the device.
Step 3 Choose Home > Smart Module View and click Bind Cabinets and Devices.
Step 4 In the displayed dialog box for binding IT cabinets and devices, click Auto Bind to
bind devices.
● One-to-one scenario
Each cabinet corresponds to a UIM.
Each cabinet contains two or more types of intelligent components, which can
be the rPDU-MPDU, rPDU-PN, rPDU, PDU2000-M(C), PDU2000-M(H), smart
U space manager, cabinet electronic lock, fingerprint lock, and T/H sensor.
● One-to-four scenario
Four cabinets correspond to one UIM.
In this scenario, only one type of intelligent devices is monitored in each
cabinet. The port for connecting the intelligent device to the UIM20A must
meet the physical connection rules in Table 6-3.
NOTE
– Typical intelligent devices supported in this scenario are the rPDU-MPDU, rPDU-
PN, rPDU, PDU2000-M(C), PDU2000-M(H), smart U space manager, cabinet
electronic lock, fingerprint lock, and T/H sensor.
– Each port on the UIM does not support cascading.
– The UIM must be installed in the first cabinet, and the intelligent devices in the
following three cabinets need to be connected to the first cabinet.
– If the actual number of IT cabinets is not an integral multiple of 4, connect cables
according to the rules. Idle COM ports on the UIM can be reserved.
– One UIM can connect to only one type of intelligent devices.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 121
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
Connected - - - -
Device
Step 5 (Optional) Click Add, set IT Cabinet, select a UIM and the devices connected to
each COM port of the UIM20A, and click in the Operation column to
manually bind the devices.
NOTE
If the automatic cabinet binding result is inconsistent with the actual connection or the
automatic cabinet binding function cannot be used, you need to manually bind devices.
You can determine the IT cabinet that houses the UIM through indicator blinking. Then, you
can change the IT cabinet name.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 122
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 8 (Optional) Click , change the IT cabinet name, change the UIM and the devices
connected to the COM ports of the UIM20A, and click in the Operation
column.
Hold down the BLINK button on the UIM for less than 2s. The RUN indicator on the UIM
blinks fast, and the cabinet corresponding to the UIM blinks in the smart module view.
----End
Context
● Blinking at long intervals: If the indicator is blinking at 0.5 Hz (at intervals of
2s, on for 1s and then off for 1s), communication with the host is successful.
● Blinking at short intervals: If an indicator is blinking at 4 Hz (at intervals of
0.25s, on for 0.125s and then off for 0.125s), networking is in progress.
Procedure
Step 1 Hold down the networking switch on a wireless low-power device for 8s to
delete the networking information.
Step 2 Hold down the SW button on the ECC800-Pro for 3–5 seconds to enter the
wireless networking (802.15.4) pairing state.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 123
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 3 Consider the device type and hold down the networking switch on the wireless
low-power device for 3s to implement networking until the indicator of the
component blinks at short intervals.
After the wireless networking (802.15.4) pairing is successful, the indicator of the
wireless low-power device blinks at long intervals.
Step 4 After all wireless low-power devices are networked (all indicators blink at long
intervals), log in to the ECC800-Pro WebUI and check whether the networking is
successful.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Environment from the main menu. In the navigation
tree on the left, check whether the wireless low-power devices are successfully
added under Environment.
NOTE
Step 5 After all wireless low-power devices are networked, hold down the SW button on
the ECC800-Pro main control module for 3–5 seconds. The RF_Z indicator on the
ECC800-Pro main control modules turns from blinking green at super short
intervals to blinking green at long intervals (blinking at 0.5 Hz, on for 1 second
and then off for 1 second). The ECC800-Pro exits the wireless networking
(802.15.4) pairing status.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 124
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
----End
Context
● To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. After that, the specific alarm can be reported.
● If the sensor is prefabricated, only check its settings.
● If multiple door status sensors are connected, commission one door status
sensor first and then commission the other door status sensors in the same
way.
Procedure
Step 1 Set parameters for a door status sensor.
NOTE
In this example, the door status sensor is connected to the AI/DI_1 port on the independent
deployment AI_DI 1.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device Type to Independent Deployment AI_DI Unit, set Device Name
to Independent Deployment AI_DI1 Unit, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_1 to Door1
and click Submit.
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 125
ECC800 Data Center Controller
User Manual 6 Feature Description
7. Set Door1 sensor type to Door sensor, ensure that Door1 power supply is
Yes, and click Submit.
8. Perform the preceding operations to set parameters for ports AI/DI_2 to AI/
DI_8.
----End
Context
● If the sensor is prefabricated, only check its settings.
● If multiple door status sensors are connected, commission one door status
sensor first and then commission the other door status sensors in the same
way.
Procedure
Step 1 Choose Monitoring > Cabinet > IT Cabinet1 > Cabinet Collector1 > Running
Parameters, set the door status sensor parameters.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 126
ECC800 Data Center Controller
User Manual 6 Feature Description
Close and then open the If the alarm is enabled for the front and rear
door. doors, a cabinet door open alarm is displayed on
the active alarm screen of the app or the active
alarm page of the WebUI.
----End
Context
● To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. After that, the specific alarm can be reported.
● If the sensor is prefabricated, only check its settings.
● If multiple door status sensors are connected, commission one door status
sensor first and then commission the other door status sensors in the same
way.
Procedure
Step 1 Set parameters for a door status sensor.
NOTE
In this example, the door status sensor is connected to the AI/DI_1 port on the user
interface module1.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device Type to UIM, set Device Name to UIM1, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_1 to Door1
and click Submit.
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 127
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Procedure
Step 1 For a single cabinet, set the door status sensor parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800 and Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_3 to Door1
and click Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3
Port Settings.
6. Set Door1 sensor to Enable and click Submit.
7. Set Door1 sensor type to Door sensor and click Submit.
Step 2 If there are less than or equal to two cabinets, set the door status sensor
parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800 and Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_3 to Door1
and click Submit. Change the new signal name of AI/DI_5 to Door2 and click
Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3
Port Settings.
6. Set Door1 sensor to Enable and click Submit.
7. Set Door1 sensor type to Door sensor and click Submit.
8. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_5
Port Settings.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 128
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Prerequisites
When the fingerprint reader is connected to the ECC800-Pro for the first time, the
permissions need to be synchronized.
Procedure
Step 1 Set the access user management and access permission management.
1. Choose System Settings > Access Management to access the access
management page. The system supports the management of various access
permissions through the access card, password, and fingerprint.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 129
ECC800 Data Center Controller
User Manual 6 Feature Description
2. Click Authentication Mode and set the authorization mode for the
FusionModule Actuator or access actuator.
Select Card, Fingerprint, Card and password, Card and fingerprint,
Fingerprint and password, Card, password and fingerprint or Card,
password or fingerprint.
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 130
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 131
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
▪ Record directly: Type the access card number in the text box.
▪ Record by swiping the card: Click Swipe Card and place the card on
the access control device. The card number is automatically recorded.
– Fingerprint: On the Fingerprint tab page, select Fingerprint for Select
fingerprint reader and click Scan Fingerprint. On the Please collect
fingerprint page, click OK. Then put your finger on the fingerprint reader
to collect the fingerprint after hearing the voice prompt. After you hear a
beep sound, move your finger away and collect the fingerprint again.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 132
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
▪ Press your finger against the fingerprint sensor until touching the metal
frame.
▪ Press your finger in the correct way and wait for more than 0.5s. You need to
record each fingerprint for three times.
▪ Each access user can register a maximum of three groups of fingerprints. The
three groups of fingerprints need to be registered using different fingers. The
system supports a maximum of 3000 registered fingerprints.
▪ The fingerprint information is used only for configuring the access control
function and is not used for other purposes. The fingerprint information is
encrypted during transmission in the ECC800-Pro to ensure that the personal
data of users is fully protected.
▪ The cabinet fingerprint lock does not support access user registration. Access
users can be registered only on the aisle access control device, and the
registered information is sent to the cabinet fingerprint lock through the
ECC800-Pro.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 133
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 134
ECC800 Data Center Controller
User Manual 6 Feature Description
The card reader with a keypad is Set Logical level configuration for
connected to WG_1 port on the reader 1 removed to High level alarm.
access actuator. Logical level configuration for reader 2
removed remains as Low level alarm.
The card reader with a keypad is Set Logical level configuration for
connected to WG_2 port on the reader 2 removed to High level alarm.
access actuator. Logical level configuration for reader 1
removed remains as Low level alarm.
● If the access control system uses a Card, Card and fingerprint, or Card,
password and fingerprint reader, retain the default value Low level alarm
for Logical level configuration for reader removed.
Step 3 Check the functions of the access control device and access actuator.
Method 1: Attempt to open the door For method 1: The aisle door is opened
using the configured authentication successfully.
mode. For method 2: After you choose Query
Method 2: On the WebUI, choose > Access Event on the WebUI, you can
Monitoring > Aisle > Access Actuator view the type of this access control
Group > Access Actuator n, and click event.
Controls to open the door remotely.
Step 4 Check the functions of the cabinet electronic lock or fingerprint lock.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 135
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 136
ECC800 Data Center Controller
User Manual 6 Feature Description
Procedure
Step 1 Check functions of the exit button.
Attempt to open the door by pressing The aisle door is opened successfully.
the exit button when the aisle door is
closed.
Attempt to open the door by pressing The skylight can be opened manually.
the skylight button when the aisle
door is closed.
Attempt to open the door The aisle door is You need to restore the
by pressing the emergency opened successfully. emergency button.
button when the aisle
door is closed.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 137
ECC800 Data Center Controller
User Manual 6 Feature Description
Verify that the door sensor is connected to Choose Query > Access Event
the AI/DI Spare port on the FusionModule and check whether there is a
Actuator. Trigger the door sensor when the Door open by sensor event.
aisle door is properly closed.
----End
Procedure
Step 1 Check the function of an emergency door release button.
When the room door is The room door is opened Remove the short-circuit
properly closed, short- properly. cable from the wiring
circuit the wiring terminals NC and COM
terminals NC and COM or NO and COM on the
or NO and COM on the emergency door release
emergency door release button.
button.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 138
ECC800 Data Center Controller
User Manual 6 Feature Description
Figure 6-11 Camera + VCN or IVS1800 connecting to the smart ETH gateway
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 139
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTICE
● To ensure the normal operating of the ECC800-Pro, avoid high data traffic, such
as the concurrent display of dynamic monitoring of cameras and VCN or
IVS1800 video playback.
● To ensure the normal operating of ECC800-Pro services, you can view video
from a maximum of two cameras concurrently.
Prerequisites
● If multiple cameras are connected, commission one camera first and then
commission other cameras in the same way.
● The camera has connected to the smart ETH gateway and the smart ETH
gateway communicates properly with the ECC800-Pro.
● The camera software version is later than SDC 8.0.RC111.
Context
● Before commissioning the C3220 camera, set its IP address based on customer
requirements.
● Configure the internal IP addresses of the camera and VCN or IVS1800 and
the IP address of the LAN port on the ECC800-Pro in the same network
segment.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 140
ECC800 Data Center Controller
User Manual 6 Feature Description
● Configure the external IP addresses of the camera and VCN or IVS1800 and
the IP address of the WAN1 port on the ECC800-Pro in the same network.
● Set the internal and external IP addresses as planned by the customer. The
following IP addresses are for reference only.
Procedure
Step 1 Log in to the camera WebUI and enable ONVIF.
1. Remove the network cables that connect the smart ETH gateway to the LAN1
and LAN2 ports on the ECC800-Pro.
2. Use a network cable to connect the PC to the PoE port on the smart ETH
gateway. Then, set the local IP address of the PC to 192.168.0.11.
3. Remove the camera shell and hold down the reset button for 6s to 10s to
restart the camera.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 141
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
– To prevent security risks, the system prompts you to set the password of the admin
user when you log in to the system for the first time.
– If you enter incorrect passwords for five consecutive times, the account will be
locked for 5 minutes by default.
– To prevent security risks, periodically log in to the system as the admin user, click
the drop-down list in the upper right corner, and click Change Password to change
the administrator password.
– You need to set Internet Explorer before accessing the camera WebUI for the first
time.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 142
ECC800 Data Center Controller
User Manual 6 Feature Description
Settings Procedure
6. Choose View > Network/Time > Second Protocol Parameters, and select
Enable ONVIF.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 143
ECC800 Data Center Controller
User Manual 6 Feature Description
7. Choose View > Network/Time > Set Time and set the camera time.
NOTE
– You can directly set the camera time or set NTP parameters to synchronize the
camera time with the server time on the network.
– Changing the time during video recording will damage the video file. Therefore, do
not change the time during video recording.
a. Choose Set Time and select the time zone of the corresponding city from
the Time zone drop-down list box.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 144
ECC800 Data Center Controller
User Manual 6 Feature Description
b. Select a time calibration mode, set related parameters, and click Submit.
NOTE
There are two time calibration modes: Manual and NTP. In Manual mode, you
can set the time directly. In NTP mode, you need to configure an NTP server so
that the camera time is synchronized with the NTP server time. The two
calibration modes cannot be selected at the same time.
8. Choose Settings > Network > TCP/IP, set Way to obtain IPv4 to Use the
following IP address and set an IPv4 address to the planned IP address for
the camera. The IPv4 address should be in the range of 192.168.248.50 to
192.168.248.99.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 145
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 2 For details about how to commission the camera and set parameters, see the
documents delivered with the device or the documents obtained by referring to
the section "Preparing Documentation."
1. Preview the site situation in real time and check the camera coverage through
videos. Adjust the lens if necessary.
2. (Optional) Configure an SD card if the VCN or IVS1800 is not configured.
3. Choose Settings > Video/Audio/Image > Video, and set camera Stream
type, Primary stream, and Secondary stream 1 parameters, as shown in the
following figures.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 146
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTICE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 147
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 148
ECC800 Data Center Controller
User Manual 6 Feature Description
– The search timeout interval is 10s. If the search fails, a search failure message is
displayed.
– To avoid missing cameras, you can perform Search for multiple times.
5. On the found camera record, click and set the external IP address and
related parameters for the camera based on the one allocated by the network
administrator (PC IP address and camera external IP address should be in the
same network segment).
6. Click the link under Link to access and log in to the camera WebUI. Enter the
preset user name admin and the preset password HuaWei123, and click Log
In.
7. Choose Settings > Network > TCP/IP, set Way to obtain IPv4 to Use the
following IP address and set an IPv4 address to the planned IP address for
the camera. The IPv4 address should be in the range of 192.168.248.50 to
192.168.248.99.
Step 4 On the ECC800-Pro WebUI, choose System Settings > Video Management and
click Add in the lower left corner. In the New Video Information dialog box that
is displayed, enter camera and VCN or IVS1800 information.
● Name: Enter the camera and VCN or IVS1800 names (for example, Camera1).
● External IP: Enter the external IP address based on the customer's plan.
● Internal IP: Enter the internal IP addresses of the camera and VCN or
IVS1800, for example, 192.168.248.56.
● Video Type: Select the video type based on the customer's device.
● Link: Enter the external IP address of the camera (for example, https://
external IP address of the camera).
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 149
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 6 (Optional) If you have an ONVIF certificate, choose System Settings > Video
Management > ONVIF Certificate and upload the certificate on the WebUI.
----End
Context
If the VCN or IVS1800 is not configured and an SD card is chosen, perform the
following procedure.
Procedure
Step 1 Log in to the Huawei camera WebUI.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 150
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
If longer-time video storage is required, set camera parameters according to the following table.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 151
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 4 Choose Settings > Intelligent Analysis > Common Intelligence. Select Enable,
click Add, add motion detection areas, set motion detection parameters, and click
Save.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 152
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
You can set the start time, end time, and schedule for an alert plan.
NOTE
You can enable the snapshot, recording, or email linkage function in the case of alarms
generated in the alert area.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 153
ECC800 Data Center Controller
User Manual 6 Feature Description
Prerequisites
If multiple cameras are connected, retain the connection of one camera and
disconnect other cameras. After commissioning the connected camera,
commission other cameras in the same way.
Procedure
Step 1 Log in to the camera WebUI.
1. Configure the PC IP address and the camera IP address in the same network
segment. Enter the camera IP address (192.168.0.120 by default) in the
address bar of the Internet Explorer and press Enter.
NOTE
The following lists the requirements for the operating system and browser of the
camera WebUI:
– Supports Windows 7: Internet Explorer 10/11, Chrome 38+, Firefox 35–51
– Supports Windows 8: Internet Explorer 10/11, Chrome 38+, Firefox 35–51
– Supports Windows 10: Internet Explorer 11, Chrome 38+, Firefox 35–51
– The Internet Explorer tab plugin needs to be installed for Google Chrome 45 and
later versions.
2. Set the password as prompted upon the first login. Then use the new
password to log in.
NOTE
– To prevent security risks, the system prompts you to set the password of the admin
user when you log in to the system for the first time.
– If you enter incorrect passwords for five consecutive times, the account will be
locked for 5 minutes by default.
– To prevent security risks, periodically log in to the system as the admin user, click
the drop-down list in the upper right corner, and click Change Password to change
the administrator password.
– You need to set Internet Explorer before accessing the camera WebUI for the first
time.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 154
ECC800 Data Center Controller
User Manual 6 Feature Description
Settings Procedure
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 155
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 2 Commission cameras and set parameters for them. For details, see the delivered
documents.
1. Preview the site situation in real time and check the camera coverage through
videos. Adjust the lens if necessary.
2. On the View tab page, click the Network/Time tab to access the Network/
Time tab page.
Parameter Description
IPv4 address Method for obtaining the IP address. The options are
assignment Obtain IP address automatically and Use the
following IP address. The default value is Obtain IP
address automatically.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 156
ECC800 Data Center Controller
User Manual 6 Feature Description
3. On the View tab page, click the General tab to access the General tab page.
Select Video and set the parameters, as shown in the following figures.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 157
ECC800 Data Center Controller
User Manual 6 Feature Description
Primary stream/ Set the stream type based on the site requirements.
Secondary – Primary stream: The primary streams feature high
stream bit rate, definition, and bandwidth consumption.
They are applicable to local storage.
– Secondary stream: The secondary streams provide
smooth video, occupy small bandwidth, and are
applicable to data transmission over low-bandwidth
networks.
NOTE
SD card recording supports only primary streams.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 158
ECC800 Data Center Controller
User Manual 6 Feature Description
Parameter Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 159
ECC800 Data Center Controller
User Manual 6 Feature Description
Parameter Description
Bit rate type This parameter is available only when you set Encoding
protocol to H.264 or H.265.
The bit rate is measured by data bits transmitted in a
unit of time.
– Variable bit rate: The bit rate varies depending on
the image complexity to ensure the clarity of images
with great dynamic changes. The bit rate is low if the
image is simple or static. The variable bit rate is
recommended.
