Bill of Quantity
Bill of Quantity
SUMMARIZED
BILL OF QUANTITY
2013
TABLE OF CONTENTS
SERIES 1000: GENERAL 5
1300 CONTRACTOR'S ESTABLISHMENT ON SITE 5
1400 ACCOMMODATION, SERVICES, AND ATTENDANCE FOR THE ENGINEER'S STAFF 5
1500 TRAFFIC MANAGEMENT 6
1600 SOCIAL, HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION AND MITIGATION MEASURES
6
SERIES 2000: SITE CLEARANCE 8
2100 CLEARING AND GRUBBING 8
2200 DEMOLITION, REMOVAL, DISPOSAL, STORAGE OR CLEANING OF EXISTING STRUCTURES
8 AND INSTALLATIONS
SERIES 3000: DRAINAGE STRUCTURES 9
3100 OPEN DRAINS, CASCADES, BANKS, DYKES AND SUB-SOIL DRAINS 9
3200 CULVERTS AND APPURTENANT STRUCTURES 10
3300 KERBING, CHANNELLING, OPEN CHUTES, DOWNPIPES, AND LINING OF OPEN DRAINS 12
3400 STONE PITCHING, MASONRY, PRECAST CONCRETE BLOCK AND RIPRAP 13
3500 DRAINAGE STRUCTURE PROTECTION 14
SERIES 4000: EARTHWORK & MATERIAL STABILIZATION 15
4100 PREPARATION OF ROADBED 15
4200 ROADWAY AND BORROW EXCAVATION 15
4300 BORROW MATERIALS 15
4400 EMBANKMENT CONSTRUCTION 16
4500 MATERIAL STABILISATION 16
SERIES 5000: SUB BASE, ROAD BASE AND GRAVEL WEARING COURSE 18
5100 SUB-BASES 18
5200 ROAD BASES (EXCLUDING BITUMINOUS BASES) 18
5300 BREAKING UP EXISTING PAVEMENT LAYERS 20
5400 GRAVEL WEARING COURSE AND GRAVEL SHOULDERS 20
5500 HAND-PACKED STONE PAVING AND MORTARED HAND-PACKED STONE PAVING 21
5600 STONE SETTS AND COBBLESTONE PAVING 21
5700 FIRED CLAY BRICK PAVEMENT 21
SERIES 6000: BITUMINOUS SURFACING AND ROAD BASE 22
6100 BITUMINOUS PRIME COAT 22
6200 TACK COAT 22
6300 SURFACE SEALS 22
6400 ASPHALT ROAD BASE AND SURFACINGS 23
6500 SURFACING OF BRIDGE DECKS 25
6600 TREATMENT OF CERTAIN DEFECTS IN EXISTING BITUMINOUS SURFACING 25
6700 BITUMINOUS ROAD-MIX SURFACING 26
SERIES 7000: RIGID PAVEMENTS 27
7100 RIGID (CONCRETE) PAVEMENT 27
7200 ULTRA-THIN REINFORCED CONCRETE PAVEMENT 29
7300 NON-REINFORCED CONCRETE PAVEMENT (NRC) 29
SERIES 8000: STRUCTURES 30
8100 FOUNDATIONS FOR STRUCTURES 30
8200 FALSEWORK, FORMWORK, AND CONCRETE FINISHES 32
8300 STEEL REINFORCEMENT FOR STRUCTURES 33
8400 CONCRETE FOR STRUCTURES 33
8500 TIMBER STRUCTURES 33
8600 PRE-STRESSING 33
8700 BRIDGE BEARINGS, PARAPETS, RAILINGS, FOOTWAYS, NO-FINES CONCRETE, WATERPROOFING
33
8800 STRUCTURAL STEELWORK 35
8900 STONE MASONRY STRUCTURES 35
81000 MECHANICALLY STABILISED EARTH 35
SERIES 9000: ANCILLARY WORKS 36
9100 GABIONS AND MATTRESSES 36
9200 DELINEATORS, MARKERS AND KILOMETRE POSTS 36
9300 GUARDRAILS 36
9400 ROAD SIGNS 36
9500 ROAD TRAFFIC MARKINGS, ROAD STUDS AND TRAFFIC CALMING 37
9600 LANDSCAPING AND GRASSING 37
9700 PAINTING OF STEEL 37
9800 FENCING 37
9900 FOOTWAYS AND MASONRY AND CONCRETE SAFETY BARRIERS 38
SERIES 11000: DAYWORKS 39
11E00 0EQUIPMENT 39
11L00 LABOUR 42
11M00 MATERIAL 43
(b) Laboratory fully fitted, furnished and equipped including all services month
Housing Accommodation fully fitted, furnished and equipped
(c) including all services
(i) Type A houses month
(ii) Type B houses month
(iii) Type C houses month
(iv) Type D houses month
(d) Vehicles including all operating costs
(i) Type A month
(ii) Type B month
(iii) Type C month
(e) Surveying equipment month
14.12 Communication Equipment for the Engineer
(a) Radio equipment LS
(b) SIM card for mobile phone (work-related usage) no
(c) Airtime for work-related SIM card airtime/month
1500 TRAFFIC MANAGEMENT
15.01 Temporary Diversions
(a) Construction of diversions km
(b) Maintenance of Diversion km
(c) Reinstatement of Diversion km
(d) Traffic Management – full width km
1600 (e)
SOCIAL,Traffic Management
HEALTH, SAFETY – half-width km
AND ENVIRONMENTAL PROTECTION AND MITIGATION
MEASURES
16.01 Preparation of a Management Plans
(a) Site Environmental and Social Management Plan (SESMP) LS
(b) Health and Safety Management Plan (HSMP) LS
Provision of Occupational Health and Safety Equipment with Worker
16.02 Training LS
Provision of a suitably equipped and staffed Clinic in the main
construction camp; and the provision of first aid equipment, kits and
medical supplies, sick bay and a suitable ambulance service at all
16.03 camps on the site LS
Watering of the road under construction, temporary diversions, and
16.04 access and haul roads at settlement areas km
16.05 STD and HIV/AIDS Prevention and Control Programme
Preparation of action plans on STD and HIV/AIDS alleviation
measures, provision of information and educational materials,
