Bill of Quantity

The document is a summarized Bill of Quantity for the Ethiopian Roads Authority, detailing various construction and engineering works required for road projects. It includes sections on general provisions, site clearance, drainage structures, earthwork, material stabilization, and ancillary works, among others. Each section outlines specific tasks, item codes, descriptions, and unit measures for accurate project estimation and execution.

Uploaded by

Abudi Kasahun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
73 views79 pages

Bill of Quantity

The document is a summarized Bill of Quantity for the Ethiopian Roads Authority, detailing various construction and engineering works required for road projects. It includes sections on general provisions, site clearance, drainage structures, earthwork, material stabilization, and ancillary works, among others. Each section outlines specific tasks, item codes, descriptions, and unit measures for accurate project estimation and execution.

Uploaded by

Abudi Kasahun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 79

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA

ETHIOPIAN ROADS AUTHORITY

SUMMARIZED
BILL OF QUANTITY

2013

TABLE OF CONTENTS
SERIES 1000: GENERAL 5
1300 CONTRACTOR'S ESTABLISHMENT ON SITE 5
1400 ACCOMMODATION, SERVICES, AND ATTENDANCE FOR THE ENGINEER'S STAFF 5
1500 TRAFFIC MANAGEMENT 6
1600 SOCIAL, HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION AND MITIGATION MEASURES
6
SERIES 2000: SITE CLEARANCE 8
2100 CLEARING AND GRUBBING 8
2200 DEMOLITION, REMOVAL, DISPOSAL, STORAGE OR CLEANING OF EXISTING STRUCTURES
8 AND INSTALLATIONS
SERIES 3000: DRAINAGE STRUCTURES 9
3100 OPEN DRAINS, CASCADES, BANKS, DYKES AND SUB-SOIL DRAINS 9
3200 CULVERTS AND APPURTENANT STRUCTURES 10
3300 KERBING, CHANNELLING, OPEN CHUTES, DOWNPIPES, AND LINING OF OPEN DRAINS 12
3400 STONE PITCHING, MASONRY, PRECAST CONCRETE BLOCK AND RIPRAP 13
3500 DRAINAGE STRUCTURE PROTECTION 14
SERIES 4000: EARTHWORK & MATERIAL STABILIZATION 15
4100 PREPARATION OF ROADBED 15
4200 ROADWAY AND BORROW EXCAVATION 15
4300 BORROW MATERIALS 15
4400 EMBANKMENT CONSTRUCTION 16
4500 MATERIAL STABILISATION 16
SERIES 5000: SUB BASE, ROAD BASE AND GRAVEL WEARING COURSE 18
5100 SUB-BASES 18
5200 ROAD BASES (EXCLUDING BITUMINOUS BASES) 18
5300 BREAKING UP EXISTING PAVEMENT LAYERS 20
5400 GRAVEL WEARING COURSE AND GRAVEL SHOULDERS 20
5500 HAND-PACKED STONE PAVING AND MORTARED HAND-PACKED STONE PAVING 21
5600 STONE SETTS AND COBBLESTONE PAVING 21
5700 FIRED CLAY BRICK PAVEMENT 21
SERIES 6000: BITUMINOUS SURFACING AND ROAD BASE 22
6100 BITUMINOUS PRIME COAT 22
6200 TACK COAT 22
6300 SURFACE SEALS 22
6400 ASPHALT ROAD BASE AND SURFACINGS 23
6500 SURFACING OF BRIDGE DECKS 25
6600 TREATMENT OF CERTAIN DEFECTS IN EXISTING BITUMINOUS SURFACING 25
6700 BITUMINOUS ROAD-MIX SURFACING 26
SERIES 7000: RIGID PAVEMENTS 27
7100 RIGID (CONCRETE) PAVEMENT 27
7200 ULTRA-THIN REINFORCED CONCRETE PAVEMENT 29
7300 NON-REINFORCED CONCRETE PAVEMENT (NRC) 29
SERIES 8000: STRUCTURES 30
8100 FOUNDATIONS FOR STRUCTURES 30
8200 FALSEWORK, FORMWORK, AND CONCRETE FINISHES 32
8300 STEEL REINFORCEMENT FOR STRUCTURES 33
8400 CONCRETE FOR STRUCTURES 33
8500 TIMBER STRUCTURES 33
8600 PRE-STRESSING 33
8700 BRIDGE BEARINGS, PARAPETS, RAILINGS, FOOTWAYS, NO-FINES CONCRETE, WATERPROOFING
33
8800 STRUCTURAL STEELWORK 35
8900 STONE MASONRY STRUCTURES 35
81000 MECHANICALLY STABILISED EARTH 35
SERIES 9000: ANCILLARY WORKS 36
9100 GABIONS AND MATTRESSES 36
9200 DELINEATORS, MARKERS AND KILOMETRE POSTS 36
9300 GUARDRAILS 36
9400 ROAD SIGNS 36
9500 ROAD TRAFFIC MARKINGS, ROAD STUDS AND TRAFFIC CALMING 37
9600 LANDSCAPING AND GRASSING 37
9700 PAINTING OF STEEL 37
9800 FENCING 37
9900 FOOTWAYS AND MASONRY AND CONCRETE SAFETY BARRIERS 38
SERIES 11000: DAYWORKS 39
11E00 0EQUIPMENT 39
11L00 LABOUR 42
11M00 MATERIAL 43

Included => This item considered in other items


Addendum => this items removed in addendum
Missed => this items should be considred but overlooked
Adopted => included in the BOQ
Not Required => not in the scope of the work

SERIES 1000: GENERAL


Item Code Item Description Unit Measure
1300 CONTRACTOR'S ESTABLISHMENT ON SITE
13.01 Contractor establishment
(a) Fixed Cost LS
(b) Time-related Cost month
1400 ACCOMMODATION, SERVICES, AND ATTENDANCE FOR THE ENGINEER'S STAFF
Office Building complete as specified including furniture (Tables
14.01 1409/1 and 1409/5) LS
Laboratory Building complete as specified including furniture (Tables
14.02 1409/4 and 1409/6) LS
14.03 Items measured and paid for by the lump sum
(a) Office Equipment and supplies as per Table 1409/2 LS
Laboratory Equipment and supplies as required and specified in
(b) Tables 1409/3 (a), (b), (c) and/or (d) LS
14.04 Services and Maintenance
(a) Fixed Costs LS
Services and Maintenance for residential accommodation, offices
(b) and laboratories month
14.05 Vehicles for Engineer and his staff
(a) Vehicle type A no
(b) Vehicle type B no
(c) Vehicle type C no
Provision of fuel and lubricants and the servicing, maintenance, and
14.06 repair of vehicles for the Engineer and his staff
(a) Fuel, service and maintain vehicle, Type A veh-mth
(b) Fuel, service and maintain vehicle, Type B veh-mth
(c) Fuel, service and maintain vehicle, Type C veh-mth
Fuel, service and maintain vehicle in excess of 3000 km for any
(d) vehicle in any one calendar month, vehicle Type A km
Fuel, service and maintain vehicle in excess of 3000 km for any
(e) vehicle in any one calendar month, vehicle Type B km
Fuel, service and maintain vehicle in excess of 3000 km for any
(f) vehicle in any one calendar month, vehicle Type C km
14.07 Attendance upon the Engineer and his staff
(a) Driver for the Engineer's vehicles man-mth
(b) Chainman man-mth
(c) Laboratory Assistants man-mth
(d) Cleaners man-mth
(e) Watchman/Security man-mth

14.08 Additional office and laboratory equipment ordered by the Engineer


(a) Additional equipment ordered by the Engineer PS
Laboratory test to be conducted in external laboratories as
(b) instructed by the Engineer PS
Percentage allowed for overhead and profit on items 14.08 (a) and
(c) (b) %
Building, House Type, complete, as specified, including fixtures
14.09 furniture and equipment (Tables 1409/7 and 1409/8)
(a) Type A housing no
(b) Type B housing no
(c) Type C housing no
(d) Type D housing no
14.1 Items measured by number
(a) Air conditioning unit no
(b) Heater no
(c) Gas burners (including provision of gas installation) no
14.11 Temporary facilities of the Engineer
(a) Office fully fitted, furnished and equipped including all services month

(b) Laboratory fully fitted, furnished and equipped including all services month
Housing Accommodation fully fitted, furnished and equipped
(c) including all services
(i) Type A houses month
(ii) Type B houses month
(iii) Type C houses month
(iv) Type D houses month
(d) Vehicles including all operating costs
(i) Type A month
(ii) Type B month
(iii) Type C month
(e) Surveying equipment month
14.12 Communication Equipment for the Engineer
(a) Radio equipment LS
(b) SIM card for mobile phone (work-related usage) no
(c) Airtime for work-related SIM card airtime/month
1500 TRAFFIC MANAGEMENT
15.01 Temporary Diversions
(a) Construction of diversions km
(b) Maintenance of Diversion km
(c) Reinstatement of Diversion km
(d) Traffic Management – full width km
1600 (e)
SOCIAL,Traffic Management
HEALTH, SAFETY – half-width km
AND ENVIRONMENTAL PROTECTION AND MITIGATION
MEASURES
16.01 Preparation of a Management Plans
(a) Site Environmental and Social Management Plan (SESMP) LS
(b) Health and Safety Management Plan (HSMP) LS
Provision of Occupational Health and Safety Equipment with Worker
16.02 Training LS
Provision of a suitably equipped and staffed Clinic in the main
construction camp; and the provision of first aid equipment, kits and
medical supplies, sick bay and a suitable ambulance service at all
16.03 camps on the site LS
Watering of the road under construction, temporary diversions, and
16.04 access and haul roads at settlement areas km
16.05 STD and HIV/AIDS Prevention and Control Programme
Preparation of action plans on STD and HIV/AIDS alleviation
measures, provision of information and educational materials,
counselling and testing services and establishment and training of
(a) peer educators and Anti-AIDS Committees PS
(b) Percentage allowed for overhead and profit on item 16.05 (a) %
16.06 Liaison with Communities and Local Authorities