– Constant bit rate: The constant bit rate remains the
same. The upper limit of the instantaneous bit rate is
set to 110%. If the bit rate is incorrectly configured
for images with great dynamic changes, the images
will be unclear.
Max. bit rate This parameter is available only when you set Bit rate
type to Variable bit rate.
The bit rate range depends on the selected resolution.
Bit rate value Average bit rate when Bit rate type is set to Constant
bit rate.
The bit rate range depends on the selected resolution.
Bit rate control This parameter is available only when you set Bit rate
mode type to Constant bit rate. The options are as follows:
– Frame rate priority: Ensure the smoothness of the
video image.
– Image quality priority: Ensure the quality of the
video image.
Image quality This parameter is available only when you set Encoding
protocol to H.264 or H.265 and Bit rate type to
Variable bit rate.
Better image quality requires higher bandwidth.
Therefore, select proper image quality based on the site
requirements.
I-frame interval This parameter is available only when you set Encoding
protocol to H.264 or H.265.
An I frame is an intra-coded frame that represents a
fixed image independent of other picture types. Each
group of pictures (GOP) begins with this type of frame.
A smaller I-frame interval indicates better video quality
and higher bandwidth consumption.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 160
ECC800 Data Center Controller
User Manual 6 Feature Description
Parameter Description
JPEG quality This parameter is available only when you set Encoding
protocol to MJPEG.
A larger value indicates higher image quality.
----End
Follow-up Procedure
Commission other cameras by referring to this section.
Context
If the VCN or IVS1800 is not configured and an SD card is chosen, perform the
following procedure.
Procedure
Step 1 Log in to the Huawei camera WebUI.
1. Configure the PC IP address and the camera IP address in the same network
segment. Enter the camera IP address (192.168.0.120 by default) in the
address bar of the Internet Explorer and press Enter.
2. Set the password as prompted upon the first login. Then use the new
password to log in.
Step 2 For details about how to commission the camera and set parameters, see the
documents delivered with the device or the documents obtained by referring to
the "Preparing Documentation" section.
1. Preview the site situation in real time and check the camera coverage through
videos. Adjust the lens if necessary.
2. Set IPv4 address, IPv4 subnet mask, and IPv4 gateway address to the
planned values.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 161
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 162
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
If longer-time video storage is required, set camera parameters according to the following
table.
Condition Result
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 163
ECC800 Data Center Controller
User Manual 6 Feature Description
Condition Result
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 164
ECC800 Data Center Controller
User Manual 6 Feature Description
Context
When the VCN510 is delivered to the site, recording data can be stored only after
you install and initialize the disks.
Procedure
Step 1 Log in to the OMU portal of the VCN.
Step 2 Choose Local Configuration > Local Disk.
Step 3 In the upper-right corner of the RAID Groups area, click Initial disk.
Step 4 Choose whether to create a RAID group. To set disks as a RAID group, select
RAID1. To set disks to work independently, select NON-RAID.
NOTE
The VCN510 supports only RAID1 or NON-RAID. If only one disk is configured, the VCN510
supports only NON-RAID. This section assumes that two disks are configured for the
VCN510.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 165
ECC800 Data Center Controller
User Manual 6 Feature Description
The server will be restarted during the initialization of disks. The process takes about 5 to
10 minutes.
----End
Verification
Step 1 Choose Local Configuration > Local Disk.
Step 2 View the RAID group status in the RAID Groups area.
If RAID1 is selected for the disks, RAID 1 is created for both the system partition
(used to store system data) and data partition (used to store recordings).
When two disks are configured, if NON-RAID is selected for the disks, RAID 1 is
created for the system partition.
Figure 6-36 RAID group status of disks that work independently (two disks)
If only one disk is configured, RAID 0 is created for the system partition after disks
are initialized.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 166
ECC800 Data Center Controller
User Manual 6 Feature Description
Figure 6-37 RAID group status of disks that work independently (one disk)
NOTE
● After a RAID 1 is created for the system partition, the system partition's RAID group is in
data restoration state. At this time, one disk is synchronizing data in the system
partition to the system partition of another disk. The synchronization process takes
about 20 hours, which does not impact services. During this process, do not remove and
insert disks.
● If the OMU portal stays at the Local Disk tab page, even if users do not perform any
operation for a long period of time, the OMU portal will not automatically return to the
login page. For service security reasons, if users do not perform any operation for a long
period of time, the OMU portal will return to the login page or does not stay at the
Local Disk tab page.
----End
Context
When the VCN520 or VCN540 is delivered to the site, recording data can be stored
only after you install and initialize the disks. The function and configuration
procedure of the VCN520 are the same as those of the VCN540. This section
describes how to initialize VCN540 disks.
Procedure
Step 1 Log in to the OMU portal of the VCN.
Step 3 In the upper-right corner of the RAID Groups area, click Initial disk.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 167
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 4 Choose whether to create a RAID group. To set disks as a RAID group, select
RAID5. To set disks to work independently, select NON-RAID.
Step 5 (Perform this step only when the RAID mode is set to RAID5.) Select RAID
configuration. This step uses Recommended configuration as an example.
Step 6 Click Start. A risk warning is displayed.
Step 7 Click OK. The system starts to initialize the disks.
NOTE
The server will be restarted during the initialization of disks. The process takes about 5 to
10 minutes.
----End
Verification
Step 1 Choose Local Configuration > Local Disk.
Step 2 View the RAID group status in the RAID Groups area.
If you select the RAID 5 mode, RAID 1 is created for the system partition (for
storing system data) and RAID 5 is created for the data partition (for storing
recordings). The disk in yellow in the following figure is a hot spare disk.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 168
ECC800 Data Center Controller
User Manual 6 Feature Description
When multiple disks are configured, if NON-RAID is selected for the disks, RAID 1
is created for the system partition.
Figure 6-40 RAID group status of disks that work independently (multiple disks)
If only one disk is configured, RAID 0 is created for the system partition after disks
are initialized.
Figure 6-41 RAID group status of disks that work independently (one disk)
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 169
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
● After a RAID 1 is created for the system partition, the system partition's RAID group is in
data restoration state. At this time, one disk is synchronizing data in the system
partition to the system partition of another disk. The synchronization process takes
about 20 hours, which does not impact services. During this process, do not remove and
insert disks.
● If the OMU portal stays at the Local Disk tab page, even if users do not perform any
operation for a long period of time, the OMU portal will not automatically return to the
login page. For service security reasons, if users do not perform any operation for a long
period of time, the OMU portal will return to the login page or does not stay at the
Local Disk tab page.
----End
Prerequisites
For details about the VCN hardware description and installation, see the
"Hardware Guide" in the corresponding VCN product documentation. For details
about the VCN configuration, see Configuration Guide.
NOTE
The version number is subject to the Quick Start delivered with the VCN. The description
and link in this document are for reference only.
Context
A default IP address has been configured for the VCN before delivery. Modify the
IP address based on the actual network plan.
Procedure
Step 1 Modify the IP address for the VCN.
1. Configure the PC IP address and the VCN IP address in the same network
segment. Enter the OMU Portal address (the default address for VCN500 is
https://192.168.1.100:8443; the default address for VCN510&VCN520&VCN540
is https://192.168.2.101:8443) in the address bar of the Internet Explorer and
press the Enter button.
NOTE
The OMU Portal supports Internet Explorer 8.0 and later versions.
2. On the login page, enter the user name admin and preset password
Change_Me, and click Log In to enter the OMU Portal page. A message is
displayed upon the first login indicating that you should modify the password.
After modifying the password, keep it properly.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 170
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
– If the VCN software version is V100R003 or later, the default user name is admin.
– If the VCN software version is V100R002 or earlier, the default user name is
Admin.
– The following uses V100R003 as an example.
3. Choose Local Configuration > Server configuration. Set the service IP
address (internal IP address of the VCN), time zone, and time according to
the site requirements.
NOTE
Currently, the VCN and NTP source server must be in the same LAN for NTP
synchronization. For details, see Step 2.
If the VCN and the NTP source server are not in the same LAN, you need to manually
set the time as follows: Choose Local Configuration > Server configuration and
change Timezone config and Time config based on the time of the source server to
be synchronized.
5. Choose Maintenance > Unified Configuration, set Module name to MU,
and click Search.
6. In the search result, click Edit in the row where the value of Parameter Name
is NatIP and set Value to the external IP address of the VCN. Click Save.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 171
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
Set NatIP to the external IP address of the VCN, which is the same as the external IP
address mapped by the VCN on the ECC800-Pro.
7. Set Module name to OMU and click Search.
8. In the search result, click Edit in the row where the value of Parameter Name
is OMUNatIP and set Value to the NATIP address of the MU. Click Save.
4. In the search results, click Edit in the row where Parameter Name is NTPIPC
and set Value to 1.
5. Click Save. After the camera NTP synchronization function is enabled, the
camera, after being connected to the server, will automatically time-
synchronize with the server.
----End
Follow-up Procedure
● The VCN automatically restarts after the IP address is modified. The restart
takes about 5 minutes. After the restart, use the new IP address to access the
VCN.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 172
ECC800 Data Center Controller
User Manual 6 Feature Description
For the VCN500, search for VCN500 Product Documentation. For the
VCN510&VCN520&VCN540, search for VCN510&VCN520&VCN540 Product
Documentation.
Prerequisites
The network communication between the VCN and the camera is normal.
Procedure
Step 1 Install the VCN IVS client.
1. Download the VCN IVS client.
You can obtain the VCN IVS in either of the following ways:
Method 2 1. Log in to the VCN OMU Portal, choose Local Configuration >
Basic Configuration, and view Current version.
2. Log in to https://support.huawei.com/enterprise/, and search
for Client Package.zip followed by the VCN model (Client
Package.zip VCN540 for example). In the search result, click
the Software Download tab, click the version and patch
number corresponding to the current version, and download
the Client Package.zip software package.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 173
ECC800 Data Center Controller
User Manual 6 Feature Description
3. Right-click the client program and choose Run as administrator from the
shortcut menu. The login page is displayed, enter the user name admin and
preset password Change_Me, and set Server address to the actual service IP
address (VCN IP address) and Port to 9900.
NOTE
If the VCN IVS and VCN are deployed in the same LAN, set Server IP address to the
VCN internal IP address (192.168.248.55, for example). If the VCN IVS is on an
extranet and the VCN is on a LAN, set Server IP address to the VCN external IP
address.
4. Click Log In to access the client home page. A message is displayed upon the
first login indicating that you should modify the password. After modifying
the password, keep it properly.
Step 2 Add a camera. For details, see the documentation delivered with the equipment or
obtain the documentation by referring to the "Preparing Documentation" section.
View the corresponding section.
NOTE
Item Value
Drive HWSDK
NOTE
If there are multiple VCNs for multiple smart modules, you are advised to evenly distribute
the cameras to each VCN.
3. Click Search, in each camera record, enter the user name and password in the
text boxes and click Verify. If the camera is verified successfully, select
cameras to add and click Next.
4. Preview live video images, click the camera in the camera list on the left, and
adjust camera parameters to optimize the image effect. Then click Next.
5. (Optional) Group the cameras and click Next after grouping.
6. Click Finish to finish adding a camera.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 174
ECC800 Data Center Controller
User Manual 6 Feature Description
If you set the recording plan policy is to All, you do not need to set the recording plan
time.
5. Click Next to complete the recording plan setting. When is displayed in the
status bar, the recording plan has been set successfully.
6. Click Finish.
When connecting to the VCN on the NetEco, you need to log in to the VCN as a
non-admin user.
When creating a user, you can select Enable account validity period and set Valid from
and Valid to to set the account validity period for the created user.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 175
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Context
A default IP address has been configured for the IVS1800 before delivery. Modify
the IP address based on the actual network plan.
Procedure
Step 1 Check whether the network connection between the PC for logging in to the OMU
portal and the IVS1800 is normal.
If the device is just delivered or has just been restored to factory settings, ensure
that the PC for logging in to the OMU portal is directly connected to the IVS1800
and is in the same network segment as the IVS1800.
For the device that is just delivered or has just been restored to factory settings, its
network information is as follows:
● IP address: 192.168.3.111
● Subnet mask: 255.255.255.0
● Gateway address: 192.168.3.1
Step 2 Enter https://IP address:8443 in the address box, and press Enter.
In the URL, IP address indicates the IP address of the IVS1800.
NOTE
The OMU portal supports Internet Explorer 10.0 and later versions.
Step 3 Log in to the OMU portal. Set the service system and operating system passwords
at the first login.
1. Set the password for user admin of the service system.
2. Set the password for user admin of the operating system.
3. Set the password for user root of the operating system.
4. Use the configured service system password to log in to the OMU portal
again.
Step 4 Configure disk initialization.
NOTE
Recording data can be stored only after you install and initialize the disks.
1. Choose Local Configuration > Local Disk.
2. In the upper right corner of the RAID Groups area, click Initial Disk
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 176
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 177
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 178
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
(4) Set other parameters based on the site requirements by referring to the
preceding steps.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 179
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 7 (Optional) Configure the IVS1800 to synchronize time with the NTP server. Choose
Local Configuration > Server configuration and configure the server time
information.
The NTP clock source server Indicates whether the NTP clock
source server is specified for time
synchronization.
● Select Yes if an NTP server is
configured onsite.
● Select No If no NTP server is
configured onsite.
● If an NTP server is configured onsite, synchronize the time with the NTP
server.
● If no NTP server is configured onsite, manually configure the server time:
Change Timezone config and Time config based on the time of the source
server to be synchronized.
Step 8 Configure cameras to synchronize time with the IVS1800.
The camera NTP synchronization function for the server is disabled by default. The
camera NTP synchronization function needs to be enabled for the server that
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 180
ECC800 Data Center Controller
User Manual 6 Feature Description
connects to the camera. After the camera NTP synchronization function is enabled
on the server, cameras will automatically synchronize time with the server.
1. Log in to the OMU portal as user admin.
2. Choose Maintenance > Unified Configuration.
3. Set Module Name to SCU and click Search.
4. In the search results, click Edit in the row where Parameter Name is NTPIPC
and set Value to 1.
5. Click Save. After the camera NTP synchronization function is enabled, the
camera, after being connected to the server, will automatically time-
synchronize with the server.
When creating a user, you can select Enable account validity period and set Valid from
and Valid to to set the account validity period for the created user.
3. Set Multi-point logins to a value greater than 2.
4. On the User List page, click Permission Settings next to the new user, select
the cameras to be browsed and queried, set other parameters, and click Save.
----End
Prerequisites
The network communication between the IVS1800 and the camera is normal.
Procedure
Step 1 Install the iClient.
1. Download the iClient.
You can obtain the iClient in either of the following ways:
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 181
ECC800 Data Center Controller
User Manual 6 Feature Description
Method 1 Obtain the iClient installation program from the OMU portal.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 182
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 183
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
– If the iClient and IVS1800 are deployed in the same LAN, set Address to the
internal IP address of the IVS1800. If the iClient is installed on an external network
and the IVS1800 is deployed in the LAN, set Address to the external IP address of
the IVS1800.
– When the IVS1800 is added to the iClient by the admin user, the iClient checks
whether the login password of the admin user has been set. If the password is not
set, log in to the OMU portal to set the password.
– The iClient supports a maximum of 128 micro edge devices, and a maximum of 48
micro edge devices can be online at the same time.
– After logging in to the client, you may need to add more IVS1800 devices. You can
choose System Management > Devices to add, edit, or delete a device.
Step 3 Add cameras. For details, see the documentation delivered with the device or
obtain the documentation by referring to the "Reference Documentation" section.
View the corresponding section.
1. Choose System Management > Devices > Device Management > Micro
Edge on the iClient home page.
2. Right-click a device and choose Camera Access.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 184
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 185
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 186
ECC800 Data Center Controller
User Manual 6 Feature Description
4. Click Save.
----End
Linkage Grouping
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 187
ECC800 Data Center Controller
User Manual 6 Feature Description
Link video with lighting ● FusionModule This function is not available for
2000 smart the FusionModule2000 smart
module modular data center solution and
solution: off available for the IT data hall
● FusionDC100 module of the FusionDC1000C
0C prefabricated modular data center
prefabricated solution.
modular data
center
solution IT
data hall
module: on
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 188
ECC800 Data Center Controller
User Manual 6 Feature Description
Context
● The ECC800-Pro can generate an alarm using the multi-functional sensor or
smoke sensor in the aisle. This alarm, however, cannot be used to trigger the
customer's fire extinguishing system.
● A passive dry contact alarm signal of the customer's fire extinguishing system
can be used to achieve the following purposes: (1) Open the skylight using
the ECC800-Pro AI/DI port, so that the fire extinguishing system in the
customer's equipment room can quickly function in the aisle. (2) Enable the
aisle access control system and turn on the lighting to facilitate escape. (3)
Shut down the smart cooling product and prevent the smart cooling product
from supplying air to increase the fire.
NOTE
An active dry contact signal of the customer's fire extinguishing system cannot be
connected to the ECC800-Pro AI/DI port.
● The default status of fire control linkage is off. Set it based on the actual
situation.
● Shutting down the smart cooling product by fire linkage is used as an
example. Refer to this section for details about opening the skylight,
unlocking the aisle access control, and turning on the lighting system by fire
linkage.
● In this example, the fire controller connects to port AI/DI_3. The actual port
prevails.
Procedure
Step 1 Install cables between the fire controller and ECC800-Pro.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 189
ECC800 Data Center Controller
User Manual 6 Feature Description
Figure 6-62 Installing cables between the fire controller and ECC800-Pro
Step 5 On the Linkage Group tab page, set Link fire control with air conditioner off to
on.
NOTE
Select Link fire control with air conditioner off under Linkage Group. If its value is on, the
corresponding logic configurations under Linkage Logic List are available. If its value is off, the
corresponding logic configurations under Linkage Logic List are unavailable.
After the corresponding AI/DI device is enabled, the AI/DI device type must be
consistent with the DO state.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 190
ECC800 Data Center Controller
User Manual 6 Feature Description
Item Definition
4. Click Submit.
----End
Follow-up Procedure
After the alarm has been cleared when fire control linkage or smoke alarm
linkage occurs, perform the following operations:
When a smart module actuator is configured, you need to set parameters for the
smart module actuator. The setting process is similar.
Context
● The ECC800-Pro implements high temperature linkage. If it detects high
temperature alarms by interacting with multi-functional sensors and all smart
cooling products fail to communicate with the ECC800-Pro, the ECC800-Pro
opens skylights based on the alarm status to facilitate heat dissipation.
● The default status of high temperature linkage is off. Set it based on the
actual situation.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 4 Ensure that Link high temperature with skylight open is in on state on the
Linkage Group tab page.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 191
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
Click Link high temperature with skylight open on the Linkage Group tab page. If it is in on
state, the corresponding logic configurations on the Linkage Logic List tab page are available. If
it is in off state, the corresponding logic configurations on the Linkage Logic List tab page are
unavailable.