counselling and testing services and establishment and training of
(a) peer educators and Anti-AIDS Committees PS
(b) Percentage allowed for overhead and profit on item 16.05 (a) %
16.06 Liaison with Communities and Local Authorities
(f) Chamber covers and frames, gully gratings and frames and the like no
(g) Individual blocks, features or stones no
22.04 Cleaning of existing open drainage structures m
22.05 Removal of existing road pavements m3
22.06 Removal of existing concrete and masonry structures
(a) Plain concrete m3
(b) Reinforced concrete m3
(c) Masonry Structures - mortared m3
(d) Masonry Structures - dry m3
SERIES 3000: DRAINAGE STRUCTURES
Item Code Item Description Unit Measure
31.11 Composite in-plane drainage systems (state size, type, grade, etc) m
Concrete outlet structures, manhole boxes, junction boxes and
31.12 cleaning eyes for subsoil drainage systems
(a) Outlet structures no
(b) Manholes boxes no
(c) Junction boxes no
(d) Cleaning eyes no
31.13 Concrete caps for subsoil drain pipes no
31.14 Repairing or replacing existing drainage systems PS
31.15 Backfilling existing eroded side drains m3
31.16 Test flushing of pipe subsoil drains no
31.17 Excavation for the clearing of existing drainage Systems
(a) Manholes and inlet and outlet structures m3
(b) Culvert barrels m3
(c) Concrete side drains m3
31.18 Cascades m
3200 CULVERTS AND APPURTENANT STRUCTURES
32.01 Excavation
Excavating soft material situated within the following depth ranges
(a) below the surface level
(i) 0 to 1.5m m3
(ii) 1.5m to 3.0m m3
(iii) > 3m in increments of 1.5m m3
Extra over sub item 32.01(a) for excavation in hard material,
(b) irrespective of depth m3
32.02 Backfilling
(a) Using the excavated material m3
(b) Using imported selected material m3
Extra over sub-items 32.02(a) and (b) for soil cement backfilling
(c) (percentage of cement indicated) m3
32.03 Concrete pipe culverts
(a) On Class A bedding (type, length and diameter indicated) m
(b) On Class B bedding (type, length and diameter indicated) m
(c) On Class C bedding (type, length and diameter indicated) m
(d) On Class D bedding (type, length and diameter indicated) m
32.04 Metal and other culverts
(a) Size, wall thickness and type indicated m
(b) Cutting of bevelled or skew ends (size and type indicated) no
32.05 Extra-over items 32.03 and 32.04 for constructing inclined culverts m
32.06 Cast in-situ concrete and formwork
In Class A bedding, screeds and the encasing for pipes, including
(a) formwork (class of concrete indicated) m3
In inlet and outlet structures, skewed ends, catchpits, manholes,
thrust and anchor blocks, excluding formwork but including Class U2
(b) surface finish (class of concrete indicated) m3
(c) Formwork of concrete under Item 32.06 (b) (type of finish indicated) m2
In concrete linings for the inverts of metal culverts under Item 32.04,
including formwork and class U2 surface finish (class of concrete
(d) indicated) m3
32.07 Concrete backfill for culverts (class indicated) m3
32.08 Prefabricated/Precast concrete inlets and outlets to culverts no
32.09 Steel reinforcement
(a) Mild steel (grade specified) ton
(b) High tensile steel (grade specified) ton
(c) Mild steel mesh kg
(d) High tensile steel mesh kg
32.1 Dowels for joining old and new concrete kg
32.11 Removal, stacking and relaying
(a) existing pipes (size and type of bedding indicated) m
(b) existing prefabricated culverts (type and size indicated) m
Treating surfaces with epoxy resin for joining new to old concrete
32.12 (type of epoxy resin specified) litre
Protective mastic asphalt coating for corrugated metal culvert units
32.13 (state whether to be applied by brush or by spray gun) m2
32.14 Manhole and catchpit structures complete
(a) Manholes (type indicated) no
(b) Catchpits (type indicated) no
Extra over or less than sub-item 32.16(a) for variations in the depths
of manholes from the standard depth designated for tendering
(c) purposes (standard depth and type of manhole indicated) m
Extra over or less than sub-item 32.16(b) for variations in the depths
of catchpits from the standard depth designated for tendering
(d) purposes (standard depth and type of catchpit indicated) m
32.15 Anchors for pipes (description) no
32.16 Service ducts
(a) Ordinary pipes (type and diameter indicated) m
(b) Split pipes (type and diameter indicated) m
