Work Item : 21.01 Clearing and Grubbing Production rate (per SPD) : 1 - 1.2 Ha/day
Production rate (per Hour) : 0.125 - 0.15 Ha/hr
* 411 Activity No. in old CMS replaced by 21.01 Clearing & Grubbing
1
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 31.01.a Excavating Soft Material to any depth Production rate (per SPD) : 280- 320 m3/day
* 451 Activity No. Structural Excavation minor in old CMS replaced by 31.01.a Excavating Soft Material to any depth
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 31.01.b. Excavating Hard Material to any depth Production rate (per SPD) : 120 - 150 m3/day
* 451 Activity No. Structural Excavation minor in old CMS replaced by 31.01.b. Excavating Hard Material to any depth
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 32.02..a Back filling using the excavated Material Production rate (per SPD) : 150 - 180 M3/day
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 32.02.b. Back filling using imported selected material Production rate (per SPD) : 150 - 180 M3/day
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 32.01.a.i Excavation in soft material, 0m up to 1.5m Production rate (per SPD) : 300 - 350 m3/day
* 451 Activity No. Structural Excavation minor in old CMS replaced by 32.01.a.i Excavation in soft material, 0m up to 1.5m
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 451 Activity No. Structural Excavation minor in old CMS replaced by 32.01.a.ii Excavation in soft material, Exceeding 1.5m and up to 3m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 451 Activity No. Structural Excavation minor in old CMS replaced by 32.01.a.iii Excavation in soft material, Extra in increament of 1.5m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 451 Activity No. Structural Excavation minor in old CMS replaced by 32.01.b EO item 32.01 (a) for excavation in hard material irrespective of depth
UF : Utilization Factor
* 422 Activity No. Quarry rock Production in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 423 Activity No. Quarry rock Hauling in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 424 Activity No. Concrete Aggregate Crushing in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 452 Activity No. Pipe production in old CMS replaced by this activity
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 452 Activity No. Pipe production in old CMS replaced by this activity
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 452 Activity No. Pipe production in old CMS replaced by this activity
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.i.a. Concrete Pipe Culverts, on class A Bedding, 900mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.i.b. Concrete Pipe Culverts, on class A Bedding, 1060mm diam
UF : Utilization Factor
** As required
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.i.c. Concrete Pipe Culverts, on class A Bedding, 1220mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.ii.a. Concrete Pipe Culverts, on class B Bedding, 900mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Project : Shire Airfield upgrading project Production rate (per SPD) : 15.00 m/day
32.03.ii.b. Concrete Pipe Culverts, on class B Bedding,
Work Item : Production rate (per Hour) : 1.88 m/hr
1060mm diam
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.ii.b. Concrete Pipe Culverts, on class B Bedding, 1060mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.ii.c. Concrete Pipe Culverts, on class B Bedding, 1220mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Project : Shire Airfield upgrading project Production rate (per SPD) : 15 - 20 M2/day
Work Item : Form Work for minor Structure Production rate (per Hour) : 1.87 - 2.5 M2/hr
* 457 Activity No.Form work minor in old CMS replaced by this activity
UF : Utilization Factor
** As required
* 454 Activity No. class A concrete Minor in old CMS replaced by 32.07.a.i. Cast insitu concrete and form work, Concrete including form work, Class 25/20 Concrete in class A Bedding
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 458 Activity No. class C concrete Minor in old CMS replaced by 32.07.a.i. Cast insitu concrete and form work, Concrete including form work, Class 25/20 Concrete in class A Bedding
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 452 Activity No. Pipe production in old CMS replaced by this activity
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 454 Activity No. class A concrete Minor in old CMS replaced by 33.01.a. Kerbing, class 25/20 concrete curbing (0.17m*0.45m)
UF : Utilization Factor
** As required
* 465 Activity No. Form work major in old CMS replaced by this activity
UF : Utilization Factor
** As required
UF : Utilization Factor
** As required
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 454 Activity No. class A concrete Minor in old CMS replaced by 33.08a. Concrete lining for open drains, Class 25/20 concrete as per detail
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 456 Activity No. class B massonary Minor in old CMS replaced by 33.16.a. Paved drains in towns, U or Trapizoidal shaped massonery drains in towns as per the drawing