----End
Follow-up Procedure
After the alarm is cleared in high temperature linkage, close the skylights
manually.
Prerequisites
The upstream power input circuit breaker of the AC actuator is turned on.
Context
After the intelligent aisle lighting is set successfully, perform the following steps:
● After the door is opened using the access control system, the lighting is
turned on.
NOTE
When using the intelligent lighting function, pay attention to the following:
● If a foreign object is hung on the skylight ceiling of the smart module and when the foreign
object moves, the camera may mistakenly generate a motion detection alarm to change the
lighting status.
● When the human body moves, the camera generates a motion detection alarm and the
lighting is turned on. If the motion amplitude of the human body is small, the camera
cannot generate the motion detection alarm. If the lighting is turned off due to this reason,
wave to the camera and the lighting is turned on again.
● If light greatly changes outside the smart module, the camera may mistakenly generate a
motion detection alarm and the lighting is mistakenly turned on.
● If you manually turn off the lighting when you leave the smart module, the lighting will be
turned on again when the camera detects that the person leaves.
● The effective detection distance of the multi-functional sensor is 2.5 m.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 192
ECC800 Data Center Controller
User Manual 6 Feature Description
Monitoring > Aisle > AC Actuator Set Route 1 Control Mode to Light,
Group > AC Actuator > Running and click Submit.
Parameters
Set Route 2 Control Mode to PAD
Charging, and click Submit.
NOTE
If two AC actuators are configured, you
only need to set Route 2 Control Mode
for one AC actuator.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 193
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
When the FusionModule Actuator is configured, you need to set parameters for the
actuator. The setting process and parameters are similar.
Path: Monitoring > Aisle > AC Actuator Group > The light is on.
AC Actuator
1. Choose Running Parameters, and set Set
light mode to Manual.
2. Choose Controls, select Light control, select
ON, and click Submit.
When the light is normal, set Set light mode to Automatic. Path: Monitoring >
Aisle > AC Actuator Group > AC Actuator. Click Running Parameters.
● If the camera is connected to the smart ETH gateway, you need to set camera
parameters for intelligent lighting linkage.
● The camera checks whether there are people motions in the aisle and an infrared alarm
is generated. If so, the AC actuator turns on the lights.
● If the IP address of the camera that is automatically connected is the same as the IP
address of the camera that is manually added, the information about the camera that is
manually added is overwritten.
1. Select the actual camera type and go to the camera web page. For details, see
the section about camera commissioning.
2. Choose Settings > Network > Platform Connection > Second Protocol
Parameters. On the ONVIF and GENETEC tab pages, set platform
interconnection parameters.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 194
ECC800 Data Center Controller
User Manual 6 Feature Description
3. Choose Settings > Intelligent > Common Intelligence > Motion Detection
> Area Parameters.
4. Select Enable, click Add, add motion detection areas, set motion detection
parameters, and click Save.
Prerequisites
● This section uses the skylight button connecting to the AI/DI_1 port on the
ECC800-Pro as an example.
● A smoke sensor has been connected to the skylight actuator, or a multi-
functional sensor has been connected to the smart ETH gateway.
Context
● If a skylight button is configured, follow the instructions provided in this
section to link the smoke alarm with skylight open.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 195
ECC800 Data Center Controller
User Manual 6 Feature Description
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Monitoring > System > ECC800 > Running Parameters.
Step 3 Click AI/DI_1 Port Settings, set AI/DI_1 sensor to Enable, and click Submit.
Step 4 Set AI/DI_1 sensor type to Normal open or Normal close and click Submit.
NOTE
Step 5 Choose Monitoring > Aisle > Skylight Actuator Group > Skylight Actuator 1 >
Running Parameters > DI1 alarm level.
NOTE
When a smart module actuator is configured, you need to set parameters for the smart
module actuator. The setting process is similar.
Step 6 Set DI1 alarm level to Low voltage alarm or High voltage alarm, and click
Submit.
NOTE
● Set DI1 alarm level to Low voltage alarm if the smoke sensor is connected over NO.
● Set DI1 alarm level to High voltage alarm if the smoke sensor is connected over NC.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 196
ECC800 Data Center Controller
User Manual 6 Feature Description
4. Click Submit.
Step 11 Ensure that Link smoke alarm with skylight open on the Linkage Group tab
page is on.
NOTE
Click Link smoke alarm with skylight open on the Linkage Group tab page. If it is in on state,
the corresponding logic configurations on the Linkage Logic List tab page are available. If it is
in off state, the corresponding logic configurations on the Linkage Logic List tab page are
unavailable.
Step 12 Check the Link smoke alarm with skylight open linkage function.
----End
Follow-up Procedure
After Link smoke alarm with skylight open linkage is triggered and the alarm is
cleared, perform the following operations:
● Press the reset button on the smoke sensor to clear the alarm.
● Close the skylight manually.
Prerequisites
Devices related to the high-density scenario have been connected to the ECC800-
Pro.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 197
ECC800 Data Center Controller
User Manual 6 Feature Description
Context
In high-density scenarios, the system reliability and energy efficiency can be
improved.
Procedure
Step 1 Choose Home > Plan View, click Create smart module, set Layout to Single-row
dual aisle, and set Half-size cabinet qty./row and Room monitoring based on
the actual smart module scenario.
Step 2 Click Modify Device. Drag the icons of registered devices and devices on the
cabinet list to appropriate positions in the layout to create a smart module plan
view.
Step 3 Go to the ECC running parameter page, click Unhide All Advanced Signals, and
select Other Parameters. Set Smart module scenario to NE5000E or
FusionModule2000-S and click Submit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 198
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 4 Go to the linkage control page and check that Enable linkage control function is
set to Yes. Set the linkage control signals in the high-density scenario to on.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 199
ECC800 Data Center Controller
User Manual 6 Feature Description
4. Click Unhide All Advanced Signals, and click Power Supply Parameters.
Ensure that III power supply enable(AIDI_1/DO) is set to Enable.
----End
Follow-up Procedure
After the condition for stopping high-density linkage is met, manually close the
cabinet electronic lock.
Linkage Grouping
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 200
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 201
ECC800 Data Center Controller
User Manual 6 Feature Description
Context
In this example, the NTC connects to port AI/DI_2. The actual port prevails.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 202
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 4 On the Linkage Group tab page, set Link air conditioner fault with emergency
fan to on.
NOTE
Select Link air conditioner fault with emergency fan under Linkage Group. If its value is on,
the corresponding logic configurations under Linkage Logic List are available. If its value is off,
the corresponding logic configurations under Linkage Logic List are unavailable.
----End
6.7.2.2 Link Smoke Alarm with Cabinet Electronic Clasp Lock Open
Context
In this example, the smoke sensor connects to port AI/DI_1. The actual port
prevails.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 4 On the Linkage Group tab page, set Link smoke alarm with Cabinet Electronic
Clasp lock open to on.
NOTE
Select Link smoke alarm with Cabinet Electronic Clasp lock open under Linkage Group. If its
value is on, the corresponding logic configurations under Linkage Logic List are available. If its
value is off, the corresponding logic configurations under Linkage Logic List are unavailable.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 203
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Follow-up Procedure
After the smoke alarm is cleared, you need to manually close the door. After the
door is closed, the door open alarm is cleared.
Context
In this example, the fire controller connects to port AI/DI_2. The actual port
prevails.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 4 On the Linkage Group tab page, set Link fire control with Cabinet Electronic
Clasp lock open to on.
NOTE
Select Link fire control with Cabinet Electronic Clasp lock open under Linkage Group. If its
value is on, the corresponding logic configurations under Linkage Logic List are available. If its
value is off, the corresponding logic configurations under Linkage Logic List are unavailable.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 204
ECC800 Data Center Controller
User Manual 6 Feature Description
2. Set Fire sensor to Enable. Click Submit to access the AI/DI_2 setting page.
3. Select Fire sensor type and set it to Normal Open or Normal Close as
required.
4. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.
5. Click Submit.
----End
Follow-up Procedure
After the fire alarm is cleared, you need to manually close the IT cabinet door.
After the door is closed, the door open alarm is cleared.
Context
● This function can be used when the default linkage logic does not fit the
application scenario.
● This section describes how to add the logic for turning on lights when a door
is opened.
– A complete linkage logic consists of input 1, an operator, input 2, and
output. After the calculation of the specified operator is performed on
input 1 and input 2, the corresponding output action can be performed if
the calculation result is true.
– A record of linkage logic must be added to a logical group. Multiple
records of linkage logic can be added to a logical group. Multiple records
of linkage logic in a logical group jointly complete a complex linkage
control.
– Linkage logic terms are described as follows.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 205
ECC800 Data Center Controller
User Manual 6 Feature Description
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 3 In the Linkage Group area, click Add, enter Turn on lights if door open, and click
OK. A linkage group is added.
Step 4 In the linkage group list, select the new linkage group and click Linkage Logic List
to expand the linkage logic list.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 206
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 5 In the Linkage Logic List area, click Add, set the linkage logic listed in the
following table, and click Submit.
Step 6 Set Turn on lights if door open to on to make the linkage logic take effect.
----End
Related Tasks
● If the linkage logic in Table 6-44 uses a register, refer to the following
implementation.
● If the linkage logic in Table 6-45 is changed to Turn on lights 10s after door
open, refer to the following logic.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 207
ECC800 Data Center Controller
User Manual 6 Feature Description
Procedure
Step 1 Connect the T/H sensor to the COM1 port on the ECC800-Pro using a network
cable.
Step 2 Connect the infrared remote control module to the T/H sensor using a network
cable.
----End
Prerequisites
● The infrared remote control module is connected to the ECC800-Pro, and both
are powered on.
● You have obtained the IP address of the ECC800-Pro as well as the user name
and password for WebUI login.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
prepared, and the PC is connected to the WAN port on the ECC800-Pro.
Context
After an infrared remote control module is replaced, you need to add the new
infrared remote control module on the ECC800-Pro WebUI.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 208
ECC800 Data Center Controller
User Manual 6 Feature Description
Procedure
Step 1 Set monitoring parameters for the infrared remote control module.
1. Set the device address to 2 by setting the DIP switch on the infrared remote
control module. Table 6-47 describes how to set the DIP switch.
The DIP switch consists of toggle switches 1–5 (from left to right). Toggle
switches 1–4 specify the address of the infrared remote control module.
Toggle switch 5 specifies the address of the RS485 build-out resistor. 0
indicates OFF and 1 indicates ON. Toggle switch 5 is set to OFF.
NOTE
3. Click Test Connect to check whether the infrared remote control module
connects to the ECC800-Pro properly.
a. If the connection succeeds, click Confirm.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 209
ECC800 Data Center Controller
User Manual 6 Feature Description
Context
● The infrared remote control module supports self-learning and can remotely
control the startup of the civil smart cooling product.
● The infrared remote control module can be in infrared learning state and
control code sending state. After power-on, the device is in normal operating
mode by default.
Procedure
Step 1 Set functions of the infrared remote control module on the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Linkage Control, set Enable linkage control to
Yes, and click Submit. Set Automatic air conditioner startup to On.
3. Choose Monitoring > System > Infrared Remote Control Module.
4. On the Controls tab page, choose Learning the startup instruction, and
click Submit.
5. Direct the remote control of the smart cooling product to the infrared
receiving place on the infrared remote control module, and press the power
button once.
NOTE
If you do not press the button within 20s, the remote control of the smart cooling
product will exit the learning mode due to a timeout. You can click Learning the
startup instruction on the ECC800-Pro WebUI and start the learning mode again.
6. On the Controls tab page, choose Exiting the learning mode, and click
Submit.
7. On the Controls tab page, select Air conditioner startup and click Submit.
The re-authentication page is displayed. Enter Login Password and click
Submit.
8. Check whether the smart cooling product is powered on. If yes, the control
function is enabled. If no, rectify the faults and perform the operation again.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 210
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
● After you perform Learning the startup instruction on the WebUI, check the indicator
status. If the indicator on the infrared remote control module blinks yellow, it indicates
that the infrared remote control module enters the infrared learning state. If the green
indicator blinks, it indicates learning success of the key code. If the indicator is steady
yellow, it indicates learning failure and you need to rectify the faults and perform
Learning the startup instruction again.
● After you perform Air conditioner startup on the WebUI, check whether the smart
cooling product starts. If it starts, the control function works; if it cannot start, rectify
the fault and perform the preceding steps again.
The device will quit learning operating mode automatically once finish learning.
4. After the smart cooling product is shut down, direct the infrared remote
control module to the smart cooling product and press the SW button once.
5. Check whether the smart cooling product is powered on. If yes, the control
function is enabled. If no, rectify the faults and perform the operation again.
----End
NOTE
If the device electrical energy cannot be collected, disable the PUE function for the scenarios
where the PUE calculation condition is not met, for example, the smart cooling product is
powered by the wall-mounted PDB.
Feature Description
● Supports user-defined settings of the PUE and power consumption on the
ECC800-Pro WebUI.
● Synchronizes the PUE and power consumption calculated by the ECC800-Pro
from the WebUI to the app, and displays the data on the app screen.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 211
ECC800 Data Center Controller
User Manual 6 Feature Description
● The ECC800-Pro connects to the NetEco over a northbound port and can
upload the calculated PUE and power consumption data to the NetEco.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 212
ECC800 Data Center Controller
User Manual 6 Feature Description
Figure 6-72 Querying the total electrical energy of system IT load output
4. Calculate the PUE of the smart module. PUE = Increment in total system input
electrical energy/Increment in total electrical energy of system IT load output
= 10.0 kWh/6.0 kWh = 1.67.
Context
This section describes how to configure PUE for the integrated PDU connected.
The following table describes functions of configuration buttons for the PUE user-
defined mode.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 213
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
This section describes how to configure the PUE in the user-defined mode (total power
consumption and IT power consumption). The configuration methods for other user-
defined modes are similar. You can calculate the PUE based on the PUE calculation formula.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > PUE Configuration.
Step 3 Set PUE function to Enable.
Step 4 Set PUE configuration mode to User-defined, and click Submit.
1. Click Add under the Total Power Consumption Configuration area. On the
Total Power Configuration page, set Device Type to Integrated PDU and
set Device Name accordingly. Under Available Signals, select Total active
electricity energy of PDU input, click to add it to the Selected Signals,
and click Confirm.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 214
ECC800 Data Center Controller
User Manual 6 Feature Description
3. Click the edit icon on the right of the Total Power Consumption
Configuration and IT Cabinet Power Consumption Configuration areas.
NOTE
● The multiple ranges from 0.01 to 4.99, with two significant digits. The default value is
1.00.
● The multiple is configured for slightly adjusting the calculated PUE, ensuring that the
calculated PUE is as close as possible to the actual PUE.
Step 5 Calculate the PUE of the smart module. PUE = Increment in total system input
electrical energy/Increment in total electrical energy of system IT load output
NOTE
Performance data source: The ECC800-Pro obtains total electricity energy of branches from
the power distribution devices.
Step 6 You can also view the PUE in the dashboard or PUE Chart on the home page.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 215
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 3 Choose Query > Performance Data to view historical PUE data.
1. Choose Device, Performance data, Start time, End time, and the display
mode (table or curve) of the PUE parameter as required.
2. Click Query.
NOTE
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 216
ECC800 Data Center Controller
User Manual 6 Feature Description
Prerequisites
Connect the smart U space manager to the COM1 or COM2 port on the rack
environment unit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 217
ECC800 Data Center Controller
User Manual 6 Feature Description
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
----End
Prerequisites
● The ECC800-Pro is connected to the NMS that supports asset management.
● The actual assets of the smart module have been allocated.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Home > Plan View to access the Plan View page, where you can create
or modify the views of the smart module. Drag the icon of a registered device or
device in the cabinet list to the planned position to generate the plan view.
Step 3 Choose Monitoring > Cabinet > IT Cabinet n > Smart U Space Manager1, check
U space quantity, U Space Information and so on.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 218
ECC800 Data Center Controller
User Manual 6 Feature Description
Prerequisites
● Connect the smart U space manager to the COM port on the UIM20A
expansion module.
NOTE
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
----End
Prerequisites
● The ECC800-Pro is connected to the NMS that supports asset management.
● The actual assets of the smart module have been allocated.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Home > Plan View to access the Plan View page, where you can create
or modify the views of the smart module. Drag the icon of a registered device or
device in the cabinet list to the planned position to generate the plan view.
Step 3 Choose Monitoring > Cabinet > IT Cabinet n > Smart U Space Manager1, check
U space quantity, U Space Information and so on.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 219
ECC800 Data Center Controller
User Manual 6 Feature Description
Prerequisites
● Power distribution devices have been connected to the ECC800-Pro.
NOTE
The following types of power distribution devices are supported: PDU8000, integrated
UPS, integrated PDU, and smart busbar.
● The smart module plan view has been created, and the device positions in the
plan view are consistent with actual positions.
Context
IT cabinets, network cabinets, and smart cooling products support power
management. The ECC800-Pro connected to an IT cabinet is used as an example
in this section.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Home > Plan View > Modify Device and click Apply Power Distribution
Standard Configuration to use the default configuration to configure electricity
for devices in the smart module. The following scenarios support the function of
applying default electricity configuration:
● N+1 scenario: The system has only one PDF and works with one power supply.
● 2N non-isolation scenario: The system has only one PDF and works with dual-
power supply.
● 2N isolation scenario: The system has two PDFs and works with one power
supply.
NOTE
For details about the power distribution solution, see the power distribution wiring diagram
delivered with the product.
Step 4 Check whether the branch information configured on the Power distribution
standard is consistent with the actual situation. Set power configuration
parameters based on site requirements, such as the Device Name, Cabinet
height, Power system, Number of power supplies, and Rated cabinet power.
NOTE
The settings in the following table are used as examples to describe the basic configuration.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 220
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 221
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
● If Apply to all cabinets is selected, all other cabinets use this configuration.
● If Clear the power distribution configuration of all cabinets is selected, the power
distribution configuration of all cabinets will be cleared.
Step 5 Click Finish after checking that electricity has been configured for all IT cabinets,
network cabinets, and smart cooling products.
Step 6 Click Exit Edit Mode to exit the view editing page of the smart module.
Step 7 Choose Monitoring > Cabinet, and set Cabinet load factor overhigh alarm
threshold (default value: 90) on the Running Parameters page.
When the cabinet load rate in the smart module is greater than the value of
Cabinet load factor overhigh alarm threshold, an alarm is generated.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 222
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
The alarm hysteresis is 5% by default. That is, if the cabinet load factor overhigh alarm
threshold is 90%, the raised alarm will be cleared when the load factor drops to a value smaller
than 85%.
----End
Context
● Smart rPDU high temperature disconnection: Whenever the ECC800-Pro
detects excessive high temperature of an rPDU branch, it disconnects the
entire rPDU to protect the IT devices. Then the rPDU branch fault information
is displayed in the power supply and distribution link diagram.