32.17 Duct marker blocks (type indicated) no
32.18 Chambers for ducts no
32.19 Hand excavation to determine the positions of existing services m3
32.2 Reinstating trenches crossing roads
(a) Selected layers m2
(b) Sub-base m2
(c) Base (including prime coat) m2
(d) Bituminous surfacing (including tack coat) m2
(e) Kerbing m
Prefabricated reinforced concrete skew end units for concrete
culverts constructed at a skew angle (type and dimensions of unit
32.21 and class of bedding indicated) no
3300 KERBING, CHANNELLING, OPEN CHUTES, DOWNPIPES, AND LINING OF OPEN
DRAINS
33.01 Kerbing
Concrete kerbing (class of concrete indicated for in-situ concrete)
(a) (Descriptions of type with reference to Drawing) m
(b) Concrete kerbing (precast) m
Stone kerbing (type of stone indicated) (Descriptions of type with
(c) reference to Drawing) m
(d) Asphalt kerbing m
33.02 Kerbing-Channelling combination
Concrete (class of concrete indicated for in-situ concrete)
(a) (Descriptions of type with reference to Drawing) m
(b) Concrete kerbing (precast) m
Stone (type of stone indicated) (Descriptions of type with reference
(c) to Drawing) m
(d) Asphalt kerbing m
33.03 Chutes
Concrete (class of concrete indicated for in-situ concrete)
(a) (Descriptions of type with reference to Drawing) m
Stone (type of stone indicated) (Descriptions of type with reference
(b) to Drawing) m
33.04 Cast in-situ concrete chutes
(a) Concrete (class indicated) m3
(b) Formwork (surface finish indicated) m2
33.05 Inlet, outlet, transition and similar structures (typical designs)
Concrete (description of structure, type, etc, with reference to
(a) Drawing and class of concrete) no
Stone masonry (description of structure, type, etc, with reference to
(b) Drawing) no
33.06 Inlet, outlet, transition and similar structures
(a) Concrete (class indicated) m3
(b) Stone masonry (class indicated) m3
(c) Formwork (surface finish indicated) m2
33.07 Trimming of excavations for concrete-lined open drains
(a) In soft material m2
(b) In hard material m2
Selected backfill material under concrete-lined side drains
33.08 compacted to 93% of modified AASHTO density m3
33.09 Concrete lining for open drains
Cast in-situ concrete lining (concrete and type of open drain
(a) indicated) m3
Class U2 surface finish to cast in-situ concrete (type of open drain
(b) indicated) m2
Formwork to cast in- situ concrete lining for open drains (class F2
33.1 surface finish)
(a) To sides with formwork on the internal face only m2
To sides with formwork on both internal and external faces (each
(b) face measured) m2
(c) To ends of slabs m2
Sealed joints in concrete linings of open drains (description of type
33.11 with reference to drawing) m
Concrete screed or backfill below chutes (class of concrete
33.12 indicated) m3
33.13 Steel reinforcement
(a) Mild steel bars (grade specified) ton
(b) High-tensile steel bars (grade specified) ton
(c) Welded steel fabric kg
33.14 Polyethylene sheeting for concrete-lined open drains m2
Cutting bituminous surfacing and pavement layers for concrete
33.15 kerbing, channeling or concrete-lined drains m
33.16 Pre-cast concrete blocks in outlet structures (size specified) no
33.17 Paved Drains in Urban Areas and Reinforced Drain Covers
(a) U-shaped drains in urban areas (as per Drawings)
(i) Stone Masonry (structure, type, size and dimensions indicated) m
(ii) Concrete (structure, type, size and dimensions indicated) m
(b) Reinforced Concrete Drain Covers (as per Drawings)
42.02 Extra over item 42.01 for excavating and breaking down material
(a) Common (normal or soft) excavation m3
(b) Rock (hard) excavation m3
42.03 Cut to spoil
(a) Common (normal or soft) excavation m3
(b) Rock (Hard) excavation m3
42.04 Stockpiling of material m3
42.05 Widening of cuts (extra over items 42.01, and 42.03)
(a) In rock (hard) material m3
(b) In all other materials m3
42.06 Crushing and screening
(a) Single stage crushing m3
(b) Two-stage crushing m3
(c) Screening m3
(c) Multi-stage crushing and screening m3
4300 BORROW MATERIALS
43.01 Reinstatement of borrow areas
(a) Rock (hard) material ha
(b) Common (normal or soft) material ha
43.02 Establishing a crushing plant in borrow pits for crushed stone No
4400 EMBANKMENT CONSTRUCTION
Extra over item 42.01 for widening of fills as specified in sub-clause
44.01 4403(l)