Establishment and management of a Project Liaison Committee


(PLC) approved by the Engineer including the organization of public
(a) meetings and project related notices to the Community PS
(b) Percentage allowed for overhead and profit on item 16.06 (a) %
16.07 Complimentary Interventions
Provision for the inclusion of complimentary interventions to the
(a) contract as agreed and directed by the Client PS
(b) Percentage allowed for overhead and profit on item 16.07 (a) %

SERIES 2000: SITE CLEARANCE


Item Code Item Description Unit Measure
2100 CLEARING AND GRUBBING
21.01 Clearing and grubbing ha
21.02 Grubbing and removal of large trees and tree stumps
(a) Girth exceeding 1m up to and including 2m no
(b) Girth exceeding 2m up to and including 3m no
(c) Girth exceeding 3m up to and including 4m no
21.03 Re-clearing of surfaces ha
21.04 Removal and storage of selected vegetation
Cost of removal, storage, protection and replanting in a protected
(a) and fenced-off area of selected vegetation PS
(b) Charge on provisional sum %
2200 DEMOLITION, REMOVAL, DISPOSAL, STORAGE OR CLEANING OF EXISTING
STRUCTURES AND INSTALLATIONS
Clearing and grubbing at inlets and outlets of existing hydraulic
22.01 structures m2
Cleaning out of existing hydraulic structures (pipes and slab/box
22.02 culverts)
(a) Pipes with an internal diameter up to and including 750mm m
(b) Pipes with an internal diameter exceeding 750mm m

(c) Slab or Box culverts up to and including 1.5m vertical dimension m


(d) Slab or Box culverts exceeding 1.5m vertical dimension m
Take up or down and set aside for reuse; or remove to store off Site,
22.03 the following
(a) Blockwork and stonework m3
(b) Paved areas and the like, brickwork m2
Kerbs, channels, edgings, combined drainage and kerb blocks,
fencing, safety fences and the like, copings, string courses and the
(c) like m
(d) Cable m
Road lighting columns, brackets and wall mountings, traffic signs,
reflecting road studs, gates, stiles, street furniture, communications
cabinets, posts, brackets, signal indicators, shelves, racking, frames,
(e) electronic units and the like no

(f) Chamber covers and frames, gully gratings and frames and the like no
(g) Individual blocks, features or stones no
22.04 Cleaning of existing open drainage structures m
22.05 Removal of existing road pavements m3
22.06 Removal of existing concrete and masonry structures
(a) Plain concrete m3
(b) Reinforced concrete m3
(c) Masonry Structures - mortared m3
(d) Masonry Structures - dry m3
SERIES 3000: DRAINAGE STRUCTURES
Item Code Item Description Unit Measure

3100 OPEN DRAINS, CASCADES, BANKS, DYKES AND SUB-SOIL DRAINS


31.01 Excavation for Open Drains
Excavating soft material situated within the following depth ranges
(a) below the surface level
(i) 0 to 1.5m m3
(ii) 1.5 to 3.0m m3
(iii) > 3.0m in increments of 1.5m m3
Extra-over sub-item 31.01(a) for excavation in hard material,
(b) irrespective of depth m3
(c) Mitre Drains
(i) Type 1 m3
(ii) Type 2 m3
(d) Furrow Drains m
31.02 Clearing and shaping existing open drains m3
31.03 Excavation for subsoil drainage Systems
Excavating soft material situated within the following depth ranges
(a) below the surface level
(i) 0 to 1.5m m3
(ii) >1.5m m3
Extra-over sub item 31.03(a) for excavation in hard material
(b) irrespective of depth m3
31.04 Impermeable backfilling to subsoil drainage systems m3
31.05 Banks and dykes m3
Natural permeable material in subsoil drainage systems (crushed
31.06 stone)
Crushed stone obtained from approved sources on the site (state
(a) grade) m3

(b) Crushed stone obtained from commercial sources (state grade) m3


31.07 Natural permeable material in subsoil drainage systems (sand)
(a) Sand obtained from approved sources on the site (state grade) m3
(b) Sand from commercial sources (state grade) m3
31.08 Pipes in subsoil drainage systems
Pitch-fibre pipes and fittings complete with couplings (state size and
(a) whether or not perforated) m

Unplasticised PVC pipes and fittings, normal duty, complete with


(b) couplings (state size and whether or not perforated or slotted) m
High-density type polyethylene pressure pipes and fittings, complete
with couplings (state size, type and class and whether or not
(c) perforated) m
(d) Concrete pipes (state type and diameter) m
Polyethylene sheeting, 0.15mm thick or similar approved material,
31.09 for lining subsoil drainage systems m2
31.1 Synthetic-fibre filter fabric (describe type, grade, etc) m2

31.11 Composite in-plane drainage systems (state size, type, grade, etc) m
Concrete outlet structures, manhole boxes, junction boxes and
31.12 cleaning eyes for subsoil drainage systems
(a) Outlet structures no
(b) Manholes boxes no
(c) Junction boxes no
(d) Cleaning eyes no
31.13 Concrete caps for subsoil drain pipes no
31.14 Repairing or replacing existing drainage systems PS
31.15 Backfilling existing eroded side drains m3
31.16 Test flushing of pipe subsoil drains no
31.17 Excavation for the clearing of existing drainage Systems
(a) Manholes and inlet and outlet structures m3
(b) Culvert barrels m3
(c) Concrete side drains m3
31.18 Cascades m
3200 CULVERTS AND APPURTENANT STRUCTURES
32.01 Excavation
Excavating soft material situated within the following depth ranges
(a) below the surface level
(i) 0 to 1.5m m3
(ii) 1.5m to 3.0m m3
(iii) > 3m in increments of 1.5m m3
Extra over sub item 32.01(a) for excavation in hard material,
(b) irrespective of depth m3
32.02 Backfilling
(a) Using the excavated material m3
(b) Using imported selected material m3
Extra over sub-items 32.02(a) and (b) for soil cement backfilling
(c) (percentage of cement indicated) m3
32.03 Concrete pipe culverts
(a) On Class A bedding (type, length and diameter indicated) m
(b) On Class B bedding (type, length and diameter indicated) m
(c) On Class C bedding (type, length and diameter indicated) m
(d) On Class D bedding (type, length and diameter indicated) m
32.04 Metal and other culverts
(a) Size, wall thickness and type indicated m
(b) Cutting of bevelled or skew ends (size and type indicated) no
32.05 Extra-over items 32.03 and 32.04 for constructing inclined culverts m
32.06 Cast in-situ concrete and formwork
In Class A bedding, screeds and the encasing for pipes, including
(a) formwork (class of concrete indicated) m3
In inlet and outlet structures, skewed ends, catchpits, manholes,
thrust and anchor blocks, excluding formwork but including Class U2
(b) surface finish (class of concrete indicated) m3

(c) Formwork of concrete under Item 32.06 (b) (type of finish indicated) m2
In concrete linings for the inverts of metal culverts under Item 32.04,
including formwork and class U2 surface finish (class of concrete
(d) indicated) m3
32.07 Concrete backfill for culverts (class indicated) m3
32.08 Prefabricated/Precast concrete inlets and outlets to culverts no
32.09 Steel reinforcement
(a) Mild steel (grade specified) ton
(b) High tensile steel (grade specified) ton
(c) Mild steel mesh kg
(d) High tensile steel mesh kg
32.1 Dowels for joining old and new concrete kg
32.11 Removal, stacking and relaying
(a) existing pipes (size and type of bedding indicated) m
(b) existing prefabricated culverts (type and size indicated) m
Treating surfaces with epoxy resin for joining new to old concrete
32.12 (type of epoxy resin specified) litre
Protective mastic asphalt coating for corrugated metal culvert units
32.13 (state whether to be applied by brush or by spray gun) m2
32.14 Manhole and catchpit structures complete
(a) Manholes (type indicated) no
(b) Catchpits (type indicated) no

Extra over or less than sub-item 32.16(a) for variations in the depths
of manholes from the standard depth designated for tendering
(c) purposes (standard depth and type of manhole indicated) m