● Smart rPDU overcurrent disconnection: Whenever the ECC800-Pro detects
overcurrent of an rPDU branch, it disconnects the rPDU of this branch to
protect the IT devices. Then the rPDU branch fault information is displayed in
the power supply and distribution link diagram.
NOTE
Procedure
Step 1 Set the Smart rPDU auto disconnection parameters.
1. Choose Monitoring > Cabinet > Running Parameters and click Smart
Distribution Information.
2. Set rPDU auto close enable to Enabled.
3. If the user has no special requirements, choose Monitoring > Cabinet > IT
Cabinet > rPDU > Running Parameters and retain the default value of
Branch Auto Close Current Parameter.
----End
Prerequisites
Power distribution devices have been connected to the ECC800-Pro.
Procedure
Step 1 View the power information on the ECC800-Pro WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cabinet to access the Electricity Information in Each
Cabinet page.
3. View the power usage information about each cabinet, such as the Current
Power (kW), Power Consumption (kWh), and Load Percentage (%).
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 223
ECC800 Data Center Controller
User Manual 6 Feature Description
– Transient mPUE = Total input power/Total IT power of the smart module. For example,
if a PDU8000 with the total input power of 5 kW connects to the smart module, whose
total IT power is 3.6 kW, the transient mPUE = 5 kW/3.6 kW = 1.39.
– If the power management is not configured, the PUE area in Plan View displays the
average PUE.
– Instant is displayed for a transient mPUE.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 224
ECC800 Data Center Controller
User Manual 6 Feature Description
4 IT cabinet (tap to view the cabinet name, current power, and status)
● Yellow: The cabinet has an alarm. Tap to view the alarm.
● Blue: The cabinet is running properly.
● Gray: The cabinet is not running.
5 rPDU
● Yellow: smart rPDU (Click to view the rPDU number, current, and
status)
● Blue or green: non-smart rPDU
6 Branch switch
7 SPD switch
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 225
ECC800 Data Center Controller
User Manual 6 Feature Description
Item Specifications
8 SPD
9 Main switch
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 226
ECC800 Data Center Controller
User Manual 6 Feature Description
smart cooling product user manual of the corresponding model. One smart
module has only one group. In this group, communication between the slave
and master units as well as communication between the master unit and the
ECC800-Pro is normal.
● The WebUI displays the Enable iCooling page only for smart cooling products
that support the iCooling function.
● The scenario is dual-row cold aisle containment and the following conditions
are met:
– Smart cooling product should be placed face to face.
– The smart module is configured with an integrated UPS or integrated
PDU. Electricity has been configured for IT cabinets, network cabinets,
and smart cooling products. The ECC800-Pro collects statistics on IT
branch power information, which is mapped to IT cabinets and network
cabinets.
– Rack environment units or UIM20A expansion module and cabinet-level
temperature sensors are installed for IT cabinets or network cabinets. The
ECC800-Pro can monitor the temperature of each cabinet.
– At least one cold-aisle temperature and humidity sensor is installed for
each smart cooling product, and each smart cooling product can detect
the sensor readings.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 If the iCooling function needs to be used, choose Monitoring > Cooling >
Running Parameters. On the iCooling parameter setting page, set Enable
iCooling to Yes and click Submit to finish the iCooling function setting.
Step 3 Set the iCooling temperature set point and humidity setpoint according to the
actual environment.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 227
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
● When iCooling is enabled, smart cooling products enter the iCooling teamwork control
mode.
● The temperature and humidity refer to the values at the air intake vents of the IT
cabinets.
● After iCooling linkage is enabled, if the preceding conditions are not met, the smart
cooling product automatically exits the iCooling teamwork mode and enters the
standalone mode. To view Team work status, choose Monitoring > Cooling >
NetCol5000 > Running Info > Status Information.
● When iCooling is enabled, the T/H threshold can only be set on the ECC800-Pro WebUI.
● When iCooling is disabled, smart cooling products enter the intelligent teamwork
control mode (teamwork control of smart cooling products).
Step 4 Choose Monitoring > Cooling > Running Parameters to access the Temperature
and Humidity Parameters page. Check whether Temperature and humidity
control type is Cold-aisle.
----End
Prerequisites
Smart cooling products have been connected to the ECC800-Pro.
Procedure
Step 1 Connect the PAD to the WiFi network of the corresponding ECC800-Pro in the
room.
Step 3 Choose Home > Temp.. The view displays the temperature distribution map of
each cabinet.
Step 4 Choose Home > Resource Consump > Cooling, view the real-time cooling
capacity and maximum cooling capacity of the smart module as well as the real-
time cooling capacity of each cabinet, and check whether the cooling capacity
exceeds the alarm threshold.
----End
Context
When the air cooled smart cooling products are connected to the ECC800-Pro, you
can view the cooling link diagram.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 228
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 2 Choose Monitoring > Cooling > Running Parameters to access the Running
Parameters page. Set Number of redundant smart cooling products and Local
yearly highest temperature as required and tap Submit.
Step 3 Use the PAD to connect to the WiFi network of the ECC800-Pro in the room.
Step 4 Log in to the ECC800-Pro app as the administrator.
Step 5 View the cooling distribution information.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 229
ECC800 Data Center Controller
User Manual 6 Feature Description
Item Specifications
4 Alarm status (The alarm icon is displayed based on the alarm severity
of the smart cooling product. You can tap the smart cooling product to
view the alarm.)
Step 6 Tap the corresponding smart cooling product to check the operating status and
working mode of each component in the smart cooling product.
Table 6-54 Specifications of the link diagram for a single smart cooling product
Item Specifications
3 Internal fan
6 Refrigerant status
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 230
ECC800 Data Center Controller
User Manual 6 Feature Description
Prerequisites
1. Cables to the NTC and T/H sensors have been connected.
NOTE
● Sensors NTC1 to NTC6 are installed in the following positions of the cabinet
respectively: upper part of the front door, middle part of the front door, lower part
of the front door, upper part of the rear door, middle part of the rear door, and
lower part of the rear door.
● A maximum of eight T/H sensors can be cascaded to each COM port.
● A T/H sensor can be connected only to the COM1, COM3, COM5, or COM7 port on
the UIM20A expansion module.
Context
The BOM number of T/H sensors is 02311FQG or 02312PBL.
Procedure
Step 1 Set the T/H sensor device address.
Set the T/H sensor device address through the DIP switch on the T/H sensor.
Toggle switches 1–6 are used to set device addresses, toggle switch 7 is reserved,
and toggle switch 8 is used to switch the temperature unit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 231
ECC800 Data Center Controller
User Manual 6 Feature Description
Device addresses are set in binary coding format in the range of 1–63. The first bit
is the least significant bit, and the sixth bit is the most significant bit. ON indicates
1, and OFF indicates 0.
NOTE
● In the smart module view on the ECC800-Pro WebUI, cabinets are arranged from left to
right and from top to bottom according to T/H sensor addresses 1 to 8.
● Each COM port on the UIM20A expansion module allows a maximum of eight T/H
sensors to be cascaded. Each UIM20A expansion module supports a maximum of 32 T/H
sensors.
● The addresses of the T/H sensors connected to the same COM port must be different.
Addresses 1 to 8 are supported. The addresses of UIM20A expansion modules connected
to different COM ports can be the same. In actual configuration, bind sensors to the
corresponding cabinets in sequence.
● If the number of IT cabinets connected to the smart module is greater than 32, two
UIMs are required. Each UIM must be placed in the first cabinet of the corresponding IT
cabinets. The cable connection principles are the same.
● Set the T/H sensor addresses onsite based on the layout in the smart module view.
Step 3 Bind the T/H sensor to the cabinet referring to 6.3 Commissioning a UIM20A
Expansion Module.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 232
ECC800 Data Center Controller
User Manual 6 Feature Description
Check the running Choose Monitoring > Cabinet > IT Cabinet n > T/H
information about the Sensor n > Running Info, and check the current T/H
T/H sensor on the and NTC information of the cabinet.
WebUI.
Set T/H sensor alarm Choose Monitoring > Cabinet > IT Cabinet n > T/H
thresholds. Sensor n > Running Parameters, and set High
temperature alarm threshold, Low temperature
alarm threshold, High humidity alarm threshold, and
Low humidity alarm threshold as required.
NOTE
The default values of High temperature alarm threshold,
Low temperature alarm threshold, High humidity alarm
threshold, and Low humidity alarm threshold are 30.0°C,
5.0°C, 85.0% RH, and 15.0% RH, respectively.
----End
2. On the main screen of the app, tap . On the displayed Edit page, select
Face Account Management. After reading the message, tap OK.
3. Click Add to start recording facial data.
NOTE
The facial data is used only for configuring the facial recognition function and is not
used for other purposes. The facial data is encrypted during transmission to ensure
that the personal data of users is fully protected.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 233
ECC800 Data Center Controller
User Manual 6 Feature Description
4. Tap OK.
Context
You can collect facial data and import the collected facial data to other devices in
offline mode for facial recognition.
Procedure
Step 1 Collect facial data in offline mode.
1. Log in to the ECC800-Pro app as the administrator.
2. On the login screen of the app, tap Settings and select Face Info Collection
to collect facial data.
3. In the Face Info Collection dialog box, set Please enter nickname and
Please enter encryption password for the facial data, and tap OK.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 234
ECC800 Data Center Controller
User Manual 6 Feature Description
4. The Message dialog box displays Success and the path for storing facial data.
5. Tap Cancel to complete data collection, or tap Share to share the collected
data to other devices.
----End
Prerequisites
Facial data has been recorded and bound to the access actuator.
Procedure
Method 1: When you open the access control system for the first time, tap
on the ECC800-Pro app login screen and align the face with the
green circle on the screen. After facial recognition is successful, log in to the app
as an administrator to open the access control system at the same time.
NOTE
After you log in to the system using facial recognition, the system uses facial recognition
for user authentication the next time by default.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 235
ECC800 Data Center Controller
User Manual 6 Feature Description
Procedure
Step 1 Use the PAD to connect to the WiFi network of the ECC800-Pro in the room.
Step 2 Log in to the ECC800-Pro app as the administrator.
Step 3 On the app home screen, tap . On the displayed Settings screen, select Face
Account Management.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 236
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
4G Networking
4G communication can be used to access the NetEco management system that
has a public IP address.
Step 1 Loosen the screws on both sides of the panel of the ECC800-Pro main control
module.
Step 2 Pull the handles on both sides of the panel of the ECC800-Pro main control
module to remove the module.
The monthly traffic of the SIM card is not less than the total traffic of all networked
devices. It is recommended that the monthly traffic of the SIM card be greater than or
equal to the total number of networked devices multiplied by 20 MB.
Step 4 Insert the ECC800-Pro main control module into the slot.
Step 5 Tighten the screws on both sides of the panel of the ECC800-Pro main control
module.
Step 6 Install a 4G antenna.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 237
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Procedure
Step 1 Apply for a fixed IP address or management system domain name/DNS server
address from the network administrator of the equipment room.
Step 2 Set ECC800-Pro communications parameters.
● (WAN port networking) On the ECC800-Pro WebUI, set the IP address, subnet
mask, and default gateway, and click Submit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 238
ECC800 Data Center Controller
User Manual 6 Feature Description
The address type of management system parameters can be IPv4 or domain name.
● If the address type is set to IPv4, refer to Table 6-60.
● If the address type is set to the domain name, refer to Table 6-61.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 239
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 240
ECC800 Data Center Controller
User Manual 6 Feature Description
Confirm – –
authentication
password
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 241
ECC800 Data Center Controller
User Manual 6 Feature Description
Prerequisites
● You have logged in to the NetEco client by web browser.
● You have created a smart module in Data Center Planning.
Context
For detailed operations, see iMaster NetEco Device Installation and Commissioning
Guide of the corresponding version.
Procedure
1. Log in to the NetEco client.
2. On the main menu, choose Device Management > Configuration >
Planning Configuration.
3. Choose the smart module where you want to create a device from the
navigation tree on the left.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 242
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
Click OK, and you can view the task information, including Type, Device Name,
Management Domain, Progress, Status, Start Time, End Time, and Detailed
Information in the displayed window.
Context
● Using the transparent transmission function, the NMS can directly manage
southbound components that are not monitored by the ECC800-Pro.
● In this example, the COM2 port of the ECC800-Pro is used for transparent
transmission.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > NMS Application > Transparent Transmission
Channel.
Step 3 Set COM2(Port:3212) to Enable and click Submit.
If a device is connected to a COM port on the UIM20A expansion module, the port
number is displayed on the WebUI after transparent transmission is enabled for
the COM port and the configuration is saved. For example, the port number of
COM1 on UIM1 is 3215 in Figure 6-93.
NOTE
● An ECC800-Pro can connect to a maximum of four UIM20A expansion modules with the
transparent transmission function.
● A UIM20A expansion module provides a maximum of eight COM ports with the
transparent transmission function.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 243
ECC800 Data Center Controller
User Manual 6 Feature Description
● If the port is set for the first time, you are prompted to set an authentication
password. On the Set Authentication Password tab page, set
Authentication password and Confirm authentication password and click
Submit.
NOTE
Step 6 Choose the management domain where you want to create a device from the
navigation tree on the left.
NOTE
● Ensure that the ECC800-Pro connected to the device has been synchronized to the
NetEco.
● Ensure that the management domain to add the device is the management domain or
sub-management domain of the ECC800-Pro.
Step 7 (Optional) If the management domain is a rack, click the management domain
and choose Design under . The page for adding a device is displayed.
Otherwise, skip this step.
Step 8 In the lower-left corner of the page, click the Device tab.
Step 9 In the Device area, select Sensor from the drop-down list box.
In this example, a Polymer temperature and humidity (T/H) sensor is added in the
equipment room of the root node. Select the device to be added and drag its icon
to the management domain.
Step 10 Click the device. In the device parameter area on the right, set device parameters.
● IP Address indicates the ECC800-Pro login IP address.
● Port indicates the ECC800-Pro COM2 port (3212).
● Device Address indicates the Polymer T/H sensor address.
Step 12 On the main menu, choose Device Management > Configuration > Device
Integration.
Step 13 In the navigation tree on the left, choose Transparent Transmission Channel
Management.
Step 14 Click Modify after selecting the IP address of the ECC800-Pro connected to the
NMS.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 244
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Procedure
Step 1 Connect a communications cable to the WAN1 port on the ECC800-Pro.
----End
Prerequisites
Before setting SNMP parameters, obtain the information listed as follows from the
NMS.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 245
ECC800 Data Center Controller
User Manual 6 Feature Description
SNMP version SNMPv3 SNMP version and port number used by the
ECC800-Pro and NMS. The SNMP versions
SNMP port number 161 include SNMPv1, SNMPv2c, and SNMPv3.
Context
● SNMPv3 parameters should be set before connecting the ECC800-Pro to the
NMS. These parameters are required for setting up the ECC800-Pro on the
NMS.
● SNMPv1 and SNMPv2c are insecure. Therefore, SNMPv3 is recommended.
This section uses SNMPv3 as an example.
Procedure
Step 1 Apply to the equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and default gateway on the ECC800-Pro WebUI.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 246
ECC800 Data Center Controller
User Manual 6 Feature Description
– Set User name, MD5/SHA password, and DES/AES password to any character
strings that meet the system requirements. Note that MD5/SHA password and
DES/AES password must be set to different values. Record the settings.
– MD5 and DES are insecure protocols. Therefore, you are advised to set
Authentication protocol to SHA or set Privacy protocol to AES.
6. Set Password validity period and Advance expiration notification (days).
7. After setting the parameters, click Confirm.
8. Click Add under SNMP Trap.
9. Set Trap target address and Trap port, set SNMP version to SNMPv3, and
specify SNMPv3 user name. Set Trap target address to the IP address of the
NMS server and set Trap port to the port defined by the user.
10. After setting the parameters, click Confirm.
11. Click Export in the Mib File pane, export the MIB file, and send it to the
development engineers of the NMS.
----End
● If dual NMSs are used for management, only one NetEco and one SNMP-based third-
party NMS can be connected at the same time.
● Connect the WAN1 port to the NetEco or an SNMP-based NMS based on the actual
scenario.
● The dual-NMS function is supported only in SmartDC V100R021C10SPC210 and later
versions.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 247
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Context
● The ECC800-Pro can be accessed through two WAN ports. By default, the
MAC addresses of the WAN1 and WAN2 ports are the same. The ECC800-Pro
also provides a method for resetting the MAC address of the WAN2 port to
ensure that the MAC addresses of the WAN1 and WAN2 ports are different.
● The WAN1 port of the ECC800-Pro supports cross-route communication. By
default, the WAN2 port supports only straight-through communication. The
ECC800-Pro allows you to configure a static route for the WAN2 port to
support cross-route communication.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Monitoring > System > ECC800 > Controls > Reset WAN2 network
adapter.
Step 3 Click Submit.
NOTE
There is a low probability that the random algorithm causes the MAC address conflict
between the WAN1 and WAN2 ports. If the conflict occurs, you need to reset the WAN2
network adapter.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 248
ECC800 Data Center Controller
User Manual 6 Feature Description
Step 4 Choose System Settings > System Parameters > Monitor IP.
Step 5 (Optional) In the Static Route Configuration area, enter the WAN2 destination
address and click Submit.
NOTE
● Static Route Configuration is used only for cross-route data communication of the
WAN2 port.
● After the ECC800-Pro is restarted or the WAN2 network adapter is reset, the WAN2
static route address is not affected.
● The dual-port communication and cross-route communication functions are not
supported in the FusionModule500 or FusionModule800. The WAN2 port in those
systems is used only for southbound device communication.
● Incorrect static route configuration may cause a network interruption. Configure the
static route under the guidance of professional network engineers.
----End
Context
● This section describes how to configure dual NMSs if the WAN1 port is
connected to an SNMP-based third-party NMS and the WAN2 port is
connected to the NetEco.
● Before connecting the ECC800-Pro to a third-party NMS, you need to set
SNMP parameters, which are required for creating the ECC800-Pro on the
NMS.
● SNMPv1 and SNMPv2c are insecure. Therefore, SNMPv3 is recommended.
This section uses SNMPv3 as an example.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 249
ECC800 Data Center Controller
User Manual 6 Feature Description
NOTE
The WAN2 port does not support cross-route access to an SNMP-based third-party
NMS.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Set the IP address, subnet mask, and default gateway for the WAN2 port on the
ECC800-Pro WebUI.
Step 3 Set the NetEco communication parameters and authentication password on the
ECC800-Pro WebUI.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 250
ECC800 Data Center Controller
User Manual 6 Feature Description
Confirm - -
authenticatio
n password
Step 5 Create the ECC800-Pro and configure the transparent transmission function on the
NetEco by referring to 6.14.1.3 Creating an ECC800-Pro on the NetEco and
6.14.1.4 Setting the Transparent Transmission Function.
Step 6 Set the IP address, subnet mask, and default gateway for the WAN1 port on the
ECC800-Pro WebUI.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 251
ECC800 Data Center Controller
User Manual 6 Feature Description
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 252
ECC800 Data Center Controller
User Manual 6 Feature Description
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 253
ECC800 Data Center Controller
User Manual 6 Feature Description
Choose Monitoring > System > ECC800 > Running Parameters > Unhide All
Advanced Signals > Channel Security Configuration.