(a) Cut to fill m3
(b) Borrow to fill m3
Extra over item 42.03 for spoiling material excavated from benches
44.02 constructed for widening existing fills m3
44.03 Sand fills (as described in sub-clause 4403(j) and 4402(d))
Non-plastic sand with up to 20% passing the 0.075mm sieve
(a) compacted to100% of modified AASHTO density m3
Non-plastic sand with more than 20% passing the 0.075 mm sieve
(b) compacted to 95% of modified AASHTO density m3
44.04 Rock Fill, Pioneer Layers and Sand Filter Blankets
(a) Rock fill m3
(b) Toes for rock fill embankments m3
(c) Pioneer layer m3
(d) Sand filter blanket m3
44.05 Side fills or Fill-flattening m3
4500 MATERIAL STABILISATION
Chemical stabilization (layer thickness indicated) extra over
45.01 unstabilised compacted layers (layer to be stabilized indicated) m3
45.02 Chemical stabilizing agent
(a) Ordinary Portland cement ton
(b) Portland blast-furnace cement ton
(c) Lime (type indicated) ton
(d) Other chemical stabilizing agents (type specified) ton
45.03 Mechanical modification (extra over untreated layer)
(a) By adding a soil binder m3
(b) By mixing materials from different sources m3
45.04 Bituminous stabilization (extra over the untreated layer) m3
45.05 Provision and application of water for curing K.lit.
45.06 Curing by covering with the subsequent layer m2
45.07 Bituminous stabilizing agent
(a) Anionic stable grade bituminous emulsion (60% net bitumen) litre
(b) Cationic stable grade bituminous emulsion (60% net bitumen) litre
(c) Other (specify) litre
45.08 Additives for bituminous stabilization
(a) Ordinary Portland cement ton
(b) Lime ton
45.09 Extra over item 46.01 for chemical stabilization in restricted areas
(a) Mixing in mechanical mixers m3
(b) In-situ mixing m3
(c) Mixing as for in-situ mixing but on adjacent surfaces m3
45.1 Extra over item 46.03 for mechanical modification in restricted areas
(a) Mixing in mechanical mixers m3
(b) In-situ mixing m3
(c) Mixing as for in-situ mixing but on adjacent surfaces m3
45.11 Extra over item 46.06 for bituminous stabilization in restricted areas
(a) Mixing in mechanical mixers m3
(b) In-situ mixing m3
(c) Mixing as for in-situ mixing but on adjacent surfaces m3
45.12 Extra over items 46.01 and 46.06 for trial sections m3
SERIES 5000: SUB BASE, ROAD BASE AND GRAVEL WEARING COURSE
Item Code Item Description Unit Measure
5100 SUB-BASES
51.01 Sub-base layer constructed from gravel or crushed stone
(b) Crusher fines for improving the grading of recovered crushed stone
(i) Material from approved borrow pits m3
(ii) Material from commercial sources m3
Extra over Pay item 52.04 for temporarily blading the material to
52.06 windrow m3
Extra over Pay item 52.03 for excavating material in existing
52.07 pavement layers in restricted areas
(a) Non-cemented material m3
(b) Cemented material m3
52.08 Trial sections
Gravel base (unstabilised or chemically stabilised) trial section
(thickness indicated) constructed in accordance with the provisions
(a) of this Division m2
Crushed-stone base trial section (thickness indicated) constructed in
(b) accordance with the provisions of this Division m2
5300 BREAKING UP EXISTING PAVEMENT LAYERS
Excavating and removing existing bituminous material (except milled
53.01 material)
(a) Material intended for recycling with the average depth of excavation
(i) Not exceeding 30mm m2
(ii) Exceeding 30mm but not exceeding 60mm m2
(iii) Exceeding 60mm m2
(b) Material to be disposed of with the average depth of excavation
Material to be disposed of with the average depth of excavation: Not
(i) exceeding 30mm m2
Material to be disposed of with the average depth of excavation:
(ii) Exceeding 30mm but not exceeding 60mm m2