Extra over or less than sub-item 32.16(b) for variations in the depths
of catchpits from the standard depth designated for tendering
(d) purposes (standard depth and type of catchpit indicated) m
32.15 Anchors for pipes (description) no
32.16 Service ducts
(a) Ordinary pipes (type and diameter indicated) m
(b) Split pipes (type and diameter indicated) m
32.17 Duct marker blocks (type indicated) no
32.18 Chambers for ducts no
32.19 Hand excavation to determine the positions of existing services m3
32.2 Reinstating trenches crossing roads
(a) Selected layers m2
(b) Sub-base m2
(c) Base (including prime coat) m2
(d) Bituminous surfacing (including tack coat) m2
(e) Kerbing m
Prefabricated reinforced concrete skew end units for concrete
culverts constructed at a skew angle (type and dimensions of unit
32.21 and class of bedding indicated) no
3300 KERBING, CHANNELLING, OPEN CHUTES, DOWNPIPES, AND LINING OF OPEN
DRAINS
33.01 Kerbing
Concrete kerbing (class of concrete indicated for in-situ concrete)
(a) (Descriptions of type with reference to Drawing) m
(b) Concrete kerbing (precast) m
Stone kerbing (type of stone indicated) (Descriptions of type with
(c) reference to Drawing) m
(d) Asphalt kerbing m
33.02 Kerbing-Channelling combination
Concrete (class of concrete indicated for in-situ concrete)
(a) (Descriptions of type with reference to Drawing) m
(b) Concrete kerbing (precast) m
Stone (type of stone indicated) (Descriptions of type with reference
(c) to Drawing) m
(d) Asphalt kerbing m
33.03 Chutes
Concrete (class of concrete indicated for in-situ concrete)
(a) (Descriptions of type with reference to Drawing) m
Stone (type of stone indicated) (Descriptions of type with reference
(b) to Drawing) m
33.04 Cast in-situ concrete chutes
(a) Concrete (class indicated) m3
(b) Formwork (surface finish indicated) m2
33.05 Inlet, outlet, transition and similar structures (typical designs)
Concrete (description of structure, type, etc, with reference to
(a) Drawing and class of concrete) no
Stone masonry (description of structure, type, etc, with reference to
(b) Drawing) no
33.06 Inlet, outlet, transition and similar structures
(a) Concrete (class indicated) m3
(b) Stone masonry (class indicated) m3
(c) Formwork (surface finish indicated) m2
33.07 Trimming of excavations for concrete-lined open drains
(a) In soft material m2
(b) In hard material m2
Selected backfill material under concrete-lined side drains
33.08 compacted to 93% of modified AASHTO density m3
33.09 Concrete lining for open drains
Cast in-situ concrete lining (concrete and type of open drain
(a) indicated) m3
Class U2 surface finish to cast in-situ concrete (type of open drain
(b) indicated) m2
Formwork to cast in- situ concrete lining for open drains (class F2
33.1 surface finish)
(a) To sides with formwork on the internal face only m2
To sides with formwork on both internal and external faces (each
(b) face measured) m2
(c) To ends of slabs m2
Sealed joints in concrete linings of open drains (description of type
33.11 with reference to drawing) m
Concrete screed or backfill below chutes (class of concrete
33.12 indicated) m3
33.13 Steel reinforcement
(a) Mild steel bars (grade specified) ton
(b) High-tensile steel bars (grade specified) ton
(c) Welded steel fabric kg
33.14 Polyethylene sheeting for concrete-lined open drains m2
Cutting bituminous surfacing and pavement layers for concrete
33.15 kerbing, channeling or concrete-lined drains m
33.16 Pre-cast concrete blocks in outlet structures (size specified) no
33.17 Paved Drains in Urban Areas and Reinforced Drain Covers
(a) U-shaped drains in urban areas (as per Drawings)
(i) Stone Masonry (structure, type, size and dimensions indicated) m
(ii) Concrete (structure, type, size and dimensions indicated) m
(b) Reinforced Concrete Drain Covers (as per Drawings)

(i) Pedestrian crossing covers (type, size and dimensions indicated) no


(ii) Vehicle crossing covers (type, size and dimensions indicated) no
Stone masonry paved ditch in rolling and other terrain as per
33.18 Drawings (structure, type, size and dimensions indicated) m

3400 STONE PITCHING, MASONRY, PRECAST CONCRETE BLOCK AND RIPRAP


34.01 Stone Pitching
(a) Plain (dry stone) pitching
(i) Method 1 m2
(ii) Method 2 m2
(b) Grouted pitching m2
(c) Wired and grouted pitching m2
34.02 Riprap
(a) Packed riprap (class indicated) m3
(b) Dumped riprap (class indicated) m3
(c) Filter layer
(i) Crushed stone m3
(ii) Filter sand obtained from borrow pits m3
(d) Synthetic fibre filter fabric (type class and grade stated) m2
34.03 Stone masonry walls
(a) Dry stone masonry walls m3
(b) Cement-mortared stone walls m3
34.04 Concrete pitching
Cast in-situ concrete pitching (class of concrete and thickness of
(a) pitching indicated) m2
Interlocking pre-cast concrete block pitching (type and thickness
(b) indicated) m2
Pre-cast concrete blocks for side walk pavement (thickness
(c) indicated m2
Concrete in edge beams and foundation trenches (Class of concrete
34.05 indicated) m3
34.06 Excavations for edge beams and foundation trenches
(a) In solid rock (material requiring blasting) m3
(b) In all other classes of material m3
3500 DRAINAGE STRUCTURE PROTECTION
35.01 Drainage Structure Protection
(a) Protection type 1 – rock spill through m2
(b) Protection type 2 – reinforced concrete over earth spill-through m2
(c) Protection type 3 – rockwork over earth spill-through m2

(d) Protection type 4 – interlocking blockwork over earth spill-through m2

SERIES 4000: EARTHWORK & MATERIAL STABILIZATION


Item Code Item Description Unit Measure
4100 PREPARATION OF ROADBED
41.01 Removal of unsuitable material
(a) In layer thicknesses of 200mm and less m3
(b) In layer thicknesses exceeding 200mm m3
41.02 Roadbed preparation and compaction m3
41.03 In-situ treatment of roadbed
(a) In-situ treatment by ripping m3
(b) In-situ treatment by blasting m3
4200 ROADWAY AND BORROW EXCAVATION
42.01 Cut and borrow to fill
(a) Cut to fill material
(i) Compacted to 90% of modified AASHTO density m3
(ii) Compacted to 93% of modified AASHTO density m3
(iii) Compacted to 95% of modified AASHTO density m3

(iv) Cut to fill material: Capping layer or Improved/selected subgrade m3


Borrow to fill material (including all specified borrow pit requirements
(b) under Division 4300)
(i) Compacted to 90% of modified AASHTO density m3
(ii) Compacted to 93% of modified AASHTO density m3
(iii) Compacted to 95% of modified AASHTO density m3
(iv) Capping layer or improved/selected subgrade m3

42.02 Extra over item 42.01 for excavating and breaking down material
(a) Common (normal or soft) excavation m3
(b) Rock (hard) excavation m3
42.03 Cut to spoil
(a) Common (normal or soft) excavation m3
(b) Rock (Hard) excavation m3
42.04 Stockpiling of material m3
42.05 Widening of cuts (extra over items 42.01, and 42.03)
(a) In rock (hard) material m3
(b) In all other materials m3
42.06 Crushing and screening
(a) Single stage crushing m3
(b) Two-stage crushing m3
(c) Screening m3
(c) Multi-stage crushing and screening m3
4300 BORROW MATERIALS
43.01 Reinstatement of borrow areas
(a) Rock (hard) material ha
(b) Common (normal or soft) material ha
43.02 Establishing a crushing plant in borrow pits for crushed stone No
4400 EMBANKMENT CONSTRUCTION
Extra over item 42.01 for widening of fills as specified in sub-clause
44.01 4403(l)
(a) Cut to fill m3
(b) Borrow to fill m3
Extra over item 42.03 for spoiling material excavated from benches
44.02 constructed for widening existing fills m3
44.03 Sand fills (as described in sub-clause 4403(j) and 4402(d))
Non-plastic sand with up to 20% passing the 0.075mm sieve
(a) compacted to100% of modified AASHTO density m3
Non-plastic sand with more than 20% passing the 0.075 mm sieve
(b) compacted to 95% of modified AASHTO density m3
44.04 Rock Fill, Pioneer Layers and Sand Filter Blankets
(a) Rock fill m3
(b) Toes for rock fill embankments m3
(c) Pioneer layer m3
(d) Sand filter blanket m3
44.05 Side fills or Fill-flattening m3
4500 MATERIAL STABILISATION
Chemical stabilization (layer thickness indicated) extra over
45.01 unstabilised compacted layers (layer to be stabilized indicated) m3
45.02 Chemical stabilizing agent
(a) Ordinary Portland cement ton
(b) Portland blast-furnace cement ton
(c) Lime (type indicated) ton
(d) Other chemical stabilizing agents (type specified) ton
45.03 Mechanical modification (extra over untreated layer)
(a) By adding a soil binder m3
(b) By mixing materials from different sources m3
45.04 Bituminous stabilization (extra over the untreated layer) m3
45.05 Provision and application of water for curing K.lit.
45.06 Curing by covering with the subsequent layer m2
45.07 Bituminous stabilizing agent
(a) Anionic stable grade bituminous emulsion (60% net bitumen) litre
(b) Cationic stable grade bituminous emulsion (60% net bitumen) litre
(c) Other (specify) litre
45.08 Additives for bituminous stabilization
(a) Ordinary Portland cement ton
(b) Lime ton

45.09 Extra over item 46.01 for chemical stabilization in restricted areas
(a) Mixing in mechanical mixers m3
(b) In-situ mixing m3
(c) Mixing as for in-situ mixing but on adjacent surfaces m3

45.1 Extra over item 46.03 for mechanical modification in restricted areas
(a) Mixing in mechanical mixers m3
(b) In-situ mixing m3
(c) Mixing as for in-situ mixing but on adjacent surfaces m3

45.11 Extra over item 46.06 for bituminous stabilization in restricted areas
(a) Mixing in mechanical mixers m3
(b) In-situ mixing m3
(c) Mixing as for in-situ mixing but on adjacent surfaces m3
45.12 Extra over items 46.01 and 46.06 for trial sections m3

SERIES 5000: SUB BASE, ROAD BASE AND GRAVEL WEARING COURSE
Item Code Item Description Unit Measure
5100 SUB-BASES
51.01 Sub-base layer constructed from gravel or crushed stone

(a) Crushed stone (specify compacted layer thickness) compacted to


95% of modified AASHTO density (specify compacted layer
(i) thickness)
97% of modified AASHTO density (specify compacted layer
(ii) thickness)
(b) Gravel sub-base (unstabilised gravel) compacted to
95% of modified AASHTO density (specify compacted layer
(i) thickness) m3
97% of modified AASHTO density (specify compacted layer
(ii) thickness) m3

Sub-base layer constructed from non-cemented or cemented gravel;


51.02 or crushed stone obtained from existing pavement layers

Crushed stone sub-base (unstabilised) compacted to 95% or 97% of


(a) modified AASHTO density as required on the Drawing using
(i) Non-cemented material (specify compacted layer thickness) m3
(ii) Cemented material (specify compacted layer thickness) m3
Crushed stone sub-base compacted to 95% or 97% of modified
(b) AASHTO density as required on the Drawing using
(i) Non-cemented material (specify compacted layer thickness) m3
(ii) Cemented material (specify compacted layer thickness) m3
51.03 In-situ reconstruction of existing Sub-base layer as
Crushed stone sub-base (unstabilised gravel) compacted to 95% of
(a) modified AASHTO density using:
(i) Non-cemented material (specify compacted layer thickness) m3
(ii) Cemented material (specify compacted layer thickness) m3