NOTE
NOTE
Since TLS1.1 has security risks, you are recommended to use a version later than TLS1.1.
Context
When multiple power distribution devices of the same type are connected to the
ECC, the management system can distinguish the devices by device No.
● Identifiers of the transformer, SVG, APF, UPS, feeder cabinet, and lithium
battery cabinet: device type ID + device No.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 254
ECC800 Data Center Controller
User Manual 6 Feature Description
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Home > Plan View. The PowerPOD view is displayed.
Step 3 Click Modify Device, click the corresponding power distribution device, and set
Device No. based on the device number planned in the power supply and
distribution link diagram.
----End
Follow-up Procedure
View the power supply and distribution link diagram of the PowerPOD on the
NetEco. If the device sequence in the link diagram is inconsistent with the actual
physical device positions, adjust the device No. accordingly.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 255
ECC800 Data Center Controller
User Manual 7 Maintenance
7 Maintenance
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 256
ECC800 Data Center Controller
User Manual 7 Maintenance
Table 7-2 Routine maintenance for the main control module in the ECC800-Pro
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 257
ECC800 Data Center Controller
User Manual 7 Maintenance
The ALM indicator (red) Output overvoltage If the PSU is locked out,
is steady on. protection is triggered. disconnect the AC input
from the PSU, and then
power on the PSU again
after the indicator turns
off. If the fault persists,
replace the PSU.
Table 7-4 Common faults and troubleshooting for the main control module
Symptom Possible Cause Measure
The RUN indicator (green) The main control Register the main control
is blinking at 5 Hz. module does not module with the NetEco.
register with the
NetEco.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 258
ECC800 Data Center Controller
User Manual 7 Maintenance
Table 7-5 Common faults and troubleshooting for UIM20A expansion module
Symptom Possible Cause Measure
The RUN indicator is off. The contact between the Check whether the cable
independent deployment connection between the
AI_DI unit and the ECC800-Pro and the
ECC800-Pro is abnormal, UIM20A expansion
or the independent module is normal and
deployment AI_DI unit is whether the board is
faulty. faulty.
The ALM indicator is on. An alarm whose default Check and clear the
severity is major exists. alarm.
Table 7-6 Common faults and troubleshooting for the independent deployment
AI_DI unit
Symptom Possible Cause Measure
The PWR indicator is off. The independent Check whether the board
deployment AI_DI unit is is faulty and whether the
faulty or the power to cable connection
the independent between the ECC800-Pro
deployment AI_DI unit is and independent
abnormal. deployment AI_DI unit is
normal.
The RUN indicator is off. The contact between the Check whether the
independent deployment independent deployment
AI_DI unit and the AI_DI unit is faulty and
ECC800-Pro is abnormal, whether the cable
or the independent connection between the
deployment AI_DI unit is ECC800-Pro and
faulty. independent deployment
AI_DI unit is normal.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 259
ECC800 Data Center Controller
User Manual 7 Maintenance
The ALM indicator is on. An alarm whose default Check and clear the
severity is major exists. alarm.
NOTICE
● Tools: ESD wrist strap, ESD gloves, Phillips screwdriver, label, marker
● Materials: a new undamaged and undeformed ECC800-Pro main control
module of the appropriate model
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Use the Back Up Current Settings function to record the ECC800-Pro
configuration information or manually record the information.
Path: Maintenance > Configuration File > Back Up Current Settings
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 260
ECC800 Data Center Controller
User Manual 7 Maintenance
NOTE
If the main control module is damaged, you may fail to log in to the ECC800-Pro. In this case,
you cannot back up the settings.
The following information cannot be backed up: monitoring module IP address parameters,
smart module certificate, management system certificate, management system second-
challenge password, time configuration parameters, access user management, access permission
management, device access certificate, logs, and user configuration information.
Step 3 Label each cable and antenna based on the corresponding ports on the ECC800-
Pro main control module.
Step 4 Remove cables, USB flash drive, USB-to-WiFi module, and antennas from the
ECC800-Pro main control module.
Step 5 Loosen the screws on both sides of the ECC800-Pro main control module and pull
the handles on both sides of the ECC800-Pro main control module to remove the
main control module.
Step 6 (Optional) Remove the SIM card from the corresponding slots of the ECC800-Pro
main control module.
Step 7 (Optional) Install the removed SIM card in the corresponding slot of the new
ECC800-Pro main control module.
Step 8 Install the spare ECC800-Pro main control module in the ECC800-Pro subrack and
tighten the screws on both sides of the ECC800-Pro main control module.
Step 9 Connect the communications cables and antennas to the ECC800-Pro main control
module.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 261
ECC800 Data Center Controller
User Manual 7 Maintenance
Step 10 Choose Maintenance > Configuration File and import the backup configuration
file, or set parameters for the devices that connect to the ECC800-Pro to ensure
normal communication.
----End
DANGER
Do not touch the terminals in the rear of a removed PSU to avoid electric shocks.
Context
The PSU is hot-swappable.
Procedure
Step 1 Push the locking latch on the PSU leftwards, and pull the handle outwards to
remove the PSU from the subrack.
Step 2 Gently push the reserved PSU into the subrack along guide rails, and push the
locking latch rightwards to secure the handle.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 262
ECC800 Data Center Controller
User Manual 7 Maintenance
Prerequisites
● Tools: ESD wrist strap, ESD gloves
● Materials: Spare ECC800-Pro antennas of the same model are available and
functional.
Procedure
Step 1 Remove the 4G antenna cables or RF_Z antenna cables connected to the ports on
the ECC800-Pro, as shown in Figure 7-5.
Step 2 Install the spare 4G antenna cables or RF_Z antenna cables in the original
positions and connect them to the ECC800-Pro.
----End
Prerequisites
● Tools: ESD wrist strap, ESD gloves
● Materials: A spare SIM card of the same model is available and functional.
Procedure
Step 1 Record the position of the signal cable connected to the ECC800-Pro main control
module panel, and then disconnect the signal cable.
Step 2 Loosen the screws on both sides of the ECC800-Pro main control module.
Step 3 Pull the handles on both sides of the ECC800-Pro main control module, and to
remove the main control module.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 263
ECC800 Data Center Controller
User Manual 7 Maintenance
Step 5 Insert the spare SIM card into the card slot.
Step 6 Install the ECC800-Pro main control module in the card slot.
Step 7 Tighten the screws on both sides of the ECC800-Pro main control module.
Step 8 Reconnect signal cables to the ECC800-Pro main control module panel based on
the recorded information.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 264
ECC800 Data Center Controller
User Manual 8 FAQ
8 FAQ
Step 2 Click in the upper right corner of the home page and view the ECC800-Pro
version information.
Step 3 Choose Maintenance > Version Information and view the version information of
ECC800-Pro and connected device.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 265
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
● After the upgrade file is uploaded successfully, the WebUI lists the components and
versions that can be upgraded using the upgrade file.
● The ECC800-Pro upgrade package includes the ECC800-Pro software upgrade program
and Board Support Package (BSP) software upgrade program.
Step 4 Set Device Type to ECC800 and click Local Upgrade. When a message is
displayed, click OK to confirm the upgrade or click Cancel to cancel the upgrade.
Step 5 After the monitoring software is upgraded successfully, a message is displayed,
indicating that the monitoring module has been upgraded successfully and is
restarting.
NOTE
● After the ECC800-Pro software or BSP software is upgraded successfully, the ECC800-Pro
system will restart. After the restart is complete, log in to the WebUI again.
● Protocols and algorithms are embedded in the software package and do not need to be
configured. After the software package is installed, all functions are available.
----End
----End
8.4 How Can I Check the System Type and Set the
Smart Module Name?
Context
● System type: Select a system type based on the actual project type. The
FusionModule5000, FusionModule2000, FusionModule500/800,
FusionModule1000B, FusionModule1000A, FusionModule500, General, and
FusionPower6000 scenarios are supported.
● Site ID: Alarms of devices under monitoring in the site are sent to the
specified mobile phone numbers of maintenance engineers by SMS. After
Smart module name is changed, the new site ID will be displayed in the
short message content (for example, XXX device communication interruption)
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 266
ECC800 Data Center Controller
User Manual 8 FAQ
so that maintenance engineers will know the site where the fault has
occurred.
Procedure
Step 1 Choose System Settings > System Parameters > Site Configuration, and check
whether System Type is consistent with the type of the smart module.
(Optional) If the system type is inconsistent with the type of the smart module,
perform the following operations. The system type FusionModule2000 is used as
an example.
NOTE
● By default, the system type displayed on the WebUI is the system type selected last
time. Change the system type as required.
● If the system type is changed, the monitoring software will restart and you can log in to
the WebUI again after 3 minutes.
1. Select FusionModule2000 from the System type drop-down list box.
2. Click Submit in the System Type area.
3. Go to the Re-authentication page, enter the login user name and password,
and click Submit.
Step 2 Choose System Settings > System Parameters > Site Configuration, modify
Smart module name, and click Submit in the Site ID area.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 267
ECC800 Data Center Controller
User Manual 8 FAQ
● Operator: has only the browse right but no rights for user management,
system setting, version upgrade, running parameters, smart module plan view
editing, and internal fault information exporting.
● Engineer: has administrator rights except user management.
Procedure
Step 1 Change the login password.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Maintenance > User Management. The user management page is
displayed.
3. Choose the user to be modified and click Modify. Reset the login password on
the displayed page.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 268
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
– Select Email for Password retrieval mode, set Email Address, and click Test. After
the test is successful, you can retrieve the password using the email address.
– Select Short message for Password retrieval mode, set Mobile Number, and click
Test. After the test is successful, you can retrieve the password by SMS.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 269
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
– On the user management page, you can modify, delete, lock, and unlock a user.
– The value of Advance expiration notification (days) must not be greater than
the value of Password validity period.
– You can choose the password retrieval mode as required, either by email or SMS or
by both.
– The WebUI supports a maximum of 16 users and a maximum of 3 concurrent
online users.
----End
Follow-up Procedure
If you forgot the password, perform the following steps:
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 270
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Choose Home > Plan View and click Create smart module in Smart Module
View. The Modify Basic Config dialog box is displayed. Set the layout and device
quantity in Layout and Half-size cabinet qty./row based on the actual smart
module scenario.
● If Room monitoring is set to No, draw a smart module view.
● If Room monitoring is set to Yes, draw equipment room view and smart
module view.
Step 2 Click OK. The page for editing the smart module plan view is displayed.
● Drag the icons of registered devices (for example, the access actuator) and
devices on the cabinet list to appropriate positions in the layout, click a device
icon, modify the value of Device Name in the displayed Basic Configuration
dialog box.
● Click One-Click Layout. The power distribution devices, IT cabinets, and
smart cooling products on the cabinet list are automatically arranged in the
view. The icons of other registered devices (for example, the access actuator)
and devices on the cabinet list need to be manually arranged.
NOTE
– If the locations of devices automatically deployed are inconsistent with their actual
locations, you can manually adjust them.
– The general input unit and power distribution unit support one-click layout only
when the versions are the same, ring networking is used, and cables are connected
based on the standard scenario in the corresponding user manual. If the version of
the general input unit and power distribution unit is earlier than V306B001D01, a
maximum of 20 devices can form a ring network. If the version of the general
input unit and power distribution unit is V306B001D01 or later, a maximum of 104
devices can form a ring network.
– If both room-level and smart module access actuators exist, modify the value of
Device Name to distinguish them.
– The value of Device Name for the power distribution unit should be consistent
with its label, for example, NMW A 01.
– Click Exit Edit Mode to create a smart module plan view.
Step 3 There are multiple same device icons on the editing page. If you cannot determine
the positions of communications devices such as the access actuator, general input
unit, and power distribution unit, hold down the BLINK button on a device such as
a smart ETH gateway for less than 1s to report the blinking status to the ECC800-
Pro. The corresponding device icon in the WebUI plan view blinks. Check that the
device positions and types in the plan view are consistent with the actual situation
by delivering the blinking command.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 271
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
● Drag a device in the WebUI plan view. The RUN indicator on the corresponding device
blinks intermittently at super short intervals.
● If a room-level access control device and camera exist, drag them to the equipment
room view.
● Choose Home > Plan View, and click the camera icon in Create smart module to go to
the camera WebUI.
----End
Follow-up Procedure
To modify the smart module plan view, perform the following steps:
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 272
ECC800 Data Center Controller
User Manual 8 FAQ
Prerequisites
One end of the straight-through cable has been connected to the FE port on the
integrated UPS, and the other end has been connected to the PoE port on the
smart ETH gateway.
Procedure
Step 1 Start the integrated UPS, and tap System Info on the LCD.
Step 2 Choose System Info > Settings, enter the user name admin and password
000001, and tap . In the displayed dialog box for confirming the password,
tap Confirm.
NOTE
If you enter incorrect passwords for five consecutive times, you will be locked out for 5
minutes.
After setting parameters for the integrated UPS, the ECC800-Pro discovers the access from
the integrated UPS automatically.
----End
Prerequisites
One end of the straight-through cable has been connected to the COM_1 or
COM_2 port on the Modbus expansion card of the UPS2000G-A, and the other
end has been connected to the COM port on the ETH converter.
Procedure
Step 1 Set monitoring parameters for the UPS2000G-A.
● Set monitoring parameters for UPS2000G-A-(1 kVA–3 kVA).
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 273
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
Operate the DIP switch SW1 on the optional Modbus card to set the UPS2000G-A device
address. Toggle switches 1 to 8 of DIP switch SW1 specify the device address in binary
mode. ON indicates 1, and OFF indicates 0.
Operate the DIP switch S2 on the optional Modbus card to set the UPS2000G-A device
address. Toggle switches 1 to 8 of DIP switch S2 specify the device address in binary mode.
ON indicates 0, and OFF indicates 1.
1 OFF ON ON ON ON ON ON ON
2 ON OFF ON ON ON ON ON ON
3 OFF OFF ON ON ON ON ON ON
4 ON ON OFF ON ON ON ON ON
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 274
ECC800 Data Center Controller
User Manual 8 FAQ
The section describes how to add a UPS2000G-A in a single UPS scenario. In a parallel UPS
scenario, if the common communications address of the Modbus card is added to the
ECC800-Pro, all UPS2000G-As can be connected to the ECC800-Pro.
----End
Procedure
Step 1 Set the communications address parameters for the UPS2000G_L.
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 275
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Prerequisites
● One end of the straight-through cable has been connected to the RS485 port
on the UPS5000 monitoring module, and the other end has been connected
to the COM port on the ETH converter.
● When connecting devices, you are advised to add devices one by one and
ensure that the view is consistent with the real object. If all devices have been
added and powered on, only the BLINK function of the ETH converter can be
used to identify the mapping between the UPS5000 and ETH converter.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 276
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Set the UPS5000 monitoring parameters.
1. On the displayed screen after UPS5000 startup, tap System Info.
2. Choose System Info > Settings, enter the user name admin and password
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 277
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Set the UPS5000 monitoring parameters.
1. Enter the UPS5000 home screen and tap System Info.
2. Choose System Info > Settings, enter the user name admin and password
----End
Context
The method of connecting the PDU8000 to the ECC800-Pro is the same as that for
the integrated PDU. Connecting the integrated PDU to the ECC800-Pro by
following the instructions in this section.
Procedure
Step 1 Set the PDU8000 monitoring parameters.
1. Enter the PDU8000 home screen and tap System Info.
2. Choose System Info > Settings, enter the user name admin and password
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 278
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
----End
Prerequisites
One end of the RS485 cable has been connected to ports 19 and 20 on the
transformer temperature controller, and the other end has been connected to the
COM port on the ECC800-Pro.
Procedure
Step 1 Set the communications address for the transformer LCD.
2 SET / /
3 Communicati /
ons address
setting
password
4 SET Communicati /
ons address
5 SET 1: address /
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 279
ECC800 Data Center Controller
User Manual 8 FAQ
----End
NOTE
Procedure
Step 1 Set SVG display parameters.
1. Tap Expert Setting. On the displayed SVG communication settings screen, set
ID to 1 and Baud to 9600.
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 280
ECC800 Data Center Controller
User Manual 8 FAQ
3. Click Test Connect to check whether the SVG connects to the ECC800-Pro
properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 281
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
● Terminals 1 and 2 of the air conditioner electric control box are RS485+ and RS485–,
respectively. Terminals 7 and 8 are Boolean dry contacts, which are polarity insensitive.
● Cables need to be connected to both the Envicool CRU and IFX terminal.
Procedure
Step 1 Set monitoring parameters for the air conditioner.
1. On the home screen of the air conditioner, click SetPoint, enter the password
8866, and click OK.
2. On the air conditioner parameter setting page, set MonAddr to 1.
Step 2 Add an Envicool air conditioner (Modbus-RTU).
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add an Envicool air conditioner.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 282
ECC800 Data Center Controller
User Manual 8 FAQ
3. Click Test Connect to check whether the Envicool air conditioner is properly
connected to the ECC800-Pro.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 283
ECC800 Data Center Controller
User Manual 8 FAQ
properly, and whether the parameter settings are consistent with the
device parameters.
----End
Prerequisites
One end of the straight-through cable has been connected to the RS485/RS232
port on the power distribution monitoring unit in the DC PDF, and the other end
has been connected to the COM port on the ECC800-Pro collector or UIM20A.
Procedure
Step 1 Add a DC PDF (Modbus-RTU).
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Add a DC PDF.
3. Click Test Connect to check whether the DC PDF is properly connected to the
ECC800-Pro.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 284
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Procedure
Step 1 Set SmartLi monitoring parameters.
1. On the home screen of the SmartLi, tap System Info.
2. Choose System Info > Settings, enter the user name admin and password
----End
8.7.12 How Can I Add and Set the Smart Module Actuator
(Modbus-MAC)?
Prerequisites
One end of the straight-through cable has been connected to the LAN port on the
smart module actuator, and the other end has been connected to the PoE port on
the smart ETH gateway.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Open the aisle door.
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 285
ECC800 Data Center Controller
User Manual 8 FAQ
Monitoring > Aisle > Select Remote door opening and click Submit
Smart Module Actuator
Group > Smart Module
Actuator n > Controls
CAUTION
● Remotely opening the door may open the smart module door, and this may
pose security risks. Exercise caution when performing this operation.
● Remotely opening the skylight may open the smart module skylight, and this
may pose security risks. Exercise caution when performing this operation.
----End
Procedure
Step 1 Set the PDU8000 monitoring parameters.