Material to be disposed of with the average depth of excavation:
(iii) Exceeding 60mm m2
53.02 Milling out existing bituminous material with an average milling depth
(a) Not exceeding 30mm m3
(b) Exceeding 30mm but not exceeding 60mm m3
(c) Exceeding 60mm m3
Excavating and spoiling material from an existing pavement and/or
53.03 the underlying fill
(a) Non-cemented material m3
(b) Cemented material m3
53.04 Sawing or cutting asphalt or cemented pavement layers
(a) Sawing asphalt m2
(b) Cutting asphalt m
(c) Sawing cemented material m2
53.05 Removing the remaining asphalt from the underlying layer m2
53.06 Preparing stockpile sites m2
5400 GRAVEL WEARING COURSE AND GRAVEL SHOULDERS
Gravel Wearing course and Shoulder constructed from gravel taken
54.01 from cut or borrow pits
63.01 Single surface seal (indicate grade of aggregate and type of binder)
(a) Using 19.0 mm chippings m2
(b) Using 13.2 mm chippings m2
(c) Using 9.5 mm chippings m2
(d) Using 6.7 mm chippings m2
63.02 Double surface seal using
(a) 19.0 mm and 9.5 mm chippings (with specified binder) m2
(b) 13.2 mm and 6.7 mm aggregate (with specified binder) m2
63.03 Triple bituminous surface treatment using
(a) 26.5 mm, 13.2 mm and 6.7 mm chippings (with specified binder) m2
(b) 19.0 mm, 9.5 mm and 6.7 mm aggregate (with specified binder) m2
63.04 Single surface treatment and slurry (Cape Seal) using
(a) 19.0 mm chippings {state type and grade of binder and aggregate} m2
(b) 13.2 mm chippings {state type and grade of binder and aggregate} m2
63.05 Sand Seal using
(a) Sand seal {state type and grade of binder) m2
(b) Grit seal {state type and grade of binder} m2
63.06 Graded aggregate seal or Otta Seal
First layer or single graded aggregate/Otta seal (grading of material
(a) and type and grade of binder specified) m2
Second layer for double graded aggregate/Otta seal (grading of
(b) material and type and grade of binder specified) m2
63.07 Variations in the rate of application of Bituminous Binder
(a) 80/100 penetration-grade bitumen litre
(b) 150/200 penetration-grade bitumen litre
(c) 65% cationic spray grade emulsion litre
(d) 60% cationic spray grade emulsion litre
(e) 60% anionic spray grade emulsion litre
(f) Pre-coating fluid litre
(g) MC-3000 cutback bitumen litre
(h) Modified binders as classified in Table 6303/4 litre
63.08 Variations in the rate of application of Chippings
(a) 26.5 mm chippings m3
(b) 19.0 mm chippings m3
(c) 13.2 mm chippings m3
(d) 9.5 mm chippings m3
(e) 6.7 mm chippings m3
63.09 Application of fog spray
(a) 60% spray grade emulsion (indicate type) litre
(b) 30% spray grade emulsion (indicate type) litre
63.1 Pre-coating chippings (as specified) m3
63.11 Addition of wetting agent
(a) Providing and supplying pcs
(b) Handling, applying, profit and all other costs %
63.12 Aggregate for blinding
(a) Natural sand m3
(b) Crusher sand m3
Extra over item for surface treatment of areas inaccessible to
63.13 mechanical equipment
(a) For Single Seal m2
(b) For Double Seals m2
(c) For Triple Seals m2
(d) For Cape Seals m2
(e) For Sand Seals m2
(f) For Single Graded Aggregate/Otta Seals m2
(g) For Double Graded Aggregate/Otta Seals m2
63.14 Resurfacing at bridge joints
(a) Where the existing surface is not removed m
(b) Where the existing surface is removed m
63.15 Correction for bleeding using
(a) Chippings
(i) 13.2 mm chippings m3
(ii) 9.5 mm chippings m3
(iii) 6.7 mm chippings m3
(b) Pre-coating of chippings m3
(c) Treatment of surface m3
63.16 Supplying and mixing of kerosene for cutback bitumen litre
63.17 Variations in the rate of application of slurry m3
63.18 Variations in Active Filler content for Slurry Seal ton
63.19 Anti-striping agent lt