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 454 Activity No. class A concrete Minor in old CMS replaced by 33.16.b.i. Paved drains in towns, Class 25/20 reinforced concrete drains cover units including reinforcement and formwork as per detail,
Pedesterian crossing cover as shown on the drawing (Ass. 1m*1.35m*.10m dimension)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 454 Activity No. class A concrete Minor in old CMS replaced by 333.16.b.ii. Paved drains in towns, Class 25/20 reinforced concrete drains cover units including reinforcement and formwork as per detail,
Vehicle crossing cover as shown on the drawing(1*1.35*0.2)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 471 Activity No. Paved waterway Grouted in old CMS replaced by 34.01.b.i Grouted stone pitching, Grouted stone pitching at culverts
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 471 Activity No. Paved waterway Grouted in old CMS replaced by 34.01.b.ii Grouted stone pitching, Grouted stone pitching rural ditch
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 471 Activity No. Paved waterway Grouted in old CMS replaced by 34.01.b.iv Grouted stone pitching, Grouted stone pitching at bridges
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 456 Activity No. Class B Massonary in old CMS replaced by 34.03.b. Stone masonery walls, Cement mortared stone walls (1:3 mortar ratio)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 418, 419A & 419B Activity No. Road Bed Preparation in old CMS replaced by 41.03.b. Road bed Preparation and the compaction of material, Compaction to 93% of modified AASHTO density depth
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 418, 419A & 419B Activity No. Road Bed Preparation in old CMS replaced by 41.04.a. In situ treatment of road bed, in situ treatment by ripping
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 421 B Activity No. Borrow material Production in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : Borrow Material Hauling Av.Dis 2 km Production rate (per SPD) : 2000 - 2400 m3/day
Av.Sp. 35 km/hr Production rate (per Hour) : 250 - 300 m3/hr
t for L/Unl 5m
* 413 B Activity No. Borrow material hauling in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*412 A & 412 B Activity No. Common Excavation & Embankment in old CMS replaced by 42.01.a. Cut and Borrow to fill, Material in layer thickness of 200mm and less compacted to 93% modified
AASHTO density
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*413 A & 417 Activity No. Borrow Excavation & Embankment & Borrow Placing in old CMS replaced by 42.01.b.ii. Improved subgrade or Capping layer, Improved subgrade layer compacted to 95% of
modified AASHTO density
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : Waste Desposal Av.Dis 3 km Production rate (per SPD) : 1400 - 1600 m3/day
Av.Sp. 25 Km/hr Production rate (per Hour) : 175 - 200 m3/hr
t for L/Unl 5m
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*415 A & 415 B Activity No. Unclassified Excavation & Embankment in old CMS replaced by 42.03.a. Cut to spoil material obtained from, Soft excavation
UF : Utilization Factor remarks.The above condition works for only sideway spoiling. In other cases we have to consider efficiency
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*414 Activity No. Rock Excavation in old CMS replaced by 42.03.b. Cut to spoil material obtained from, Hard excavation
UF : Utilization Factor
remarks.The above condition works for only sideway spoiling. In other cases we have to consider efficiency
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*421 A Activity No. Select Material Production (Subbase) in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : Gravel Sub base Material Hauling Cap. 14m3 Production rate (per SPD) : 1800 - 2000 m3/day
Av.Dis 10km Production rate (per Hour) : 225 - 250 m3/hr
Av.Sp. 40 km/hr
tfor L/Unl 5m
*431 Activity No. Select Material Hauling (Subbase) in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*432 Activity No. Select Material Placing (Subbase) in old CMS replaced by 51.01.a.ii. Unstablised gravel subbase compacted to 97 % of modified AASHTO density layer thickness, 150mm layer thickness
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*425 Activity No. Rock crushing for Base Course in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Cap. 14m3
Project : Shire Airfield upgrading project Av.Dis 20 km
Work Item : Crushed Base Course Material Hauling Av.Sp. 60 km/hr Production rate (per SPD) : 1600 - 1800 m3/day
*433 Activity No. Base Course hauling in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*429 Activity No. Base Course material mixing in old CMS replaced by this activity
UF : Utilization Factor
*434 A & 434 B Activity No. Select Material Placing in old CMS replaced by 52.01.b.ii. Crushed stone base compacted to 100% of modified AASHTO density, layer thickness 175mm or as shown on the
drawing
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*437 Activity No. Prime coat application in old CMS replaced by 61.01.a. Prime Coat, MC-30 cut back bitumen applied at 0,8lit per sq.m