Gravel sub-base (unstabilised gravel) compacted to 95% or 97% of


(b) modified AASHTO density as required on the Drawings using:
(i) Non-cemented material (specify compacted layer thickness) m3
(ii) Cemented material (specify compacted layer thickness) m3
51.04 Extra over Pay item 51.02 for adding extra material
(a) Gravel sub-base m3
(b) Crushed stone Sub-base m3
Extra over Pay item 51.03 for temporarily blading the material to
51.05 windrow m3
Extra over Pay item 51.02 for excavating material in existing
51.06 pavement layers in restricted areas
(a) Non-cemented material m3
(b) Cemented material m3
5200 ROAD BASES (EXCLUDING BITUMINOUS BASES)
52.01 Base layer construction
(a) Crushed-stone base compacted to
(i) 98% of modified AASHTO density (Layer thickness indicated) m3
(ii) 100% of modified AASHTO density (Layer thickness indicated) m3
Natural Gravel base taken from cut or borrow (unstabilised gravel)
(b) compacted to
98% of modified AASHTO density (Specify compacted layer
(i) thickness) m3
100% of modified AASHTO density (Specify compacted layer
(ii) thickness) m3
52.02 Extra over Pay Item 52.01 for excavation of hard material m3
Base layer constructed from material obtained from existing
52.03 pavement layers
Crushed stone base material: Material compacted to 98% of
modified AASHTO density: Material from existing uncemented
(a) crushed-stone layers
(i) Unscreened m3
(ii) Screened and recombined in a plant m3
(iii) not milled but crushed, screened and recombined in a plant m3
Crushed stone base material: Material compacted to 100% of
modified AASHTO density: Material from existing uncemented
(b) crushed-stone layers
(i) Unscreened m3
(ii) Screened and recombined in a plant m3
(iii) not milled but crushed, screened and recombined in a plant m3
Gravel base (unstablised gravel) compacted to 98% of modified
(a) AASHTO density using:
(i) Non-cemented material (specify compacted layer thickness) m3
(ii) Cemented material (specify compacted layer thickness) m3
Gravel base (unstablised gravel) compacted to 100% of modified
(b) AASHTO density using:
(i) Non-cemented material (specify compacted layer thickness) m3
(ii) Cemented material (specify compacted layer thickness) m3
52.04 In-situ reconstruction of existing base layer
Uncemented Crushed stone base material: Material compacted to
(a) 98% of modified AASHTO density m3
Uncemented Crushed stone base material: Material compacted to
(b) 100% of modified AASHTO density using, m3
Gravel base material: Gravel base (unstablised gravel) compacted
(a) to 98% of modified AASHTO density
(i) Non-cemented material (specify compacted layer thickness) m3
(ii) Cemented material (specify compacted layer thickness) m3
Gravel base (unstabilised gravel chemically stabilised material)
(b) compacted to 100% of modified AASHTO density using
(i) Non-cemented material (specify compacted layer thickness) m3
(ii) Cemented material (specify compacted layer thickness) m3
Extra over Pay item 52.04 for adding extra material as specified
52.05 below
(a) Gravel base m3

(b) Crusher fines for improving the grading of recovered crushed stone
(i) Material from approved borrow pits m3
(ii) Material from commercial sources m3
Extra over Pay item 52.04 for temporarily blading the material to
52.06 windrow m3
Extra over Pay item 52.03 for excavating material in existing
52.07 pavement layers in restricted areas
(a) Non-cemented material m3
(b) Cemented material m3
52.08 Trial sections
Gravel base (unstabilised or chemically stabilised) trial section
(thickness indicated) constructed in accordance with the provisions
(a) of this Division m2
Crushed-stone base trial section (thickness indicated) constructed in
(b) accordance with the provisions of this Division m2
5300 BREAKING UP EXISTING PAVEMENT LAYERS
Excavating and removing existing bituminous material (except milled
53.01 material)

(a) Material intended for recycling with the average depth of excavation
(i) Not exceeding 30mm m2
(ii) Exceeding 30mm but not exceeding 60mm m2
(iii) Exceeding 60mm m2
(b) Material to be disposed of with the average depth of excavation
Material to be disposed of with the average depth of excavation: Not
(i) exceeding 30mm m2
Material to be disposed of with the average depth of excavation:
(ii) Exceeding 30mm but not exceeding 60mm m2
Material to be disposed of with the average depth of excavation:
(iii) Exceeding 60mm m2

53.02 Milling out existing bituminous material with an average milling depth
(a) Not exceeding 30mm m3
(b) Exceeding 30mm but not exceeding 60mm m3
(c) Exceeding 60mm m3
Excavating and spoiling material from an existing pavement and/or
53.03 the underlying fill
(a) Non-cemented material m3
(b) Cemented material m3
53.04 Sawing or cutting asphalt or cemented pavement layers
(a) Sawing asphalt m2
(b) Cutting asphalt m
(c) Sawing cemented material m2
53.05 Removing the remaining asphalt from the underlying layer m2
53.06 Preparing stockpile sites m2
5400 GRAVEL WEARING COURSE AND GRAVEL SHOULDERS
Gravel Wearing course and Shoulder constructed from gravel taken
54.01 from cut or borrow pits

Gravel wearing course compacted to 93% or 95% of modified


(a) AASHTO density as required (specify compacted layer thickness) m3
Gravel shoulders wearing course compacted to 93% or 95% of
(b) modified AASHTO density (specify compacted layer thickness) m3
Gravel Wearing course and Shoulder constructed from non-
54.02 cemented gravel obtained from existing pavement layers

Gravel wearing course compacted to 93% or 95% of modified


(a) AASHTO density as required (specify compacted layer thickness) m3
Gravel shoulders wearing course compacted to 93% or 95% of
(b) modified AASHTO density (specify compacted layer thickness) m3
In-situ reconstruction of existing gravel wearing course and shoulder
54.03 layer as

Gravel wearing course compacted to 93% or 95% of modified


(a) AASHTO density as required (specify compacted layer thickness) m3
Gravel shoulders wearing course compacted to 93% or 95% of
(b) modified AASHTO density (specify compacted layer thickness) m3
Extra over Pay item 54.04 for adding extra material as specified
54.04 below
(a) Gravel wearing course m3
(b) Gravel shoulder wearing course m3
Extra over Pay item 54.04 for temporarily blading the material to
54.05 windrow m3
Extra over Pay item 54.03 for excavating material in existing
54.06 pavement layers in restricted areas m3
5500 HAND-PACKED STONE PAVING AND MORTARED HAND-PACKED STONE PAVING
55.01 Hand-packed Stone Paving

(a) Unmortared Hand-Packed Stone Paving (150mm; 200 or 250mm) m2


(b) Mortared Hand-Packed Stone Paving (150mm; 200 or 250mm) m2
5600 STONE SETTS AND COBBLESTONE PAVING
56.01 Stone Sett, Dressed Stones and Cobblestones Paving
(a) Stone Sett, Dressed stones and Cobblestones Paving m2
(b) As in item 56.01 (a) – Mortared Option m2
5700 FIRED CLAY BRICK PAVEMENT
57.01 Fired Clay Brick Paving
(a) Fired Clay Brick Paving m2
(b) Mortared Joints m2

SERIES 6000: BITUMINOUS SURFACING AND ROAD BASE


Item Code Item Description Unit Measure
6100 BITUMINOUS PRIME COAT
61.01 Prime coat
(a) MC-30 cutback bitumen {Application Rate} litre
(b) Decrease or increase from normal rate of application for MC-30 litre
(c) Invert bitumen emulsion litre
61.02 Aggregate for blinding m2
6200 TACK COAT
62.01 Tack coat
(a) Stable-grade bitumen emulsion (30%) litre
6300 SURFACE SEALS

63.01 Single surface seal (indicate grade of aggregate and type of binder)
(a) Using 19.0 mm chippings m2
(b) Using 13.2 mm chippings m2
(c) Using 9.5 mm chippings m2
(d) Using 6.7 mm chippings m2
63.02 Double surface seal using
(a) 19.0 mm and 9.5 mm chippings (with specified binder) m2
(b) 13.2 mm and 6.7 mm aggregate (with specified binder) m2
63.03 Triple bituminous surface treatment using
(a) 26.5 mm, 13.2 mm and 6.7 mm chippings (with specified binder) m2

(b) 19.0 mm, 9.5 mm and 6.7 mm aggregate (with specified binder) m2
63.04 Single surface treatment and slurry (Cape Seal) using

(a) 19.0 mm chippings {state type and grade of binder and aggregate} m2

(b) 13.2 mm chippings {state type and grade of binder and aggregate} m2
63.05 Sand Seal using
(a) Sand seal {state type and grade of binder) m2
(b) Grit seal {state type and grade of binder} m2
63.06 Graded aggregate seal or Otta Seal
First layer or single graded aggregate/Otta seal (grading of material
(a) and type and grade of binder specified) m2
Second layer for double graded aggregate/Otta seal (grading of
(b) material and type and grade of binder specified) m2
63.07 Variations in the rate of application of Bituminous Binder
(a) 80/100 penetration-grade bitumen litre
(b) 150/200 penetration-grade bitumen litre
(c) 65% cationic spray grade emulsion litre
(d) 60% cationic spray grade emulsion litre
(e) 60% anionic spray grade emulsion litre
(f) Pre-coating fluid litre
(g) MC-3000 cutback bitumen litre
(h) Modified binders as classified in Table 6303/4 litre
63.08 Variations in the rate of application of Chippings
(a) 26.5 mm chippings m3
(b) 19.0 mm chippings m3
(c) 13.2 mm chippings m3
(d) 9.5 mm chippings m3
(e) 6.7 mm chippings m3
63.09 Application of fog spray
(a) 60% spray grade emulsion (indicate type) litre
(b) 30% spray grade emulsion (indicate type) litre
63.1 Pre-coating chippings (as specified) m3
63.11 Addition of wetting agent
(a) Providing and supplying pcs
(b) Handling, applying, profit and all other costs %
63.12 Aggregate for blinding
(a) Natural sand m3
(b) Crusher sand m3
Extra over item for surface treatment of areas inaccessible to
63.13 mechanical equipment
(a) For Single Seal m2
(b) For Double Seals m2
(c) For Triple Seals m2
(d) For Cape Seals m2
(e) For Sand Seals m2
(f) For Single Graded Aggregate/Otta Seals m2
(g) For Double Graded Aggregate/Otta Seals m2
63.14 Resurfacing at bridge joints
(a) Where the existing surface is not removed m
(b) Where the existing surface is removed m
63.15 Correction for bleeding using
(a) Chippings
(i) 13.2 mm chippings m3
(ii) 9.5 mm chippings m3
(iii) 6.7 mm chippings m3
(b) Pre-coating of chippings m3
(c) Treatment of surface m3
63.16 Supplying and mixing of kerosene for cutback bitumen litre
63.17 Variations in the rate of application of slurry m3
63.18 Variations in Active Filler content for Slurry Seal ton
63.19 Anti-striping agent lt
6400 ASPHALT ROAD BASE AND SURFACINGS
64.01 Bituminous road base
(a) Continuously graded m2
(b) Gap-graded m2
(c) Dense Bitumen Macadam m2
64.02 Asphaltic surfacing