6400 ASPHALT ROAD BASE AND SURFACINGS
64.01 Bituminous road base
(a) Continuously graded m2
(b) Gap-graded m2
(c) Dense Bitumen Macadam m2
64.02 Asphaltic surfacing
64.14 Application of prime coat and/or tack coat to the edges of a layer litre
Extra over item 64.03 for applying rolled-in chippings in restricted
64.15 areas ton
64.16 Asphalt reinforcing complete (state type) m2
64.17 Variations from nominal mix ratios in recycled asphaltic mixes
(a) New binder ton
(b) New aggregate ton
(c) New active mineral filler ton
64.18 Variations in cellulose fibre content of stone mastic asphaltic mixes ton
64.19 Backfilling of excavations for patching with
(a) Asphaltic base ton
(b) Asphaltic surfacing ton
6500 SURFACING OF BRIDGE DECKS
65.01 Asphalt Surfacing on bridge deck
(a) Continuously graded (state grade) m2
(b) Gap-graded (state grade) m2
(c) Open-graded (state grade) m2
(d) Stone-mastic asphaltic (state maximum size of aggregate) m2
(e) Dense Bitumen macadam m2
65.02 Rolled-in chippings (nominal size indicated) in surfacing m3
6600 TREATMENT OF CERTAIN DEFECTS IN EXISTING BITUMINOUS SURFACING
66.01 Treatment with diluted bituminous emulsion (fog spray)
(a) 30% bitumen emulsion litre
(b) 40% bitumen emulsion litre
(c) 50% bitumen emulsion litre
(d) 60% bitumen emulsion litre
66.02 Texturing
(a) Tack coat litre
(b) Application of slurry seal with double-washed aggregate m3
66.03 Slurry seal
(a) Tack coat using 30% bitumen emulsion litre
(b) Slurry applied by hand m3
(c) Slurry applied by spreader box m3
(d) Slurry applied by hand ton
(e) Slurry applied by spreader box ton
66.04 Screed of bituminous concrete or coarse slurry
(a) Tack coat using 30% stable-grade bitumen emulsion litre
(b) Continuously-graded AC ton
(c) Coarse grade slurry m3
66.05 Repairing edge breaks in surfacing
(a) Tack coat using 30% bitumen emulsion litre
(b) Reconstructing edges using continuously-graded AC ton
66.06 Cleaning the cracks with compressed air km
66.07 Applying bituminous binders and herbicides for sealing cracks
(a) Herbicide litre
(b) Prime litre
(c) Anionic stable-grade emulsion litre
Modified Crack sealant (state type as classified in sub-clause
(d) 6602(a)) litre
(e) Other specified agents (type indicated) litre
66.08 Rolling the cracks m
66.09 Planing m2
66.1 Fog spraying on planed surfaces
(a) Hand spraying litre
(b) Spraying with mechanical equipment litre
66.11 Rolling planed surfaces m2-pass
66.12 Filling depressions in planed surfaces with AC ton
6700 BITUMINOUS ROAD-MIX SURFACING
67.01 Road-mix surfacing, Case 1 m2
67.02 Road-mix surfacing, Case 2 m2
67.03 Road-mix aggregate m3
67.04 Bituminous Binder (grade indicated) ton
(d) 150 mm cores drilled from the pavement for compressive strength no
Extra over item 81.17, irrespective of the depth, to form augered and
81.21 bored pile holes through identified obstructions consisting of
Coarse gravel with a matrix content of less than x% (maximum
(a) percentage to be indicated) m
(b) Boulders (description of and maximum size indicated) m
(c) Rock formation (description and class of rock indicated) m
Forming augered and bored pile holes through unidentified
81.22 obstructions
(a) Fixed cost PS
(b) Percentage allowed for overhead and profit on item 81.22 (a) %
Driving temporary casings for driven displacement piling systems or
installing prefabricated piles through identified or unidentified
81.23 obstructions
(a) Fixed cost PS
(b) Percentage allowed for overhead and profit on item 81.22 (a) %
81.24 Extra over items 81.17, 81.18 and 81.20 for raking piles
(a) Holes for piles of (diameter and rake indicated) m
Temporary casing for driven displacement pile systems (diameter
(b) and rake indicated) m