1. Enter the PDU8000 home screen and tap System Info.
2. Choose System Info > Settings, enter the user name admin and password
000001, and tap . In the displayed dialog box for confirming the
password, tap Confirm.
3. Tap Communication to access the PDU8000 communication settings screen
and set IP address assign to Manual. Set Serial port baud rate to 9600, and
Serial port address to 1.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 286
ECC800 Data Center Controller
User Manual 8 FAQ
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 287
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Prerequisites
One end of the straight-through cable has been connected to the RS485 port on
the SMU02C in the MTS9604B-N20B1 cabinet, and the other end has been
connected to the COM port on the ECC800-Pro collector or ETH converter.
Procedure
Step 1 Connect the RS485 communications port on the SMU02C.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 288
ECC800 Data Center Controller
User Manual 8 FAQ
devices are Communicati Select COM1 from the drop-down list box.
displayed. ons Port NOTE
The setting example indicates that the DC
power supply is connected to the COM1 port on
the ECC800-Pro. If the DC power supply is
connected to another port, select the number of
the connected port.
----End
Prerequisites
One end of the straight-through cable has been connected to the COM, SER, or
RS485 port on the rPDU, and the other end has been connected to the COM port
on the ECC800-Pro collector, UIM20A expansion module, or ETH converter.
Context
PDU2000-32-1PH-20/4- PDU2000-M(C) FT
M1/CLEVER
PDU2000-32-1PH-20/4- PDU2000-M(H) 6B
M1/HPX
MD-1324-2004 rPDU-MPDU FT
PN1-32I10-20E4G-AV4 rPDU-PN 6B
ZFIF-112-0800 rPDU FT
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 289
ECC800 Data Center Controller
User Manual 8 FAQ
PN1-16X18-8E-AH4W 6B
ZZIF-130-2004 FT
PN1-32I15-20E4G-AV4W 6B
Procedure
Step 1 Set the PDU2000 monitoring parameters.
● Set the PDU2000-M (C) monitoring parameters.
NOTE
The parameter settings take effect only if you press MENU and then the
PDU2000-M (C) buzzes and restarts. If you do not press MENU, the PDU2000-M
(C) buzzes and restarts automatically after 30s and the settings are not saved.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 290
ECC800 Data Center Controller
User Manual 8 FAQ
.
– Press MENU again to access the device communications address screen.
is displayed:
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 291
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Prerequisites
One end of the straight-through cable has been connected to the COM port on
the ATS, and the other end has been connected to the COM port on the ECC800-
Pro or ETH converter.
Context
The ATS (ABB) model is OMD800.
Procedure
Step 1 Set the ATS device address. On the ATS display panel, tap , choose Device
Configuration > Modbus and set the device address.
NOTE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 292
ECC800 Data Center Controller
User Manual 8 FAQ
3. Click Test Connect to check whether the ATS is properly connected to the
ECC800-Pro.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 293
ECC800 Data Center Controller
User Manual 8 FAQ
Data bit 8 8
Stop bit 1 1
Context
The supported electricity meter models are subject to change due to product
upgrade. The actual UI may vary.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Add an electricity meter.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 294
ECC800 Data Center Controller
User Manual 8 FAQ
Step 3 Click Test Connect to check whether the electricity meter is properly connected to
the ECC800-Pro.
● If the connection succeeds, click Confirm. The device connection information
is displayed in the Number of connected devices list.
● If the connection fails, check whether the device is properly connected to the
ECC800-Pro, whether the device and ECC800-Pro are running properly, and
whether the parameter settings are consistent with the device parameters.
----End
Prerequisites
One end of the straight-through cable has been connected to the FE_1 port on the
NetCol5000-A011/A025/A035/A042/A050/A065 main control board, and the other
end has been connected to the PoE port on the smart ETH gateway.
Context
The following describes how to set and add a NetCol5000-A042.
Procedure
Step 1 Set NetCol5000-A042 monitoring parameters.
1. Enter the NetCol5000-A042 home screen, tap Settings, choose the user name
admin, and enter the password 000001. After login, the settings screen of the
NetCol5000-A042 is displayed.
2. Choose Comm Settings > LAN IP Settings, set LAN IP assigning mode to
Automatic (DHCP), and click Submit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 295
ECC800 Data Center Controller
User Manual 8 FAQ
3. Choose Settings > Comm Settings > Modbus Settings, and set Connection
mode to Server and client, Server encryption to Enable.
NOTE
After the NetCol5000-A042 parameters are set, the ECC800-Pro can automatically identify
the automatic access of the NetCol5000-A042.
Step 2 Set the running parameters and control parameters for the NetCol5000-A042 on
the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol5000-A0421.
NOTE
CAUTION
After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.
----End
Prerequisites
One end of the straight-through cable has been connected to the FE_1 port on the
NetCol5000-A025 main control board, and the other end has been connected to
the PoE port on the ETH converter.
Procedure
Step 1 Set NetCol5000-A025 monitoring parameters.
1. Enter the NetCol5000-A025 home page, click Settings, choose the user name
admin, and enter password 000001. After login, the settings screen of the
NetCol5000-A025 is displayed.
2. Choose Comm Settings > LAN IP Settings, set LAN IP assigning mode to
Automatic (DHCP), and click Submit.
3. Choose Settings > Comm Settings > Modbus Settings, and set Connection
mode to Server and client, Server encryption to Enable.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 296
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
After the NetCol5000-A025 parameters are set, the ECC800-Pro can automatically identify
the automatic access of the NetCol5000-A025.
Step 2 Set the running parameters and control parameters for the 25 kW smart cooling
product on the ECC800-Pro WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol5000-A0251.
NOTE
CAUTION
After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.
----End
Prerequisites
One end of the straight-through cable has been connected to the FE port on the
NetCol5000-C(030, 032) or the NetCol5000-C(065, 080) main control board, and
the other end has been connected to the POE port on the ETH converter.
Context
The following describes how to set and add a NetCol5000-C(030, 032).
Procedure
Step 1 Set NetCol5000-C(030, 032) monitoring parameters.
1. Enter the NetCol5000-C(030, 032) home page, click Settings, choose user
name admin and enter password 000001. After login, the settings screen of
the NetCol5000-C(030, 032) is displayed.
2. Choose Settings > Comm Settings > LAN IP Settings, set LAN IP assigning
mode to Automatic(DHCP), and tap Submit.
3. Choose Settings > Comm Settings > Modbus Settings, and set Connection
mode to Server and client, Server encryption to Enable.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 297
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
● After setting parameters for the NetCol5000-C(030, 032), the ECC800-Pro discovers the
access from the smart cooling product automatically.
● The earlier version has Protocol setting on the screen. The actual screen prevails.
Step 2 Set the running parameters and control parameters for the NetCol5000-C(030,
032) on the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol5000-C0301.
NOTE
CAUTION
After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.
----End
Prerequisites
One end of the straight-through cable has been connected to the J73
communications port on the NetCol5000-C030 main control board, and the other
end has been connected to the COM port on the ECC800-Pro collector or ETH
converter.
Procedure
Step 1 Set NetCol5000-C030 monitoring parameters.
1. Enter the NetCol5000-C030 home page, click Settings, choose the user name
Admin and enter password 000001. After login, the settings screen of the
NetCol5000-C030 is displayed.
2. Choose Settings > Comm Settings > Modbus Settings, choose Baud rate to
9600 and set Comm address to 1.
NOTE
The earlier version has Protocol setting on the screen. The actual screen prevails.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 298
ECC800 Data Center Controller
User Manual 8 FAQ
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 299
ECC800 Data Center Controller
User Manual 8 FAQ
CAUTION
After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.
----End
Prerequisites
One end of the straight-through cable has been connected to the FE port on the
NetCol8000-A main control board, and the other end has been connected to the
LAN port on the ECC800-Pro, PoE port on the smart ETH gateway, or PoE port on
the smart busbar.
Procedure
Step 1 Set NetCol8000-A monitoring parameters.
1. Enter the NetCol8000-A home screen, tap Settings, choose the user name
admin and enter the password 000001. After login, the settings screen of the
NetCol8000-A is displayed.
2. Choose Settings > Comm Settings > LAN IP Settings, set LAN IP assigning
mode to Automatic(DHCP), and tap Submit.
3. Choose Settings > Comm Settings > Modbus Settings, and set Connection
mode to Server and client, Server encryption to Enable.
NOTE
After the NetCol8000-A parameters are set, the ECC800-Pro can automatically identify the
NetCol8000-A.
Step 2 Set the running parameters and control parameters for the NetCol8000-A on the
WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cooling > NetCol8000-A1.
NOTE
1 in NetCol8000-A1 is variable and subject to change with the smart cooling product
model and connection sequence. The displayed value may vary.
3. On the Running Parameters tab page, set smart cooling product running
parameters.
4. On the Controls tab page, set the smart cooling product control parameters
(such as on/off control parameters).
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 300
ECC800 Data Center Controller
User Manual 8 FAQ
CAUTION
After the smart cooling product is shut down, the temperature of the smart
module increases and data running is affected. Exercise caution when
performing this operation.
----End
Context
● IP devices, such as ATMs, are devices with IP attributes in equipment room or
site. By adding an IP device, you connect the device to the ECC800-Pro in the
same network so that the ECC800-Pro monitors the device status. If the IP
device is offline, the ECC800-Pro will report a disconnection alarm on its
WebUI.
NOTE
In the LAN scenario, the IP devices and the ECC800-Pro must be in the same network.
● Following is a procedure example about how to add five IP devices with the
online detection timeout interval being 29 seconds.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Monitoring > System > ECC800 > Running Parameters.
Step 3 Click Unhide All Advanced Signals, on the IP Device Detection Parameters tab
page, set Online detection timeout interval to 29. The value range is 10 to 60
seconds. Click Submit.
NOTE
Online detection timeout interval is 30 by default, which means that the ECC800-Pro
determines that the communication with the device is interrupted if the device has no
response within 30 seconds.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 301
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
● Set IP device 1 address to the IP address of IP device 1. For example, set IP device 1
address to 192.168.2.137.
● Add other IP devices in the same way.
Step 10 (Optional) If you need to change the name of an IP device, perform the following
steps:
1. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
2. Set Device type to ECC800, set Device name to ECC800, and click OK.
3. On the query result tab page, set the new signal name of IP device 1 to XXX
and click Submit.
----End
Prerequisites
One end of the straight-through cable has been connected to the COM_IN port on
the independent deployment AI_DI unit, and the other end has been connected to
the COM port on the ECC800-Pro collector or ETH converter.
Procedure
Step 1 Set monitoring parameters for the independent deployment AI_DI unit.
Set the address of the independent deployment AI_DI unit to 1 or 2 by setting its
DIP switch.
The DIP switch consists of toggle switches 1–4 (from left to right). Toggle switches
1–3 specify the address of the independent deployment AI_DI unit. Toggle switch 4
specifies the address of the RS485 build-out resistor. 1 indicates ON, and 0
indicates OFF.
NOTE
The device address for the independent deployment AI_DI unit can only be set to 1 or 2.
1 OFF ON ON
2 ON OFF ON
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 302
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
If the signal quality is poor due to signal reflection caused by long communications cables
(longer than 50 m), set toggle switch 4 to ON for the furthest independent deployment AI_DI
unit. After the DIP switch settings are modified, power off and restart the independent
deployment AI_DI unit for the new settings to take effect.
3. Click Test Connect to check whether the independent deployment AI_DI unit
connects to the ECC800-Pro properly.
a. If the connection succeeds, click Confirm. The device connection
information is displayed in the Number of connected devices list.
b. If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 303
ECC800 Data Center Controller
User Manual 8 FAQ
Prerequisites
Connect one end of a network cable to the PoE port on the UIM20A expansion
module and the other end to the LAN port on the ECC800-Pro or the PoE port on
the smart ETH gateway.
NOTE
Context
The UIM20A expansion module supports self-discovery and does not need to set
parameters.
Procedure
Step 1 Set the running parameters and control parameters for the UIM20A expansion
module on the WebUI.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > System > UIM Group > UIMn.
3. On the Running Parameters tab page, set UIM20A expansion module
running parameters.
4. On the Controls tab page, set the UIM20A expansion module control
parameters.
----End
Prerequisites
One end of the straight-through cable has been connected to the PoE port on the
multi-functional sensor, and the other end has been connected to the PoE port on
the smart ETH converter.
Procedure
Step 1 Set multi-functional sensor parameters.
On the WebUI, choose Monitoring > Aisle > Multi-Func Sensor Group > Multi-
Func Sensor1 > Running Parameters, ensure that Smoke enable and Temp
enable are set to Enable, set High temperature alarm threshold and other
parameters as required, and then click Submit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 304
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
Temperature and humidity You can view the current ambient temperature
detection: View the running and humidity.
information about the multi-
functional sensor on the
WebUI.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 305
ECC800 Data Center Controller
User Manual 8 FAQ
----End
8.7.27 How Can I Set and Add the Smoke Sensor (Connected
to the AI/DI Port on the ECC800-Pro)?
If a smoke sensor is installed, perform the following steps to configure it.
Prerequisites
● Connecting Cables to the Smoke Sensor (NC):
The smoke sensor has been connected to the AI/DI port on the ECC800-Pro
collector using a network cable.
Short-circuit core wires 1 and 8 on the other end of the network cable, and
connect the network cable to the cable delivered with the smoke sensor. The
following table describes the cable connection.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 306
ECC800 Data Center Controller
User Manual 8 FAQ
Context
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.
Procedure
Step 1 Set smoke sensor parameters.
NOTE
In this example, the smoke sensor is connected to the AI/DI_2 port on the ECC800-Pro.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_2 to Smoke
and click Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2
Port Settings.
6. Set Smoke sensor to Enable and click Submit.
7. Confirm that Smoke sensor type is automatically identified as Smoke sensor
or Smoke sensor(NC).
8. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.
Step 2 Check the monitoring functions of smoke sensor.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 307
ECC800 Data Center Controller
User Manual 8 FAQ
----End
8.7.28 How Can I Set and Add the Smoke Sensor (Connected
to the AI/DI Port on the Skylight Actuator)?
If a smoke sensor is installed, perform the following steps to configure it.
Prerequisites
The smoke sensor has been connected to the AI/DI port on the skylight actuator
using a network cable.
To connect the cable for the smoke sensor, perform the following steps:
Short-circuit core wires 1 and 8 on the other end of the network cable, and
connect the network cable to the cable delivered with the smoke sensor. The
following table describes the cable connection.
Context
● If the sensor is prefabricated, only check its settings.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 308
ECC800 Data Center Controller
User Manual 8 FAQ
● The actual value prevails. Only the method of the parameter settings is
described.
Procedure
Step 1 Set smoke sensor parameters.
NOTE
In this example, the smoke sensor is connected to the AI/DI_1 port on the skylight actuator.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Aisle > Skylight Actuator Group > Skylight Actuator
1 > Running Parameters > DI1 alarm level.
3. Set DI1 alarm level to Low voltage alarm or High voltage alarm, and click
Submit.
NOTE
– Set DI1 alarm level to Low voltage alarm if the smoke sensor is connected over
NO.
– Set DI1 alarm level to High voltage alarm if the smoke sensor is connected over
NC.
----End
8.7.29 How Can I Set and Add the Smoke Sensor (Connected
to the AI/DI Port on the Rack Environment Unit)?
If a smoke sensor is installed, perform the following steps to configure it.
Prerequisites
One end of the network cable has been stripped, core wires 1, 5 and 8 have been
short-circuited, core wires 6 and 7 have been connected to the cable delivered
with the smoke sensor, and the other end of the network cable has been
connected to the AI/DI port on the rack environment unit.
Context
● If the sensor is prefabricated, only check its settings.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 309
ECC800 Data Center Controller
User Manual 8 FAQ
● The actual value prevails. Only the method of the parameter settings is
described.
Procedure
Step 1 Set smoke sensor parameters.
NOTE
In this example, the smoke sensor is connected to the AI/DI_1 port on the rack environment
unit.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > Cabinet > IT Cabinet n > Cabinet Collector n >
Running Parameters.
3. In AI/DI_1 Port Settings area, set AI/DI_1 sensor to Enable, and click
Submit.
4. Set AI/DI_1 sensor type to Smoke sensor, and click Submit.
----End
8.7.30 How Can I Set and Add the Smoke Sensor (Connected
to the AI/DI Port on the UIM20A expansion module)?
If a smoke sensor is installed, perform the following steps to configure it.
Prerequisites
One end of the network cable has been stripped, core wires 1, 5, and 8 have been
short-circuited, core wires 6 and 7 have been connected to the cable delivered
with the smoke sensor, and the other end of the network cable has been
connected to the AI/DI port on the UIM20A expansion module.
Context
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 310
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Set smoke sensor parameters.
NOTE
In this example, the smoke sensor is connected to the AI/DI_1 port on the UIM20A
expansion module.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > System > UIM Group> UIM n > Running Parameters.
3. In AI/DI_1 Port Settings area, set AI/DI_1 sensor to Enable, click Submit.
4. Set AI/DI_1 sensor type to Smoke sensor, click Submit.
----End
8.7.31 How Can I Set and Add the WLDS900 Water Sensor?
If a water sensor is installed, perform the following steps to configure it.
Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the
WLDS900 water sensor, and the other end has been connected to the AI/DI port
on the ECC800-Pro.
Context
● To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. The specific alarm then can be reported.
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.
Procedure
Step 1 Set water sensor parameters.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 311
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
● In this example, the water sensor is connected to the AI/DI_1 port on the ECC800-Pro.
● The default alarm severity of the AI/DI port is Minor. If you want to change the alarm
severity, see How Should I Configure Alarm Parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_1 to Leak
and click Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1
Port Settings.
6. Set Leak sensor to Enable and click Submit.
7. Confirm that Leak sensor type is automatically identified as Leak
sensor(Rope).
8. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that III power supply enable(AIDI_1/DO) is Yes.
----End
Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the
WLDS600 water sensor, and the other end has been connected to the energized
COM port on the ECC800-Pro.
Procedure
Step 1 The default communications address 1 of the water sensor is used for connecting
to the ECC800-Pro.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 312
ECC800 Data Center Controller
User Manual 8 FAQ
Step 4 Click Test Connect to check whether the water sensor connects to the ECC800-Pro
properly.
● If the water sensor connects to the ECC800-Pro successfully, click Confirm.
The connected devices are displayed in the Number of connected devices
list.
● If the connection fails, check whether the water sensor is properly connected
to the ECC800-Pro, whether the water sensor and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the water
sensor parameters.
Step 5 Set water sensor parameters.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose Monitoring > System > Water Sensor > Running Parameters.
3. Set the parameters based on actual conditions, and click Submit.
Step 6 Check functions of water sensors.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 313
ECC800 Data Center Controller
User Manual 8 FAQ
Immerse the ● Choose Monitoring > Wipe dry the water detection
water detection System > Water Sensor > cable. The alarm disappears
cable in water. Running Info. Check that automatically.