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*426 Activity No. Surface aggregate crushing in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*442 Activity No. Batch Plant Operation in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : Asphalt Hot Mix Hauling Av. Dis 20 km Production rate (per SPD) : 360 - 400 m3/day
Av. Sp. 60 km/hr Production rate (per Hour) : 45- 50 m3/hr
t for L and Ul 5m
*443 Activity No. Asphalt mix hauling in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*444 Activity No. Asphalt mix hauling in old CMS replaced by 64.02.a.iii. Asphalt concrete surfacing course; continuously graded course grading 50mm thick, asphalt concrete surface course with 60/70
penetration grade bitumen
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
Cap. 14 m3
Work Item : Massonery Rock Hauling Av.Sp. 30 km/hr Production rate (per SPD) : 680 - 720 m3/day
t for L/Unl 5m Production rate (per Hour) : 85 - 90 m3/hr
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Cap. 9m3
Work Item : Sand Production and Hauling Av.Sp. 30 km/hr Production rate (per SPD) : 650 - 750 m3/day
t for L/Unl 5m Production rate (per Hour) : 81.25 - 93.75 m3/hr
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*461 Activity No. Structural Excavation major in old CMS replaced by 81.02.a.i. Excavating Material with in the following succecive depth ranges, 0m up to 2m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*461 Activity No. Structural Excavation major in old CMS replaced by 81.02.a.ii. Excavating Material with in the following succecive depth ranges, Exceeding 2m and up to 4m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*461 Activity No. Structural Excavation major in old CMS replaced by 81.02.a.iii. Excavating Material with in the following succecive depth ranges, Extra increment of 1m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*461 Activity No. Structural Excavation major in old CMS replaced by 81.02.b EO item 81.02. (a) for hard excavation irrespective of depth
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
Project : Shire Airfield upgrading project Production rate (per SPD) : 15 - 18 M2/day
Work Item : 82.01.a. Form Works to Provide all class of finishes Production rate (per Hour) : 1.87 - 2.25 M2/hr
(Assuming 5cm lumber thickness)
* 465 Activity No.Form work minor in old CMS replaced by 82.01.a. Form Works to Provide all class of finishes (Assuming 5cm lumber thickness)
UF : Utilization Factor
** As required
*463 Activity No. Reinforcement Steel major in old CMS replaced by 83.01.a. Steel reinforcement for structures, Mild steel bars (Grade 300)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*463 Activity No. Reinforcement Steel major in old CMS replaced by 83.01.b. Steel reinforcement for structures, Mild steel bars (Grade 420)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*462 Activity No. Class A Concrete major in old CMS replaced by 84.01.a.i. Cast in situ concrete, Class C-30 in all super structure parts, abutment back wall and walls foundation
UF : Utilization Factor
** As required
*462 Activity No. Class A Concrete major in old CMS replaced by 84.01.a.ii. Cast in situ concrete, Class C-20/25 in abutment and walls footing pads
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*466 Activity No. Class C Concrete major in old CMS replaced by 84.01.a.iii. Cast in situ concrete, Class C-15/19 concrete in blinding
UF : Utilization Factor
** As required
*462 Activity No. Class A Concrete major in old CMS replaced by 84.06 Approach slab for Bridges class C-25/29 Concrete, Approach slabs for new bridges of class C25/19Concrete
UF : Utilization Factor
** As required
Work Item : 87.03.i. Bridge Bearings, Supply and installation of Production rate (per SPD) : 8.00 m/day
Elastomeric Bearings as shown on the drawing,
Elastomeric Bearing
Production rate (per Hour) : 1.00 m/hr
1
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*478 Activity No. Bridge Railing Concrete in old CMS replaced by 87.07. Concrete Bridge Parapets/Railings, Class C-30/25 Concrete
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*464 Activity No. Class B Massonary major in old CMS replaced by 89.01.b.i. Stone Massonery Structures, Class B Cement Mortared Stone Massonery walls (1:3 Mortar ratio) for culverts and other
mislaneaous structures
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*464 Activity No. Class B Massonary major in old CMS replaced by 89.01.b.ii. Stone Massonery Structures, Class B Cement Mortared Stone Massonery walls (1:3 Mortar ratio) for Construction of RW,
Check dams
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 89.03. Repointing of existing Massonery walls Production rate (per SPD) : 20 - 25 m2/day
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 93.01. Galvanized Guardrails on steel posts, complete Production rate (per SPD) : 30.00 m/day
UF : Utilization Factor
** As required
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 21.01 Clearing and Grubbing Production rate (per SPD) : 1.3 - 1.5 Ha/day