(c) Prefabricated piles (type, size and rate Indicated) m
81.25 Forming under-reams for piles no
81.26 Forming the bulbous bases for piles no
81.27 Socketing piles into rock formation no
81.28 Installing and removing temporary casings in augered holes for piles m
81.29 Installing permanent pile casing for piles m
81.3 Steel reinforcement in cast in situ piles
(a) Mild-steel bars ton
(a) High-yield stress-steel bars (type indicated) ton
Cast in situ concrete in piles, under reams, bulbous bases and
81.31 sockets m3
81.32 Extra over item 81.31 for concrete cast under water m3
81.33 Splicing/coupling prefabricated piles for lengthening no
81.34 Stripping/cutting the pile heads no
81.35 Establishment on the site of the load testing of piles ls
81.36 Load tests on piles no
81.37 Establishment on the site for core drilling ls
Moving the equipment to and assembling it at each location where
81.38 cores are to be drilled no
81.39 Drilling the cores (Diameter indicated) in
(a) Concrete m
(b) Founding formation
(i) Irrespective of hardness m
(ii) With a hardness of (hardness indicated) m
81.4 Standing time for pile-installation frame hr
81.41 Establishment on the site for constructing the caisson LS
81.42 Formwork for caissons m2
81.43 Steel reinforcement for caissons
(a) Mild-steel bars ton
(b) High-yield-stress-steel bars (type indicated) ton
81.44 Cast in situ concrete in caissons and concrete seals m3
81.45 Cutting edge for caissons no
81.46 Sinking caissons through material situated
(a) 0m up to 5m m
(b) Exceeding 5 m and up to 10 m m
(c) tc in increments of 5 m depths m
81.47 Excavation for caissons
Excavating soft material situated within the following successive
(a) depth ranges
(i) 0m up to 2m m3
(ii) Exceeding 2 m and up to 4 m m3
(iii) Etc in increments of 2 m depths m3
Extra over sub-pay item 81.47(a) for excavation in hard material
(b) irrespective of depth m3
81.48 Filling the caissons m3
81.49 Stripping the caisson heads no
8200 FALSEWORK, FORMWORK, AND CONCRETE FINISHES
82.01 Formwork for indicated class of finish m2
82.02 Vertical formwork for indicated class of finish m2
82.03 Horizontal formwork for indicated class of finish m2
82.04 Inclined formwork for indicated class of finish m2
82.05 Permanent formwork
To form voids of (diameter size of void indicated), in (description of
(a) member to which applicable) m2
(b) Of (description of material and member to which applicable) m2
82.06 Formwork to form open joints m2
82.07 Establishment on the site for sliding formwork operations LS
82.08 Transporting to and setting up the sliding formwork assembly no
82.09 Forming the concrete by sliding formwork for structures m
8300 STEEL REINFORCEMENT FOR STRUCTURES
83.01 Steel reinforcement for structure
(a) Steel bars (Size, Type, Class and Grade indicated) ton
(b) Welded steel fabric kg
83.02 Mechanical couplers for (diameter of bar indicated) no
83.03 Spacer "ladders" ton
8400 CONCRETE FOR STRUCTURES
84.01 Cast in situ concrete
(a) (Class of concrete and part of structure or use indicated) m3
Etc for other classes of concrete and other uses or parts of the
(a) structure m3
84.02 Manufacturing pre-cast concrete members no
84.03 Transporting and erecting pre-cast concrete members no
84.04 Portal and rectangular (Box or Slab) culverts
(a) Complete with pre-cast invert slabs (size and type indicated) m
(b) Without pre-cast invert slabs (size and type indicated) m
84.05 Epoxy bonding of new concrete surfaces to old m2
84.06 Demolishing existing concrete
(a) Plain concrete (Member indicated) m3
(b) Reinforced concrete (Member indicated) m3
8500 TIMBER STRUCTURES
85.01 Untreated structural timber and lumber MBM
85.02 Treated structural timber and lumber MBM