(a) Continuously graded m2


(b) Gap-graded m2
(c) Open-graded m2
(d) Stone-mastic asphaltic m2
(e) Dense Bitumen Macadam m2
64.03 Rolled-in chippings in surfacing ton
64.04 Tack coat of 30% stable-grade bitumen emulsion litre
64.05 Binder variations ton
64.06 Variation in active filler content
(a) Cement ton
(b) Lime ton
(c) Milled granulated blast-furnace slag ton
(d) Fly-ash ton
64.07 Trial sections m2
64.08 100mm diameter cores in asphaltic layers no
Asphaltic overlays constructed for rehabilitation purposes in
64.09 accordance with the provisions of sub-clause 6414(f)
Base constructed with new asphaltic mix (state thickness, type of
(a) bitumen and maximum size of aggregate)
(i) Continuously graded m2
(ii) Gap graded m2
Surfacing or overlay constructed with new asphaltic mix (state
(b) thickness, type of bitumen and maximum size of aggregate)
(i) Continuously graded m2
(i) Gap graded m2
Base constructed with recycled asphaltic mix (state thickness, type
(c) of bitumen and maximum size of aggregate) m2

Surfacing or overlay constructed with recycled asphaltic mix (state


(d) thickness, type of bitumen and maximum size of aggregate) m2
Asphaltic layer constructed for rehabilitation purposes in accordance
64.1 with the provisions of sub-clause 6414(f)
(a) Base constructed with new asphaltic mix
(i) Continuously graded m2
(ii) Gap graded m2
(b) Surfacing or overlay constructed with new asphaltic mix
(i) Continuously graded m2
(i) Gap graded m2
Base constructed with recycled asphaltic mix (state thickness, type
(c) of bitumen and maximum size of aggregate) m2

Surfacing or overlay constructed with recycled asphaltic mix (state


(d) thickness, type of bitumen and maximum size of aggregate) m2
Extra over items 64.01, 64.02, 64.09 and 64.10 for placing small
quantities of asphaltic mixes of less than 10 tons, specially produced
64.11 as specified in sub-clause 6407(d) ton
64.12 Placing and compacting asphaltic mixes in restricted areas
(a) Extra over items 64.01, 64.02 and 64.09 m2
(b) Extra over item 64.10 m2
64.13 Extra over item 64.04 for applying tack coat in restricted areas litre

64.14 Application of prime coat and/or tack coat to the edges of a layer litre
Extra over item 64.03 for applying rolled-in chippings in restricted
64.15 areas ton
64.16 Asphalt reinforcing complete (state type) m2
64.17 Variations from nominal mix ratios in recycled asphaltic mixes
(a) New binder ton
(b) New aggregate ton
(c) New active mineral filler ton

64.18 Variations in cellulose fibre content of stone mastic asphaltic mixes ton
64.19 Backfilling of excavations for patching with
(a) Asphaltic base ton
(b) Asphaltic surfacing ton
6500 SURFACING OF BRIDGE DECKS
65.01 Asphalt Surfacing on bridge deck
(a) Continuously graded (state grade) m2
(b) Gap-graded (state grade) m2
(c) Open-graded (state grade) m2
(d) Stone-mastic asphaltic (state maximum size of aggregate) m2
(e) Dense Bitumen macadam m2
65.02 Rolled-in chippings (nominal size indicated) in surfacing m3
6600 TREATMENT OF CERTAIN DEFECTS IN EXISTING BITUMINOUS SURFACING
66.01 Treatment with diluted bituminous emulsion (fog spray)
(a) 30% bitumen emulsion litre
(b) 40% bitumen emulsion litre
(c) 50% bitumen emulsion litre
(d) 60% bitumen emulsion litre
66.02 Texturing
(a) Tack coat litre
(b) Application of slurry seal with double-washed aggregate m3
66.03 Slurry seal
(a) Tack coat using 30% bitumen emulsion litre
(b) Slurry applied by hand m3
(c) Slurry applied by spreader box m3
(d) Slurry applied by hand ton
(e) Slurry applied by spreader box ton
66.04 Screed of bituminous concrete or coarse slurry
(a) Tack coat using 30% stable-grade bitumen emulsion litre
(b) Continuously-graded AC ton
(c) Coarse grade slurry m3
66.05 Repairing edge breaks in surfacing
(a) Tack coat using 30% bitumen emulsion litre
(b) Reconstructing edges using continuously-graded AC ton
66.06 Cleaning the cracks with compressed air km
66.07 Applying bituminous binders and herbicides for sealing cracks
(a) Herbicide litre
(b) Prime litre
(c) Anionic stable-grade emulsion litre
Modified Crack sealant (state type as classified in sub-clause
(d) 6602(a)) litre
(e) Other specified agents (type indicated) litre
66.08 Rolling the cracks m
66.09 Planing m2
66.1 Fog spraying on planed surfaces
(a) Hand spraying litre
(b) Spraying with mechanical equipment litre
66.11 Rolling planed surfaces m2-pass
66.12 Filling depressions in planed surfaces with AC ton
6700 BITUMINOUS ROAD-MIX SURFACING
67.01 Road-mix surfacing, Case 1 m2
67.02 Road-mix surfacing, Case 2 m2
67.03 Road-mix aggregate m3
67.04 Bituminous Binder (grade indicated) ton

SERIES 7000: RIGID PAVEMENTS


Item Code Item Description Unit Measure
7100 RIGID (CONCRETE) PAVEMENT
71.01 Concrete trial pavement
(a) Mechanical construction m2
(b) Manual construction m2
71.02 Concrete pavement (thickness indicated)
(a) Mechanical construction m2
(b) Manual construction m2
71.03 Texturing and curing the concrete pavement
(a) Burlap-dragged and grooved texture m2
(b) Curing m2
71.04 Variation in the rate of application of the curing compound litre
71.05 Joints
(a) Expansion joints complete (excluding dowels) m
Longitudinal hinge joints: Sealed hinge joints (type indicated with
(b) reference to Drawings) m
Longitudinal hinge joints: Unsealed hinge joints (type indicated with
(c) reference to Drawings) m
Longitudinal hinge joints: Hinge joints between existing and new
(d) concrete in remedial/ rehabilitation work m
Sealed transverse contraction joints sawn in two separate
(e) operations (widths as shown on the Drawings) m
Dowel bars (mild steel) (diameter and length indicated): Installed in
(f) new concrete no
Dowel bars (mild steel) (diameter and length indicated): Installed in
(g) existing concrete in rehabilitation work no

(h) Tie-bars (diameter and length indicated): Installed in new concrete no


Tie-bars (diameter and length indicated): Installed in existing
(i) concrete in remedial/rehabilitation work no
(j) End caps for dowels at expansion joints no
Forming and sealing the joints between asphalt and concrete
(k) pavements linear metre m
Cleaning of tie-bars and dowels in existing concrete pavement and
straightening tie-bars in existing concrete pavement in
(l) remedial/rehabilitation work m
71.06 Drilling and testing of cores
(a) 100 mm cores drilled from the pavement no
150 mm cores drilled from the pavement and tested for compressive
(b) strengthnumber no
71.07 Steel reinforcement in concrete pavement
(a) Mild steel bars (grade specified) ton
(b) High tensile steel bars (grade specified) ton
(c) Welded steel fabric kg
71.08 Removing existing concrete in remedial/rehabilitation work
(a) Concrete without reinforcement m3
(b) Reinforced concrete m3
71.09 Sawing existing concrete in remedial/rehabilitation work m2

71.1 Removing existing pavement layers in remedial/rehabilitation work


(a) Un-cemented material m3
(b) Cemented material m3
(c) Cemented crushed stone m3
Re-compaction of underlying pavement layers of gravel (Required
71.11 density stated) in remedial/rehabilitation work m3
Remedial/Rehabilitation work: Reconstructing underlying pavement
71.12 layers with
(a) Gravel material m3
(b) Crushed stone m3
(c) Asphalt m3
Extra over item 71.12 for stabilisation of underlying pavement layers
71.13 under reconstruction
(a) Chemical stabilisation of gravel layers m3
(b) Chemical stabilisation of crushed-stone layers m3
(c) Bituminous stabilisation of crushed-stone layers m3
71.14 Stabilising agents applied in remedial/rehabilitation work
(a) Ordinary Portland cement ton
(b) Anionic stable grade bitumen emulsion (60% net bitumen) litre
(c) Other chemical stabilising agents (type indicated) ton
(d) Other bituminous stabilising agents (type and grade stated) litre
Preparing the underlying layers after the concrete has been
71.15 removed in remedial/rehabilitation work
(a) Chemically stabilised gravel or crushed-stone layer m2
(b) Unstabilised crushed-stone layer m2
(c) Asphalt sub-base m2
Placing fine asphalt and coarse slurry in preparing the underlying
71.16 layers as specified in sub-clause 7106(d)
(a) Fine continuously graded asphalt for levelling the surface ton
(b) Coarse slurry for levelling the surface m3
Retexturing existing concrete pavement in remedial/rehabilitation
71.17 work m2
Repairing joints and cracks in existing concrete pavement in
71.18 remedial/rehabilitation work
(a) Joints m
(b) Cracks m
Drilling and placing dowels and tie bars in existing concrete in
71.19 remedial/rehabilitation work
(a) Dowels no
(b) Tie bars no
71.2 Re-treating existing dowels
(a) Sliding end in existing concrete no
(b) Sliding end in new concrete no
7200 ULTRA-THIN REINFORCED CONCRETE PAVEMENT
50mm Ultra-Thin Reinforced Concrete Pavement (type of welded
72.01 mesh fabric indicated) m2
72.02 Anchor Beams no
72.03 Sawing and Sealing of Joints m
7300 NON-REINFORCED CONCRETE PAVEMENT (NRC)