Production rate (per Hour) : 0.16 - 0.19 Ha/hr
* 411 Activity No. in old CMS replaced by 21.01 Clearing & Grubbing
con.form
UF : Utilization Factor
1
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 31.01.a Excavating Soft Material to any depth Production rate (per SPD) : 200 - 250 m3/day
* 451 Activity No. Structural Excavation minor in old CMS replaced by 31.01.a Excavating Soft Material to any depth
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 31.01.b. Excavating Hard Material to any depth Production rate (per SPD) : 80 - 100 m3/day
* 451 Activity No. Structural Excavation minor in old CMS replaced by 31.01.b. Excavating Hard Material to any depth
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 32.02..a Back filling using the excavated Material Production rate (per SPD) : 150 - 180 M3/day
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 32.02.b. Back filling using imported selected material Production rate (per SPD) : 150 - 180 M3/day
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 32.01.a.i Excavation in soft material, 0m up to 1.5m Production rate (per SPD) : 200 - 250 m3/day
* 451 Activity No. Structural Excavation minor in old CMS replaced by 32.01.a.i Excavation in soft material, 0m up to 1.5m
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 451 Activity No. Structural Excavation minor in old CMS replaced by 32.01.a.ii Excavation in soft material, Exceeding 1.5m and up to 3m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 451 Activity No. Structural Excavation minor in old CMS replaced by 32.01.a.iii Excavation in soft material, Extra in increament of 1.5m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 451 Activity No. Structural Excavation minor in old CMS replaced by 32.01.b EO item 32.01 (a) for excavation in hard material irrespective of depth
UF : Utilization Factor
* 422 Activity No. Quarry rock Production in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 423 Activity No. Quarry rock Hauling in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 424 Activity No. Concrete Aggregate Crushing in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 452 Activity No. Pipe production in old CMS replaced by this activity
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 452 Activity No. Pipe production in old CMS replaced by this activity
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 452 Activity No. Pipe production in old CMS replaced by this activity
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.i.a. Concrete Pipe Culverts, on class A Bedding, 900mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.i.b. Concrete Pipe Culverts, on class A Bedding, 1060mm diam
UF : Utilization Factor
** As required
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.i.c. Concrete Pipe Culverts, on class A Bedding, 1220mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.ii.a. Concrete Pipe Culverts, on class B Bedding, 900mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Project : Shire Airfield upgrading project Production rate (per SPD) : 15.00 m/day
32.03.ii.b. Concrete Pipe Culverts, on class B Bedding,
Work Item : Production rate (per Hour) : 1.88 m/hr
1060mm diam
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.ii.b. Concrete Pipe Culverts, on class B Bedding, 1060mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 453 Activity No. Pipe Installation in old CMS replaced by 32.03.ii.c. Concrete Pipe Culverts, on class B Bedding, 1220mm diam
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Project : Shire Airfield upgrading project Production rate (per SPD) : 15 - 18 M2/day
Work Item : Form Work for minor Structure Production rate (per Hour) : 1.87 - 2.25 M2/hr
* 457 Activity No.Form work minor in old CMS replaced by this activ
UF : Utilization Factor
** As required
* 454 Activity No. class A concrete Minor in old CMS replaced by 32.07.a.i. Cast insitu concrete and form work, Concrete including form work, Class 25/20 Concrete in class A Bedding
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 458 Activity No. class C concrete Minor in old CMS replaced by 32.07.a.i. Cast insitu concrete and form work, Concrete including form work, Class 25/20 Concrete in class A Bedding
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 452 Activity No. Pipe production in old CMS replaced by this activity
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 454 Activity No. class A concrete Minor in old CMS replaced by 33.01.a. Kerbing, class 25/20 concrete curbing (0.17m*0.45m)
UF : Utilization Factor
** As required
* 465 Activity No. Form work major in old CMS replaced by this activity
UF : Utilization Factor
** As required
UF : Utilization Factor
** As required
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 454 Activity No. class A concrete Minor in old CMS replaced by 33.08a. Concrete lining for open drains, Class 25/20 concrete as per detail
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 456 Activity No. class B massonary Minor in old CMS replaced by 33.16.a. Paved drains in towns, U or Trapizoidal shaped massonery drains in towns as per the drawing