Leakage status is Alarm
and Distance from the
leakage point is greater
than or equal to 0 m.
● Choose Home > Active
Alarms. Check that a
water sensor alarm is
generated.
----End
Prerequisites
One end of the network cable has been stripped, core wires 7 and 8 have been
connected to the cable delivered with the electrode water sensor, and the other
end of the network cable has been connected to the AI/DI port on the rack
environment unit.
Context
● To use the AI/DI sensor, enable the corresponding AI/DI port and name the
sensor. The specific alarm then can be reported.
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.
Procedure
Step 1 Set water sensor parameters.
NOTE
In this example, the water sensor is connected to the AI/DI_5 port on the ECC800-Pro.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_5 to Leak
and click Submit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 314
ECC800 Data Center Controller
User Manual 8 FAQ
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_5
Port Settings.
6. Set Leak sensor to Enable and click Submit.
7. Confirm that Leak sensor type is automatically identified as Leak
sensor(Electroc).
8. Click Unhide All Advanced Signals, and click Power Supply Parameters.
Ensure that II power supply enable(AIDI_3/COM2/AIDI_5) is Yes.
Immerse the two Leak DI alarm is generated Wipe dry the two contacts of
contacts of the on the active alarm screen of the water sensor. The alarm
electrode water the app or on the WebUI. disappears automatically.
sensor in water.
----End
Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the
temperature sensor, and the other end has been connected to the AI/DI port on
the ECC800-Pro.
Context
● If the sensor is prefabricated, only check its settings.
● The actual value prevails. Only the method of the parameter settings is
described.
● If multiple temperature sensors are connected, commission them one by one.
Procedure
Step 1 Set temperature sensor parameters.
NOTE
In this example, the temperature sensor is connected to the AI/DI_2 port on the ECC800-
Pro.
1. Log in to the ECC800-Pro WebUI as an administrator.
2. Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 315
ECC800 Data Center Controller
User Manual 8 FAQ
3. Set Device type to ECC800, set Device name to ECC800, and click OK.
4. On the query result tab page, set the new signal name of AI/DI_2 to
Temperature and click Submit.
5. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2
Port Settings.
6. Set Temperature sensor to Enable and click Submit.
7. Confirm that Temperature sensor type is automatically identified as NTC.
Ensure that Temperature power supply is Yes.
8. Click Unhide All Advanced Signals, then click Power Supply Parameters.
Ensure that I power supply enable(AIDI_2/COM1/AIDI_4/COM3) is Enable.
View the operating You can view the current cabinet temperature.
information about the
temperature sensor on the
WebUI.
----End
Prerequisites
One end of the straight-through cable has been connected to the RJ45 port on the
temperature sensor, and the other end has been connected to the NTC port on the
rack environment unit.
Procedure
Step 1 The temperature sensor supports self-discovery and does not need to set
parameters.
Path: Monitoring > Cabinet You can view the current cabinet temperature.
> IT Cabinet n > Cabinet
Collector n
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 316
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Prerequisites
Cables have been connected to the NTC, T/H sensor, and UIM20A expansion
module.
(1) UIM20A expansion module (2) T/H sensor (3) Temperature sensor
Procedure
Step 1 The NTC port on the T/H sensor connected to the temperature sensor supports
automatic identification. Therefore, you do not need to set parameters.
Choose System Settings > Device Management and click Auto Discover
Device to add the T/H sensor. The device connection information is displayed.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 317
ECC800 Data Center Controller
User Manual 8 FAQ
Path: Monitoring > You can view the current cabinet temperature.
Cabinet> IT Cabinet n > T/H
sensor n
----End
8.7.37 How Can I Set and Add a T/H Sensor (BOM Number:
33010516)?
If a T/H sensor is installed, perform the following steps to configure it.
Prerequisites
One end of the straight-through cable has been connected to the RS485_IN port
on the T/H sensor, and the other end has been connected to the COM port on the
ECC800-Pro or the UIM20A expansion module.
Context
This section describes how to set and add a T/H sensor by using the COM port on
the ECC800-Pro as an example.
Procedure
Step 1 Set the T/H sensor device address.
Set the T/H sensor device address through the DIP switch on the T/H sensor.
Toggle switches 1 to 6 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 318
ECC800 Data Center Controller
User Manual 8 FAQ
3. Click Test Connect to check whether the T/H sensor connects to the ECC800-
Pro properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
Check the running Choose Monitoring > Aisle > T/H Sensor Group
information about the T/H > T/H Sensorn > Running Info, and check the
sensor on the WebUI. current T/H information of the cabinet.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 319
ECC800 Data Center Controller
User Manual 8 FAQ
Set T/H sensor alarm Choose Monitoring > Aisle > T/H Sensor Group
thresholds. > T/H Sensorn > Running Parameters, and set
High temperature alarm threshold, Low
temperature alarm threshold, and High
humidity alarm threshold, Low humidity
alarm threshold as required.
NOTE
The default values of High temperature alarm
threshold, Low temperature alarm threshold, High
humidity alarm threshold, and Low humidity alarm
threshold are 30.0°C, 5.0°C, 85.0% RH, and 15.0%
RH, respectively.
----End
8.7.38 How Can I Set and Add the T/H Sensor (BOM Number:
02310NBS)?
If a T/H sensor is installed, perform the following steps to configure it.
Prerequisites
One end of the straight-through cable has been connected to the RS485_IN port
on the T/H sensor, and the other end has been connected to the COM port on the
ECC800-Pro or the UIM20A expansion module.
Context
This section describes how to set and add a T/H sensor by using the COM port on
the ECC800-Pro as an example.
Procedure
Step 1 Set the T/H sensor device address.
Set the T/H sensor device address through the DIP switch on the T/H sensor.
Toggle switches 1 to 6 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 320
ECC800 Data Center Controller
User Manual 8 FAQ
3. Click Test Connect to check whether the T/H sensor connects to the ECC800-
Pro properly.
– If the T/H sensor connects to the ECC800-Pro successfully, click Confirm.
The connected devices are displayed in the Number of connected
devices list.
– If the connection fails, check whether the T/H sensor is properly
connected to the ECC800-Pro, whether the T/H sensor and ECC800-Pro
are running properly, and whether the parameter settings are consistent
with the T/H sensor parameters.
Step 3 Check functions of the T/H sensor.
Check the running Choose Monitoring > Aisle > T/H Sensor Group
information about the T/H > T/H Sensorn > Running Info, and check the
sensor on the WebUI. current T/H information of the cabinet.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 321
ECC800 Data Center Controller
User Manual 8 FAQ
Set T/H sensor alarm Choose Monitoring > Aisle > T/H Sensor Group
thresholds. > T/H Sensorn > Running Parameters, and set
High temperature alarm threshold, Low
temperature alarm threshold, High humidity
alarm threshold and Low humidity alarm
threshold as required.
NOTE
The default values of High temperature alarm
threshold, Low temperature alarm threshold, High
humidity alarm threshold, and Low humidity alarm
threshold are 30.0°C, 5.0°C, 85.0% RH and 15.0% RH
respectively.
----End
8.7.39 How Can I Set and Add a T/H Sensor (BOM Number:
02311FQG/02312PBL)?
Prerequisites
One end of the straight-through cable has been connected to the RS485_IN port
on the T/H sensor, and the other end has been connected to the COM port on the
ECC800-Pro or the UIM20A expansion module.
Context
This section describes how to set and add a T/H sensor by using the COM port on
the ECC800-Pro as an example.
Procedure
Step 1 Set the T/H sensor device address.
Set the T/H sensor device address through the DIP switch on the T/H sensor.
Toggle switches 1–6 are used to set device addresses, toggle switch 7 is reserved,
and toggle switch 8 is used to switch the temperature unit.
Device addresses are set in binary encoding format in the range of 1–63. The first
bit is the least significant bit, and the sixth bit is the most significant bit. ON
indicates 1, and OFF indicates 0.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 322
ECC800 Data Center Controller
User Manual 8 FAQ
3. Click Test Connect to check whether the T/H sensor connects to the ECC800-
Pro properly.
– If the T/H sensor connects to the ECC800-Pro successfully, click Confirm.
The connected devices are displayed in the Number of connected
devices list.
– If the connection fails, check whether the T/H sensor is properly
connected to the ECC800-Pro, whether the T/H sensor and ECC800-Pro
are running properly, and whether the parameter settings are consistent
with the T/H sensor parameters.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 323
ECC800 Data Center Controller
User Manual 8 FAQ
Check the running Choose Monitoring > Aisle > T/H Sensor Group
information about the T/H > T/H Sensorn > Running Info, and check the
sensor on the WebUI. current T/H and NTC information of the cabinet.
Set T/H sensor alarm Choose Monitoring > Aisle > T/H Sensor Group
thresholds. > T/H Sensorn > Running Parameters, and set
High temperature alarm threshold, Low
temperature alarm threshold, High humidity
alarm threshold, Low humidity alarm
threshold, NTC1-6 high temperature alarm
threshold and NTC1-6 low temperature alarm
threshold as required.
NOTE
The default values of High temperature alarm
threshold, Low temperature alarm threshold, High
humidity alarm threshold, Low humidity alarm
threshold, NTC1-6 high temperature alarm
threshold and NTC1-6 low temperature alarm
threshold are 30.0°C, 5.0°C, 85.0% RH, 15.0% RH,
45°C and 10°C respectively.
----End
Context
This section describes how to set and add a vibration sensor by using the COM
port on the ECC800-Pro as an example.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Add a vibration sensor. For details, see the following table.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 324
ECC800 Data Center Controller
User Manual 8 FAQ
Choose System Device Select Sensor from the drop-down list box.
Settings > attribute
Device
Management Device Type Select Vibration Sensor from the drop-down
and click Add list box.
Device. The Communicat Select COM3 from the drop-down list box.
parameters for ions Port NOTE
adding devices
The setting example indicates that the vibration
are displayed. sensor is connected to the COM3 port on the
ECC800-Pro. If the T/H sensor is connected to
another port, select the number of the connected
port.
Device 1
Address
Step 3 Click Test Connect to check whether the vibration sensor connects to the ECC800-
Pro properly.
● If the connection succeeds, click Add Device. The device connection
information is displayed in the Number of connected devices list.
● If the connection fails, check whether the device is properly connected to the
ECC800-Pro, whether the device and ECC800-Pro are running properly, and
whether the parameter settings are consistent with the device parameters.
----End
Prerequisites
One end of the straight-through cable has been connected to the COM port on
the SMU11B and the other end has been connected to the COM port on the
ECC800-Pro or ETH converter.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 325
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Ensure that the PC IP address is in the same network segment as the SMU IP
address.
The default user name is admin and the preset password is Changeme.
Step 3 Choose System Settings > Serial Port and set Communication Address as
planned.
Parameter Setting
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 326
ECC800 Data Center Controller
User Manual 8 FAQ
properly, and whether the parameter settings are consistent with the
device parameters.
----End
NOTICE
Restoring factory settings will restore parameters to their default values. Back up
data before performing this operation. Perform this operation with caution.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Maintenance > Configuration File and click Restore Factory Settings.
Step 3 Enter the password currently used for logging in to the WebUI and click Submit.
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 327
ECC800 Data Center Controller
User Manual 8 FAQ
5. Click Select File on the right of Select a network security certificate key.
6. Select the network security certificate key to be imported from the PC and
click Upload.
7. (Optional) If the network security certificate is encrypted, select If an
encrypted private key is imported, enter the password for decryption, and
specify Key cryptography and Confirm key cryptography.
8. Click Submit in the Network Security Certificate area.
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Device Management > Security Certificate Change.
Step 4 Select the certificate to be imported from the PC and click Upload.
Step 5 Click Select File on the right of Upload local certificate file.
Step 6 Select the certificate to be imported from the PC and click Upload.
Step 8 Select the key file to be imported from the PC and click Upload.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 328
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > System Parameters > Monitor IP and change the IP,
subnet mask, and default gateway information for the ECC800-Pro as planned.
Step 3 Click Submit.
Step 4 In the displayed Setting succeeded. Log in again. dialog box, click OK.
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Alarm Parameters.
Step 3 On the Basic Alarm Parameters page, choose ECC800 from the Select a device
type drop-down list box, choose the ECC800 to be set from the Device name
drop-down list box, and then click Confirm.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 329
ECC800 Data Center Controller
User Manual 8 FAQ
Step 4 Set Enable Alarm to Enable or Disable for Operation log full as required. Set
Severity to Critical, Major, Minor, or Warning as required.
NOTE
To modify Enable Alarm or Severity in batches, click Batch Setting in the left corner of
the Basic Alm Para page, and choose ECC800 from the Select a device type drop-down
list box. Set Destination Parameter of Enable Alarm or Source Parameter and
Destination Parameter of Severity, and click OK.
Step 5 Enter the Alarm Linkage page. Select Device Type for ECC800, select Device
Type or Device for Linkage Type, and click Confirm.
Step 6 (Optional) If you select Device for Linkage type, select ECC800 for Device name.
Step 7 Click Select in the Output Dry Contact column corresponding to Operation log
full as required, select Yes or No for DO, and click OK.
Step 8 Click Select in the Loudspeaker column corresponding to Operation log full as
required, set Loudspeaker to Yes or No, and click OK.
----End
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 330
ECC800 Data Center Controller
User Manual 8 FAQ
----End
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 331
ECC800 Data Center Controller
User Manual 8 FAQ
Step 3 Set Device type to ECC800, set Device name to ECC800, and click OK.
Step 4 On the query result tab page, set the new signal name of AI/DI_3 to Smoke and
click Submit.
Step 5 Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3 Port
Settings. Check that the signal name of AI/DI_3 has been changed to Smoke.
NOTE
After the signal name is changed, the original name in the alarm, collection, and settings is
changed accordingly.
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Maintenance > Export Data.
Step 3 (Optional) Select Encryption password and enter an encryption password.
NOTE
Record the password, which is required for decompressing the data package.
Step 4 Set export parameters and export the data to the PC or a USB flash drive.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 332
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
● Data can be exported from the integrated PDU, integrated UPS, smart cooling product,
and other devices that have the local data storage function.
● If a USB flash drive is inserted, click Export Fault Info to USB, Export Historical Data
to USB, or Export Local Data of Southbound Devices to USB to export the data to the
USB flash drive.
----End
NOTICE
Procedure
Step 1 Log in to the ECC800-Pro_1 WebUI as an administrator.
Step 2 Choose Maintenance > Configuration File.
Step 3 Export a configuration file.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 333
ECC800 Data Center Controller
User Manual 8 FAQ
NOTICE
● Before importing the configuration file, ensure that the current system type is
the same as the system type when the configuration file is exported.
● The ECC800-Pro_2 will restart after you import the configuration file.
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Maintenance > Parameter Sync.
Step 3 Select a value from the Device type drop-down list box.
Step 4 Specify source device and target device, click Submit.
NOTICE
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 334
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
The source device can be a device that communicates properly or fails to communicate, but the
target device must be a device that communicates properly.
----End
Procedure
Step 1 Manually refresh the browser page.
----End
.
NOTE
The preset user name is admin and the preset password is 000001.
Step 3 Choose Settings > Advanced and set Modbus TCP encryption to Disable.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 335
ECC800 Data Center Controller
User Manual 8 FAQ
WARNING
Holding down the SW button for 1 minute will restore factory settings and clear
user information. Exercise caution when performing this operation.
----End
Step 2 If the message is still displayed after you perform Step 1, synchronize the
fingerprint information.
1. Choose System Settings > Access Management. On the Authorization
Operations tab page, click Synchronize to Device, select the device for
synchronizing fingerprint information, and click Start Synchronization.
2. After the Synchronization Status of the device becomes Synchronized, close
the Synchronize Access Permission page.
3. Scan the fingerprint on the access control device again.
Step 3 If the message indicating unauthorized fingerprint is still displayed after you
perform Step 1 and Step 2, you need to record the user's fingerprint again.
1. Choose System Settings > Access Management.
2. Select the involved user and record the fingerprint again.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 336
ECC800 Data Center Controller
User Manual 8 FAQ
Context
The camera is inaccessible after the MAC address and IP address are bound in
network configuration.
Procedure
Step 1 Configure the free-rule MAC address using the free-rule configuration method so
that users can access the network without authentication. For details, see the
authentication free-rule in the latest S12700 documentation.
----End
Prerequisites
● You have obtained the IP address (192.168.8.10 by default) of the ECC800-Pro.
● The browser (Internet Explorer 11 or later, Firefox, or Chrome) for logging in
to the ECC800-Pro WebUI is available.
● You have installed hardware for the ECC800-Pro and powered it on.
● A PC with an IP address in the same subnet as that of the ECC800-Pro is
connected to the ECC800-Pro over a LAN switch.
● You have obtained the IP address, subnet mask, and default gateway planned
for the ECC800-Pro.
Context
A unified IP address (192.168.8.10) is configured for all ECC800-Pros before
delivery. Reconfigure an IP address for the ECC800-Pro as required to ensure
normal communication with a server.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > System Parameters > Monitor IP, and change the IP
address, subnet mask, and default gateway of the ECC800-Pro based on the
parameters planned for the ECC800-Pro collector.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 337
ECC800 Data Center Controller
User Manual 8 FAQ
Context
When connecting the ECC800-Pro outside the smart module to the management
system, you need to set the system type to General.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose System Settings > System Parameters > Site Configuration, set System
type to General, and click Submit.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 338
ECC800 Data Center Controller
User Manual 8 FAQ
Context
● This section describes how to set monitoring parameters for the door status
sensor when it is connected to the AI/DI_1 port on the ECC800-Pro. Set the
parameters based on the actually connected port.
● After connecting a door status sensor to an AI/DI port on the ECC800-Pro, set
monitoring parameters for the door status sensor on the ECC800-Pro WebUI.
Procedure
Step 1 Log in to the WebUI of the ECC800-Pro collector.
Step 2 Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1 Port
Settings.
Step 3 Set AI/DI_1 to Enable.
Step 4 Click Submit.
Step 5 Select Door sensor from the AI/DI_1 sensor type drop-down list box.
Step 6 Click Unhide All Advanced Signals, and click Power Supply Parameters. Ensure
that III power supply enable(AIDI_1/DO) is set to Enable.
Step 7 Click Submit.
----End
Context
● This section describes how to set monitoring parameters for the smoke sensor
or water sensor when the sensor is connected to the AI/DI_1 port on the
ECC800-Pro. Set the parameters based on the actually connected port.
● A smoke sensor or water leakage sensor is a self-identification device. After a
smoke sensor or water leakage sensor is connected to the AI/DI port of an
ECC800-Pro collector, the sensor type is automatically identified and you do
not need to manually set AI/DI Sensor Type on the WebUI.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 339
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Log in to the WebUI of the ECC800-Pro collector.