8600 PRE-STRESSING
86.01 Pre-stressing tendons
(a) Longitudinal Tendons (size, class & grade stated) m
(b) Transverse Tendons (size, class & grade stated) m
(c) Vertical Tendons (size, class & grade stated) m
86.02 Anchorages and couplers
(a) Anchorage at jacking end (size stated) no
(b) Anchorage at dead end (size stated) no
(c) Coupler at jacking end (size stated) no
8700 (d)
BRIDGECoupler at dead end
BEARINGS, (size stated)
PARAPETS, no
RAILINGS, FOOTWAYS, NO-FINES CONCRETE,
WATERPROOFING
87.01 Proprietary bearings
(a) Prime cost sum allowed for purchasing and taking delivery of bearing PCS
(b) Percentage on prime cost sum for charges and profit %
87.02 Installing the proprietary bearings no
87.03 Bearings no
87.04 Concrete hinges
(a) (Description of hinge measured per meter) m
(b) (Description of hinge measured by number) no
87.05 Bearing strips m2
87.06 Dowels/guides no
87.07 Concrete parapets m
87.08 Steel railings m
87.09 End blocks no
87.1 Numbers for structures
(a) Number plates no
(b) Painted numbers no
(c) Numbers formed in concrete no
87.11 Proprietary expansion joints
(a) Prime cost sum allowed for purchasing and taking delivery of expansio PCS
(b) Percentage on prime cost sum for charges and profit %
87.12 Installation of proprietary expansion joints
(a) (Description of joint measured per meter) m
(b) (Description of joint measured by number) no
87.13 Expansion joints
(a) (Description of joint measured per meter) m
(b) (Description of joint measured by number) no
87.14 Filled joints
(a) Filled joints (Description of joint and thickness of joint filler for join m2
(b) Filled joints (Description of joint and thickness of joint filler for joint m
87.15 Unfilled joints
(a) Unfilled joints (Description of joint for joints measured per square met m2
(b) Unfilled joints (Description of joint for joints measured per linear meter m
87.16 Sealing joints with
(a) Sealant (description of joint, sealant and size) m
(b) Water stop (description of joint, water stop and size) m
87.17 Cast in situ no- fines concrete m3
87.18 Precast no-fines concrete units no
87.19 Drainage pipes and weep holes
(a) Drainage pipes
(i) Type and size indicated) m
(ii) (Type and size indicated) no
(b) Weep holes
(i) (Type and size indicated) m
(ii) (Type and size indicated) no
87.2 Drainage gullies no
87.21 Synthetic-fiber filter fabric m2
87.22 Concrete channeling m
87.23 Crushed stone in drainage strips m3
87.24 Nose-endings at balustrades no
87.25 Concrete transition blocks no
8800 STRUCTURAL STEELWORK
88.01 Structural steel
(a) Structure and steel quality described) ton
(b) Structure and steel quality described) m
(c) Structure and steel quality described) no
88.02 Anchor bolts
(Description of each assembly, and grade/type of steel, diameter
(a) and length indicated) kg
(Description of each assembly, and grade/type of steel, diameter
(b) and length indi) no
88.03 Corrosion protection
(a) Sprayed-on metal
(i) (Type of metal and thickness or type symbol of coating indicated) ton
(c) Percentage allowed for overhead and profit on item 96.05 (a) & (b) %
9700 PAINTING OF STEEL
97.01 Preparation of steelwork prior to coating
(a) Preparation of bare metal surfaces m2
(b) Preparation of existing metal surfaces m2
97.02 Protective system to steelwork
(a) Protective system to bare metal surfaces m2
(b) Protective system to existing steelwork m2
9800 FENCING
98.01 Fencing km
98.02 New gate (size and type indicated) no
98.03 Moving of existing fences and gates
(a) Fences km
(b) Moving of gates no
9900 FOOTWAYS AND MASONRY AND CONCRETE SAFETY BARRIERS
99.01 Footway m2
99.02 Safety Barrier
(a) Masonry m
(b) Precast Concrete (cross-sectional dimensions specified) m