73.01 Non Reinforced Concrete Pavement (at specified layer thickness)


(a) Mechanical construction m2
(b) Manual construction m2
73.02 Joints
(a) Expansion joints complete (excluding dowels) m
Longitudinal joints: Sealed (type indicated with reference to
(b) Drawings) m
Longitudinal joints: Unsealed (type indicated with reference to
(c) Drawings) m
Sealed transverse contraction joints sawn in two separate
(d) operations (widths as shown on the Drawings) m
(e) Dowel bars (mild steel) (diameter and length indicated) no
(f) Tie-bars (diameter and length indicated) no
(g) End caps for dowels at expansion joints no
Forming and sealing the joints between asphalt and concrete
(h) pavements. linear meter m
Cleaning of tie-bars and dowels in existing concrete pavement and
straightening tie-bars in existing concrete pavement in rehabilitation
(i) work no
73.03 Drilling and testing of cores
(c) 100 mm cores drilled from the pavement no

(d) 150 mm cores drilled from the pavement for compressive strength no

SERIES 8000: STRUCTURES


Item Code Item Description Unit Measure
8100 FOUNDATIONS FOR STRUCTURES
81.01 Additional foundation investigations
(a) Additional foundation investigations: Fixed cost PS
Additional foundation investigations: Percentage allowed for
(b) overhead and profit on item 81.01(a) %
81.02 Excavation of materials
(a) Excavation of soft material situated in the following ranges
(i) 0 m to 2m m3
(ii) Exceeding 2m to 4 m m3
(iii) Etc in increments of 1m depth m3
(b) For excavation in hard material irrespective of depth m3
For additional excavation required by the Engineer after the
(c) excavation has been completed m3
81.03 Access ls
81.04 Drainage ls
81.05 Backfill to excavations utilizing
(a) Material from the excavation m3
(b) Imported material m3
81.06 Fill within restricted areas m3
81.07 Overbreak in excavation in hard material m2
81.08 Foundation fill
(a) Rock fill m3
(b) Crushed stone fill m3
(c) Compacted granular fill m3
(d) Mass concrete (Grade indicated) m3
(e) Blinding layer (Grade of concrete and thickness indicated) m2
81.09 Establishment on site for the grouting of rock fissures ls
81.1 Move to and set up equipment at each hole to be drilled ls
81.11 Drilling of holes m
81.12 Grouting of holes kg
81.13 Doweling into rock
(a) Drilling and cleaning m
(b) Supply and installation of dowel bars kg
81.14 Foundation lining m2
81.15 Establishment on the site for piling ls
Moving to, and setting up the equipment at each position for
81.16 installing the piles no
81.17 Augered or bored holes for piles
(a) Augered holes
(i) 0m up to 10m m
(ii) Exceeding 10m and up to 15m m
(iii) Etc in increments of 5m depths m
(b) Bored holes
(i) 0m up to 10m
(ii) Exceeding 10m and up to 15m
(iii) Etc in increments of 5m depths
Driving the temporary casing for driven displacement piling systems
81.18 for forming holes for piles
(a) 0m up to 10m m
(b) Exceeding 10m and up to 15m m
(c) Etc in increments of 5m depths m
81.19 Manufacturing, supplying and delivering prefabricated piles m
81.2 Installation of prefabricated piles m
(a) 0m up to 10m m
(b) Exceeding 10m and up to 15m m
(c) Etc in increments of 5m depths m

Extra over item 81.17, irrespective of the depth, to form augered and
81.21 bored pile holes through identified obstructions consisting of
Coarse gravel with a matrix content of less than x% (maximum
(a) percentage to be indicated) m
(b) Boulders (description of and maximum size indicated) m
(c) Rock formation (description and class of rock indicated) m
Forming augered and bored pile holes through unidentified
81.22 obstructions
(a) Fixed cost PS
(b) Percentage allowed for overhead and profit on item 81.22 (a) %
Driving temporary casings for driven displacement piling systems or
installing prefabricated piles through identified or unidentified
81.23 obstructions
(a) Fixed cost PS
(b) Percentage allowed for overhead and profit on item 81.22 (a) %
81.24 Extra over items 81.17, 81.18 and 81.20 for raking piles
(a) Holes for piles of (diameter and rake indicated) m
Temporary casing for driven displacement pile systems (diameter
(b) and rake indicated) m
(c) Prefabricated piles (type, size and rate Indicated) m
81.25 Forming under-reams for piles no
81.26 Forming the bulbous bases for piles no
81.27 Socketing piles into rock formation no

81.28 Installing and removing temporary casings in augered holes for piles m
81.29 Installing permanent pile casing for piles m
81.3 Steel reinforcement in cast in situ piles
(a) Mild-steel bars ton
(a) High-yield stress-steel bars (type indicated) ton
Cast in situ concrete in piles, under reams, bulbous bases and
81.31 sockets m3
81.32 Extra over item 81.31 for concrete cast under water m3
81.33 Splicing/coupling prefabricated piles for lengthening no
81.34 Stripping/cutting the pile heads no
81.35 Establishment on the site of the load testing of piles ls
81.36 Load tests on piles no
81.37 Establishment on the site for core drilling ls
Moving the equipment to and assembling it at each location where
81.38 cores are to be drilled no
81.39 Drilling the cores (Diameter indicated) in
(a) Concrete m
(b) Founding formation
(i) Irrespective of hardness m
(ii) With a hardness of (hardness indicated) m
81.4 Standing time for pile-installation frame hr
81.41 Establishment on the site for constructing the caisson LS
81.42 Formwork for caissons m2
81.43 Steel reinforcement for caissons
(a) Mild-steel bars ton
(b) High-yield-stress-steel bars (type indicated) ton
81.44 Cast in situ concrete in caissons and concrete seals m3
81.45 Cutting edge for caissons no
81.46 Sinking caissons through material situated
(a) 0m up to 5m m
(b) Exceeding 5 m and up to 10 m m
(c) tc in increments of 5 m depths m
81.47 Excavation for caissons
Excavating soft material situated within the following successive
(a) depth ranges
(i) 0m up to 2m m3
(ii) Exceeding 2 m and up to 4 m m3
(iii) Etc in increments of 2 m depths m3
Extra over sub-pay item 81.47(a) for excavation in hard material
(b) irrespective of depth m3
81.48 Filling the caissons m3
81.49 Stripping the caisson heads no
8200 FALSEWORK, FORMWORK, AND CONCRETE FINISHES
82.01 Formwork for indicated class of finish m2
82.02 Vertical formwork for indicated class of finish m2
82.03 Horizontal formwork for indicated class of finish m2
82.04 Inclined formwork for indicated class of finish m2
82.05 Permanent formwork
To form voids of (diameter size of void indicated), in (description of
(a) member to which applicable) m2
(b) Of (description of material and member to which applicable) m2
82.06 Formwork to form open joints m2
82.07 Establishment on the site for sliding formwork operations LS
82.08 Transporting to and setting up the sliding formwork assembly no
82.09 Forming the concrete by sliding formwork for structures m
8300 STEEL REINFORCEMENT FOR STRUCTURES
83.01 Steel reinforcement for structure
(a) Steel bars (Size, Type, Class and Grade indicated) ton
(b) Welded steel fabric kg
83.02 Mechanical couplers for (diameter of bar indicated) no
83.03 Spacer "ladders" ton
8400 CONCRETE FOR STRUCTURES
84.01 Cast in situ concrete
(a) (Class of concrete and part of structure or use indicated) m3
Etc for other classes of concrete and other uses or parts of the
(a) structure m3
84.02 Manufacturing pre-cast concrete members no
84.03 Transporting and erecting pre-cast concrete members no
84.04 Portal and rectangular (Box or Slab) culverts
(a) Complete with pre-cast invert slabs (size and type indicated) m
(b) Without pre-cast invert slabs (size and type indicated) m
84.05 Epoxy bonding of new concrete surfaces to old m2
84.06 Demolishing existing concrete
(a) Plain concrete (Member indicated) m3
(b) Reinforced concrete (Member indicated) m3
8500 TIMBER STRUCTURES
85.01 Untreated structural timber and lumber MBM
85.02 Treated structural timber and lumber MBM
8600 PRE-STRESSING
86.01 Pre-stressing tendons
(a) Longitudinal Tendons (size, class & grade stated) m
(b) Transverse Tendons (size, class & grade stated) m
(c) Vertical Tendons (size, class & grade stated) m
86.02 Anchorages and couplers
(a) Anchorage at jacking end (size stated) no
(b) Anchorage at dead end (size stated) no
(c) Coupler at jacking end (size stated) no
8700 (d)
BRIDGECoupler at dead end
BEARINGS, (size stated)
PARAPETS, no
RAILINGS, FOOTWAYS, NO-FINES CONCRETE,
WATERPROOFING
87.01 Proprietary bearings
(a) Prime cost sum allowed for purchasing and taking delivery of bearing PCS
(b) Percentage on prime cost sum for charges and profit %
87.02 Installing the proprietary bearings no
87.03 Bearings no
87.04 Concrete hinges
(a) (Description of hinge measured per meter) m
(b) (Description of hinge measured by number) no
87.05 Bearing strips m2
87.06 Dowels/guides no
87.07 Concrete parapets m
87.08 Steel railings m
87.09 End blocks no
87.1 Numbers for structures
(a) Number plates no
(b) Painted numbers no
(c) Numbers formed in concrete no
87.11 Proprietary expansion joints
(a) Prime cost sum allowed for purchasing and taking delivery of expansio PCS
(b) Percentage on prime cost sum for charges and profit %
87.12 Installation of proprietary expansion joints
(a) (Description of joint measured per meter) m
(b) (Description of joint measured by number) no
87.13 Expansion joints
(a) (Description of joint measured per meter) m
(b) (Description of joint measured by number) no
87.14 Filled joints
(a) Filled joints (Description of joint and thickness of joint filler for join m2
(b) Filled joints (Description of joint and thickness of joint filler for joint m
87.15 Unfilled joints
(a) Unfilled joints (Description of joint for joints measured per square met m2
(b) Unfilled joints (Description of joint for joints measured per linear meter m
87.16 Sealing joints with
(a) Sealant (description of joint, sealant and size) m
(b) Water stop (description of joint, water stop and size) m
87.17 Cast in situ no- fines concrete m3
87.18 Precast no-fines concrete units no
87.19 Drainage pipes and weep holes
(a) Drainage pipes
(i) Type and size indicated) m
(ii) (Type and size indicated) no
(b) Weep holes
(i) (Type and size indicated) m
(ii) (Type and size indicated) no
87.2 Drainage gullies no
87.21 Synthetic-fiber filter fabric m2
87.22 Concrete channeling m
87.23 Crushed stone in drainage strips m3
87.24 Nose-endings at balustrades no
87.25 Concrete transition blocks no
8800 STRUCTURAL STEELWORK
88.01 Structural steel
(a) Structure and steel quality described) ton
(b) Structure and steel quality described) m
(c) Structure and steel quality described) no
88.02 Anchor bolts
(Description of each assembly, and grade/type of steel, diameter
(a) and length indicated) kg
(Description of each assembly, and grade/type of steel, diameter
(b) and length indi) no
88.03 Corrosion protection
(a) Sprayed-on metal