Step 2 Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1 Port
Settings.
Step 3 Set AI/DI_1 to Enable.
Step 4 Click Submit.
Step 5 Check whether AI/DI_1 sensor type is automatically identified. The following uses
Smoke sensor as an example.
Step 6 Click Unhide All Advanced Signals, and click Power Supply Parameters. Ensure
that III power supply enable(AIDI_1/DO) is set to Enable.
Step 7 Click Submit.
----End
Context
● An NO or NC dry contact is a device whose normal status signal is open (or
closed) and whose alarm signal is closed (or open), such as a skylight
controller.
● This section describes how to set monitoring parameters for the skylight
controller when it is connected to the AI/DI_1 port on the ECC800-Pro. Set the
parameters based on the actually connected port.
● After a normally open (NO) or normally closed (NC) dry contact device is
connected to an AI/DI port on the ECC800-Pro, you need to set monitoring
parameters for the NO or NC dry contact device on the ECC800-Pro WebUI.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 340
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Log in to the WebUI of the ECC800-Pro collector.
Step 2 Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1 Port
Settings.
Step 3 Set AI/DI_1 to Enable.
Step 4 Click Submit.
Step 5 Select NO or NC for AI/DI_1 Sensor Type from the drop-down list.
NOTE
● NO: indicates a normally open dry contact. The dry contact will report an alarm in the closed
state.
● NC: indicates a normally closed dry contact. The dry contact will report an alarm in the open
state.
Step 6 Click Unhide All Advanced Signals, and click Power Supply Parameters. Ensure
that III power supply enable(AIDI_1/DO) is set to Enable.
Step 7 Click Submit.
----End
Prerequisites
● The communication between the management system and the chiller plant
control device connected to the LAN switch is normal.
● The management system communicates properly with the ECC800-Pro and
the smart cooling product connected to the ECC800-Pro.
● Power management has been configured for the smart cooling product
connected to the ECC800-Pro, and the IT cabinet power statistics are correct.
● The number of smart cooling products (number of started smart cooling
products) with the valid maximum cooling capacity received by the ECC800-
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 341
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Choose Monitoring > Cooling > Running Parameters to access the Temperature
and Humidity Parameters page. Set Temperature and humidity control type as
required and click Submit.
Step 3 Choose Monitoring > Cooling > Running Parameters. In the Cooling Capacity
Management area, set the parameters related to cooling capacity management
for the water cooled smart cooling product, such as the target cooling load rate
and recommended supply water temperature statistics cycle.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 342
ECC800 Data Center Controller
User Manual 8 FAQ
Context
Procedure
Step 1 Ensure that the device communication mode has been set to DHCP.
Step 2 Log in to the ECC800-Pro WebUI as an administrator, and check whether the
device exists on the Monitoring page.
● If the device exists and communication status is normal, the device has
accessed the ECC800-Pro successfully.
● If the device does not exist, check that the cable is properly connected
between the device and the ECC800-Pro, the ECC800-Pro is operating
properly, and communications parameters are set correctly.
----End
Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 343
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Connect the WiFi converter (for example) to the smart ETH gateway based on the
networking scenario.
Step 2 Log in to the ECC800-Pro WebUI as an administrator, and check whether the
device exists on the Monitoring page.
● If the device exists and communication status is normal, the device has
accessed the ECC800-Pro successfully.
● If the device does not exist, check that the cable is properly connected
between the device and the ECC800-Pro and that the device and ECC800-Pro
are operating properly.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 344
ECC800 Data Center Controller
User Manual 8 FAQ
Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.
Procedure
Step 1 Set communications parameters on the device.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 345
ECC800 Data Center Controller
User Manual 8 FAQ
Communicati COM1/COM2
ons Port
3. Click Test Connect to check whether the device connects to the ECC800-Pro
properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 346
ECC800 Data Center Controller
User Manual 8 FAQ
4. Choose Monitoring > System > ETH Converter Group > ETH Converter n >
Running Parameters and set Device name to ETH Converter n_Device
name.
----End
Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.
Context
Procedure
Step 1 Set communications parameters on the device.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 347
ECC800 Data Center Controller
User Manual 8 FAQ
3. Click Test Connect to check whether the device connects to the ECC800-Pro
properly.
– If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
– If the connection fails, check whether the device is properly connected to
the ECC800-Pro, whether the device and ECC800-Pro are running
properly, and whether the parameter settings are consistent with the
device parameters.
----End
Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 348
ECC800 Data Center Controller
User Manual 8 FAQ
Context
The AI/DI_1, AI/DI_2, and AI/DI_3 ports on the ECC800-Pro can be automatically
identified by devices, but the AI/DI_4 and AI/DI_5 ports cannot be automatically
identified.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Add the device.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 349
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the
corresponding position in the Smart Module View pane based on the actual
device layout.
Procedure
Step 1 Set communications parameters on the device.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 350
ECC800 Data Center Controller
User Manual 8 FAQ
Choose System Settings > Device Management and click Auto Discover
Device to add the device. The device connection information is displayed.
----End
Context
Each UIM20A expansion module supports a maximum of eight dry contact
devices. If one smart module has multiple UIMs, a maximum of 48 dry contact
devices can be connected.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 351
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Follow-up Procedure
Choose Home > Plan View on the ECC800-Pro WebUI, and drag the dry contact
device to the corresponding position in the Smart Module View pane based on
the actual device layout.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 352
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Open the aisle door.
Path Setting
Monitoring > Aisle > Select Remote door opening and click Submit
Access Actuator Group >
Access Actuator n >
Controls
CAUTION
● Remotely opening the door may open the smart module door, and this may
pose security risks. Exercise caution when performing this operation.
● When a smart module actuator is configured, you need to set parameters for
the smart module actuator. The setting process is similar.
----End
Example
The following figure shows how to remotely open the aisle door controlled by
access actuator 1.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 353
ECC800 Data Center Controller
User Manual 8 FAQ
● When the local light button is faulty or lights cannot be turned on through a
linkage, you can remotely turn on the lights over the ECC800-Pro WebUI.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Path Setting
Monitoring > Aisle > AC Select Remote open scuttle, select ON or OFF as
Actuator Group > AC required, and click Submit.
Actuator n > Controls
----End
Example
The following figure shows how to turn on or off the lights controlled by AC
actuator 2.
Follow-up Procedure
Set Set light mode to Automatic.
CAUTION
When a smart module actuator is configured, you need to set parameters for the
smart module actuator. The setting process is similar.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 354
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Open skylights.
Monitoring > Aisle > Select Remote open scuttle and click Submit
Skylight Actuator Group >
Skylight Actuator n >
Controls
CAUTION
● Remotely opening the skylight may open the smart module skylight, and this
may pose security risks. Exercise caution when performing this operation.
● When a smart module actuator is configured, you need to set parameters for
the smart module actuator. The setting process is similar.
----End
Example
The following figure shows how to open the skylights controlled by skylight
actuator 1.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 355
ECC800 Data Center Controller
User Manual 8 FAQ
Follow-up Procedure
After the maintenance is complete, O&M personnel need to close the skylights in
the smart module manually.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Turn on or off smart cooling products.
----End
Example
The following figure shows how to turn on or off the NetCol5000-A025.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 356
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 Open the cabinet electronic lock.
----End
Example
The following figure shows how to open electronic lock 1 for IT cabinet 1.
Follow-up Procedure
After the maintenance is complete, O&M personnel need to close the cabinet door
manually.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 357
ECC800 Data Center Controller
User Manual 8 FAQ
8.43 How Can I Link the Smoke Alarm with the Alarm
Beacon over the ECC800-Pro WebUI?
Prerequisites
The alarm beacon is connected to the DO port on the ECC800-Pro.
Context
After the smoke alarm is linked with the alarm beacon, if smoke is detected inside
the smart module, the alarm beacon connecting to the corresponding DO port will
generate an audible and visual alarm.
Procedure
Step 1 Choose System Settings > Alarm Parameter > Alarm Linkage.
Step 2 Select Multi-Func Sensor for Device Type, select Device Type or Device for
Linkage type, and click Confirm.
NOTE
Select Multi-Func Sensor n from the Device Name list if you have selected Device for
Linkage type, and click Confirm.
Step 3 Click Select in the Output Dry Contact list for Smoke alarm. On the Set Dry
Contact Outputs(Multi-Func Sensor) page, set DO to Yes and click OK.
Step 4 Click Select in the loudspeaker list for Smoke alarm. On the Please set the
sound(Multi-Func Sensor) page, set loudspeaker to Yes and click OK.
----End
8.44 How Can I Link the AI/DI Alarm with the Alarm
Beacon over the ECC800-Pro WebUI?
Prerequisites
The alarm beacon is connected to the DO port on the ECC800-Pro.
Context
After the AI/DI alarm is linked with the alarm beacon, if smoke is detected inside
the smart module, the alarm beacon connecting to the corresponding DO port will
generate an audible and visual alarm.
This section describes how to set an alarm linkage by linking output dry contact of
the smoke DI alarm on the AI/DI_1 sensor to the DO port.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 358
ECC800 Data Center Controller
User Manual 8 FAQ
Procedure
Step 1 Choose System Settings > Alarm Parameter > Alarm Linkage.
Step 2 Select ECC800 for Device type, select Device Type or Device for Linkage type,
and click Confirm.
NOTE
Select ECC800 from the Device name list if you have selected Device for Linkage type,
and click Confirm.
Step 3 Click Select in the Output Dry Contact list for AI/DI_1 DI alarm. On the Set Dry
Contact Outputs(ECC800) page, set DO to Yes and click OK.
Step 4 Click Select in the loudspeaker list for AI/DI_1 DI alarm. On the Please set the
sound(ECC800) page, set loudspeaker to Yes and click OK.
----End
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Path Setting
Monitoring > System > Select Device name, enter the new name in the
Smart ETH Gateway text box as planned, and click Submit.
Group > Smart ETH
Gateway 1 > Running
Parameters
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 359
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Procedure
Step 1 Use a PAD to download the NetEco app from Huawei AppGallery and install it.
NOTE
Before the installation, ensure that the PAD is connected to the Internet and the network is
running properly.
● Huawei AppGallery installed on the PAD
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 360
ECC800 Data Center Controller
User Manual 8 FAQ
Log in to the Huawei AppGallery client, search for NetEco, and tap Install.
Huawei AppGallery is preinstalled on Huawei PAD by default.
● Huawei AppGallery not installed on the PAD
Table 8-58 Operation methods for the scenario where Huawei AppGallery is
not installed on the PAD
Method Procedure Installation
Verification
Method 1: Install the 1. Log in to Huawei Check that the app icon
app from the AppGallery (https://
Huawei AppGallery appgallery.huawei.co
official website. m/), search for NetEco, exists on the
and tap Install. PAD desktop.
2. In the displayed Tip
dialog box, tap Install
AppGallery.
3. The Huawei AppGallery
installation file is
displayed on the
screen. Download and
install the Huawei
AppGallery as
prompted.
4. On the Huawei
AppGallery client,
search for NetEco, and
tap Install.
Step 2 Hold down the SW button on the ECC800-Pro for 1s to enable the WiFi function.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 361
ECC800 Data Center Controller
User Manual 8 FAQ
NOTE
● The preset password is Changeme. The password is valid only after you hold down the
button for the first time to enable the WiFi function. If you enable the WiFi function on
the WebUI, there is no preset password.
● After WiFi is enabled by pressing the button, the app prompts the user to change the
preset password when logging in on the PAD.
● After you disable the WiFi hotspot function on the WebUI and press the button again,
the WiFi function is still enabled. In this case, the WiFi password is the one you changed
into last time.
● The WiFi function is disabled by default. When you enable the WiFi function, change the
WiFi password to ensure connection security.
● A password that has been used for a long time is more likely to be stolen or cracked.
The risk increases over time. Change the WiFi password periodically (recommended:
once half a year).
– If you have set a password when enabling WiFi for the first time, you do not need
to set the password again.
– The WiFi function is disabled by default. When you enable the WiFi function,
change the WiFi password to ensure connection security.
– A password that has been used for a long time is more likely to be stolen or
cracked. The risk increases over time. Change the WiFi password periodically
(recommended: once half a year).
7. Enter the password currently used for logging in to the WebUI and click
Submit.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 362
ECC800 Data Center Controller
User Manual 8 FAQ
– After the first login, change the preset password in time to ensure system access
security.
– A password that has been used for a long time is more likely to be stolen or cracked.
The risk increases over time. Change the password once every three months.
– It is recommended that you use different user accounts to log in to the ECC800-Pro
WebUI and app concurrently. Otherwise, either of them will be logged out.
----End
Context
The rack environment unit is used as an example.
Procedure
Step 1 Log in to the ECC800-Pro app as an administrator.
Step 2 Choose Home > More > iFind.
Step 3 Tap Cabinet Collector n Blink to deliver a blinking command. The corresponding
device in the smart module blinks. Check that the device positions and types in the
plan view are consistent with the actual situation by delivering the blinking
command.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 363
ECC800 Data Center Controller
User Manual 8 FAQ
----End
Procedure
Step 1 Log in to the ECC800-Pro app as an administrator.
Step 2 To view the smart module data center layout, tap Home.
Step 3 To view active alarms and historical alarms, choose Alarms > Active Alarms or
Alarms > Historical Alarms.
Step 4 Choose More to view network parameters, operation logs, asset details, and
version information.
----End
Procedure
Step 1 Log in to the ECC800-Pro app as an administrator.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 364
ECC800 Data Center Controller
User Manual 8 FAQ
The ECC800-Pro will restart after you import the configuration file.
----End
Context
After a device is replaced, you can synchronize the parameters of the original
device to the new device.
Procedure
Step 1 Log in to the ECC800-Pro app as an administrator.
Step 2 Choose Parameter Sync.
Step 3 Select the source device and target device.
● Source device: device before replacement
● Target device: device after replacement
Step 4 Tap Submit.
----End
Context
If the message The IP is already used is displayed when you attempt to log in to
the PAD app, perform the operations in this section to handle the issue.
Procedure
Step 1 If you have obtained the user name and password used in the previous successful
login, perform the following operations:
1. Check that the PAD connects to the ECC800-Pro over WiFi properly.
2. Use the obtained user name and password to log in to the app and exit.
3. Use the user name and password that previously failed the login to log in to
the app again.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 365
ECC800 Data Center Controller
User Manual 8 FAQ
Step 2 If you have not obtained the user name and password used in a previous
successful login, perform the following operations:
1. Close the app and wait for about 22 to 23 minutes.
2. Log in as the current user.
----End
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 366
ECC800 Data Center Controller
User Manual 9 PLC Function
9 PLC Function
Logic Parameters
The following are the inputs, operators, and outputs for linkage control logic
programs:
● Inputs:
– Sample: such as AI/DI device signals
– Alarm: such as AI/DI alarm signals
– Constant
– Register: A register can combine multiple levels of logic programs.
● Operators:
– AND: The output is valid if both inputs are valid.
– OR: The output is valid if either input is valid.
– NOT: The output is the inverse value of the input signal or constant.
– >: The output is active if the input is greater than the constant.
– <: The output is active if the input is less than the constant.
– DELAY: The output of the input signal or constant is delayed and the
output is constant.
– FILTER: The output is active if the input reaches the constant.
● Outputs:
– Outputs are associated with dry contact outputs and can be used for
generating alarms or controlling devices.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 367
ECC800 Data Center Controller
User Manual 9 PLC Function
Feature Description
The linkage control configuration is concise and easy to operate. You can perform
the following operations:
NOTICE
● Linkage control does not need to be configured onsite and its default
configuration applies. Before adding or modifying linkage control linkage logic,
consult the technical support.
● When you do not know how to rectify the incorrect linkage control
configuration or want to synchronize the linkage control configuration from
another ECC800-Pro, use the linkage control configuration import and export
function.
● The ECC800-Pro supports fire control linkage and high temperature linkage
control. For example, the ECC800-Pro can implement fire linkage by detecting
fire alarms through the fire controller and opening the skylight, opening the
aisle door, and shutting down the smart cooling product based on the alarm
status.
● The following describes how to configure the linkage control linkage, using
Link fire control with skylight open as an example.
● In this example, the fire controller connects to port AI/DI_1. The actual port
may vary.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 368
ECC800 Data Center Controller
User Manual 9 PLC Function
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
For details about how to add or edit a linkage group name for high temperature linkage control,
see Step 4.
2. On the Linkage Logic List tab page, click Add or the edit icon .
3. Click Submit.
● Set Linkage Logic List parameters for Link fire control with skylight open.
● Set Linkage Logic List parameters for Link high temperature with skylight
open.
NOTE
When adding high temperature linkage control, ensure that all smart cooling products fail
to communicate with the ECC800-Pro. If smart cooling products communicate properly,
cooling can be automatically implemented when the smart cooling products are at high
temperature. Opening the skylights may cause the cooling effect to fail.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 369
ECC800 Data Center Controller
User Manual 9 PLC Function
----End
Follow-up Procedure
You can use the configuration file import and export function to export the
linkage control linkage rules configured for an ECC800-Pro to a local PC and then
import the rules to another ECC800-Pro. This function achieves quick configuration
for the linkage control.
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 370
ECC800 Data Center Controller
User Manual 10 Acronyms and Abbreviations
A
AC alternating current
AES Advanced Encryption Standard
AI analog input
APP application
B
BCB battery control I/O board
C
COM component object model
D
DC direct current
DES Data Encryption Standard
DI digital input
DO digital output
E
ECC Energy Control Center
ESN equipment serial number
ETH Ethernet
F
FE fast Ethernet
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 371
ECC800 Data Center Controller
User Manual 10 Acronyms and Abbreviations
G Gigabit Ethernet
GE
I
IC integrated circuit
iCooling iCooling
IEEE Institute of Electrical and Electronics Engineers
IP Internet protocol
IT Internet technology
L
LED light emitting diode
M
MTBF mean time between failures
MTTR mean time to repair
MAC media access control
MD5 message digest algorithm
MIB management information base
N
NAT network address translation
NetEco iManager NetEco data center infrastructure
management system
NTC negative temperature coefficient
NO normally open
NC normally closed
P
PDU power distribution unit
PoE power over Ethernet
PSU power supply unit
PUE power usage effectiveness
R
RF radio frequency
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 372
ECC800 Data Center Controller
User Manual 10 Acronyms and Abbreviations
RH relative humidity
RJ registered jack
RoHS Restriction of Hazardous Substances
S
SD secure digital
SHA Secure Hash Algorithms
SIM subscriber identity module
SMS short message service
SMTP Simple Mail Transfer Protocol
SNMP Simple Network Management Protocol
SSL Secure Sockets Layer
SSID service set identifier
T
TLS Transport Layer Security
U
UPS uninterruptible power system
USB universal serial bus
V
VCN video cloud node
W
WiFi wireless fidelity
WPS WiFi Protected Setup
Issue 01 (2022-06-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 373