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 454 Activity No. class A concrete Minor in old CMS replaced by 33.16.b.i. Paved drains in towns, Class 25/20 reinforced concrete drains cover units including reinforcement and
formwork as per detail, Pedesterian crossing cover as shown on the drawing (Ass. 2m*1.32m*.15m dimension)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 454 Activity No. class A concrete Minor in old CMS replaced by 333.16.b.ii. Paved drains in towns, Class 25/20 reinforced concrete drains cover units including reinforcement and
formwork as per detail, Vehicle crossing cover as shown on the drawing
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 471 Activity No. Paved waterway Grouted in old CMS replaced by 34.01.b.i Grouted stone pitching, Grouted stone pitching at culverts
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 471 Activity No. Paved waterway Grouted in old CMS replaced by 34.01.b.ii Grouted stone pitching, Grouted stone pitching rural ditch
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 471 Activity No. Paved waterway Grouted in old CMS replaced by 34.01.b.iv Grouted stone pitching, Grouted stone pitching at bridges
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 456 Activity No. Class B Massonary in old CMS replaced by 34.03.b. Stone masonery walls, Cement mortared stone walls (1:3 mortar ratio)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 418, 419A & 419B Activity No. Road Bed Preparation in old CMS replaced by 41.03.b. Road bed Preparation and the compaction of material, Compaction to 93% of modified
AASHTO density depth
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 418, 419A & 419B Activity No. Road Bed Preparation in old CMS replaced by 41.04.a. In situ treatment of road bed, in situ treatment by ripping
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
* 421 B Activity No. Borrow material Production in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : Borrow Material Hauling Av.Dis 2 km Production rate (per SPD) : 2000 - 2400 m3/day
Av.Sp. 35 km/hr Production rate (per Hour) : 250 - 300 m3/hr
t for L/Unl 5m
* 413 B Activity No. Borrow material hauling in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*412 A & 412 B Activity No. Common Excavation & Embankment in old CMS replaced by 42.01.a. Cut and Borrow to fill, Material in layer thickness of 200mm and less compacted to
93% modified AASHTO density
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*413 A & 417 Activity No. Borrow Excavation & Embankment & Borrow Placing in old CMS replaced by 42.01.b.ii. Improved subgrade or Capping layer, Improved subgrade layer
compacted to 95% of modified AASHTO density
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : Waste Desposal Av.Dis 3 km Production rate (per SPD) : 1400 - 1600 m3/day
Av.Sp. 25 Km/hr Production rate (per Hour) : 175 - 200 m3/hr
t for L/Unl 5m
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*415 A & 415 B Activity No. Unclassified Excavation & Embankment in old CMS replaced by 42.03.a. Cut to spoil material obtained from, Soft excavation
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*414 Activity No. Rock Excavation in old CMS replaced by 42.03.b. Cut to spoil material obtained from, Hard excavation
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*421 A Activity No. Select Material Production (Subbase) in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : Gravel Sub base Material Hauling Cap. 14m3 Production rate (per SPD) : 1800 - 2000 m3/day
Av.Dis 10km Production rate (per Hour) : 225 - 250 m3/hr
Av.Sp. 40 km/hr
tfor L/Unl 5m
*431 Activity No. Select Material Hauling (Subbase) in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*432 Activity No. Select Material Placing (Subbase) in old CMS replaced by 51.01.a.ii. Unstablised gravel subbase compacted to 97 % of modified AASHTO density layer thickness,
150mm layer thickness
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*425 Activity No. Rock crushing for Base Course in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Cap. 14m3
Project : Shire Airfield upgrading project Av.Dis 20 km
Work Item : Crushed Base Course Material Hauling Av.Sp. 60 km/hr Production rate (per SPD) : 1600 - 1800 m3/day
*433 Activity No. Base Course hauling in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*429 Activity No. Base Course material mixing in old CMS replaced by this activity
UF : Utilization Factor
*434 A & 434 B Activity No. Select Material Placing in old CMS replaced by 52.01.b.ii. Crushed stone base compacted to 100% of modified AASHTO density, layer thickness 175mm or
as shown on the drawing
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*437 Activity No. Prime coat application in old CMS replaced by 61.01.a. Prime Coat, MC-30 cut back bitumen applied at 0,8lit per sq.m