(i) (Type of metal and thickness or type symbol of coating indicated) ton

(ii) (Type of metal and thickness or type symbol of coating indicated) m

(iii) (Type of metal and thickness or type symbol of coating indicated) no


(b) Hot-dip galvanizing
(i) (Thickness or type symbol of zinc coat indicated) ton
(ii) (Thickness or type symbol of zinc coat indicated) m
(iii) (Thickness or type symbol of zinc coat indicated) no
8900 STONE MASONRY STRUCTURES
89.01 Stone masonry walls

(a) Plain packed stone masonry walls (Class of masonry described) m3


Cement-mortared stone masonry walls (Class of masonry
(b) described) m3
89.02 Plastering of Stone Masonry Walls m2
81000 MECHANICALLY STABILISED EARTH
810.01 Supply and erection of MSE structure
Structure as shown on the Drawings (Supplier, cladding and
(a) reinforcement indi’d) m2
Additional structures as appropriate and shown on the Drawings
(b) (Supplier, cladding and reinforcement indicated) m2
Extra over standard fill items for the construction of fills with soil
810.02 reinforcement m3

SERIES 9000: ANCILLARY WORKS


Item Code Item Description Unit Measure
9100 GABIONS AND MATTRESSES
91.01 Foundation trench excavation and backfilling
(a) In solid rock (material requiring blasting) m3
(b) Excavation (common) in all other classes of material m3
(c) Foundation trench excavation and backfilling: Backfilling m3
91.02 Surface preparation for bedding m2
91.03 Gabions and Mattresses
(a) Gabion boxes (Type, size of box and mesh indicated) m3
Gabion mattresses (Type, depth of mattresses, mesh size an
(b) diaphragm spacing indicated) m2
91.04 Filter fabric m2
9200 DELINEATORS, MARKERS AND KILOMETRE POSTS
92.01 Delineators, markers (guide posts) and kilometer posts
(a) Delineators (material) no
(b) Markers (guide posts) (material) no
(c) Kilometer posts (material) no
9300 GUARDRAILS
93.01 Guardrails on [material] posts Galvanized m
93.02 End units and mitre units
(a) End units no
(b) Terminal return unit no
9400 ROAD SIGNS
Sign faces with painted background. Symbols, lettering and borders
in Engineering grade retro-reflective material with signboard
94.01 constructed from (Specify material and thickness)
(a) Warning and regulatory signs
(i) Warning and regulatory signs: Area not exceeding 2 m² m2
(ii) Warning and regulatory signs: Area exceeding 2 m² m2
(b) Information and Guide signs
(i) Warning and regulatory signs: Area not exceeding 2 m² m2
(ii) Warning and regulatory signs: Area exceeding 2 m² m2
94.02 Sign supports
(a) Concrete supports, Class C 20/20 no
(b) Steel posts no
(c) Concrete posts no
Concrete in road sign footings including excavation and
94.03 backfilling(class indicated) m3
Dismantling, storing and re-erecting road signs with a surface area
94.04 of
(a) Up to 2 m² no
(b) Exceeding 2 m² no
94.05 Dismantling and storing road signs with a surface area of
(a) Up to 2m² no
(b) Exceeding 2m² no
9500 ROAD TRAFFIC MARKINGS, ROAD STUDS AND TRAFFIC CALMING
Paint (specify road marking, retro-reflective road marking and/or
95.01 thermoplastic)
(a) White lines (broken or unbroken) (width of line indicated) km
(b) Yellow lines (broken or unbroken) (width of line indicated) km
(c) White lettering and symbols m2
95.02 Variation in rate of application
(a) White paint liter
(b) Yellow paint liter
(c) Glass beads kg
95.03 Road studs (type stated) no
95.04 Traffic Calming

(a) In situ asphalt Speed Bumps (dimensions and spacing specified) no


In situ asphalt Rumble Strips (classification of set of 4 strips
(b) specified) m
(c) Proprietary traffic calming measures (type indicated) no
9600 LANDSCAPING AND GRASSING
96.01 Stockpiling of Topsoil m3
96.02 Preparation of areas for grassing
(a) Top-soiling m3
(b) Provide and apply chemical fertilizers (type) ton
96.03 Grassing
(a) Planting of grass cuttings ha
(b) Seeding ha
96.04 Replacement or replanting of trees and growth management no
96.05 Reinstatement of construction sites
(a) Reinstatement of camp sites PS
Reinstatement of quarries, borrow pits, plant sites, storage sites,
(b) diversions, and access and haul roads PS

(c) Percentage allowed for overhead and profit on item 96.05 (a) & (b) %
9700 PAINTING OF STEEL
97.01 Preparation of steelwork prior to coating
(a) Preparation of bare metal surfaces m2
(b) Preparation of existing metal surfaces m2
97.02 Protective system to steelwork
(a) Protective system to bare metal surfaces m2
(b) Protective system to existing steelwork m2
9800 FENCING
98.01 Fencing km
98.02 New gate (size and type indicated) no
98.03 Moving of existing fences and gates
(a) Fences km
(b) Moving of gates no
9900 FOOTWAYS AND MASONRY AND CONCRETE SAFETY BARRIERS
99.01 Footway m2
99.02 Safety Barrier
(a) Masonry m
(b) Precast Concrete (cross-sectional dimensions specified) m

SERIES 11000: DAYWORKS


Item Code Item Description Unit Measure
11E00 0EQUIPMENT
E.1 Pick up, single cab, 4x4 diesel load weight 1 ton hr
E.2 Pick up, single cab, 4x4 petrol load weight 1 ton hr
E.3 Van 4x2 diesel upto 1 ton hr
E.4 Truck upto 5 ton hr
E.5 Water Tanker upto 6000L hr
E.6 Water Tanker 6000 - 9000L hr
E.7 Water Tanker 9000 - 13000L hr
E.8 Water Tanker 13000 - 15000L hr
E.9 Water Tanker 15000 - 18000L hr
E.10 Water Tanker more than 18000L hr
E.11 Water Tanker (tank 2 axle) 13000 - 15000L hr
E.12 Fuel Tanker upto 6000L hr
E.13 Fuel Tanker 6000 - 9000L hr
E.14 Fuel Tanker 9000 - 13000L hr
E.15 Fuel Tanker 13000 - 15000L hr
E.16 Water Tanker more than 15000L hr
E.17 Fuel Tanker (tank 2 axle) 13000 - 15000L hr
E.18 Cargo Truck upto 4 ton hr
E.19 Forklift Truck 4 - 5 ton hr
E.20 Service Truck 8 - 10 ton hr
E.21 Stake Truck 11 - 13 ton hr
E.22 Tractor with Trailer upto 13 ton hr
E.23 Trailer 13 - 15 ton hr
E.24 Trailer 15 - 20 ton hr
E.25 Trailer 20 - 30 ton hr
E.26 Low Bed Trailer 30 - 45 ton hr
E.27 Truck Tractor with Low Bed 60 ton hr
E.28 Truck Tractor Low Bed Trailer 60 ton, 3 axle hr
E.29 Farm Tractor Wheel Type 75 - 80 HP hr
E.30 Articulated Truck hr
E.31 Dump Truck upto 5m3 hr
E.32 Dump Truck 5 - 7m3 hr
E.33 Dump Truck 7 - 9m3 hr
E.34 Dump Truck 9 - 12m3 hr
E.35 Dump Truck 12 - 14m3 hr
E.36 Dump Truck over 14m3 hr
E.37 Truck Crane upto 5 ton hr
E.38 Truck Crane 5 - 10 ton hr
E.39 Truck Crane 10 - 15 ton hr
E.40 Truck Crane 15 - 20 ton hr
E.41 Truck Crane 20 - 25 ton hr
E.42 Truck Crane 25 - 45 ton hr
E.43 Truck Crane 45 - 50 ton hr
E.44 Water Pump 230L/min hr
E.45 Wagon Drill, Self Propelled, Crawler Type 4500kg hr
E.46 Drill, Rock, Hand Held 25kg hr
E.47 Street Sweeper, Self Propelled 1 - 2m hr
E.48 Bar Bending and Cutting Machine hr
E.49 Road Marking Vehicle hr
E.50 Water Bowers 15m3 hr
E.51 Flood Light hr
E.52 Milling Machine hr
E.53 Jack Hammer hr
E.54 Plate Compactor hr
E.55 Dozer Crawler Type upto 70 HP hr
E.56 Dozer Crawler Type 71 - 90 HP hr
E.57 Dozer Crawler Type 91 - 120 HP hr
E.58 Dozer Crawler Type 121 - 139 HP hr
E.59 Dozer Crawler Type 140 - 180 HP hr
E.60 Dozer Crawler Type 181 - 199 HP hr
E.61 Dozer Crawler Type 200 - 250 HP hr
E.62 Dozer Crawler Type 251 - 279 HP hr
E.63 Dozer Crawler Type 280 - 330 HP hr
E.64 Dozer Crawler Type 331 - 400 HP hr
E.65 Dozer Crawler over 400 HP hr
E.66 Dozer Wheeled Type upto 150 HP hr
E.67 Dozer Wheeled Type 151 - 200 HP hr
E.68 Dozer Wheeled Type over 200 HP hr
E.69 Loader Crawler upto 0.99m3 hr
E.70 Loader Crawler upto 1.0 - 1.50m3 hr
E.71 Loader Crawler upto 1.51 - 1.99m3 hr
E.72 Loader Crawler upto 2.0 - 2.50m3 hr
E.73 Loader Crawler upto 2.51 - 3.00m3 hr
E.74 Loader Crawler over 3.00m3 hr
E.75 Loader Wheel Type upto 0.99m3 hr
E.76 Loader Wheel Type 1.0 - 1.50m3 hr
E.77 Loader Wheel Type 1.51 - 2.00m3 hr
E.78 Loader Wheel Type 2.0 - 2.50m3 hr
E.79 Loader Wheel Type 2.51 - 3.00m3 hr
E.80 Loader Wheel Type 3.01 - 3.50m3 hr
E.81 Loader Wheel Type 3.51 - 4.00m3 hr
E.82 Loader Wheel over 4.00m3 hr
E.83 Motor Grader upto 85 HP hr
E.84 Motor Grader 86 - 115 HP hr
E.85 Motor Grader 116 - 125 HP hr
E.86 Motor Grader 126 - 144 HP hr
E.87 Motor Grader 145 - 160 HP hr
E.88 Motor Grader 161 - 200 HP hr
E.89 Motor Grader over 200 HP hr
E.90 Roller Tandam upto 6 ton hr
E.91 Roller Tandam over 6 ton hr
E.92 Roller Vibratory 6 - 8 ton hr
E.93 Roller Vibratory 8 - 10 ton hr
E.94 Roller Vibratory 10 - 16 ton hr
E.95 Roller Vibratory 17 - 20 ton hr
E.96 Roller Vibratory over 20 ton hr
E.97 Roller Sheep Foot 14 - 17 ton hr
E.98 Roller Pneumatic 10 ton hr
E.99 Oscillatory Roller hr
E.100 Grid Roller hr
E.101 Excavator Crawler Type upto 0.50m3 hr
E.102 Excavator Crawler Type 0.51 - 0.99m3 hr
E.103 Excavator Crawler Type 1.00 - 1.50 m3 hr
E.104 Excavator Crawler Type 1.51 - 2.00m3 hr
E.105 Excavator Crawler over 2.00m3 hr
E.106 Excavator Wheel Type upto 0.50m3 hr
E.107 Excavator Wheeled Type 0.51 - 0.99m3 hr
E.108 Excavator Wheeled Type 1.00 - 1.50 m3 hr
E.109 Excavator Wheeled Type over 1.51m3 hr
E.110 Scraper upto 10m3 hr
E.111 Scraper 11 - 13m3 hr
E.112 Scraper 14 - 16m3 hr
E.113 Scraper 17 - 20m3 hr
E.114 Scraper over 20m3 hr
E.115 Concrete Mixer, Trailer Mounted 250L hr
E.116 Concrete Mixer, Trailer Mounted 500L hr
E.117 Concrete Mixer, Truck Mounted 5 - 6m3 hr
E.118 Concrete Mixer 0.5m3 hr
E.119 Asphalt Plant 130 - 150 TPH hr
E.120 Asphalt Paver 5 - 7m hr
E.121 Power Broom 290psi hr
E.122 Bitumen Distributer 6000L hr
E.123 Aggregate Box Spreader 5 -7m hr
E.124 Concrete Vibrator 4 HP hr
E.125 Concrete Paver 5 - 8m hr
E.126 Air Compressor 250 CFM hr
E.127 Air Compressor 350 CFM hr
E.128 Air Compressor 600 CFM hr
E.129 Generator 10 - 30 KW hr
E.130 Generator 40 - 50 KW hr
E.131 Generator 60 - 100 KW hr
E.132 Generator 101 - 150 KW hr
E.133 Generator 200 - 250 KW hr
E.134 Motor Cycle <150cc hr
E.135 Motor Cycle >150cc hr
E.136 Station Wagon, SWB, 4x4, diesel 6 -7 Seater hr
E.137 Station Wagon, SWB, 4x4, petrol 6 -7 Seater hr
E.138 Station Wagon, LWB, 4x4, diesel 8 -10 Seater hr
E.139 Station Wagon, LWB, 4x4, diesel 8 -10 Seater hr
E.140 Pick Up, Double Cab, 4x4, diesel hr
E.141 Pick Up, Double Cab, 4x4, petrol hr
E.142 Bus 30 Seater day
E.143 Bus 60 Seater day
E.144 Grease Unit, Petrol hr
E.145 Small Hand Tools hr
E.146 Steel Cutter hr
E.147 Asphalt / Concrete Saw hr
E.148 Welding Machine, Diesel Engine 300 - 400 AMP hr
E.149 Welding Machine, Electric 300 - 400 AMP hr
11L00 LABOUR
L.1 Labourer Foreman hr
L.2 Quarry Foreman hr
L.3 Quarry Supervisor hr
L.4 Mason Foreman hr
L.5 Carpenter Foreman hr
L.6 Construction Foreman hr
L.7 Construction Foreman II hr
L.8 Superintendent I hr
L.9 Superintendent II hr
L.10 Electrician II hr
L.11 Mechanic II hr
L.12 Welder II hr
L.13 Electrician III hr
L.14 Mechanic III hr
L.15 Welder I hr
L.16 Equipment Operator I hr
L.17 Equipment Operator II hr
L.18 Equipment Operator III hr
L.19 Equipment Operator IV hr
L.20 Equipment Operator V hr
L.21 Sta. Equipment Operator I hr
L.22 Sta. Equipment Operator II hr
L.23 Sta. Equipment Operator III hr
L.24 Sta. Equipment Operator IV hr
L.25 Sta. Equipment Operator V hr
L.26 Chief plant Operator hr
L.27 DRIVER I hr
L.28 DRIVER II hr
L.29 DRIVER III hr
L.30 DRIVER IV hr
L.31 DRIVER V hr
L.32 Powder man I hr
L.33 Powder man II hr
L.34 Bar setter I hr
L.35 Bar setter II hr
L.36 Carpenter I hr
L.37 Carpenter II hr
L.38 Carpenter III hr
L.39 Mason I hr
L.40 Mason II hr
L.41 Mason III hr
L.42 Labourer II hr
L.43 Labourer III hr
L.44 Helper II hr
L.45 Helper III hr
L.46 Labourer I hr
L.47 Helper I hr
11M00 MATERIAL
M.1 Annealled Binding Wire kg
M.2 Cement OPC kg
M.3 Concrete Paint litre
M.4 Course Crushed Aggregate m3
M.5 Crush Dust ton
M.6 Cutback bitumen MC-30 litre
M.7 Cutback bitumen MC-70 litre
M.8 Cutback asphalt MC-3000 litre
M.9 Ammonium Nitrate kg
M.10 Water Gel kg
M.11 Detonator each
M.12 Eucalyptus Poles 12mm dia. x 4m long no
M.13 Fertiliser litre
M.14 Filler kg
M.15 Filter Fabric m2
M.16 Fine Aggregate m3
M.17 Formwork Timber m2
M.18 Formwork Steelwork m2
M.19 Fuses m
M.20 Gabion Boxes m3
M.21 Gabion Mattresses m3
M.22 Gas Oil (NOC) litre
M.23 Gasoline (NOC) litre
M.24 Glass Beads kg
M.25 Grass Cuttings m2
M.26 Grass Seed kg
M.27 Guard Rail Beam kg
M.28 Guard Rail Nuts and Bolts kg
M.29 Guard Rail Spacers kg
M.30 Guard Rail Steel Posts kg
M.31 High Tensile Steel Reinforcement ton
M.32 Kerosene litre
M.33 Loam Soil m3
M.34 Lubricants kg
M.35 Masonry Stone m3
M.36 Mild Steel Reinforcement ton
M.37 Nails kg
M.38 Penetration Grade Bitumen 60/70 litre
M.39 Penetration Grade Bitumen 80/100 litre
M.40 Penetration Grade Bitumen 150/200 litre
M.41 Precast Concrete Blocks m2
M.42 Reflective Paint litre
M.43 Road Marking Paint litre
M.44 Road Signs (face <2m2) m2
M.45 Road Signs (face >2m2) m2
M.46 Rock m3
M.47 Sand m3
M.48 Selected Fill m3
M.49 Selected Subgrade m3
M.50 Steel Wire kg
M.51 Water litre