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*426 Activity No. Surface aggregate crushing in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*442 Activity No. Batch Plant Operation in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : Asphalt Hot Mix Hauling Av. Dis 20 km Production rate (per SPD) : 375 - 400 m3/day
Av. Sp. 60 km/hr Production rate (per Hour) : 46.87 - 50 m3/hr
t for L and Ul 5m
*443 Activity No. Asphalt mix hauling in old CMS replaced by this activity
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*444 Activity No. Asphalt mix hauling in old CMS replaced by 64.02.a.iii. Asphalt concrete surfacing course; continuously graded course grading 50mm thick, asphalt concrete surface
course with 60/70 penetration grade bitumen
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
Cap. 14 m3
Work Item : Massonery Rock Hauling Av.Sp. 30 km/hr Production rate (per SPD) : 680 - 720 m3/day
t for L/Unl 5m Production rate (per Hour) : 85 - 90 m3/hr
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Cap. 9m3
Work Item : Sand Production and Hauling Av.Sp. 30 km/hr Production rate (per SPD) : 650 - 750 m3/day
t for L/Unl 5m Production rate (per Hour) : 81.25 - 93.75 m3/hr
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*461 Activity No. Structural Excavation major in old CMS replaced by 81.02.a.i. Excavating Material with in the following succecive depth ranges, 0m up to 2m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*461 Activity No. Structural Excavation major in old CMS replaced by 81.02.a.ii. Excavating Material with in the following succecive depth ranges, Exceeding 2m and up to 4m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*461 Activity No. Structural Excavation major in old CMS replaced by 81.02.a.iii. Excavating Material with in the following succecive depth ranges, Extra increment of 1m
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*461 Activity No. Structural Excavation major in old CMS replaced by 81.02.b EO item 81.02. (a) for hard excavation irrespective of depth
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
Project : Shire Airfield upgrading project Production rate (per SPD) : 15 - 18 M2/day
Work Item : 82.01.a. Form Works to Provide all class of finishes Production rate (per Hour) : 1.87 - 2.25 M2/hr
(Assuming 5cm lumber thickness)
* 465 Activity No.Form work minor in old CMS replaced by 82.01.a. Form Works to Provide all class of finishes (Assuming 5cm lumber thickness)
UF : Utilization Factor
** As required
*463 Activity No. Reinforcement Steel major in old CMS replaced by 83.01.a. Steel reinforcement for structures, Mild steel bars (Grade 300)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*463 Activity No. Reinforcement Steel major in old CMS replaced by 83.01.b. Steel reinforcement for structures, Mild steel bars (Grade 420)
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*462 Activity No. Class A Concrete major in old CMS replaced by 84.01.a.i. Cast in situ concrete, Class C-30 in all super structure parts, abutment back wall and walls foundation
UF : Utilization Factor
** As required
*462 Activity No. Class A Concrete major in old CMS replaced by 84.01.a.ii. Cast in situ concrete, Class C-20/25 in abutment and walls footing pads
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*466 Activity No. Class C Concrete major in old CMS replaced by 84.01.a.iii. Cast in situ concrete, Class C-15/19 concrete in blinding
UF : Utilization Factor
** As required
*462 Activity No. Class A Concrete major in old CMS replaced by 84.06 Approach slab for Bridges class C-25/29 Concrete, Approach slabs for new bridges of class C25/19Concrete
UF : Utilization Factor
** As required
Work Item : 87.03.i. Bridge Bearings, Supply and installation of Production rate (per SPD) : 8.00 m/day
Elastomeric Bearings as shown on the drawing,
Elastomeric Bearing
Production rate (per Hour) : 1.00 m/hr
1
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*478 Activity No. Bridge Railing Concrete in old CMS replaced by 87.07. Concrete Bridge Parapets/Railings, Class C-30/25 Concrete
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*464 Activity No. Class B Massonary major in old CMS replaced by 89.01.b.i. Stone Massonery Structures, Class B Cement Mortared Stone Massonery walls (1:3 Mortar ratio) for
culverts and other mislaneaous structures
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
*464 Activity No. Class B Massonary major in old CMS replaced by 89.01.b.ii. Stone Massonery Structures, Class B Cement Mortared Stone Massonery walls (1:3 Mortar ratio) for
Construction of RW, Check dams
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 89.03. Repointing of existing Massonery walls Production rate (per SPD) : 20 - 25 m2/day
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Work Item : 93.01. Galvanized Guardrails on steel posts, complete Production rate (per SPD) : 30.00 m/day
UF : Utilization Factor
** As required
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
Limestone Ammonium
ton
Nitrate
Planting og grass cuttinm2
UF : Utilization Factor
** As required
1
ETHIOPIAN CONSTRUCTION WORKS CORPORATION
PROJECT ACTIVITY PERFORMANCE
UF : Utilization Factor
** As required